:-~ TUT 007 1955 *65014* 65014 DRAFT FINAL FEASIBILITY STUDY TUTU WELLS SITE ST. THOMAS, U.S. VIRGIN ISLANDS August 4,1995 Prepared by Geraghty & Miller, Inc. BrenrerO'Dell, P.E. Project Engineer Thomas V. Danahy Senior Scientist/Project Manager Daniel A. Nachman Vice President/Project Director TUT OO7 1956 GERAGHTY & MILLER, INC. CONTENTS Page 1. INTRODUCTION........................................................................................................ 1-1 1.1 PURPOSE OF THE FEASIBILITY STUDY................................................... 1-3 1.2 ORGANIZATION OF THE FEASIBILITY STUDY REPORT....................... 1-3 2. SUMMARY OF REMEDIAL INVESTIGATION RESULTS....................................... 2-1 2.1 SITE BACKGROUND....................................................................................2-1 2.1.1 Site Description, Geology, Hydrogeology, and Aquifer Characteristics................................................................................2-1 2.1.1.1 Description.........................................................................2-1 2.1.1.2 Geology.............................................................................. 2-3 2.1.1.3 Hydrogeology.....................................................................2-5 2.1.1.4 Summary of Aquifer Hydraulic Characteristics ....................2-9 2.1.2 History of Known Public Concerns.................................................... 2-10 2.2 NATURE AND EXTENT OF CONTAMINATION........................................ 2-14 2.2.1 Soil Quality ....................................................................................... 2-14 2.2.1.1 Chlorinated VOCs in Soil....................................................2-17 2.2.1.2BTEXin Soil......................................................................2-18 2.2.2 Groundwater Quality......................................................................... 2-20 2.2.2.1 Chlorinated VOCs...............................................................2-20 2.2.2.2 Petroleum-Related Compounds...........................................2-22 2.2.2.3 Evaluation of the Potential Presence ofNonaqueous Phase Liquids......................................................................2-23 2.3 CONTAMINANT FATE AND TRANSPORT ................................................ 2-26 2.4 BASELINE RISK ASSESSMENT..................................................................2-26 3. REMEDIAL ACTION GOALS AND GENERAL RESPONSE ACTIONS................... 3-1 GERAGHTY & MILLER, INC. TUT OO7 1958 CONTENTS (continued) 3.1 REMEDIAL ACTION OBJECTIVES AND PRELIMINARY REMEDIAL GOALS................................................................................. 3-1 3.1.1 Remedial Action Objectives............................................................... 3-1 3.1.2 Preliminary Remedial Goals............................................................... 3-3 3.1.2.1 ARARs............................................................................... 3-3 3.1.2.2 To-Be-Considered Material................................................. 3-4 3.1.2.3 Remedial Action Levels and Cleanup Goals.................. ......3-4 3.2 IDENTIFICATION OF GENERAL RESPONSE ACTIONS........................... 3-5 4. IDENTIFICATION AND SCREENING OF REMEDIAL TECHNOLOGIES.............. 4-1 4.1 TECHNOLOGY IDENTIFICATION.............................................................. 4-1 4.2 TECHNOLOGY SCREENING CRITERIA..................................................... 4-2 4.3 IDENTIFICATION AND SCREENING OF REMEDIAL TECHNOLOGIES FOR SOIL...................................................................4-3 4.3.1 No Action.........................................................................:................4-3 4.3.2 Institutional Controls.........................................................................4-4 4.3.3 Containment......................................................................................4-5 4.3.4 Treatment..........................................................................................4-6 4.3.4.1 In-Situ Soil Vapor Extraction..............................................4-7 4.3.4.2 In-Situ Bioventing...............................................................4-9 4.3.5 Removal Technologies.......................................................................4-10 4.3.5.1 Biopiles/Ex-Situ SVE..........................................................4-11 4.3.5.2 On-Site Thermal Desorption................................................4-12 4.3.5.3 Incineration.........................................................................4-13 4.4 IDENTIFICATION AND SCREENING OF REMEDIAL TECHNOLOGIES FOR GROUND WATER.............................................. 4-14 g:\aproject\tutu\pr0013.037\reports\lutufs.doc GERAGHTY & MILLER, INC. TUT 007 1959 Ill CONTENTS (continued) Page 4.4.1 No Action..........................................................................................4-14 4.4.2 Institutional Controls.........................................................................4-15 4.4.2.1 Access Restrictions............................................................. 4-15 4.4.2.2 Alternate Water Supply....................................................... 4-16 4.4.2.2.1 Public Water Supply Extension............................. 4-16 4.4.2.2.2 Trucking Water.................................................... 4-17 4.4.2.2.3 New Community Well........................................... 4-17 4.4.3 Collection/Containment.....................................................................4-18 4.4.3.1 Extraction...........................................................................4-18 4.4.3.1.1 Extraction Wells...................................................4-18 4.4.3.1.2 Extraction/Injection Wells..................................... 4-19 4.4.3.2 Subsurface Drains...............................................................4-20 4.4.3.3 Well Points..........................................................................4-21 4.4.3.4 Vertical Barriers..................................................................4-22 4.4.3.4.1 Slurry Wall........................................................... 4-22 4.4.3.4.2 Synthetic Membrane CutoffWalls......................... 4-23 4.4.3.5 Enhanced Groundwater Recovery .......................................4-24 4.4.3.5.1 Bedrock Fracturing...............................................4-24 4.4.3.5.2 Vacuum Enhanced Recovery................................4-25 4.4.4 Treatment..........................................................................................4-26 4.4.4.1 In-Situ Treatment................................................................4-26 4.4.4.1.1 Air Sparging.........................................................4-26 4.4.4.1.2 Bio-Sparging........................................................4-27 4.4.4.2 Ex-Situ Treatment...............................................................4-27 g:\aproject\tutu\ptOO 13.037\reportsMutufs.doc GERAGHTY^ MILLER, INC "JT °07 196° IV CONTENTS (continued) 4.4.4.2.1 Air Stripping......................................................... 4-28 4.4.4.2.2 Granular Activated Carbon Adsorption................. 4-29 4.4.4.2.3 Filtration...............................................................4-30 4.4.4.2.4 Precipitation, Flocculation, and Sedimentation...... 4-31 4.4.4.2.5 Reverse Osmosis...................................................4-31 4.4.4.2.6 Ion Exchange........................................................ 4-32 4.4.4.2.7 Ultraviolet Oxidation/Reduction ...........................4-33 4.4.4.2.8 GAC Fluidized Bed System .................................. 4-34 4.4.4.3 Natural Remediation ........................................................... 4-34 4.4.5 Discharge..........................................................................................4-35 4.4.5.1 Discharge to Publicly Owned Treatment Works................... 4-35 4.4.5.2 Discharge to a RCRA-Permitted Treatment, Storage, and/or Disposal Facility....................................................... 4-36 4.4.5.3 Discharge to Surface Water.................................................4-37 4.4.5.4 Conveyance to Beneficial Non-Potable User........................ 4-38 4.4.5.5 Re-Injection........................................................................4-39 4.4.5.6 Distribution for Potable Use................................................4-40 4.5 TECHNOLOGIES RETAINED FOR FURTHER CONSIDERATION............ 4-41 4.6 FURTHER EVALUATION OF SCREENED TECHNOLOGIES.................... 4-44 4.6.1 Source Control Plans.........................................................................4-44 4.6.1.1 Texaco Tutu Service Station Source Control Plan...............4-45 4.6.1.2 Esso Tutu Service Station Source Control Plan...................4-45 4.6.2 Soil Remedial Technologies...............................................................4-46 4.6.2.1 Curriculum Center...............................................................4-48 4.6.2.2 Ramsay Motors...................................................................4-49 4.6.2.3 Texaco Tutu Service Station...............................................4-50 4.6.2.4 Tillett Gardens....................................................................4-50 4.6.2.5 Western Auto...................................................................... 4-51 4.6.2.6 Esso Tutu Service Station...................................................4-52 g:\aproject\tutu\pr0013.037Veports\lutufs.doc GERAGHTY & MILLER, INC. TUT 007 1961 CONTENTS (continued) 4.6.2.7 OHenry Dry Cleaners ......................................................... 4-52 4.6.3 Groundwater Remedial Alternatives................................................... 4-53 4.6.3.1 Collection and Containment ................................................4-54 4.6.3.2 Treatment...........................................................................4-58 4.6.3.3 Natural Remediation...........................................................4-62 5. DEVELOPMENT AND SCREENING OF REMEDIAL ALTERNATIVES................. 5-1 5.1 EVALUATION CRITERIA............................................................................. 5-1 5.2 DEVELOPMENT AND EVALUATION OF REMEDIAL ALTERNATIVES FOR SOIL.................................................................... 5-2 5.2.1 SRA 1: No Action/Institutional Controls............................................5-5 5.2.1.1 Description of SRA1..........................................................5-5 5.2.1.2 Evaluation of SRA 1 ...........................................................5-6 5.2.2 SRA 2: Institutional Controls/Capping............................................... 5-7 5.2.2.1 Description of SRA 2.......................................................... 5-7 5.2.2.2 Evaluation of SRA 2........................................................... 5-8 5.2.3 SRA 3: Institutional Controls/Capping/In-Situ SVE (Soil and Bedrock)/Excavation and Off-Site Disposal.................................... 5-10 5.2.3.1 Description of SRA 3..........................................................5-10 5.2.3.2 Evaluation of SRA 3 ........................................................... 5-13 5.2.4 SRA 4: Institutional Controls/Capping/Ex-Situ SVE/Excavation and On-Site Disposal ......................................................................5-16 5.2.4.1 Description of SRA 4.......................................................... 5-17 5.2.4.2 Evaluation of SRA 4........................................................... 5-19 g:\aproject\tutu\pr0013.037\reports\tutufs.doc GERAGHTY & MILLER, INC. TUT OO7 1962 VI CONTENTS (continued) 5.2.5 SRA 5: Institutional Controls/Capping/In-Situ SVE (Bedrock)/Excavation and............................................................... 5-22 5.2.5.1 Description of SRA 5..........................................................5-22 5.2.5.2 Evaluation of SRA 5 ........................................................... 5-23 5.3 DEVELOPMENT AND EVALUATION OF REMEDIAL ALTERNATIVES FOR GROUNDWATER.............................................. 5-25 5.3.1 GRA 1: No Action/Institutional Controls........................................... 5-27 5.3.1.1 Description of GRA 1......................................................... 5-27 5.3.1.2 Evaluation of ORAL..........................................................5-28 5.3.2 GRA 2: Institutional Controls/Source Containment/POET Systems/Treatment/Discharge.........................................................5-30 5.3.2.1 Description of GRA2.........................................................5-30 5.3.2.2 Evaluation of GRA 2........................................................... 5-32 5.3.3 GRA 3: Institutional Controls/Plume Containment/Treatment/Discharge..................................................5-35 5.3.3.1 Description of GRA 3 .........................................................5-35 5.3.3.2 Evaluation of GRA 3...........................................................5-37 5.3.4 GRA 4: Institutional Controls/Source and Plume Containment/Treatment/Discharge................................................. 5-39 5.3.4.1 Description of GRA4.........................................................5-39 5.3.4.2 Evaluation of GRA 4........................................................... 5-41 5.4 COMPARATIVE ANALYSIS OF ALTERNATIVES..................................... 5-44 5.4.1 Protection of Human Health and the Environment.............................. 5-44 5.4.2 Compliance with ARARs................................................................... 5-45 5.4.3 Short-Term Effectiveness .................................................................. 5-47 g:\aproject\tutu\pr0013.037Veports\tutufs. doc GERAGHTY & MILLER, INC. TUT O07 1963 VII CONTENTS (continued) 5.4.4 Long-Term Effectiveness................................................................... 5-48 5.4.5 Reduction in Toxicity, Mobility, and Volume..................................... 5-49 5.4.6 Implementability................................................................................ 5-49 5.4.7 Cost.................................................................................................. 5-50 5.4.8 Summary of Comparative Analysis of Alternatives............................. 5-51 6. PRE-DESIGN ACTIVITIES.....;................................................................................... 6-1 6.1 PRE-DESIGN ACTIVITIES FOR SOIL REMEDIATION.............................. 6-1 6.2 PRE-DESIGN ACTIVITIES FOR GROUNDWATER REMEDIATION........ 6-2 6.3 PRE-DESIGN ACTIVITIES FOR TREATMENT SYSTEMS ........................6-3 7. REFERENCES ............................................................................................................. 7-1 TABLES 2-1. Summary of Soil Screening Levels Provided by the U.S. Environmental Protection Agency, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 2-2. Summary of Carcinogenic Risks Exceeding the U.S. Environmental Protection Agency Guidance Value, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 2-3. Summary of Noncarcinogenic Risks Exceeding the U. S. Environmental Protection Agency Hazard Quotient of 1, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 2-4. Summary of Analytes Detected in Soil Above Soil Screening Levels at the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 3-1. Groundwater Chemical-Specific Remedial Action Levels Identified for the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 3-2. Summary of Potential Federal Location-Specific Applicable or Relevant and Appropriate Requirements, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. g:\aprojecttotuVr0013.03 7\reports\tutufs.doc GERAGHTY & MILLER, INC. TUT O07 1964 VUl TABLES (continued) 3-3. Summary of Potential Federal Action-Specific Applicable or Relevant and Appropriate Requirements, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 3-4. Summary of Potential Federal Chemical-Specific Applicable or Relevant and Appropriate Requirements and To-Be-Considered Material, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 3-5. Summary of Potential U.S. Virgin Islands Location-Specific Applicable or Relevant and Appropriate Requirements, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 3-6. Summary of Potential U.S. Virgin Islands Action-Specific Applicable or Relevant and Appropriate Requirements, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 3-7. Summary of Potential U.S. Virgin Islands Chemical-Specific Applicable or Relevant and Appropriate Requirements, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 3-8. Summary of Analytes Detected in Groundwater Above Remedial Action Levels at the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 4-1. Development and Screening of Technologies for Soil, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 4-2. Off-Gas Treatment Technology Evaluation, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 4-3. Development and Screening of Technologies for Groundwater, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 4-4. Summary of Influent Concentrations and Maximum Contaminant Levels, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 4-5. Summary of Estimated Impacted Soil Volumes, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 4-6. Evaluation of No Action/Institutional Controls Technologies Option on Property-Specific Basis, Tutu Wells Site, U.S. Virgin Islands. 4-7. Evaluation of Capping Technology Option on Property-Specific Basis, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. g:\aproject\tutu\prOO 13.037\reports\tutufs.doc GERAGHTY 6? MILLER, INC. TUT °°7 1965 IX TABLES (continued) 4-8. Evaluation of In-Situ SVE and Bioventing Technologies Option on Property-Specific Basis, Tutu Wells Site, U.S. Virgin Islands. 4-9. Evaluation of Ex-Situ SVE and Biopiles Technologies Option on Property-Specific Basis, Tutu Wells Site, U.S. Virgin Islands. 4-10. Evaluation of Excavation and Off-Site Disposal Technology Option on Property-Specific Basis, Tutu Wells Site, U.S. Virgin Islands. 4-11. Summary of Proposed Pumping Rates for New Recovery Wells, Tutu Wells Site, U.S. Virgin Islands. 4-12. Summary of Potential POET Supply Well Installations for GRA 2, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 4-13. Half-Lives of Chlorinated Compounds in Groundwater, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 4-14. Estimated Natural Degradation Rates for Groundwater Contaminants, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 4-15. Range of Values for Travel-Time and Natural Degradation of Tetrachloroethene, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 5-1. Evaluation of NCP Criteria for Soil Remedial Alternatives, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 5-2. Evaluation of NCP Criteria for Groundwater Remedial Alternatives, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 5-3. Cost Estimate - SRA 1 (No Action/Institutional Controls), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 5-4. Cost Estimate - SRA 2 (Institutional Controls/Capping), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 5-5. Cost Estimate - SRA 3 (Institutional Controls/Capping/In-Situ SVE [Soil and BedrockJ/Excavation and Off-Site Disposal), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. g:\aproject\tutu\prOO 13.037\reports\tutufs.doc GERAGHTYi0013.037\reports\tutu&doc GERAGHTY & MILLER, INC. TUT OO7 1999 /\ 2-25 OHenry Dry Cleaners and Curriculum Center properties. The following information supports this conclusion: • The historical use of PCE as a dry cleaning solvent at both locations suggests the high probability of a DNAPL release (USEPA 1992b). • Concentrations of PCE in soil at the OHenry Dry Cleaners exceed USEPA SSLs for potential groundwater contaminant source areas. • Samples from the abandoned pipes in the floor of the Curriculum Center contained 30 percent PCE. Groundwater samples from wells downgradient of the Curriculum Center and the OHenry Dry Cleaners contained greater than 1 percent of the solubility of PCE (1,500 ug/L) (USEPA 1992b). For example, from 1987 to 1991, the maximum annual PCE concentration in the Harvey Supply Well, located downgradient of the OHenry Dry Cleaners, ranged as high as 1,500 to 7,600 ug/L. In the Tillett Supply Well, which is downgradient of the Curriculum Center, the concentration of PCE was as high as 2,040 ug/L on July 22,1987 (Weston/SPER 1988). Therefore, DNAPL may be present in the vicinity of the Curriculum Center and the OHenry Dry Cleaners. Due to the shallow depth to bedrock at the Curriculum Center, the release of DNAPL at this location could result in downward migration of DNAPL into the fractured bedrock above the water table. Similarly, at the OHenry Dry Cleaners, a release of DNAPL near the land surface could migrate downward into the soil and weathered bedrock that is present above the water table. g:\aproject\tutu\pr0013.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT Of) 7 20OO 2-26 2.3 CONTAMINANT FATE AND TRANSPORT Contaminant fate and transport for soil and groundwater are evaluated in detail in the Phase n RI Report (Geraghty & Miller, Inc. 1995). Based on the results of soil and groundwater sampling at the Tutu Wells Site, numerous organic constituents were identified as COCs. To evaluate potential fate and transport processes for the COCs at the Tutu Wells Site, the physical and chemical properties of the constituents, the environmental transformation processes affecting the constituents, and the characteristics of the surrounding environment were examined. The primary COCs found in the soil and groundwater are chlorinated VOCs and petroleum-related compounds, primarily BTEX constituents. The primary route of exposure to human receptors was transport of dissolved COCs in groundwater to supply wells used for domestic and commercial uses. Secondary exposure routes include potential ingestion, inhalation, and/or dermal contact with COCs in surficial soil. 2.4 BASELINE RISK ASSESSMENT A baseline risk assessment for the Tutu Wells Site was prepared by CDM to evaluate the public health and environmental risks associated with constituents in the soil and groundwater. Both current and future risks associated with potential exposure to soil and groundwater from the Tutu Wells Site were addressed in this risk assessment (CDM Federal Programs Corporation 1995a). Based on the risk assessment, only the surface soil at Tillett Gardens was found to exceed both the carcinogenic and non-carcinogenic acceptable risks. Groundwater risks were viewed for a site-wide rather than property-specific perspective, and specific compounds were found to exceed both the carcinogenic and non-carcinogenic risks for ingestion of groundwater. Subsurface soil did g:\aprojectUutuVr0013.037VeportsUutufs.doc GERAGHTY & MILLER, INC. TUT OO7 30O1 2-27 not exceed unacceptable risks for either carcinogenic or non-carcinogenic risks, where the soil is undisturbed. As indicated in Table 2-2, the site-specific carcinogenic risk determined by the USEP A was exceeded for ingestion of surface soil at Tillett Gardens. The risk is attributed primarily to Aroclor 1242 (a PCB) and arsenic. No properties other than Tillett Gardens had a carcinogenic risk from exposure to surface soil, and all properties at the Tutu Wells Site were below the carcinogenic risk for exposure to subsurface soil. The carcinogenic risk from ingestion of groundwater was exceeded for adults. The constituents contributing the majority of the risk were PCE and vinyl chloride. For non-carcinogenic risks, the hazard index (HI) was exceeded for children via ingestion of surface soil at the Tillett property only; arsenic and manganese contributed to the majority of the risk (Table 2-3). In addition, due to manganese, the HI was greater than 1 via the inhalation pathway. The HI was exceeded for all receptor populations including adult residents, children, site workers, and future construction workers (Table 2-3). In each instance, manganese accounted for the largest risk and was the only constituent of risk for site and construction workers. Total DCE, PCE, antimony, and vanadium were above the hazard quotient (HQ) for ingestion of groundwater by children. Potential exposure pathways do exist for environmental receptors. Individual animals, such as lizards, may be exposed to low to moderate risks. However, the risk assessment has determined that the potential exposures to individual animals that may encounter COCs on-site will not result in an unacceptable risk to animal populations (CDM Federal Programs Corporation 1995a). g:\aproject^utuV«0013.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT 007 2002 o f; 3. REMEDIAL ACTION GOALS AND GENERAL RESPONSE ACTIONS This section presents the remedial objectives, goals, and general response actions identified for the Tutu Wells Site. Remedial objectives and goals were established to address any unacceptable risks identified in the USEPA Baseline Risk Assessment (CDM Federal Programs Corporation 1995a). The USEPA's comments, made during the preparation of the RI Report (Geraghty & Miller, Inc. 1995) and the final Baseline Risk Assessment (CDM Federal Programs Corporation 1995a), were considered in the formulation of these goals and objectives. 3.1 REMEDIAL ACTION OBJECTIVES AND PRELIMINARY REMEDIAL GOALS This section discusses the Remedial Action Objectives (RAOs) and preliminary remedial goals (PRGs) that will form the basis for the remediation of the Tutu Wells Site. RAOs are broad, media-specific objectives for protecting human health and the environment. These objectives were derived from the National Contingency Plan (NCP), USEPA guidance, and the results of the RI. PRGs are numerical standards and remedial endpoints for specific environmental media that, once they have been achieved, ensure that the RAOs have been satisfied. 3.1.1 Remedial Action Objectives The RAOs for human health protection at the Tutu Wells Site are as follows: • Remove and/or control the sources of groundwater contamination. • Remove contamination in groundwater to the extent practical. • Control the migration of impacted groundwater and limit the downgradient (i.e., southerly) migration. TUT OO7 7OO4. GERAGHTY & MILLER, INC. " "' 3-2 • Prevent human ingestion of groundwater containing VOCs or BNAs in excess of federal maximum contaminant levels (MCLs) and non-zero Maximum Contaminant Level Goals (MCLGs) (see Table 3-1). • Prevent human ingestion of groundwater containing site-related constituents in excess of the USVIDPNR Standards for Groundwater. • Prevent human ingestion of groundwater exhibiting excess lifetime cancer risks greater than the range of 10"4 to 10"* or hazard (non-cancer) indices greater than unity (1.0). • Prevent human direct contact and exposure to contaminated soil that pose excess lifetime cancer risks greater than the range of 10"4 to 10"6 or hazard indices greater than unity (1.0). • Minimize any potentially significant leaching of COCs from site soil into the groundwater. • Protect human health and the environment by minimizing upconing of highly mineralized water and preventing saltwater intrusion. The bedrock aquifer in the Tutu Wells Site has a finite safe yield based on the rate of groundwater recharge from precipitation. Any groundwater remedial alternatives selected will have to be designed so as not to withdraw groundwater in excess of the aquifer's safe yield. g:\aproject\tutu\pr0013.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT' OO7 2O05 3-3 3.1.2 Preliminary Remedial Goals PRGs consist of numerical limits or remedial target concentrations for specific constituents in specific media. These goals can be derived from the applicable or relevant and appropriate requirements (ARARs) identified for the site, naturally occurring or background concentrations, or health-based calculations derived using USEPA guidance on the development of risk-based PRGs (USEPA 1991b). 3.1.2.1 ARARs Remedial actions must attain a general standard of cleanup that ensures protection of human health and the environment, is cost-effective, and uses permanent solutions and alternative treatment technologies or resource recovery technologies to the maximum extent practical. Cleanup standards and remedial design guidelines are usually based on ARARs. The potential ARARs for the Tutu Wells Site are divided into the following three major categories: chemical- specific requirements, location-specific requirements, and action-specific requirements. These ARARs are provided for federal and USVI statutes in Tables 3-2 to 3-7. • Chemical-specific ARARs are health-based or risk-based numerical values or methodologies which, when applied to site-specific conditions, result in the establishment of numerical values that delineate the acceptable amount or concentration of a chemical that may be found in, or discharged to, the ambient environment. • Location-specific ARARs are restrictions that may be placed on the concentration of hazardous substances or the conduct of activities solely because they occur in a particular location. g:\aproject\Uitu\pr0013.037Veports\lutufs.doc GERAGHTY & MILLER, INC. TUT °°7 20°6 3-4 • Action-specific ARARs are generally performance, design, or other similar operational controls or restrictions on action related to management of hazardous substances or pollutants. These requirements address the particular activities that are selected to accomplish a remedy. 3.1.2.2 To-Be-Considered Material TBC materials are non-promulgated advisories or guidance issued by federal or state agencies. They are not legally binding, and do not have the status of potential ARARs, but were considered in the selecting and implementing of remedial activities for the Site. For the purposes of this FS, one criterion is classified as a TBC, the USEPA's Vadose Zone Model for Soil Cleanup Concentrations (CDM Federal Programs Corporation 1995b). This TBC proposes guidance levels to evaluate potential impacts to groundwater quality from constituents in soil. These guidance levels are used in the FS as SSLs to determine if remedial action is necessary. 3.1.2.3 Remedial Action Levels and Cleanup Goals Other PRGs will include the potential remedial action levels (RALs) and cleanup goals (CGs). RALs and CGs are developed to comply with ARARs and to be protective of human health and the environment. The RALs are chemical-specific criteria or concentrations that are used to determine if remediation is warranted. RALs can become CGs during the FS process if considered appropriate. CGs are chemical-specific criteria or concentrations that determine the degree of treatment or management required. g:\aproject\lutu\pr0013.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT 007 2O07 3-5 RALs do not exist for soil. The USEPA Baseline Risk Assessment determined that the COC concentrations detected in soil represent no risk via direct contact with human receptors, with the possible exception of PCBs and manganese at the Tillett property. The only possible impact from COCs in soil, therefore, is the potential for leaching to groundwater. For the Tutu Wells Site, the USEPA has developed SSLs to be used as screening levels, to identity COC concentrations in soil that could, by leaching, raise COC concentrations in groundwater above MCLs, and that may therefore warrant remediation (CDM Federal Programs Corporation 1995b). A comparison of compounds/analytes detected above the screening levels for soil is provided in Table 2-4. For the purposes of this FS Report, RALs for groundwater are the MCLs established by the USEPA for drinking water (see Table 3-1). The CGs for groundwater used in this report are based on the anticipated discharge standards that apply to the location to which treated groundwater is discharged (i.e., potable water, surface water, groundwater, or publicly owned treatment works [POTW]) or on the groundwater quality standards if groundwater is treated or controlled in situ. In cases where DNAPL potentially exists in the bedrock (e.g., near the Curriculum Center and possibly near the OHenry Dry Cleaners), groundwater technologies are discussed based on the ability of the technology to control further contamination by DNAPL, but not to reduce or eliminate DNAPL concentrations. Where DNAPL exists, CGs based on the groundwater source quality standards may not be achievable. A comparison of compounds/analytes detected above RALs for groundwater is provided in Table 3-8. 3.2 IDENTIFICATION OF GENERAL RESPONSE ACTIONS General response actions consist of broadly conceived actions or categories of activities that will satisfy the RAOs for the Tutu Wells Site, either singly or in combination. General response actions potentially capable of, and appropriate for, meeting the RAOs discussed above g:\aproject\tutuV«013.03TTeports\tutufs.doc GERAGHTY & MILLER, INC. TUT 007 2008 3-6 were first identified during planning activities for the RI (Geraghty & Miller, Inc. 1995). The following medium-specific general response actions were retained for the Tutu Wells Site: Soil • No action • Institutional controls • Containment • Treatment • Removal and disposal Groundwater • No action • Institutional controls • Collection/containment • Treatment • Discharge g:\aproject\tutu\pr0013.037\repoi1s\tutu&.doc GERAGHTY & MILLER, INC. TUT 007 20O9 I •3&. 4. IDENTIFICATION AND SCREENING OF REMEDIAL TECHNOLOGIES Potential remedial technologies capable of fulfilling the general response actions and meeting the RAOs set forth in Section 3.0 (Remedial Action Goals and General Response Actions) have been identified and are evaluated in this section. Remedial technologies applicable to soil and groundwater have been identified and screened for effectiveness and implementability. The technologies evaluated in the following sections can, under appropriate conditions, be protective of human health and the environment, attain ARARs and PRGs, and may be implementable at the Tutu Wells Site. The technologies retained by the screening process are further evaluated in Section 4.6 (Further Evaluation of Screened Technologies). 4.1 TECHNOLOGY IDENTIFICATION The identification of potential remedial technologies for this report utilized several sources of information, including the following: • The remedial technologies contained in the USEPA "Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA" (USEPA 1988a). • The remedial technologies contained in the USEPA "Guidance on Remedial Actions for Contaminated Groundwater at Superfund Sites" (USEPA 1988b). • Technology evaluation reports and compendia published by the USEPA under the Superfund Innovative Technology Evaluation (SITE) program. • The remedial technologies contained in the USEPA "Presumptive Remedies: Site Characterization and Technology Selection for CERCLA Sites with Volatile Organic Compounds in Soils" (USEPA 1993). GERAGHTY& MILLER, INC. ruT °07 20il 4-2 4.2 TECHNOLOGY SCREENING CRITERIA As required by USEPA guidance (USEPA 1988a), the technologies identified for the environmental media of concern were initially screened for effectiveness, implementability, and cost criteria. The evaluation of the technology focused on the following considerations: • The estimated areas or volumes of media to be remediated and meeting the goals and objectives set forth in Section 3.0 (Remedial Action Goals and General Response Actions). • The implementability and the potential impacts to human health and the environment during construction. • The efficiency and reliability of the remedial technology or process option with respect to the contaminants and conditions at the Tutu Wells Site. Implementability is based on the technical and administrative feasibility of implementing the technology. Technical implementability is used as an initial screen to eliminate those technologies that are clearly ineffective and unworkable at the Tutu Wells Site. Administrative implementability considers the ability to obtain necessary permits for on-site and off-site actions; the availability and capacity of treatment, storage, and disposal services; and the availability of necessary equipment and workers to implement the technology. Another factor that may affect administrative implementability is the ability of USEPA and the DPNR to execute enforceable agreements with responsible parties to better control withdrawal of groundwater. Unauthorized use of groundwater from the Tutu aquifer must be minimized to enable the chosen remedial action to be implemented, controlled, and effective. Cost criteria play a limited role in initial screening of remedial technologies and process options. Relative capital and operation and maintenance (O&M) costs are used in this section, and more detailed cost analysis will be provided in Section 5.0 (Development and Screening of g:\aproject\tutu\pr0013.037Veports\Uitufs.doc GERAGHTY & MILLER, INC. TUT °°7 2O12 4-3 Remedial Alternatives). In accordance with USEPA guidance (USEPA 1988a), the relative costs of technologies evaluated in this FS Report are characterized as low, moderate, or high (e.g., expensive) for comparison of similar technologies that would be utilized for the same objective. Remedial technologies for soil are based on the guidance provided by the USEPA for presumptive remedies (USEPA 1993). Review of this guidance indicates that, in order of preference, soil vapor extraction (SVE), thermal desorption, and incineration are presumptive remedies that can successfully address the type of soil contamination present at the Tutu Wells Site. Due to the complex and heterogeneous soil characteristics at the site, application of these technologies will be considered both in-situ and ex-situ. Because the screening and comparative analysis of alternatives for soil are formulated in the USEPA (1993) guidance document, screening of remedial technologies for soil is not required. However, further evaluations of additional alternative technologies are provided for completeness. 4.3 IDENTIFICATION AND SCREENING OF REMEDIAL TECHNOLOGIES FOR SOIL In this section, potentially applicable technologies for remediating the COCs in impacted soil at the Tutu Wells Site are described and reviewed for technical implementability. A summary of the screening results for soil is presented in Table 4-1. 4.3.1 No Action No action is defined as the absence of any protective steps to address the affected medium, with the possible exception of periodic site monitoring. Consideration of no action is required by the NCP because it evaluates the potential impacts associated with not implementing any remedial action for soil. The results of the Baseline Risk Assessment (CDM Federal Programs Corporation 1995b) indicate that the no action alternative may be applicable to impacted soil at several of the individual properties in the Tutu Wells Site area. g:\aproject\tutu\pf0013.037\reports\tutu&.doc GERAGHTY & MILLER, INC. TUT °°7 2013 4-4 No action will be retained for further consideration and used as a baseline for comparing the effectiveness of active remedial measures for soil at the Tutu Wells Site. 4.3.2 Institutional Controls Institutional controls encompass several strategies that limit or prevent the likelihood of human and environmental contact with impacted soil. Although institutional controls can be implemented to limit access to specific areas, they do not increase the volume or minimize constituent concentrations in the affected environmental media. At sites where a potential exists for exposure to impacted soil or groundwater, institutional controls can reduce the potential for exposure. One type of institutional control that can be implemented at the Tutu Wells Site is access restrictions. Access restrictions are a type of institutional control that can be employed to address soil and groundwater contamination problems. Access restrictions consist of preventing human contact with contaminated soil. One such access restriction is a deed restriction. Deed restrictions involve annotating the deed for the property to limit or prohibit use of the property for specific purposes or for specific uses of the property and/or soil. For example, deed restrictions could prohibit use of the property for residences, schools, or parks to prevent direct contact with impacted soil. Similarly, deed restrictions could prohibit a wide range of potential soil uses, such as use for fill at other properties. Deed restrictions are a proven, reliable, and established method of institutional site control. Minimal maintenance is required, and health risks associated with implementation of this remedial technology are minimal. Costs associated with deed restrictions would include filing and legal fees g:\aproject\taitu\prOO 13.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT °°7 2O14 4-5 and are anticipated to be moderate. Implementation and enforcement of deed restrictions would require continual monitoring at the restricted properties to ensure compliance with the restrictions. Deed restrictions will be retained for further consideration as a remedial measure for soil at the Tutu Wells Site due to their potential effectiveness and implementability. 4.3.3 Containment A containment technology considered for the contaminated soil at the Tutu Wells Site is capping. Containment serves three functions. First, it prevents direct contact by humans with impacted soil, thereby eliminating exposure pathways involving dermal contact, ingestion, or inhalation. Second, it eliminates the possibility of erosion and transport of impacted soil. Third, it reduces the infiltration of precipitation through the soil and the leaching of site constituents into the underlying groundwater. Containment of impacted soil can be attained by capping the soil in place to reduce the potential for human exposure and control fugitive emissions from impacted soil. Caps can also be low-permeability barriers placed over an area of soil contamination to prevent surface-water infiltration (if potential leaching to groundwater is a concern). The types of materials that could be used for caps include soil, clay, asphalt, concrete, and polymer membranes. With the exception of concrete and asphalt, capping materials are generally covered by soil and vegetation compatible with the region. Due to the fact that much of the Tutu Wells Site is currently covered with asphalt and concrete, at many properties, capping may consist only of checking the integrity of these surfaces and repairing or expanding them where necessary. Many of the source areas at the Tutu Wells Site are already capped by existing pavement, building foundations, or concrete pads. Improvement of g:\aproject\tutu\pr0013.037\reports\tutuis.doc TUT OO7 GERAGHTY & MILLER, INC. 4-6 existing surfaces and installation of new caps would eliminate direct contact and reduce or eliminate leaching of contaminants to the underlying groundwater. No disposal or transportation requirements for waste are associated with this remedial technology. Only inspection and periodic maintenance costs are included to ensure the caps are intact. The capital costs associated with capping are dependent on the construction materials selected for the cap and can range from low to moderate. The O&M costs will vary depending on the type of capping system installed. Containing the soil at the Tutu Wells Site by capping is technically implementable and will be retained for further evaluation. 4.3.4 Treatment As previously noted, the USEPA (1993) presumptive remedy guidance for treatment technologies for VOC-impacted soil has identified SVE as the primary presumptive remedy. For completeness, thermal desorption and incineration, which are secondary treatment options identified in the USEPA (1993) guidance, are also evaluated in the preliminary screening of technologies. Additional consideration is also given to bioventing, as it may be adaptable at specific properties within the Tutu Wells Site and the application of similar technologies in an ex- situ remedy. Ex-situ remedies are considered and evaluated in Section 4.3.5 (Removal Technologies). g:\aproject\tutu\pr0013.037Vq)orts\tutufs.doc /-CDA<-uTv^\/rri i CD TVT/- TUT °07 2016 GERAGHTY & MILLER, INC. 4-7 4.3.4.1 In-Situ Soil Vapor Extraction In-situ SVE is a treatment technology that consists of installing a network of vadose zone extraction wells or trenches through areas where soil contamination with VOCs exists. VOCs present in the unsaturated, interstitial spaces between the soil particles are extracted under the influence of a vacuum that is induced by a blower. This action upsets the equilibrium that exists between the constituents present in the interstitial vapor space and any constituents that might be present in an adsorbed phase on the soil particles or be present in a free phase. As the constituents in the vapor phase are removed by the vacuum, some of the adsorbed or free-phase constituents adjust to the shift in equilibrium by volatilizing into the soil pore spaces. These newly volatilized constituents are then removed under the constant influence of the vacuum that is induced by the extraction blower. For biodegradable compounds, such as BTEX, added benefit is gained from the enhanced biodegradation of these compounds by indigenous soil biota due to increased soil oxygen levels. Often, soil vapors extracted using this approach must be treated to reduce or destroy the constituents present in the blower exhaust to acceptable discharge levels. Potential technologies evaluated for treating the exhaust from the extraction blower include vapor phase granular activated carbon (VPGAC), incineration, thermal oxidation (thermox), or catalytic oxidation (cat- ox). Based on published information (Mobil 1992) regarding the treatment of VOCs in air, the following generalizations can be used as a guide to quickly determine an appropriate off-gas treatment technology for an SVE system: • VPGAC is generally used where total VOC concentrations are below 50 parts per million by volume (ppmv) and where poorly adsorbed compounds such as vinyl chloride do not require treatment. If air flow rates are low, VPGAC could prove to be a cost effective method of air treatment despite high VOC concentrations. g:\aproject\tutu\{)r0013.037\repotte\tutu&doc GERAGHTY & MILLER, INC. IUf °°7 2Oi7 4-8 Use of a thermox unit is suggested to treat hydrocarbon off-gas containing chlorinated VOCs present at concentrations greater than the 100 pprrv or 10 percent of the total VOC concentration. Use of a cat-ox unit is suggested to treat hydrocarbon off-gases when initial concentrations are between 50 ppmv and 10,000 ppnv of total VOCs. At most sites, SVE and bioventing system VOC off-gas concentrations will decline rapidly (exponentially) with time. Based on industry experience, thermox or cat-ox units can be removed from a property after 6 to 12 months of operation. Thus, at certain properties, several off-gas treatment technologies could be used, depending on the off-gas concentrations. Therefore, the off-gas control technology selection will be a compromise between a unit that would provide adequate treatment at the higher initial concentrations and one that would be adequate and cost-effective at the longer- term, lower concentrations. In applications that require thermox or cat-ox systems due to high VOC concentrations, the off-gas treatment may be modified after the initial concentrations of VOCs fall below 50 ppmv. A more cost-effective technology such as VPGAC is often applied in the lower concentration range. If vinyl chloride is present in the off-gas, the discharge concentration must be evaluated using air dispersion calculations to determine if vinyl chloride vapor concentrations would create potential human health concerns. Continued use of a thermox system may be required. Due to the higher costs of the thermox and cat-ox units (between $60,000 and $100,000 for a 600 standard cubic feet per minute [scfin] system), thermal destruction equipment can be moved from one site to another for re-use to reduce capital costs and maximize the use of the equipment. g:\aprqject\tutu\pr0013.037\reports\tutufs_doc GERAGHTY & MILLER, INC. TUT °07 2O1S 4-9 For the cost estimates established in this FS, it has been assumed that a therm-ox unit will be used to treat vented VOC-laden air streams. Thermox was selected because chlorinated VOCs can deactivate or degrade conventional catalysts and VPGAC is generally not cost effective at recovering chlorinated VOCs at concentrations above 100 ppnv The Source Control Plan (SCP) for Texaco has included a cat-ox unit for off-gas treatment. A general summary of off-gas treatment technologies is provided in Table 4-2. At the Tutu Wells Site, air dispersion modeling may be used to determine the need for off- gas treatments. However, due to the low soil concentrations detected, no off-gas treatment is anticipated for most of the individual sites. Furthermore, off-gas treatment, if any, should be of low duration due to the exponential decay of the concentrations over time from the SVE or bioventing systems. SVE is a very reliable and cost-effective method for treating certain soil contaminated with a wide range of VOCs, provided that the soil properties are conducive to this technology. Implementability of the technology is moderate as permits for air discharge would be required. Based on the cleanup standards for soil, SVE can be evaluated on a site-specific basis. The capital costs for in-situ vapor extraction would be moderate to high, and O&M costs would be moderate to high depending on the need and type of emission controls. The type of emission controls required at each property would have to be further evaluated during the pre- design phase. SVE will be retained for further consideration. 4.3.4.2 In-Situ Bioventing In-situ bioventing is a treatment technology that is similar to SVE. The primary difference between the two treatment technologies is that bioventing employs much lower air flow rates, g:\aprqject\tutu\pr0013.037\rqxw1s\tutufs.doc GERAGHTY & MILLER, INC. TUT °07 2O19 4-10 thereby enhancing biodegradation and minimizing contaminant volatilization and extraction. Drawing air through soil at low flow rates provides oxygen to indigenous bacteria and enhances their ability to aerobically biodegrade COCs. By reducing air flow rates, the removal of moisture from the vadose zone is minimized. Soil moisture is a factor that affects bacterial activity. A bioventing system may include the reinjection of contaminated gases (with or without some treatment), resulting in no off-gas discharge to the atmosphere, thus eliminating the need for vapor- phase treatment and an air discharge permit. Supplemental oxygen can be added to the reinjected gases to accelerate the rate of bioremediation. Bioventing is particularly suitable at sites where non-halogenated volatile and semivolatile organic compounds (SVOCs) and certain fuel hydrocarbons are the primary COCs. Bioventing of halogenated VOCs may require additional precautions and in general is not very effective unless there is a co-metabolite present. Application of this technology would require evaluation on a property specific basis. This treatment technology is relatively inexpensive to implement, as it does not require the use of expensive equipment or intensive O&M; however, it could have some limitations at properties where chlorinated VOCs are present. It is also very reliable and requires minimal downtime for maintenance and repairs. This treatment technology will be retained for further consideration. 4.3.5 Removal Technologies Source removal can be achieved by excavating contaminated soil at the Tutu Wells Site. The excavated material would be containerized and tested for waste classification. If the soils is deemed non-hazardous, they could be disposed locally. If deemed hazardous, they would either be treated ex-situ and disposed of on-site as backfill or transported off-site to a hazardous waste treatment or disposal facility. g:\aproject\tutu\prOO 13.037Veports\tuUifs.doc GERAGHTY & MILLER, INC. TUT °°7 :':"U2° 4-11 The impacted soil can be removed from the Tutu Wells Site by mechanical excavation. Standard excavating equipment, including backhoes, power shovels, and clamshells, can be used to excavate soil and can be decontaminated afterward. The excavated material can be staged for subsequent treatment or containment on-site or containerized and loaded directly into trucks for off-site treatment or disposal. Exposure to impacted soil during removal can be addressed by personal protective equipment. There is the potential for residential exposure to fugitive emissions or dust during excavation. However, engineering controls can minimize emissions. Several ex-situ treatment and disposal options related to removal technologies are further discussed in this section. The technologies evaluated are Biopiles/ex-situ SVE, thermal desorption, and incineration (USEPA 1993). Implementation of this technology is favorable assuming an approved method of disposal is readily available, and/or replacement of treated soil can be accomplished. Excavation and disposal is potentially applicable and this process option will be retained for further analysis. 4.3.5.1 Biopiles/Ex-Situ SVE Biopiles involve the ex-situ biological treatment of contaminated soil whereby the degradation of organic contaminants by micro-organisms occurs in an aboveground, controlled environment. Micro-organisms may be either indigenous or externally introduced. Oxygen is supplied to the piles via ambient air injection. The air can be blown directly into the pile or drawn through the piles using a vapor extraction blower. Where compounds are readily volatilized, such as is the case with many chlorinated VOCs, the bulk of the soil treatment takes place by volatilization with little or no biodegradation of the VOCs taking place. Biopiles applied to soil contaminated with BTEX, petroleum compounds, and other readily biodegradable hydrocarbons are designed to allow more biodegradation to take place with little or no volatilization. g:\aproject\tutu\prOO 13.037Veports\tutufs.doc GERAGHTY & MILLER, INC. VU f °°7 2°21 4-12 An ex-situ SVE system is configured similar to a biopile but is designed to optimize volatilization. These systems are designed to draw a vacuum in a covered pile, thus inducing air flow through the soil piles and volatilizing the VOCs. Ex-situ SVE systems are applied in situations where in-situ SVE is impractical or of limited use. Chlorinated VOCs, BTEX, and other VOCs can be treated with this technology. Depending on air emission limits, control of the VOC emissions from the biopile may be required. Vapor treatment will be dependent on contaminants; the same technologies evaluated for in-situ SVE treatment would apply. The capital costs associated with biopiles and ex-situ SVE would be moderate to high due to the excavation of soil and the off-gas treatment technology used (if necessary). O&M would be moderate to high and would be based on the off-gas treatment technology used. These technologies will be retained for further evaluation. 4.3.5.2 On-Site Thermal Desorption Thermal desorption is a thermal treatment technology that involves the application of elevated temperatures to soil to volatilize VOCs from excavated soils. Application of this technology may require the collection and treatment of the off-gases that are produced. The temperature used for thermal desorption (typically from around 400 to 1,100 degrees Fahrenheit [°F]) depends on the volatility and boiling point of the COCs. Thermal desorption has been shown to be effective in treating soil with VOCs. Commercial units exist and are in operation, but use of these facilities would require off-island transport and disposal of excavated soil. On-sSte thermal desorption units are usually expensive and are cost- prohibitive where soil volumes are small. g:\aproject\tutu\pr0013.037\reports\tutufs.doc TUT OO7 2O22 GERAGHTY & MILLER, INC. 4-13 The capital costs for thermal desorption would be high and O&M costs would be moderate to high depending on the need and type of emission controls. The costs to excavate and stockpile the contaminated soil would be moderate to high depending on the volume, area to be excavated, and COCs present. More cost-effective technologies are under consideration; this technology is not retained for further analysis. 4.3.5.3 Incineration Incineration is another treatment technology similar to thermal desorption except that incineration treats VOCs in the excavated soil to temperatures greater than 1,000 °F in the presence of oxygen. This causes volatilization and combustion of the VOCs, converting them to carbon dioxide (CCh), water, hydrogen chloride (HC1), nitrogen oxides (NOX), and sulfur oxides (SOX). Implementation of on-site incineration would be difficult due to permitting requirements and limited spacing which allows for air dispersion of emissions prior to reaching potential receptors. The disposal of incinerated ash, which would likely be considered a hazardous waste due to the potential metals content, would present implementation difficulties because off-island disposal would be required. The most well-developed, proven, and commercially available form of thermal destruction is rotary kiln incinerators. These incinerators consist of slightly inclined, refractory-lined cylinders where soil and auxiliary fuel are injected into the high end of the kiln and passed through the combustion zone as the kiln slowly rotates for incineration. Temperatures within the combustion zone typically range from 1,200 to 1,800 °F, and the retention time can vary from several minutes to 1 hour or more. VOCs are oxidized to gases and inert ash within this zone, with ash being removed at the lower end of the kiln. Flue gases are passed through a secondary combustion chamber and then through air pollution control units for paniculate and acid gas removal. Off-site disposal of soil would be required as the soil would not be reusable for fill or replacement. g:\aproject\tutu\prOO 13.037Veports\tutufs.doc TUT CO7 GERAGHTY & MILLER, INC. 4-14 The capital and O&M costs for this technology are high. The costs associated with excavating and stockpiling the contaminated soil are moderate to high depending on the volumes and depths of impacted soil. This technology is not retained for further consideration as there are more cost-effective and implementable technologies under consideration. 4.4 IDENTIFICATION AND SCREENING OF REMEDIAL TECHNOLOGIES FOR GROUNDWATER In this section, potentially applicable technologies for remediating the VOC contamination in groundwater at the Tutu Wells Site are described and evaluated. If treated water is considered for potable use, additional technologies to treat naturally occurring inorganic contaminants (e.g., precipitation, reverse osmosis, and ion exchange) are also evaluated. The primary COCs include chlorinated VOCs and petroleum-related hydrocarbon compounds. During this screening process, technology types or technology process options are eliminated from further consideration based on effectiveness, implementability, and/or cost. The following sections present the results of this technology screening for the technologies evaluated. A summary of the screening results for groundwater is presented in Table 4-3. 4.4.1 No Action No action is a general response action that is required by the USEPA and the NCP to be carried through to the detailed analysis phase of the FS. The no-action approach will be considered for evaluation of the potential impacts associated with not implementing any remedial action for groundwater. No action will be retained for further consideration and used as a baseline for comparing the effectiveness of active remedial measures for groundwater underlying the Tutu Wells Site. g:\aprojeclMutu\pr0013.03 7^-eports\tutufs.doc TUT no 7 GERAGHTY & MILLER, INC. 4-15 4.4.2 Institutional Controls Institutional controls encompass several strategies that limit or prevent the likelihood of human and environmental contact with impacted soil or groundwater. Although institutional controls can be implemented to limit access to specific areas, they do not increase the volume or minimize constituent concentrations in the affected environmental media. At sites where a potential exists for exposure to impacted soil or groundwater, institutional controls can effectively reduce the potential for exposure to site-related constituents. 4.4.2.1 Access Restrictions One type of institutional control that can be implemented at the Tutu Wells Site is access restrictions. Access restrictions are a type of institutional control that can be employed to address soil. Access restrictions consist of preventing human contact with impacted groundwater. One such access restriction is deed restrictions. Deed restrictions involve annotating the deed for the property to limit or prohibit use of groundwater on the property for specific purposes or for specific uses. For example, deed restrictions could prohibit a wide range of potential groundwater uses, such as pumping for water- supply use (development of the groundwater for human consumption), agricultural use (watering livestock or irrigating crops), or industrial use (cooling water or process make-up water). Deed restrictions are a proven, reliable, and established method of institutional site control. No maintenance is required, and health risks associated with implementation of this remedial technology are minimal. Costs associated with deed restrictions would include filing and legal fees and are anticipated to be low. For those sites with contaminated groundwater, provisions for an alternate water supply would have to be made. g:\aproject\tutu\pc0013.037\reports\tutufs.doc TUT OO7 2025 GERAGHTY & MILLER, INC. 4-16 Deed restrictions will be retained for further consideration as a remedial measure for groundwater at the Tutu Wells Site due to their potential effectiveness and implementability. 4.4.2.2 Alternate Water Supply Alternative residential water supply options are often considered in emergency situations, and/or when it is not practicable or feasible to actively restore groundwater to drinking water quality, and access to impacted groundwater is restricted. Three options are available for providing an alternate water supply source, including extension of public water supply lines, trucking water, and installation of a new community well for water supply. 4.4.2.2.1 Public Water Supply Extension This remedial technology involves providing a supply of drinking water from a suitable, non-contaminated source to residents in the affected areas. This can be accomplished in the Tutu Wells Site area by extending the existing municipal water supply system in the area (managed by the Virgin Islands Water and Power Authority [WAPA]) to the affected users. Plans for future upgrades exist and they could be expanded to include connections to properties that have impacted residential wells. The extension of the existing water supply system to affected users would be technically feasible, but construction of waterline extensions would be very expensive due to the shallow depth to bedrock and length of water line installation necessary to provide water to all affected residences. Connection costs for residences near the existing water main would be lower (approximately $2,000 per residence). Use of the public water supply system will not restore former commercial water supply entities in the Tutu Wells Site. g:\aproject\tutu\prOO 13.037\reports\iutufs.doc TUT OO7 2026 GERAGHTY & MILLER, INC. 4-17 A public water supply extension for residential consumptive use will be retained for further consideration as a remedial alternative for groundwater at the Tutu Wells Site. 4.4.2.2.2 Trucking Water In 1987, the DPNR closed 13 commercial wells and five private wells in the Tutu Wells Site area. Subsequently, the USEPA initiated a limited CERCLA Removal Action that included the delivery of water by tank trucks to the residents affected by the closure of the wells. This water delivery has been accepted by the USEPA as permanent solution for affected residents. It may be an option for consideration on a permanent basis for all residents in the Tutu Wells Site. Costs associated with trucking water would be high and would be contingent on the availability of water in other places in St. Thomas. Trucking of water has been accepted in the past as a remedial alternative for groundwater supply at the Tutu Wells Site. For this reason, it will be retained for further consideration. 4.4.2.2.3 New Community Well The installation of a new uncontaminated supply well for use in the affected Tutu Valley is another alternate water supply option. This new supply well could be used as a community watering point by the residents in the area who now rely on other sources of water (e.g., trucked water). A new supply well may be technically implementable, but the cost of locating and developing and distributing water from an alternate supply well would be high. The well would have to be located outside of the area of impacted groundwater, and pipelines or trucking to distribute the water to residents would be required. There would also be no guarantees as to the quantity or quality of water in a new location. g:\aproject\tutu^r0013.037\reportsUutufs.doc GERAGHTY40 GERAGHTY & MILLER, INC. 4-31 /•—•N removal of suspended particles and is relatively easy to implement. However, periodic backwashing to discharge trapped particles, which would require monitoring and maintenance, would be required. Capital and O&M costs would be moderate. Filtration may be used as part of a more complex treatment system. Due to its potential effectiveness, filtration will be retained for further evaluation. 4.4.4.2.4 Precipitation, Flocculation, and Sedimentation Precipitation, flocculation, and sedimentation have been applied widely to a variety of wastewaters for the removal of suspended solids and metals. The groundwater enters a rapid mix tank where chemicals are added to oxidize the suspended metals, soften the water, and adjust the pH to preferentially precipitate the target metals. The water then flows to a chamber in which a flocculent (e.g., anionic polymer, cationic polymer, and/or alum) is added and gently agitated so as not to shear the floe. The water then flows to a settling basin in which the flocculated particles /*•—\ agglomerate and settle quiescently. Sedimentation relies on gravity to remove flocculated particles (as opposed to filtration, which screens particles of a given diameter). Precipitation, flocculation, and sedimentation constitute a proven technology for the removal of metals, insoluble inorganic salts, and suspended solids. This technology is dependent on chemical additives and requires regular sludge removal and disposal; therefore, O&M costs would be moderate. These processes will be retained for further consideration. 4.4.4.2.5 Reverse Osmosis Reverse osmosis can be used for the separation of both organic and inorganic constituents from an aqueous stream. Separation is achieved by preferential passage of one or more constituents in an aqueous medium through a semi-permeable membrane. An applied pressure is used to overcome osmotic pressure, which is a result of a solution trying to reach an equilibrium g:\aproject\tutu\piOO 13.037\reports\tutufs.doc GERAGHTY# MILLER, INC. TUT °°7 2O4i 4-32 condition. Typically the operating conditions of these systems consume large amounts of energy to establish the required pressure differential. Effluents from the process include a permeate stream, composed primarily of water, and a concentrate stream containing water and the constituents removed from the water. The concentrate stream may require treatment or disposal as a regulated material. Reverse osmosis has been demonstrated to be an effective remedial technology for the treatment of dissolved nitrates and metals in groundwater. Organic compounds with a molecular weight of greater than 200 are generally removed by this process. Pretreatment of the groundwater is required if oil and grease and/or suspended solids are present in the water. The technology is highly temperature-sensitive, not easily adaptable to variation in flow and loading, complicated to operate and maintain, and very high in cost. This technology has been used in other portions of the Tutu Valley for removal of dissolved solids and is potentially applicable at the Tutu Wells Site. However, capital and O&M costs are high. This technology will be retained for further consideration. 4.4.4.2.6 Ion Exchange Ion exchange is a highly dependable technology for inorganic and some organic compounds. It involves the transfer of constituent ions and cations from water to an exhaustible ion exchange resin. This resin is relatively insoluble granular material that has acid or basic radicals exposed on its surface. As ion exchange generally softens the water, a polishing step may also be required to adjust effluent hardness. Ion exchange systems have low O&M costs but a high capital cost. This option is a proven technology for the removal of inorganic compounds and is retained for further analysis. g:\aproject\tutu\pcO013.03Treports'*utufs.doc TUT 007 2O42 GERAGHTY & MILLER, INC. 4-33 4.4.4.2.7 Ultraviolet Oxidation/Reduction Ultraviolet (UV) oxidation/reduction is a technology that destroys dissolved organic constituents (e.g., VOCs) in groundwater by means of chemical oxidation. Specifically, the oxidation process that takes place involves an oxidation-reduction (redox) reaction because one of the species involved gains electrons and another loses electrons, thereby destroying organic compounds. Ozone and hydrogen peroxide are widely used as oxidants in conjunction with UV light to remove organic compounds. Due to the expense, safety issues, and instability of ozone, hydrogen peroxide, rather than ozone, will be considered for the Tutu Wells Site. UV light catalyzes the chemical oxidation of organic compounds in groundwater by its combined effect on the organic constituents and its reaction with hydrogen peroxide. Many organic constituents absorb UV light and undergo a change in their chemical structure, and many become more reactive with chemical oxidants. UV light at less than a 400-nanometer (nm) wavelength reacts with hydrogen peroxide molecules to form hydroxyl radicals. UV oxidation/reduction has been demonstrated to completely destroy chlorinated VOCs such as those found in the Tutu Wells Site (e.g., PCE, and TCE) with minimal air emissions. A UV oxidation/reduction system can handle variable flow rates and loadings; however, where groundwater is excessively hard, pretreatment for the removal of dissolved solids is required. Without pretreatment, the calcium deposits would coat the quartz tubes and prevent the extracted groundwater from being exposed to UV light. The capital and operating costs are high, and the O&M costs are high due to the complexity of the system and energy consumption. Although this technology has high associated capital and O&M costs, it is an effective treatment technology for the COCs found in groundwater in the Tutu Wells Site. This technology will be retained for further consideration. g:\aproject\tutu\pt0013.037Veports\tutufs.doc TUT 007 2043 GERAGHTY & MILLER, INC. 4-34 4.4.4.2.8 GAC Fluidized Bed System The GAC fluidized bed system is a bioremediation technology that combines the use of activated carbon with an aerobic or anaerobic biological process to treat biologically degradable VOCs in groundwater. Activated carbon is utilized as the inert medium for attached microbial growth in the fluid bed reactor. As water passes upward through the bed of medium, the bed lifts and expands until it "fluidizes." This increases the surface area available for microbial growth, which enables an increased rate of organic compound degradation. The increased surface area offers the advantage of reduced system size, making the GAC fluid bed system easily portable. As the microorganisms begin to grow, a bio-film develops, grows, and rises to the top of the bed where the film is removed. Little, if any, off-gas is produced, and a minimal amount of carbon replacement is necessary since the carbon is biologically regenerated within the fluid bed. GAC fluidized bed reactors would be particularly effective in treatment of biodegradable petroleum-related COCs identified in the Tutu Wells Site groundwater. Capital and O&M costs would be moderate. This technology is considered to be potentially applicable to the Tutu Wells Site and therefore will be subject to further analysis. 4.4.4.3 Natural Remediation Natural remediation is the reduction of constituent concentrations through attenuation and degradation. Natural attenuation relies on the natural ability of groundwater to lower contaminant concentrations through physical, chemical, and biological processes until cleanup levels are met. Portions of the Tutu Wells Site aquifer that have been impacted by site constituents will naturally attenuate with time. Active remediation of these areas through extraction and treatment will not enhance or shorten the time frame in which aquifer remediation can occur. Monitoring and institutional controls would also be implemented to ensure that no off-site receptors will be impacted. Capital costs and O&M costs would be low to moderate. As this technology has potential use at the Tutu Wells Site, this technology will be retained for further consideration. g:\aprojectMutuVr0013.03 7\reports\tutufs.doc GERAGHTYorts\tutufs.doc GERAGHTY & MILLER, INC. TUT 007 2066 4-57 rate of 15 gpm; Recovery Wells RW-4 and RW-5 would be pumped at approximately 20 gpm and 35 gpm, respectively. The maximum total groundwater pumpage from recovery wells would be 100 gpm. The 40 gpm total for the source control pumpage at the Texaco Tutu Service Station (30 gpm) and Esso Tutu Service Station (10 gpm) would bring the overall maximum pumpage rate to 140 gpm, which exceeds the estimated safe yield of the catchment area of 118 gpm (see Table 4-11). It should be noted, however, that there is a significant difference in the anticipated time frames for pumpage of the site-wide plume containment and source containment wells compared to the extraction wells associated with the SCPs at the two service stations. Due to the small size of the BTEX plumes and the biodegradable nature of BTEX constituents, Geraghty & Miller anticipates that the SCPs will achieve their remedial goals in 3 to 7 years of operation. In contrast, it is envisioned that the site-wide recovery wells will likely have to operate for much longer time periods (on the order of 10 to 30 years), due to the large areas of the chlorinated VOC plumes and the potential for the existence of DNAPLs at two source areas. Geraghty & Miller anticipates that the SCPs will be implemented in 1995 or early 1996, while the site-wide groundwater remedy will not be implemented until late 1996 or 1997, allowing time for public comment on the selected remedy and pre-design work. Therefore, it is possible that the SCPs will be near completion when the site-wide groundwater remedy is implemented. Pumping rates can be adjusted during any period of overlap to maintain overall capture of contaminants and to maintain total pumpage below the estimated safe yield of the aquifer in the affected area. If the SCP groundwater pumpage is reduced, the site-wide groundwater recovery wells will provide collection and containment for the BTEX constituents in groundwater. However, the SCP pumpage should be maintained as much as possible to provide more effective withdrawal of the BTEX constituents. Geraghty & Miller has assumed that all the proposed recovery wells will be installed to a depth of approximately 150 feet bis and will be screened across the shallow and deep portions of g:\aproject\tutu\pt0013.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT OO7 2O67 4-58 the bedrock aquifer (i.e., My penetrating). The depth of 150 feet bis was selected to maximize the complete penetration of the aquifer without intercepting the deeper portions of the aquifer that contain mineralized water. Deep mineralized water contains elevated TDS and chloride. If drawn upward by pumpage, the mineralized water could degrade the quality of shallow groundwater. This mineralized water could also accelerate corrosion and fouling of the recovery and treatment systems. Therefore, a depth of 150 feet bis was selected as the optimum depth for recovery wells for the chlorinated VOC-impacted groundwater. For areas where impacted groundwater may occur below 150 feet bis, Geraghty & Miller has assumed that upward groundwater flow induced by recovery well pumpage and natural attenuation will remediate the deeper portions of the aquifer over time. The locations of the proposed recovery wells were based on a preliminary capture zone analysis, which is summarized in Appendix B. Estimated capture zones for proposed SCPs at the Texaco Tutu and Esso Tutu Service Stations are illustrated on Figure 4-8, with the shallow groundwater contour map and the BTEX concentrations in groundwater contours. Estimated capture zones at maximum pumping rates in GRA 2 and GRA 3 and proposed groundwater recovery well locations are illustrated on Figure 4-10. The proposed groundwater recovery well locations for GRA 4 are illustrated on Figure 4-9. The pumping rates of the proposed recovery wells under the different GRAs evaluated are summarized in Table 4-11. 4.6.3.2 Treatment In this section further evaluations of treatment technologies are provided. The potential effectiveness of in-situ treatment technologies (i.e., air-sparging and bio-sparging) that survived screening is difficult to evaluate without site-specific pilot testing, especially in a heterogeneous matrix of fractured bedrock. This FS Report allows the possibility for these technologies to be evaluated further because they may be beneficial. Because the effectiveness and associated costs are not well known, air-sparging and bio-sparging have not been included in the groundwater g:\aprojert\tutu\pr0013.037Veports\tutufs.ito GERAGHTY & MILLER, INC. TUT 007 2068 4-59 remedial alternatives assembled for comparison in this FS Report. In this section, further evaluations of the ex-situ treatment schemes for a central treatment facility and for the proposed POET systems are provided. In Section 4.6.3.3 (Natural Remediation), the basis for applying natural remediation in the downgradient (i.e., southeastern) portion of the chlorinated VOC plume are discussed. Each collection and containment option discussed in Section 4.6.3.1 (Collection and Containment) will be associated with a central treatment facility. The central treatment facility will consist of one or more of the ex-situ groundwater treatment technologies that were retained from the initial screening. The technologies chosen for a central treatment facility are contingent on several factors, including existing performance data and the type of contaminants, and the concentration of contaminants present in the extracted groundwater. Similar to soil, SCPs for groundwater treatment are proposed for implementation at the Texaco Tutu Service Station and the Esso Tutu Service Station. These SCPs consider similar treatment technologies and discharge options to those considered in this FS. No further groundwater treatment options are considered for the Texaco Tutu Service Station and the Esso Tutu Service Station. These SCPs were previously described in Section 4.6.1.1 (Texaco Tutu Service Station Source Control Plan), and Section 4.6.1.2 (Esso Tutu Service Station Source Control Plan). Existing performance data related to a treatment system located on the Esso Tutu Service Station property indicate that an air stripper combined with GAC polishing (of the aqueous effluent) is an effective treatment method for groundwater at the Tutu Wells Site. These technologies, used separately or in combination, are effective methods for VOC removal and can be applied to all the pumping options considered. Groundwater quality data have been collected throughout the Tutu Wells Site. Although these data may not be an accurate indicator of the influent groundwater quality from a recovery g:\aprqject\tuUi\pr0013.037\reports\tutufs.doc GERAGHTY & MILLER, INC. TUT °O7 2069 4-60 well, this information can be used to estimate influent groundwater quality to a central treatment facility. Influent groundwater quality to each treatment facility was determined by using a mass flow balance, averaging the flow rate and contaminant concentration for each collection and containment well scenario. This predicted groundwater quality was evaluated against the MCL primary and secondary standards to determine the level of treatment that may be required. In some instances, secondary standard variances may be appropriate for some parameters, such as IDS, since elevated levels of some naturally occurring inorganic parameters are common in the USVI. The influent levels of contamination will vary with each collection and containment well scenario, as different recovery wells may be used and flows from the recovery wells would be combined prior to treatment; however, groundwater quality between scenarios would not vary enough to warrant consideration of different treatment facility schemes. Table 4-4 provides a summary of the predicted groundwater quality compared to MCLs for the Source Containment and POETs scenario (GRA 2), the Plume Containment scenario (GRA 3), and the Source and Plume Containment scenario (GRA 4). The estimated influent concentrations in Table 4-4 represent weighted averages for the blended wells based on (1) groundwater quality near the proposed recovery wells and (2) the estimated flow rate from each well. One treatment scheme has been developed for a central treatment facility (i.e., discharge to surface water). This scheme is based on the level of treatment required for this discharge option. The primary reason for installing the central treatment facility is to remove the COCs identified in the RI (Geraghty & Miller, Inc. 1995). Therefore, VOC treatment and removal, consisting of air stripping and potentially GAC polishing, is included in this treatment scheme. Air stripping and GAC adsorption are selected as representative technologies for cost comparison purposes in this FS Report. Other treatment technologies that survived screening (e.g., filtration, reverse osmosis, ion exchange) are viable technologies that are typically used for treatment of inorganic constituents. g:\aproject\tutu\pr0013.037Veports\tutufe.doc GERAGHTY & MILLER, INC TUT oo? 207O 4-61 The groundwater treatment scheme shown on Figure 4-11 treats the groundwater to background groundwater quality and does not address naturally occurring inorganic constituents that are present above secondary MCLs (e.g., TDS and chloride). The treatment scheme proposed for the central treatment facility assumes that chemical sequestering of the dissolved constituents can be achieved successfully. This assumption is based on the assumed hardness, iron, and manganese concentrations in the influent to the central treatment facility, and on the assumption that the concentrations of these constituents are slightly below the maximum point where sequestering can still be achieved. If actual hardness, iron, and manganese concentrations are higher than assumed, sequestering may not be implementable. Modifications to the pre-treatment scheme may be required depending on the accuracy of these assumptions. This groundwater treatment option is also considered applicable for a surface-water discharge option; however, chemical feed rates or level of treatment may need to be modified to meet TPDES requirements. These modifications should not significantly change the treatment scheme or cost. Treatability testing, including a pilot test with actual groundwater recovery well samples, may be a required step in the pre-design phase. Even if the assumptions made for groundwater quality and level of treatment are not confirmed during pilot testing or during the final design phases of implementation of the selected GRA, the new data will not likely change the findings of this FS. In other words, evaluation of new results would most likely be consistent for each GRA, since the costs for each option will be increased by approximately the same amount. POET systems are a form of treatment that will be considered as a groundwater treatment method in this FS. POET systems refer to low capacity package groundwater treatment systems, that are designed to be a low-maintenance and reliable form of treatment for individual wells. The term POET indicates that treatment will be provided at the point of entry to a residence rather than at the point of use (i.e., at the wellhead rather than at the drinking fountain). The POET systems utilize either air stripping or GAC technologies and will be selected based on the anticipated maximum pumping rate of each well, expected TDS concentrations, and the COC concentrations g:\aprojectMutu\pr0013.037\repottsUutufs.doc GERAGHTY & MILLER, INC. TUT OO7 2071 4-62 expected. A summary of the potential POET supply well installations is provided in Table 4-12. Due to the maximum safe yield for the catchment area of 118 gpm and the pumpage of recovery wells, the maximum total average flow of all the POET supply wells that could be allowed is estimated to be approximately 15 gpm. This average flow allows for typical residential usage of the five supply wells that were selected for POET installation based on their location in the central portion of the groundwater plumes. 4.6.3.3 Natural Remediation Proposed groundwater remedial alternatives are designed to capture the majority of the chlorinated VOCs. The SCPs are designed to control BTEX. Due to aquifer safe yield limitations on total pumpage and to optimize groundwater recovery efforts, lower concentrations of total chlorinated VOCs (i.e., less than 100 ug/L) will not be recovered, rather these concentrations will be allowed to attenuate and degrade naturally. A portion of the plume with chlorinated VOC concentrations less than 100 ug/L may not be completely contained and will migrate downgradient to the southeast. The following calculations (using half-lives and groundwater flow velocities) are presented to estimate the time required for natural remediation to be effective at reducing chlorinated VOC concentrations to MCLs. Table 4-13 presents a summary of published half-lives for COCs in groundwater (Howard et al. 1991). A half-life represents the amount of time required for natural degradation to reduce a concentration to one-half of the initial concentration. The degradation rates and concentrations on Table 4-14 are based on a first order decay of unimolecular constituents. These half-lives are based on estimated rates of aerobic degradation of COCs in groundwater based on field and laboratory data (Howard et al. 1991). Using the average half-life values in Table 4-13 and assuming an initial concentration of 100 ug/L of total chlorinated VOCs, the time required for natural degradation to reduce individual g:\aproject\tutuVr0013.037\reports\tutufs.doc GERAGHTY^ MILLER, INC. TUT °°7 4-63 chlorinated VOC concentrations below MCLs is approximately 5.33 years, which is equivalent to 1,945 days (see Table 4-14). The ratios of the individual chlorinated VOCs in the assumed initial 100-ug/L concentration (see Table 4-14) were based on the ratio of compounds present at the Matthias Supply Well. If groundwater recovery systems are operated to capture and remove chlorinated VOCs at or above 100 ug/L, the groundwater concentrations at 100 ug/L that are not recovered will require approximately 5.33 years to naturally degrade below MCLs. This is a conservative estimate because other factors (such as adsorption, dispersion, and dilution) will also reduce groundwater concentrations. These calculations do not consider the potential variations of concentrations due to the formation of breakdown products. Because PCE is not formed as a breakdown product, the calculations for PCE represent a conservative estimate. Chlorinated VOCs in the deeper portions or lateral portions of the aquifer not captured by recovery wells should degrade below MCL concentrations within a maximum time frame of approximately 5.33 years. Due to the existing groundwater flow regime, the deeper and lateral portions of the main body of the chlorinated VOC plumes will not significantly expand over the time required for natural degradation to achieve MCLs. However, the downgradient portion of the existing chlorinated VOC plume in the southeastern part of the study area will continue to migrate with the prevailing groundwater flow. To assess the additional area that may be potentially impacted by chlorinated VOCs above MCLs, the downgradient extent of potential impact can be estimated by calculating the groundwater flow velocity and multiplying this velocity by the time required to reach MCLs. The average linear velocity of groundwater flow is the velocity of groundwater moving in a general downgradient direction. This velocity can be calculated using an equation derived from Darcy's law as follows: V = K dh n dl where V = Average linear velocity, in feet per day g:\aprojecl\tutuVr0013.037Veports\tutufs.doc GERAGHTYc? MILLER, INC. TUT 007 2073 4-64 K = Hydraulic conductivity, in feet per day n = Effective porosity (unitless) dh = Hydraulic gradient (unitless) dl For the southeastern portion of the study area, the nearest values for K were calculated from the pumping test at the Eglin HI Supply Well. Calculated K values for the Eglin in pumping test ranged from 6.37 to 7.61 gal/day ft2; (Geraghty & Miller, Inc. 1995). Based on the distribution of fractures interpreted from fracture trace analysis (Geraghty & Miller, Inc. 1995), the Harthman Crusher Supply Well may be characterized by a density and length of fractures to similar to the southeast portion of the study area. As such, the hydraulic conductivity (K) value calculated for the Harthman Crusher Supply Well (21.1 gal/day ft2) may provide another applicable estimate for the K values in the southeastern portion of the study area (Geraghty & Miller, Inc. 1995). Conversion of the K values to units of feet per day yields a maximum K value of 1.02 feet per day for the vicinity of the Eglin III Supply Well and 2.82 feet per day for the Harthman Crusher Supply Well, with an average K value of 1.92 feet per day. Values of effective porosity for pyroclastic rocks such as the andesitic tuff* found at the Tutu Wells Site may range from 14 to 40 percent (Keller 1960). Using the average K value of 1.92 feet per day, a hydraulic gradient of 0.0689, and an effective porosity of 0.20 (i.e., 20 percent), an average linear velocity of 0.661 foot per day (ft/day) was calculated for the southeastern portion of the study area. Multiplying 5.33 years (equivalent to 1,945 days, the estimated time required to achieve MCLs using the average half-lives) by an average linear velocity of 0.661 ft/day (the larger groundwater velocity calculated for the vicinity of the Matthias and Delegarde Supply Wells) yields a value of 1,286 feet, which represents the maximum downgradient extent of migration of chlorinated VOCs above MCLs from the 100-ug/L contour line in the vicinity of the Matthias Supply Well. Chlorinated VOCs above the MCLs have been identified at the Delegarde Supply Well, approximately 950 feet downgradient of the 100-ug/L chlorinated VOC contour line. The minimum, average, and maximum input values for the half-life and travel time calculations are g:\aproject\tutu\pr0013.037\rqx>rts\lutufs.doc GERAGHTY & MILLER, INC. TUT O07 2074 4-65 presented in Table 4-15. The average half-life and travel time calculations presented above indicate that the southeastern edge of contaminants above MCLs may potentially migrate approximately another 336 feet downgradient of the Delegarde Supply Well before natural degradation would reduce the groundwater concentrations below MCLs. This is a very conservative estimate because other retardation factors (e.g., adsorption and dilution with non-impacted groundwater) will also limit the downgradient extent of chlorinated VOCs above MCLs. In addition, it is likely that the hydraulic gradient will decrease, similar to the decrease in the topographic gradient, downgradient of the Delegarde Supply Well. The Dench Supply Well, the nearest downgradient supply well, is A located approximately 2,200 feet downgradient of the Delegarde Supply Well. Sampling of the Dench Supply Well over three sampling events (September 25,1990; February 5,1991; and March 31,1993) indicated that COCs were not present and that all results were below MCLs (Geraghty & Miller, Inc. 1993c). In summary, once the site-wide groundwater recovery is started, the main body of the chlorinated VOC plume will be captured; this main body will no longer be a continuing source of COCs to lateral and downgradient portions of the plume. Groundwater (with a maximum concentration of 100 ug/L total' VOCs) not captured by the recovery wells should naturally degrade to below MCLs within approximately 5 years. During this time, the southeast portion of the plume may continue to migrate downgradient, but it will most likely degrade and dissipate below MCLs before reaching the nearest downgradient groundwater supply well. g:\aproject\UrtuVK1013.037\reports\iutufs.doc GERAGHW & MILLER, INC. TUT O07 2O75 O o •mi 5-51 5.4.8 Summary of Comparative Analysis of Alternatives Table 5-13 provides a summary of the preferred remedial alternatives for each of the seven NCP evaluation criteria. SRA 3 and SRA 4 are the soil remedies that have been designated most often as the preferred alternative. SRA 3 (Institutional Controls/Capping/In-Situ SVE/Excavation and Off-site Disposal) is the preferred soil remedial option for four of the seven criteria. SRA 4 (Institutional Controls/Capping/Ex-Situ SVE/Excavation and Off-site Disposal) is slightly better, having been designated the preferred soil remedial option for five of the seven criteria. GRA 4 (Institutional Controls/Source and Plume Containment/Treatment/Discharge) is the most commonly selected preferred groundwater remedy (four of the seven criteria). g:\aproject\tutu\prOO 13.037\reports\tutufs.doc GERAGHTY & MILLER, INC. TUT O07 2127 5. DEVELOPMENT AND SCREENING OF REMEDIAL ALTERNATIVES In this section, screened technologies from Section 4.0 (Identification and Screening of Remedial Technologies) are assembled into remedial alternatives to address the impacts to human health and the environment that could result from COCs in soil and groundwater at the Tutu Wells Site. Each remedial alternative is assessed based on the evaluation criteria provided in Section 5.1 (Evaluation Criteria) and on its effectiveness in achieving the goals and objectives established in Section 3.0 (Remedial Action Croats and General Response Actions). The RALs and CGs identified in Section 3.0 were utilized in formulating a basis for compliance to the RAOs established for the site. As discussed in Section 3.1.2.3 (Remedial Action Levels and Cleanup Goals), RALs do not exist at this time for soils. For the Tutu Wells Site, the USEPA has developed SSLs to be used as screening levels to determine if soil remediation may be warranted at individual properties. 5.1 EVALUATION CRITERIA The evaluation criteria used to examine the remedial alternatives are derived from CERCLA statutory requirements and other program initiatives, such as the NCP promulgated by the USEPA. Each remedial alternative is evaluated against the NCP criteria as described in "Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA- Interim Final" (USEPA 1988a). The NCP criteria consist of the following nine factors, which each remedial alternative must adequately address: • Overall protection of human health and the environment. • Compliance with ARARs. • Long-term effectiveness and permanence. • Reduction of toxicity, mobility, or volume. • Short-term effectiveness. • Implementability. GERAGHTY013.037\reportsUutufs.doc GERAGHTY & MILLER, INC. TUT ?O93 5-18 Curriculum Center • Excavation, ex-situ SVE, and replacement of remediated soil. • In-situ SVE in bedrock or in soil areas not suitable for excavation (i.e., near building foundations) to remediate adsorbed chlorinated VOCs or DNAPLs that may be present in the unsaturated zone. Ramsay Motors • Capping by replacement of cracked concrete. Texaco Tutu Service Station • In-situ SVE and/or bioventing treatment of impacted soils. • Catalytic oxidation for off-gas treatment (based on the SCP design; Erler & Kalinowski, Inc. 1995a, 1995b). Tillett Gardens • Capping of impacted soil areas (to eliminate the exposure pathways). Western Auto • Excavation and off-site disposal (in southeast U.S.) of impacted soil after waste classification (for cost estimating purposes, Geraghty & Miller has assumed the g:\aprqjecttotu\pr0013.037VeportsUutufs.doc GERAGHTY & MILLER, INC. TUT O07 2O94 5-19 soil will be classified as hazardous waste). SVE would not be effective at Western Auto due to clayey soil. Esso Tutu Service Station In-situ SVE and/or bioventing treatment of impacted soil. OHenrv Dry Cleaners • Excavation, ex-situ treatment of impacted soils, and replacement of remediated soil. • In-situ SVE in bedrock or in soil areas not suitable for excavation (i.e., near building foundations) to remediate DNAPL that may be present in the unsaturated zone. 5.2.4.2 Evaluation of SRA 4 Soil quality at several properties in the Tutu Wells Site area may pose an unacceptable risk to human health and the environment. Implementation of institutional controls combined with treatment and/or capping, where required, can effectively mitigate the potential exposure pathways present for soil. Capping will reduce the infiltration of water through contaminated soil, which will reduce the potential for leaching of COCs into groundwater. These measures will also prevent human and animal contact with contaminated soil and reduce erosion. g:\aproject\tutu\prOO 13.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT 007 2095 5-20 SVE will reduce the level of contaminants in soil at the specified properties, thus reducing the potential for leaching of contaminants to groundwater and subsequent off-site migration. Air emission controls on the SVE systems and covering of the soil piles (if using ex-situ SVE treatment) will be protective of human health and the environment by meeting emission permit standards. Capping and implementation of soil erosion and sediment control at selected properties will reduce erosion and the potential for exposure to hazardous materials. Capping will also increase the quality of surface-water run-off. Dust control and emissions monitoring and control measures implemented during construction will provide short-term protection of human health and the environment. This SRA would be designed to meet the CGs for the site. Exceedances of chemical- specific goals may occur depending upon the level of contamination that can be extracted through ex-situ SVE treatment. Action-specific and location-specific ARARs can be met through proper remedial design and engineering, and through careful implementation. At properties where capping is implemented, chemical-specific ARARs are expected to continue to be exceeded. This SRA would reduce the toxicity, mobility, and volume of soil contamination at individual properties through treatment. The potential for leaching of contaminants into groundwater will be reduced since the source will be treated, reducing the source volume. If required, the impacted soil will be capped, reducing mobility. The amount of residual contamination at each site will depend on the effectiveness of each excavation and treatment system. The effectiveness may also be limited by the amount of soil that can be excavated due to potential structural concerns near building foundations. g:\aproject\tutu\prOO 13.037teports\tutufs.doc GERAGHTY & MILLER, INC. TUT OO7 2096 5-21 Moderate short-term impacts would be realized due to fugitive emissions and the potential erosion associated with installing caps, excavation of soil, and installation of SVE equipment. Air monitoring may be required to identify harmful emissions during installation. Dust control and emissions monitoring and control measures implemented during construction will provide short- term protection of human health and the environment. Standard health and safety precautions would be maintained to mitigate any risks from drilling extraction wells in waste areas. This SRA is implementable. SVE is technically and administratively implementable, and has been demonstrated to be effective in treating the COCs identified at the Tutu Wells Site. Additional pilot work may be required to refine engineering design parameters and operating conditions. Construction of caps and SVE systems should not involve any significant implementability problems. Geomembrane, pavement, concrete, and soil caps are routinely installed using standard construction procedures and equipment. Standard construction practices will be followed with the appropriate health and safety protective measures. Capital costs associated with SRA 4 would include administrative and engineering costs related to permitting and engineering design, and possible air modeling and pilot testing, and material and construction costs. O&M costs would involve costs related to the O&M of vapor phase treatment unit(s). Additional soil evaluations at some individual properties may also be required to verify that remediation is warranted. The estimated capital cost to implement SRA 4 with the SCPs is $1,530,000. The present- worth value of the estimated O&M for SRA 4 with the SCPs is $2,524,000. The total estimated cost for SRA 4 with the SCPs is $4,054,000. The cost breakdown for the activities that comprise SRA 4 is presented in Table 5-6. g:\aprojed\Urtu\prt013.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT 007 2O97 5-22 5.2.5 SRA 5: Institutional Controls/Capping/In-Situ SVE (BedrockVExcavation and Off-Site Disposal In this section, SRA 5 is described and evaluated against the NCP criteria. 5.2.5.1 Description of SRA 5 This alternative would involve implementing the following actions: • Implementation of institutional controls. • Excavation and off-site disposal of impacted soil at individual properties identified. • Implementation of the SCPs using in-situ SVE at the Texaco and Esso properties. • Capping selected areas where impacted soil is present. • In-situ SVE treatment in bedrock at the Curriculum Center and the OHenry Dry Cleaners. • Restoration of excavated areas. Soil at individual properties where contamination is above the SSLs identified for the Tutu Wells Site would be excavated and containerized as required. The exceptions to this would be Tillett and Ramsay Motors where capping would be implemented, and the Texaco and Esso g:\aprqject\tutii\|>i0013.037Vreports\tutu&.doc GERAGHTY & MILLER, INC. TUT 007 2O9R 5-23 properties where the SCPs would be implemented. The excavated soil would be containerized and sampled to determine if it should be classified as hazardous waste. Based on that sampling, the soil would be disposed as appropriate and as approved by the USEPA and the appropriate U.S. Virgin Island agencies. Geraghty & Miller has assumed, for the purposes of this FS Report, that all excavated soil will be disposed as hazardous waste. Fill material would be brought in to restore each of the areas to grade. Topsoil and seed or paving would be installed to finish the restoration. After restoration is complete, deed restrictions (if necessary) would be placed on the property restricting current and future use. During all phases of the remediation, it will be necessary to implement dust and volatile emission control measures, soil erosion, and sediment control measures. 5.2.5.2 Evaluation of SRA 5 This alternative would protect human health and the environment by effectively removing the source of contamination from individual properties or by effectively eliminating the risk of exposure by leaching of COCs to groundwater through capping. This alternative would require air monitoring, use of personal protective equipment, and engineering controls for the control of fugitive emissions during the excavation and handling of waste materials to provide short-term protection of human health. This alternative is expected to meet potential CGs for the Tutu Wells Site by placing the material in a permitted off-site landfill. Soil that is classified as hazardous would have to be shipped to a hazardous waste landfill outside the USVI (a site in the southeast U.S. is assumed for cost purposes). By removing the contaminated soil, the potential for leaching of COCs into groundwater would be eliminated. g:\apn>ject\bitu\pr0013.037\reports\Uitu&.doc GERAGHTY & MILLER, INC. TUT OO7 ?099 5-24 Location-specific and action-specific ARARs are expected to be met through proper remedial design and implementation. Chemical-specific ARARs could be met through in-situ SVE treatment and ex-situ off-site disposal. The only exceptions would be for the Ramsay and Tillett properties where capping will eliminate the exposure pathway, but capping will not reduce the contaminant concentration. Contaminated soil removal and off-site disposal represents a permanent remedial solution for soil contamination at the Tutu Wells Site. The remediated area would be backfilled with clean fill and graded to restore existing grade. Erosion control measures would be implemented. Off-site disposal and replacement with clean fill will reduce the toxicity, mobility, and volume of the impacted soil in the Tutu Wells Site area. Source removal will decrease the potential for leaching of COCs into groundwater. The volume of contamination in the soil medium will be significantly reduced on-site, and the effectiveness of the removal of the soil would be contingent upon the ability to completely remove the impacted soil. Due to the proximity of private residences and a business district in the vicinity of the Tutu Wells Site, there are more potential short-term impacts associated with this alternative than with the other SRAs. The volatile nature of some of the COCs present at the Tutu Wells Site could result in the release of harmful emissions during excavation, handling, and transport. Measures such as temporary enclosures and daily cover may be needed to contain these emissions. Air treatment would be needed for these enclosures and air monitoring would be required to monitor for off-site migration of fugitive emissions. Specific health and safety practices for the selected properties can be developed to control exposure to on-site workers and personnel, as well as to potential off-site receptors. g:\aproject\tutu\prOO 13.037\reports\tutufs.doc GERAGHTY & MILLER, INC. TUT OO7 21GO 5-25 Excavation of contaminated soil and transfer to an off-site landfill is expected to be difficult to implement. The depth and location of some excavations may require the installation of lateral support members (e.g., sheet piles), and/or underpinning of building foundations. Excavation may not be implementable for impacted soil areas beneath footings. Bedrock that may be impacted could not be excavated. Transportation of hazardous materials on local roads will be difficult, as will the transportation of impacted soil by barge. The logistics of transporting the material from the site to the off-island landfill must be tightly controlled and will be administratively difficult to implement. Capped areas will be significantly easier to implement as a remedy. Capital costs for SRA 5 would consist of administrative and engineering costs, and costs related to excavation, transport, disposal, and monitoring. O&M costs would be minimal and would be limited to the areas that are capped. The estimated capital cost to implement SRA 5 with the SCPs is $2,065,000. No O&M costs will be incurred after excavation and disposal is completed. However, the O&M required to maintain the caps at the Ramsay and Tillett properties, the in-situ SVE in bedrock at the Curriculum Center and the O'Henry Dry Cleaners and the SCPs has an estimated present-worth value of approximately $2,460,000. The estimated grand total for SRA 5 and the SCPs is $4,525,000. The cost breakdown for the activities that comprise SRA 5 is presented in Table 5-7. 5.3 DEVELOPMENT AND EVALUATION OF REMEDIAL ALTERNATIVES FOR GROUNDWATER In general, the proposed groundwater remedies are pump and treat scenarios. Past experience with sites where DNAPLs have been identified indicates that portions of the fractured bedrock may never be fully restored. Therefore, it is assumed that each GRA will continue to operate for the entire remedial action. For the purposes of cost comparison, FS guidance (USEPA 1988a) recommends the use of 30 years for the duration of remedial actions. At some point in time g:\aproject\tutu\pKX)13.037\reports\tutufs.doc GERAGHTY & MILLER, INC. TUT 007 210.1 5-26 •/—V during the life cycle of the remedial action, groundwater recovery and treatment may no longer assist in the reduction of contaminants levels to CGs (i.e., MCLs). Once this asymptotic level is reached, the groundwater remedial action will no longer be able to significantly reduce the COCs in groundwater. Every five years during the life cycle of a remedial action (or more frequently, as needed), a performance review of the remedial system should be performed to determine if portions of the aquifer have obtained MCLs. The results of the semi-annual compliance monitoring samples will provide data for these remedial system performance reviews. If VOC concentrations in portions of the aquifer are reduced below MCL concentrations, the possible use of groundwater for beneficial uses may be allowed in specified areas. Four remedial alternatives have been developed to address impacted groundwater on a site- wide basis. The four groundwater remedial alternatives (GRAs) assembled for comparison are the following: • GRA 1: No Action/Institutional Controls. • GRA 2: Institutional Controls/Source Containment/ POET Systems/Treatment/Discharge. • GRA 3: Institutional Controls/Plume Containment/Treatment/Discharge. • GRA 4: Institutional Controls/Source and Plume Containment/Treatment/Discharge. g:\aproject\tutu\pr0013.037\reports\Uitufs.doc GERAGHTY & MILLER, INC. TUT 2102 5-27 5.3.1 GRA 1; No Action/Institutional Controls In this section, GRA 1: No Action/Institutional Controls is described and evaluated. 5.3.1.1 Description of GRA 1 This remedial alternative would involve implementing deed restrictions and monitoring. Deed restrictions on groundwater use may include the following: • Requiring the decommissioning of domestic and commercial wells. Existing unpermitted supply wells can be decommissioned by removing the pump and placing a removable plug in the well. The wells can be reestablished at some point in the future, when and if groundwater quality improves to allow extraction and use of untreated groundwater. • Prohibiting unauthorized usage of groundwater or the installation of new wells. • Placing restrictions on the water supply sources for future residential growth. • Limiting water system installations to connection to the Water and Power Authority (WAPA) distribution system or an alternate authorized source. GRA 1 includes semi-annual groundwater sampling to monitor groundwater quality and contaminant migration. For purposes of comparison, the monitoring program includes the sampling of approximately 15 wells at or near the plume boundary for TCL VOCs and BNAs, and the monitoring program will be assumed to last throughout the remedial action (30 years). g:\aproject\tutuV0013.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT OO7 2103 5-28 Restrictions on groundwater use would be established to prevent the installation of new supply wells in the affected area. To prevent future use of the existing wells, all existing supply wells at the Tutu Wells Site would be decommissioned. The DPNR would be responsible for enforcing restrictions on groundwater use and for ensuring that no unpermitted groundwater pumpage occurs. Water would continue to be supplied as it is currently being supplied (i.e., through collection of rain water and trucking water from an alternate source). ,—N 5.3.1.2 Evaluation of GRA 1 Based on the results of the RI (Geraghty & Miller, Inc. 1995) and the Baseline Risk Assessment (CDM Federal Programs Corporation 1995a), the groundwater under the site currently poses and will continue to pose an unacceptable risk to human health by ingestion. Implementation of institutional actions will not control the migration of impacted groundwater. This alternative would guard against potential impacts to human health within the Tutu Wells Site area, but may not protect human health off-site since plume migration would not be controlled. Institutional controls may not completely prevent unauthorized use of groundwater, unauthorized use of groundwater could still occur. Currently, there have not been any documented impacts to ecological receptors resulting from exposure to impacted groundwater, and the RI indicated such impacts are not likely (Geraghty & Miller, Inc. 1995). Potential impacts to ecological receptors are not discussed in the Baseline Risk Assessment. This alternative would not be in compliance with chemical-specific ARARs. Exceedances of these ARARs would be expected to continue. The long-term effectiveness of this alternative is questionable. Groundwater transport of contaminants would continue, and risks from direct contact and other pathways, although reduced, would not be eliminated. No appreciable reduction in toxicity, mobility, or volume of the contaminants at the Tutu Wells Site would result from implementation of this alternative. g:\aproject\tutu\pr0013.03Treports\tutufs.doc GERAGHTY & MILLER, INC. TUT' 007 2104 5-29 Short-term effectiveness is favorable as there would be little or no short-term impacts associated with implementation of GRA 1. Minimal short-term impacts, relating to decommissioning of the existing wells in the area, can be assumed. Personal protective equipment for workers would control exposure during implementation, if warranted. The time to implement this alternative would be approximately 12 months from the date all required approvals were obtained. Institutional controls may not be easily implementable and would involve considerable administrative time. The DPNR would be responsible for preventing unauthorized groundwater pumpage. The total cost for this alternative would be a combination of administrative costs associated with securing deed restrictions, the construction costs related to abandonment of the existing wells, and the commercial costs related to monitoring and laboratory testing. The estimated capital cost to implement GRA 1 is $15,000. The estimated present-worth value of the estimated cost to conduct groundwater monitoring over 30 years is $1,757,000. The total estimated cost is $1,772,000. The cost estimates presented do not include a cost for devaluation of property due to deed restrictions. The cost breakdown for the activities that comprise GRA 1 is presented in Table 5-8. g:\aproject\tutu\pfOO 13.037Veports\iutufs.doc GERAGHTY & MILLER, INC. TUT OO7 2105 5-30 5.3.2 GRA 2: Institutional Controls/Source Containment/POET Svstems/Treatment/Discharge This section describes GRA 2 and summarizes the evaluation based on the criteria established by the NCP. 5.3.2.1 Description of GRA 2 This remedial alternative involves implementing the following: • Implementation of deed restrictions related to future site usage and water supply well installation. • Installation of groundwater recovery wells for hydraulic control of contaminant sources. • Long-term monitoring of groundwater. • Installation of POET systems at selected existing supply wells. • Installation of a central treatment facility. • Discharge of treated groundwater to surface water via the storm sewer near the OHenry Dry Cleaners (see Figure 5-1). • Natural attenuation of the dissolved chlorinated VOC plume downgradient of the Smith and Matthias Supply Wells. g:\aproject\lutu\prOOl3.037\reports\tutufs.doc GERAGHTY & MILLER, INC. TUT 007 21O& 5-31 This remedial alternative proposes a methodology for hydraulic containment of the potential groundwater contamination source areas that exhibit the highest groundwater VOC concentrations, and incorporates ex-situ treatment of groundwater and discharge of the treated groundwater to surface water. The groundwater remediation proposed for GRA 2 consists of containing high- concentration portions of the existing chlorinated VOC plumes by providing source containment at the potential sources of groundwater contamination (i.e., the Curriculum Center area and the area proximate to OHenry Dry Cleaners) and allow selected private wells to pump utilizing POETs for treatment. The currently proposed SCPs at the Texaco Tutu Service Station and the Esso Tutu Service Station will provide source containment where BTEX constituents are the primary COCs. The source containment would provide hydraulic barriers around source areas, thus reducing COCs in other parts of the aquifer and potentially reducing the time to reach CGs in large portions of the Tutu Wells Site. The recovery well scheme that would be implemented in GRA 2 involves the use of the Source Recovery Wells pumping scenario described in Section 4.6.3.1 (Collection and Containment) (see capture zones for Recovery Wells RW-4 and RW-5 in Figure 4-10, with pumpage of selected private domestic and commercial wells). Pilot studies may be required to evaluate the most effective technologies for treatment. Pumpage for commercial potable supply would not be permitted. Selected wells equipped with POET systems would be allowed to pump for private use or for sale for non-potable uses. For the purposes of this FS Report, the supply wells assumed to have POET systems include the Four Winds I, Steele, LaPlace, Matthias, and Smith Supply Wells (see Table 4-12). These wells were selected because they are located in the center of the chlorinated VOC plumes and could therefore provide containment and removal of contaminants. This selection of supply wells for pumpage is preliminary; the final selection will be made by the USEPA and the DPNR if GRA 2 is selected. g:\aprojecttartu\pf0013.037\reporU\tutu&.doc GERAGHTY & MILLER, INC. TUT OO7 21O7 5-32 The remaining wells would be decommissioned and/or sealed. The Four Winds I Supply Well could pump at an average rate of 10 gpm; the remaining four wells would be allowed to pump at an average rate of 1.25 gpm each, equivalent to normal residential usage rates for each well. The total average pumping rate allowed in GRA 2 for supply wells is approximately 1 5 gpm. Effluent quality will be specified by the requirements of the permit to discharge to surface water. The treatment scheme that would be employed is illustrated on Figure 4-11. Figure 5-1 illustrates the conceptual layout for this GRA The total flow capacity of the treatment facility would be 55 gpm. A number of residential and commercial wells within the Tutu Wells Site would have to be decommissioned. Residential groundwater use in some areas could interfere with the hydraulic containment program and reduce the program's effectiveness in containing the impacted groundwater. In areas of the aquifer where groundwater is not anticipated to create adverse impacts to human health (i.e., in the area beyond the Delegarde Well and the deeper portions of the aquifer), natural attenuation is proposed. Active remediation of these portions of the aquifer will not decrease the time required to remediate the site and would increase remediation costs substantially. 5.3.2.2 Evaluation of GRA 2 This remedial alternative includes POET systems (which the USEPA does not consider to be an adequate long-term solution for the potential impact on human health) that are unfavorable for protection of human health. The USEPA considers POET systems to pose potential risks to consumers due to potential equipment malfunctions. The effectiveness of controlling off-site migration is contingent upon developing an effective containment program. g:\aprojectttutu\prOO 13.037\reports\tutufs.doc GERAGHTY & MILLER, INC. TUT 007 2108 5-33 This alternative has the potential for compliance with anticipated ARARs related to groundwater. Potential chemical-specific ARARs for discharge can be met through ex-situ treatment, and site constituent migration will be reduced by the proposed pumping of residential wells. Natural attenuation can, in time, allow portions of the aquifer to meet the potential chemical-specific ARARs for groundwater. The effectiveness of natural attenuation will be contingent on the effective capture of the residential well pumping. Geraghty & Miller anticipates that complete capture will not be accomplished through implementation of a residential well pumping program; therefore, GRA 2 may not protect human health off-site. The remedial alternative is essentially a pump and treat system, which is a proven long-term and permanent groundwater containment remedy at many CERCLA sites. The containment program has the potential to prevent some, but not all, off-site contaminant migration. Geraghty & Miller anticipates that source containment would result in an eventual decrease in constituent concentrations site-wide and would also guard against drawing groundwater contaminants with higher VOC concentrations toward groundwater with lower VOC concentrations, thereby minimizing contaminant migration. The use of POET systems with institutional controls may not be effective as a long-term or permanent remedy. The potential for off-site groundwater transport of contaminants may still exist, depending on the ability to utilize private wells and to coordinate their pumpage to hydraulically contain impacted groundwater. These factors suggest that long-term effectiveness and permanence may be limited. The reduction of toxicity, mobility, and volume would be moderate because effective source control would maximize constituent removal from groundwater, and intermittent pumping of residential wells equipped with POETs would also result in some reduction in the volume of COCs in groundwater. g:\aproject\tutu\pf0013.037\reports\lutufs.doc GERAGHTY & MILLER, INC. TU1 OO7 :109 5-34 Short-term effectiveness is moderately favorable; there would be minimal impacts related to implementation of recovery wells, POET systems, and a central treatment facility. The time to implement institutional controls and execute well abandonment would be moderate; however, additional time may be required for start-up of the recovery program and treatment system. Installation of POETs may be difficult to implement due to potential problems with installation on individual properties. Property would have to be secured for construction of the treatment systems, and access agreements for recovery wells would be required. A permit for discharge to surface water would be required, and time to construct a treatment system would be required. Personal protective equipment for workers would be used to control exposure during implementation, if needed. Administrative implementability may be difficult. Wells are owned by individual property owners, which may create a need for a significant amount of coordination to implement. It may be difficult to ensure that the unpermitted wells are not pumped and that the safe yield of the aquifer is not exceeded. Operation issues could be significant due to maintenance related to a treatment facility and the operation of individual property owner POET systems. The reliability of POET system technologies has proven satisfactory when used as an interim measure. Monitoring of the POET systems would involve periodic O&M requirements throughout the life of the remedial action, and the risk of exposure would be high if monitoring requirements were insufficient to detect system failures. Implementation time is estimated to be approximately 12 to 18 months from the date approvals for installation are obtained. The costs to implement this remedial alternative would consist of the administrative cost and the engineering, material, and installation costs of the collection, treatment, and discharge systems. There would also be O&M costs associated with operating the collection/treatment system, monitoring of the plume, and providing O&M for the POET systems. The estimated g:\aproject\tutti*pr0013.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT OO7 2110 5-35 capital cost to implement GRA 2 with the SCPs is $2,366,000 with an estimated total O&M present-worth cost of $7,793,000 and an estimated grand total of $10,159,000 (see Table 5-9). 5.3.3 GRA 3: Institutional Controls/Plume Containment/Treatment/Discharge This section describes and evaluates GRA 3, using the criteria established by the NCP. 5.3.3.1 Description of GRA 3 The following actions would be implemented: • Implementation of deed restrictions related to further site groundwater use. • Decommissioning of residential and commercial wells. • Installation of groundwater recovery wells for hydraulic control of plume migration. • Construction of a central groundwater treatment facility. • Discharge of treated groundwater to surface water. • Natural attenuation of dissolved plume downgradient of Recovery Wells RW-2 and RW-3, and below an approximate depth of 150 feet bis. g:\aproject\tutu\pr0013.037Veports\lutufs.doc GERAGHTY & MILLER, INC. TUT O07 2111 5-36 This remedial alternative proposes a methodology for hydraulic containment of the delineated plumes and incorporates ex-sttu treatment of groundwater and discharge of the treated groundwater to surface water. The proposed containment program would include the installation of Recovery Wells RW-1, RW-2, and RW-3 strategically placed to hydraulically contain plume migration (see Figure 4-10). Existing supply wells would be decommissioned to avoid influencing the containment program and to control unauthorized exposure to groundwater impacted by site constituents. Potable water would continue to be supplied as it is now. The containment program would be as described in Section 4.6.3.1 (Collection and Containment). Recovered groundwater would be collected and conveyed to a central treatment facility. Treatment of the groundwater for surface-water discharge would be accomplished using a treatment facility similar to the facility illustrated on Figure 4-11. The total flow capacity of the treatment facility would be 45 gpm. A number of residential and commercial wells within the Tutu Wells Site would have to be decommissioned. Residential and commercial groundwater use in some areas would counteract the hydraulic containment program and reduce the program's effectiveness in containing the impacted groundwater. Property acquisition would be required for the central treatment facility. Sufficient room would be needed to construct the facility and meet local ordinance set-back requirements. A site located in the vicinity of the southern plume containment wells is assumed. Such a location would be at a lower elevation when compared to the rest of the Tutu Wells Site, thus reducing pumping requirements. g:\aproject\tutu\pKH)13.037\reports\tutuf£.doc GERAGHTY & MILLER, INC. TUT O07 211.2 5-37 Natural attenuation is proposed for the portions of the plume where groundwater impacts exist southeast of Recovery Wells RW-2 and RW-3, and for groundwater below a depth of approximately 150 feet bis. The implementation of institutional controls could initially be as extensive as those proposed in GRA 1, but could be reduced later in the remedial action depending on the effectiveness of the GRA in meeting CGs. Unauthorized groundwater pumpage will have to be effectively controlled throughout the remedial action. A monitoring program of the same scope as proposed in GRA 1 would also be required with GRA 3. 5.3.3.2 Evaluation of GRA 3 This remedial alternative can adequately address the impact that the Tutu Wells Site will have on human health. Although the potential for unauthorized use of groundwater would still exist, implementation of institutional controls with a containment program would effectively eliminate the potential exposure pathways by which groundwater would present a health risk. With monitoring and adjustment, an effective containment program can be developed that would control off-site migration, thereby reducing the potential for off-site human health impacts. The portions of the plume where natural attenuation is proposed will be naturally remediated over time. Natural attenuation will effectively reduce COCs below concentrations that could cause impacts to human health or the environment. This alternative has the potential for compliance with anticipated ARARs related to groundwater. Potential chemical-specific ARARs for discharge can be met through ex-situ groundwater treatment. Site constituent migration will be reduced by plume containment. The effectiveness of natural attenuation in meeting chemical-specific ARARs downgradient of Recovery Wells RW-2 and RW-3 will be contingent on the effectiveness of plume capture. g:\aprojert\hitu\prfm3.037Veports\tutufiuioc GERAGHTY & MILLER, INC. TUT 007 2113 5-38 Location-specific and action-specific ARARs will be met with through engineering controls and proper implementation. Since there may be sources that would continue to be active under this scenario, h is likely that portions of the aquifer will never meet the MCLs for groundwater without treatment. The toxicity, mobility, and volume of impacted groundwater would be reduced through containment and pumping; however, the potential presence of DNAPL in the bedrock aquifer at the Tutu Wells Site could act as a continual source of groundwater contamination throughout the life of the remedial action. Short-term effectiveness is moderately favorable; there would be impacts related to implementation of the recovery wells and a central treatment facility. In addition, GRA 3 is not an optimal collection system because COCs will migrate from the source areas through the aquifer to the plume containment recovery wells. The time to implement institutional controls and execute well decommissioning would be moderate; however, the time required for start-up of the recovery program and treatment system is estimated to be approximately 12 to 18 months. Property would have to be secured for construction of the central treatment facility and access agreements for recovery wells would be required. Personal protective equipment for workers would be used to control exposure during implementation. The implementability of this alternative would be more similar to other options. A permit would be required for surface-water discharge of treated water. Unauthorized groundwater pumpage that would interfere with the effectiveness of this remedial system would need to be enforced. Approvals for discharge could take as long as 12 to 18 months to secure. The costs to implement this remedial alternative would consist of administrative cost and the engineering, material, and installation costs of the collection, treatment, and discharge systems. g:\aprojectMutu\pr0013.03Tireports\tutufs.doc GERAGHTY & MILLER, INC. TUT OO7 211.4 5-39 There would also be O&M costs associated with operating the collection/treatment system and monitoring of groundwater quality and the rate of attenuation. The capital cost to implement GRA 3 with the SCPs is approximately $2,357,000. The estimated total O&M present-worth cost estimated for GRA 3 and the SCPs is $6,143,000. The estimated grand total cost is $8,680,000 (see Table 5-10). 5.3.4 GRA 4; Institutional Controls/Source and Plume Containment/Treatment/ Discharge This section presents a description and evaluation of GRA 4, using the criteria established bytheNCP. 5.3.4.1 Description of GRA 4 The following actions would be implemented: • Implementation of deed restrictions related to further site groundwater usage. • Decommissioning of residential and commercial wells. • Installation of groundwater recovery wells for hydraulic control of plume migration. • Installation of groundwater recovery wells for hydraulic control of areas identified as potential source areas. g:\aproject\tutu\pfOO 13.037\reportsttutufe.doc GERAGHTY& MILLER, INC. TUT 007 2115 5-40 • Construction of a central groundwater treatment facility. • Discharge of treated groundwater to surface water. • Natural attenuation of dissolved plume downgradient of Recovery Wells RW-2 and RW-3, and below an approximate depth of 150 feet bis. This action proposes the containment of plume migration and hydraulic source containment in areas that are suspected of being sources of impacts to groundwater. The areas where source containment would be proposed are the Curriculum Center, Texaco Tutu Service Station, Esso Tutu Service Station, and OHenry Dry Cleaners. The Texaco Tutu Service Station and the Esso Tutu Service Station are being addressed through the implementation of the SCPs (see Figure 4-8). The other potential source areas would be addressed through the installation of source containment Recovery Wells RW-4 and RW-5. Migration of the plume will be addressed through the installation of plume containment Recovery Wells RW-1, RW-2, and RW-3 (see Figure 4-9). The source containment would provide hydraulic barriers around source areas, thus reducing COCs in other parts of the aquifer and would likely reduce the time to reach CGs in other large portions of the Tutu Wells Site. The plume containment wells will guard against the continued migration of COCs away from suspected source locations. The recovery well scheme that would be implemented is the Source and Plume Containment pumping scenario described in Section 4.6.3.1 (Collection and Containment). Recovered groundwater would be collected and conveyed to a central treatment facility; the treated water would be discharged to surface water. The total flow capacity of the treatment facility would be 100 gpm. Figure 4-11 presents a schematic of the treatment system. All private wells will be decommissioned within the Tutu Wells Site. g:\apfoject\tutu\pr0013.037\reportstotufs.doc GERAGHTY & MILLER, INC. TUT OO7 2116 5-41 Property acquisition would be required for the central treatment facility. Sufficient room would be needed to construct the facility and meet local ordinance set-back requirements. A site located in the vicinity of the southern plume containment wells is assumed. Such a location would be at a lower elevation when compared to the rest of the Tutu Wells Site, thus reducing pumping requirements. Natural attenuation is proposed for the portions of the plume where groundwater impacts exist southeast of the Recovery Wells RW-2 and RW-3, and for groundwater below a depth of approximately ISO feet bis. The implementation of institutional controls could initially be as extensive as those proposed in GRA 1, but could be reduced later in the remedial action depending on the effectiveness of the source area containment. Unauthorized groundwater pumpage will have to be effectively controlled throughout the remedial action. A monitoring program of the .same scope as proposed in GRA 1 would also be required. 5.3.4.2 Evaluation of GRA 4 This alternative can adequately address the impact that contaminated groundwater under the Tutu Wells Site will have to human health. The potential for unauthorized use of groundwater would still exist. Implementation of institutional controls with plume and source control would effectively eliminate the potential exposure pathways by which groundwater would present a health risk. Geraghty & Miller anticipates that plume and source containment would result in the most effective approach for reducing constituent concentrations site-wide and would also guard against g:\aproject\tutu\pi0013.037\reports\tiitu&.doc GERAGHTY & MILLER, INC. TUT O07 2117 5-42 drawing groundwater with a higher constituent concentration toward groundwater with lower constituent concentrations, thus minimizing contaminant migration within the Tutu Wells Site. The portions of the plume where natural attenuation is proposed will be naturally remediated over time. Natural attenuation will effectively reduce COCs below concentrations that could cause impacts to human health or the environment. This alternative has the potential for compliance with anticipated ARARs related to groundwater. However, if DNAPLs are present in the fractured bedrock, as is currently suspected, remediation of the aquifer as a whole to drinking water quality ARARs will not be feasible. The effectiveness of natural attenuation meeting chemical-specific ARARs downgradient of Recovery Wells RW-2 and RW-3 will be contingent on the effectiveness of plume capture. Location-specific and action-specific ARARs will be met through engineering controls and proper implementation. Since there may be sources that would continue to be active under this scenario, it is likely that portions of the aquifer will never meet the MCLs for groundwater without treatment. The toxicity, mobility, and volume of the impacted groundwater would be reduced. This GRA would be the most effective alternative in addressing this criterion. The effects of DNAPL that may be present in the bedrock aquifer would be reduced, and source containment should decrease the time required to reduce contaminant concentrations within most of the aquifer. Long-term effectiveness and permanency can be considered favorable. The dual containment program can guard against off-site contaminant migration and can reduce further impacts caused by source areas. Implementing this program may enable the eventual use of portions of the aquifer for water supply, although under specific institutional controls. A method of replacing this source may have to be implemented (e.g., continuing current alternate supply practices). g:\aprcgect\tutu\pr0013.037\reports\tutu£i.doc GERAGHTY & MILLER, INC. TUT OO7 21.18 5-43 Short-term effectiveness is moderately favorable. There would be minimal impacts related to implementation of recovery wells and the central treatment facility. The time required to implement institutional controls and execute well decommissioning would be moderate; however, the time required for start-up of the treatment system could take an estimated 12 to 18 months. The installation of recovery wells would be required. Due to the greater number of recovery wells, GRA 4 would be more expensive than GRA 2 or GRA 3. Well development and monitoring would be required to ensure the effective capture of groundwater. A permit for discharge to a surface water would be required and construction time could be longer than for GRA 2 or GRA 3 due to the additional number of recovery wells and the additional piping that must be installed. Properties would have to be secured for construction of the treatment system, and access agreements for recovery wells would be required. Personal protective equipment for workers, if needed, would control exposure during implementation. Assuming this procedure is used, the estimated time to implement this alternative would be approximately 12 to 18 months. Implementability would not be favorable as this GRA has the potential for the most significant administrative requirements. Discharge permits could take 12 to 18 months to secure. This alternative also places the greatest withdrawal demand on the Tutu aquifer and may create upconing of mineralized water in areas of the aquifer. Therefore, pre-design studies must carefully optimize required pumping rates. The costs to implement this remedial alternative would consist of administrative costs, and engineering, material, and installation costs related to the collection/containment/treatment and discharge systems. The costs for GRA 4 would tend to be higher than for other groundwater remedial alternatives due to the increased amount of materials and installation required. g:\aproject\tutuVr0013.037Veports\lutufs.doc GERAGHTY & MILLER, INC. TUT 007 2119 5-44 The capital cost to implement GRA 4 with the SCPs is approximately $3,175,000. The estimated total O&M present-worth cost estimated for GRA 4 and the SCPs is $7,328,000. The estimated grand total cost is $10,503,000 (see Table 5-11). 5.4 COMPARATIVE ANALYSIS OF ALTERNATIVES In Section 5.1 (Evaluation Criteria), Section 5.2 (Development and Evaluation of Remedial Alternatives for Soil) and Section 5.3 (Development and Evaluation of Remedial Alternatives for Groundwater), Geraghty & Miller assembled and evaluated the SRAs and GRAs with respect to their conformance with the seven evaluation criteria established by NCP guidance. The results of the evaluations of SRAs are summarized in Table 5-1, and the results of the evaluations of GRAs are summarized in Table 5-2. This section describes the results of the evaluations conducted and provides a recommendation for a preferred remedy for each of the seven criteria evaluated and listed in Section 5.1 (Evaluation Criteria). 5.4.1 Protection of Human Health and the Environment The protection of human health and the environment is one of two threshold criteria that must be complied with for the effective implementation of a remedial alternative. The remedy that is implemented must minimize impacts to human health and the environment. All of the SRAs, except for SRA 1 (No Action/Institutional Controls) which cannot meet the requirements of this criterion, are effective in complying with this criterion. Treatment of the impacted soil (as with SRA 3 or SRA 4) would be preferred because removal of the soil (as in SRA 5) removes the contaminants, but it does not necessarily reduce the contaminant volume. SRA 2 (Institutional Controls/Capping) does not involve implementing a treatment technology; it mitigates migration and exposure. SRA 2 does not reduce the contaminant volume. Therefore, g:\aproject\tutu\prOO 13.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT 007 212O 5-45 either SRA 3 or SRA 4 should be considered the preferred remedy for compliance with protection of human health and the environment. Of the GRAs considered, GRA 2, GRA 3, and GRA 4 will meet this criterion as long as recovery well capture zones are effective and institutional controls are effectively enforced. If effective capture is not obtained, these remedies will not be folly protective of human health, especially if natural attenuation does not alleviate the remaining groundwater contaminants. Therefore, the alternative that provides the most effective capture of impacted groundwater would be considered the preferred remedy under this criterion. GRA 4 will provide the maximum protection of human health and the environment because it provides the maximum capture of impacted groundwater by implementing both plume and source containment. Implementing source containment will hopefully expedite the remediation of other portions of the aquifer and make these portions of the aquifer useable some time in the future. 5.4.2 Compliance with ARARs Compliance with ARARs is the second threshold criterion (along with protection of human health and the environment), that must be achieved by a remedial alternative. Compliance with ARARs relates to a remedy's ability to comply with chemical-, action-, and location-specific criterion for implementation of a particular remedy. It also refers to the ability of a remedy to meet other potentially applicable criteria, advisories, or guidance. The most important ARARs for evaluation of SRAs include the SSLs which are the preliminary CGs and the RCRA LDRs. The SSLs are actually TBCs rather than ARARs because these are guidance values for soil developed by the USEPA (CDM Federal Programs 1995b). The RCRA LDRs are also important, especially when considering excavation and off-site disposal as a remedial alternative. Other ARARs, mainly associated with permitting (i.e., permit applications and administration, air and water discharge g:\aproject\tutu\prOO 13.037\reportsttutufs.doc GERAGHTY6? MILLER, INC. TUT 007 2121 5-46 limits), can be achieved though proper administration and engineering controls (i.e., treatment system design). SRA 1 and SRA 2 do not comply with the SSLs because soil contaminant levels are not reduced below SSLs. The RCRA LDRs are not applicable to SRA 1 and SRA 2 because no soil removal is involved in these SRAs. SRA 3, SRA 4, and SRA 5 can comply with the SSLs. Excavation and disposal proposed in SRA 3, SRA 4, and SRA 5 can comply with the RCRA LDRs. Compliance with potential ARARs can be accomplished with all the SRAs except for SRA 1 and SRA 2. SRA 1 takes no action and SRA 2 reduces exposure and contaminant migration pathways via capping, but SRA 1 and SRA 2 do not reduce the contaminant levels in soil. SRA 3 and SRA 4 can comply with this criterion by reducing the toxicity or volume of impacted soil; SRA 5 can comply with this criterion by removing impacted soil from the site and disposing the impacted soil in a permitted hazardous waste disposal facility. A preferred remedy would maximize contaminant reduction and volume and not relocate soil from one area to another without treatment. Therefore, SRA 3 and SRA 4, which provide for contaminant reduction, would be the preferred soil remedies for this criterion. The ARAR requirements for groundwater involve the ability of a remedy to comply with applicable discharge treatment criteria and regulations. The most important ARARs for the evaluation of the GRAs are MCLs, TPDES permit requirements, and protection of wetlands. The MCLs are the preliminary CGs for groundwater, the MCLs are also used as preliminary discharge limit requirements for the proposed treatment systems. If MCLs are met in the treated water discharge, TPDES discharge limits for surface-water discharge should also be achieved. Depending on the final TPDES permit requirements, the discharge limits may be less stringent than MCLs. A possible wetland area has been identified in the southeast comer of the study area by the USEPA g:\aproject\tutu\pr0013.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT 5-47 Surface-water discharge rates will need to be evaluated to determine if an unacceptable water-level rise could impact the wetlands. Preliminary evaluation indicates that the large size of the drainage basin relative to the potential increased surface-water flow should result in little or no hydraulic impact. However, a more detailed analysis will be required as part of the pre-design activities. All the GRAs can comply with the potential ARARs except for GRA 1 (No Action/Institutional Controls). The containment treatment schemes proposed have the ability to meet the anticipated ARARs. Because GRA 4 is the most aggressive groundwater recovery scenario, GRA 4 is the preferred alternative to attempt to achieve MCLs in the aquifer. 5.4.3 Short-Term Effectiveness Short-term effectiveness evaluates the effectiveness of a remedy in protecting human health and the environment during implementation of the remedy. The least obtrusive remedies causing the least disturbance would be the most responsive to this criterion. The SRA that is responsive to the RAOs and would comply with this criterion the best is SRA 2 (Institution Controls/Capping). In-situ treatment of impacted soil will minimize the fugitive emissions caused by installation of the remedy and will reduce the off-site impacts related to the remedial action. This will result in a greater ability to control exposure to potentially hazardous conditions. Minimizing excavation and transport of impacted soil will also minimize the off-site impacts due to fugitive emissions or potential accidental releases. Therefore, SRA 2 would seem to be the most responsive to this criterion. All of the GRAs can comply with this criterion with the implementation of engineering controls or safety equipment. However, GRA 1 is not responsive to the RAOs for the site and would not be implementable due to non-compliance with other NCP criteria. The most effective remedy to address this criterion would be the remedial action that is responsive to RAOs and g:\aproject\tutu^pr0013.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT O07 2123 X——N. 5-48 minimizes the amount of construction or disturbance that is required for installation. Therefore, GRA 2 would seem to be the most effective GRA at addressing this criterion. The construction related to GRA 3 and GRA 4 is greater than GRA 2, thus creating more potential for impacts to workers and residents in the area. 5.4.4 Long-Term Effectiveness Long-term effectiveness relates to the ability of a remedy to reduce the risks associated with the potential for exposure, the impacted media at the site, and the adequacy of the remedy in managing or minimizing the residual risk after the remedial action is complete. In areas where DNAPL may be present in bedrock, the long-term effectiveness of a remedy may not be accomplished due to the inefficiencies of locating and removing DNAPLs in bedrock. The SRA that is responsive to the RAOs and would comply with this criterion would also be the most reliable in terms of compliance with RAOs in the future. SRA 1 does not meet the RAOs established for the site. The SRA that addresses this criterion is a remedy that either removes or reduces impacted soil volume from the site. SRA 3, SRA 4, and SRA 5 all provide this reliability. SRA 2 is effective at minimizing the transport of impacted soil or leaching of contaminants; however it requires maintenance and does not totally eliminate potential future exposure. The actual preferred remedy for this criterion would be based on the effectiveness of treatment methods that cannot be anticipated until pilot testing is completed at each respective property. SRA 5 involves the removal of the soil off-site, eliminating the soil source areas from the property. The removal of impacted soil in SRA 5 will be limited by building foundations and it is likely that not all of the impacted soil can be removed. Therefore, it would seem be the most favorable remedies for complying with this criterion are SRA 3 and SRA 4. This is contingent on the effectiveness of each alternative in meeting the CGs. g:\aprojed\mtuV0013.037\reports\tutufs.doc GERAGHTY & MILLER, INC. TUT OO7 2124 5-49 The most effective remedy to address this criterion for groundwater would be the remedial action that is responsive to RAOs and provides the best potential for remediation of the aquifer. Therefore, GRA 4 (Source and Plume Containment) would seem to be the most effective GRA at addressing this criterion because GRA 4 will provide the maximum protection of human health and the environment and will provide both plume and source containment. GRA 4 will also remove the most impacted groundwater, thus increasing the amount of mass that can be removed. 5.4.5 Reduction in Toxicitv, Mobility, and Volume To comply with this criterion, treatment or reduction in contaminant volume must be provided. The soil remedies that provide treatment of impacted soil are SRA 3 and SRA 4. The other SRAs considered either do not address the RAOs for the site or do not provide treatment. Of the two remedies that provide treatment, SRA 4 has the most potential for reducing COCs in soil because soil would be treated in an engineered environment for contaminant reduction rather than in situ. Therefore, SRA 4 would be the most responsive SRA to this criterion. The most responsive GRA to this criterion would be the one that extracts and treats the most impacted groundwater. This maximizes the reduction in toxicity, mobility, and volume. GRA 4 is the most active GRA remedy related to groundwater removal and treatment, and therefore would be the most responsive GRA to this criterion. 5.4.6 Implementabilitv Implementability deals with the technical and administrative feasibility of implementing an alternative and the ease with which a remedy can be implemented. Those remedies that can be g:\aproject\tutu\pr0013.037Veportsttutufs. doc GERAGHTY & MILLER, INC. TUT OO7 2125 5-50 controversial or heavily regulated would be difficult to implement. Implementability also involves the associated ease of construction and operations or simplicity of the installation and operations. The SRA that addresses this criterion the most effectively is the remedy that is anticipated to be the least administratively burdensome, the least controversial, and the most technically feasible option. Therefore, the remedy that 1) minimizes the permitting requirements, 2) is most reliable, and 3) minimizes the impacts to residents in the area will be the most administratively implementable. Of the SRAs evaluated, SRA 2, SRA 3, SRA 4, and SRA 5 are all implementable. From an administrative perspective, the actual preferred remedy relating to this criterion would be SRA 3 because it minimizes excavation of impacted soil and also minimizes the required transportation of impacted soil through residential areas for off-site disposal. From a technical perspective, the most effective SRA would be SRA 4. The GRA that would seem to be the most implementable would be GRA 3. This GRA is the least obtrusive as it minimizes the amount of impact to the area. The treatment system design for GRA 3 would be more simple to operate, as it would entail the lowest flow rate, and would require the least amount of equipment and materials to implement. 5.4.7 Cost The remedial alternative that addresses the RAOs for the site and is the most cost-effective will be the most responsive to this criterion. Table 5-12 presents a comparative summary of costs. Of the SRAs considered, the most cost-effective based on the assumptions provided in Appendix C is SRA 2 (excluding SRA 1 which does not meet the threshold criteria). Of the GRAs considered, the most cost-effective alternative based on the assumptions provided in Appendix C is GRA 3 (excluding GRA 1 which does not meet the threshold criteria). g:\aproject\tutu\prOO 13.037Veports\iutufs.doc GERAGHTY & MILLER, INC. TUT O07 m1 6. PRE-DESIGN ACTIVITIES Several pre-design activities must be completed before the selected remedy can be implemented. Some of the additional data that will be needed prior to implementing the selected remedy are described below. Work plans for pre-design sampling and testing and treatability studies should be submitted to the USEP A and DPNR for review. 6.1 PRE-DESIGN ACTIVITIES FOR SOIL REMEDIATION Although a significant amount of data has been gathered to characterize the Tutu Wells Site, little engineering design data exist that can be used to determine the design parameters for the proposed SVE systems or for the proposed treatment facility. Prior to implementing SVE at any of the properties where it is proposed, additional soil sampling (rock sampling at the Curriculum Center), soil-gas sampling, and pilot testing should be conducted to ensure that the SVE systems will work effectively. Air permeability testing of the subsurface to determine soil permeability for SVE is suggested. This testing should consist of establishing a vacuum on a monitoring well while the air pressure fluctuations in nearby wells or other subsurface vacuum measuring points are measured. Additional delineation of soil contamination is needed at two locations. First, the extent and source of the shallow oily gravel layer and its relationship with the buried PVC pipe west of the Four Winds Plaza and Western Auto should be determined. Second, soil borings should be advanced at the center of the high chlorinated VOC soil gas readings north of the building and through the floor slab in the northwest and west-central portions of the Curriculum Center (former Laga building) to determine the extent of chlorinated VOCs in the subsurface in these areas. Sampling of abandoned floor piping inside the building indicated high concentrations of PCE (approximately 30 percent PCE). This fact, in conjunction with known previous dry cleaning operations in the northwest corner of the building and the distribution of chlorinated VOCs in groundwater, indicate that a source of contamination may exist under the building. This source GERAGHTY & MILLER, INC. 6-2 should be delineated to determine the extent of contamination, to determine the potential for continuing releases, and to evaluate appropriate remedial actions (if necessary). Prior to the implementation of any remedial actions for soil, confirmatory sampling should be performed. Bioremediation (especially of BTEX constituents) will continue under natural conditions. Sampling prior to remedial action will address the following objectives: • Confirm the need for remedial action. • Determine soil concentrations prior to remedial action. • Provide additional delineation of the extent of impacted soil. • Provide data for comparison with post-remedial sampling to evaluate the effectiveness of the remedial action. 6.2 PRE-DESIGN ACTIVITIES FOR GROUNDWATER REMEDIATION If air sparging or biosparging is selected for groundwater remediation, treatability studies will be needed to determine the following: • The potential effectiveness of this technology. • Air injection rates that can be achieved. • The radius of influence that can be achieved (to determine sparging well spacing). g:\aproject\hrtu\prOO 13.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT OO7 213O O 6-3 Prior to final design of a groundwater recovery (or extraction) system, it may be necessary to install and monitor additional wells to further define the following: • The horizontal component of groundwater flow and contaminant trensport. • The horizontal and vertical extent of contamination. • The hydraulic characteristics of the aquifer in the areas of recovery or extraction. The number of recovery wells and their locations presented in this FS Report are preliminary and may be modified and optimized based on updated pre-design data. During pre- design, it may be necessary to use a predictive model to simulate the movement of groundwater and contaminants under various extraction well scenarios (e.g., number of wells, rates of extraction). Once a groundwater recovery system is designed, it may be necessary to install additional wells to monitor the effectiveness of groundwater recovery (i.e., capture zones). Once the recovery or extraction wells are installed, pumping tests will be needed to determine their yield and the concentrations of contaminants in the recovered groundwater. 6.3 PRE-DESIGN ACTIVITIES FOR TREATMENT SYSTEMS The treatment systems used for groundwater and SVE will require more specific data regarding influent concentrations and to evaluate the need for a treatment component for the air discharge is necessary. A discharge monitoring plan should be prepared for air discharges and treated water discharges. An assessment of the potential impacts on a USEPA-identified wetland may be a necessary component of the discharge to surface-water permit application. An evaluation g:\aproject\tutu\pr0013.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT 007 2131 6-4 of the potential magnitude of water-level rise and associated hydraulic impact of the discharge on the wetland may be needed. If a potentially significant water-level rise is predicted, a delineation of the wetland may be necessary. A preliminary review of the drainage basin characteristics seems to indicate that no detrimental impact would be created; this may need to be further evaluated during the permit application. Groundwater containment and treatment facility design will require installation of test recovery wells and aquifer pumping tests to determine the actual zones of hydraulic capture and the number and spacing of the recovery wells needed. In addition, pilot testing may needed to evaluate the effectiveness of the proposed technologies for treating groundwater contamination. Property acquisition, as discussed in Appendix C, will be required for a site for the construction of a central treatment facility. Figure 5-1 shows a conceptual layout for piping and the treatment system. A site evaluation would be required to find the most appropriate location. Additional evaluation of natural inorganic groundwater concentrations may be needed. The existing groundwater at the Tutu Wells Site has high naturally occurring concentrations of inorganic parameters not related to the COCs at the site (e.g., TDS, manganese, iron, and chloride). These inorganic parameters could also impact the overall operations of the central treatment facility due to the potential need for pretreatment (e.g., precipitation of metal oxides or salts). The need for sequestering agents to address this concern will have to be confirmed during the pre-design activities. Actual influent data from pumping tests and a pilot study will be needed to provide final design requirements for the central treatment facility. g:\aproject\tutai\prOO 13.037Veports\tutufs.doc GERAGHTY & MILLER, INC. TUT O07 2132 7. REFERENCES Camp, Dresser & McKee (CDM) Federal Programs Corporation. 1992. Letter to C. Kwan, U.S. Environmental Protection Agency. Re: Technical Memorandum I. April 24,1992. Camp, Dresser & McKee (CDM) Federal Programs Corporation. 1995a. Final Endangerment Assessment, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. 3 Volumes, EPA Work Assignment No. 073-2P1D, Contract No. 68-W9-0024. January 12, 1995. Camp, Dresser & McKee (CDM) Federal Programs Corporation. 1995b. Final Report - Estimation of Soil Cleanup Concentrations Required to Protect Groundwater as a Source of Drinking Water, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Work Assignment No. 073-2P1D. Document Control No. 7720-073-FR-CGTV. July 11,1995. Cooper Environmental, Inc. 1993. Site Investigation Report, Ramsay Motors, Tutu, St. Thomas, U. S. Virgin Islands. CEI Project No. 92115. December 8,1993. Department of Conservation and Cultural Afiairs, St. Thomas, Virgin Islands. 1979. Environmental Laws and Regulations of the Virgin Islands. Reprinted from Titles 12 and 19 of the Virgin Islands Code and the Virgin Islands Rules and Regulations. ENSR Consulting and Engineering (ENSR). 1994. Four Winds Plaza, Western Auto, St. Thomas, U. S. Virgin Islands, Closure Report for Underground Storage Tanks. Document Number 7218-001-200. June 1994. Erler & Kalinowski, Inc. (EKI). 1995a. Groundwater arid Soil Remediation Program for Texaco Tutu Service Station, St. Thomas, U.S. Virgin Islands. April 13,1995. Erier & Kalinowski, Inc. (EKI). 1995b. Technical Memorandum I, Basis for Design of the Groundwater and Soil Remediation, Source Control Program, Texaco Tutu Service Station, St. Thomas, U.S. Virgin Islands. June 1995. Forensic Environmental Services, Inc. (FES). 1995. (See Appendix B, page 2) Geraghty & Miller, Inc. 1983. Report on Current Groundwater Conditions in the U.S. Virgin Islands. Prepared for the U.S. Virgin Islands Department of and Cultural Affairs, April 1983,80pp. Geraghty & Miller, Inc. 1992a. Tutu Service Station Investigation Work Plan, St. Thomas, U.S. Virgin Islands. March 1992. Geraghty & Miller, Inc. 1992b. Technical Memorandum I, Tutu Service Station Investigation, St. Thomas, U.S. Virgin Islands. April 1992. GERAGHTY USEPA's Vadose Zone Model - To-Be-Considered Material Soil Cleanup Concentration Proposes guidance levels to evaluate potential impacts to ground water quality from constituents in soil. Yes Constituents detected in soil at investigated properties will be compared to soil screening levels as remedial action levels to determine if remediation is potentially warranted and will be used to develop remediation goals (CDM Federal Programs Corporation 1995b). CFR Code of Federal Regulations. MCLs Maximum Contaminant Level. USEPA United States Environmental Protection Agency. GERAGHTY & MILLER, INC. r;o Table 3-5. Summary of Potential U.S. Virgin Islands Location-Specific Applicable or Relevant and Appropriate Requirements, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Requirement Applicable or Relevant and Appropriate Requirements Comments Water Resources Conservation VIC, Title 12, Chapter 5, Sections 151 and 153 Water conservation required to protect natural resources. Requires a permit for well installation or changes. Yes Remedial activities under consideration may require the installation of extraction wells. Environmental Protection VIC, Title 12, Chapter 13, Section 533 Requires an "earth change plan" before land is cleared, graded, filled, or otherwise disturbed. Yes Portions of the Tutu Wells Site may require capping, regrading, or excavation to implement remedial activities. Coastal Zone Management VIC, Title 12, Chapter 21, Section 903 Limits activities with the U.S. Virgin Islands Coastal Zone to protect marine resources. No The Tutu Wells Site is not within an area designated a coastal zone. VIC Virgin Islands Environmental Code (USVI/DCCA 1979). en •••-i G:\APROJECT\TUTU\PR0013.037\DATAWILSARAR.XLS GERAGHTY & MILLER, INC. O Table 3-6. Summary of Potential U.S. Virgin Islands Action-Specific Applicable or Relevant and Appropriate Requirements, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Requirement Applicable or Relevant and Appropriate Requirements Comments Water Pollution Control VIC, Title 12, Chapter 7, Sub-Section 184, Division 3 Requires any person proposing to commence a discharge of pollutants to complete a TPDES application. Yes Discharge of treated groundwater to the Turpentine Run may be considered. Air Pollution Control VIC, Title 12, Chapter 9, Section 206-20 Requires permitting of controlled air discharges to atmosphere. Sewaoe Disposal VIC, Title 19, Chapter 55, Section 1522-4 Regulates waste that may be disposed to a sanitary sewer. Yes Yes Equipment related to remedial action will emit air pollutants. Remedial activities under consideration will discharge off-gas to the air (i.e., air stripping). A potential discharge option is to the local POTW. H i— *— Oo ••-J Water Resources Conservation VIC, Title 12, Chapter 5, Sections 151, 155, 156, 159 Requires a permit for withdrawal of water in excess of 500 gpd (regulates groundwater pumpage). Yes Remedial activities under consideration may involve withdrawal of groundwater in excess of 500 gpd. VIC Virgin Islands Environmental Code. TPDES Territorial Pollution Discharge Elimination System. POTW Publicly owned treatment works. gpd Gallons per day. GERAGHTY & MILLER. INC. —i Table 3-7. Summary of Potential U.S. Virgin Islands Chemical-Specific Applicable or Relevant and Appropriate Requirements, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Requirement Applicable or Relevant and Appropriate Requirements Comments Drinking Water Standards VIC, Title 19, Chapter 51, Section 1303-16 Establishes maximum contaminant levels for drinking water supplies. Yes Remedial activities under consideration may provide potable water to residents and commercial users. VIC Virgin Islands Environmental Code. -0 g:\aproject\tutu\pr0013.037\data\VICSARAR.XLS GERAGHTY & Mil ,LER, INC. o Page 1 of 9 Table 3-8. Summary of Analytes Detected in Groundwater Above Remedial Action Levels at the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Parameter Volatile Organic Compounds Vinyl chloride 1 , 2-Dichloroethene(total) * 1 ,2-Dichloroethane Trichloroethene RAU Well (ug/L) Designation 2 MW-3 MW-15 MW-16 TT-3D TT-5 100 CHT-7D DW-1 La Place** MW-1 MW-1D MW-3 MW-4 MW-6D MW-7 MW-8 MW-10 MW-10D MW-15 MW-16 Steele** Tillett TT-2 TT-2FR TT-3D TT-5 5 TT-1 5 MW-1 MW-1D MW-3 MW-4 MW-6D MW-7 MW-8 MW-10 MW-10D MW-12D MW-15 MW-16 MW-1 7 MW-21D OHMW-4 Smith Tillett TT-2 TT-2FR TT-3D Concentration (ug/L) 5/94 6/94 48 260 D 1 300 9 J 42 91 92 J 95 950 D 500 440 D -- 76 J 100 180 88 J 76 J 110J 1 500 D 2100 100 360 D 330 330 280 180 290 78 71 17 J 6 J 11 27 10 J 1 8 J 14 J 9 J - 23 72 J 9 J 14 J 16 19 J 45 20 J 20J 15 J 7/94 „ - - - - „ - - - - - - - - - - - - - -- -- - - - - -- _ - -- - -- - - — — - - -- — - - ' - - - — See last page for footnotes. G:\APROJECT\TUTU\PRO013.037\DATA\MCL.XLS GERAGHTY & MILLER, INC. TUT OO7 216O Page 2 of 9 Table 3-8. Summary of Analytes Detected in Groundwater Above Remedial Action Levels at the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. RAL Well Parameter (ug/L) Designation Volatile Organic Compounds (continued) Benzene 5 CHT-3 KFC-1 MW-5 MW-7 SW-2 SW-3 SW-7 SW-7 FR TT-1 TT-1D TT-4 Tetrachloroethene 5 CHT-6D CHT-7D Delegarde DW-1 DW-2 MW-1 MW-1D MW-3 MW-4 MW-4D MW-6D MW-6R MW-7 MW-8 MW-10 MW-10D MW-12D MW-1 3D MW-1 5 MW-1 6 MW-1 7 MW-20D MW-21D MW-25 OHMW-1 OHMW-2 OHMW-3 OHMW-4 Ramsay Smith SW-4 Concentration (ug/L) 5/94 6/94 1700 110J 460 DJ 21 550 J 10000J 99 J 110J 21 000 D 1700D 21000 12 36 15 J 42 J 18 330 D 360 56 20 J 17 J 31 10 130 38 J 34 J 48 J ——— 33 J 28 J 120 71 J 37 22 J -- 45 J 11 10 26 6 J 140 11 110J 15 J 7/94 „ - - - - — — - - - - _ — - — - - - — - — - - - — — — .. - — — — -- - - — — — - - - — See last page for footnotes. G:\APROJECT\TUTU\PR0013.037\DATA\MCL.XLS GERAGHTY & MILLER, INC. TUT O07 2161 Page 3 of 9 Table 3-8. Summary of Analytes Detected in Groundwater Above Remedial Action Levels at the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. RAL Parameter (ug/L) Volatile Organic Compounds (continued) Tetrachloroethene (continued) 5 Toluene 1 000 Ethylbenzene 700 Xylenes (total) 10000 Inorganic Compounds/A nalytes Aluminum 50 to 200 Well Designation Tillett TT-2 TT-3 TT-3D SW-3 TT-1 TT-4 CHT-3 MW-5 SW-3 TT-1 TT-4 SW-3 TT-1 Four Winds II FR»* Harvey** CHT-7D Delegarde Gassett** MW-1 MW-6R MW-7 MW-8 MW-9S MW-10 MW-10D MW-1 ID MW-12D MW-1 5 MW-1 7 MW-24 MW-25 OH MW-1 OHMW-2 OHMW-3 OHMW-4 Smith SW-5 SW-6 5/94 180 - - - __ - - — - - — - „ - _ - - 1890 B 154 B - - - - 2050 956 160B 147 B 93.9 - - - - 245000 8970 60000 356000 60.9 B 12100 14500 Concentration (ug/L) 6/94 — 90 91 23 3200 J 1 6000 D 17000 1800 D 760 DJ 4100 J 3700 D 3300 J 22000 J 1 8000 D _ - 118B - -- 1 8600 J 46400 10300 28700 - - - - - 3730 J 33000 J 41 60 15800 - -. — - - - -- 7/94 „ — - -- __ -- - — -- -- — -- .. -- 63.1 B 111 B - -- - - - -- -- - - - - - - - - — — - — - - - — See last page for footnotes. G:\APROJECT\TUTU\PR0013.037\DATA\MCL.XLS GERAGHTY & MILLER, INC. TUT OO7 »162 Page 4 of 9 Table 3-8. Summary of Analytes Detected in Groundwater Above Remedial Action Levels at the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. RAL Parameter (ug/L) Inorganic Compounds/Analvtes (continued) Aluminum (continued) 50 to 200 Antimony 6 Arsenic 50 Barium 2000 Beryllium 4 Chromium 1 00 Well Designation TT-1 TT-1D TT-2 TT-5 DW-1 DW-2 Four Winds II «* KFC-1 MW-1 MW-2 MW-3 MW-4 MW-5 MW-6D MW-7 MW-1 3D MW-1 8 MW-21D MW-22D OHMW-1 OHMW-3 SW-2 SW-3 SW-7 SW-7FR TT-1 TT-3D VIHA 1 ** OHMW-2 MW-1 3D OHMW-4 MW-1 3D DW-2 MW-1 MW-2 MW-6R MW-7 MW-8 MW-1 3D MW-1 7 OHMW-1 OHMW-3 OHMW-4 5/94 __ — - - - 1490 — - • - - - - - - - - - - - 16.1 B 50.7 B - - — — - - - 80.8 „ 4320 - 628 - - - - - - - 2200 4610 397 Concentration (ug/L) 6/94 6130 J 153 B 1090 J 787 J 300 - „ 18.6 BJ 17.6 B 15B 17B 20.1 B 20.1 B 25.3 B 21.3 B 424 B 20.6 B 19.6 B 22.3 BJ — — 15.4BJ 16.4BJ 19.2 BJ 17.6 BJ 19.7 B 19 B - - 4400 B - 40.8 B _ 453 619 203 1050 210 4300 238 — - — 7/94 __ - - - - - 22 B - - - -- - - -- - - - — - — - - - - - - 20.6 B - ._ - - _ - - - -- - - - - - — See last page for footnotes. G:\APROJECTVTUTU\PRO013.037\DATA\MCL.XLS GERAGHTY & MILLER, INC. TUT 007 2163 Page 5 of 9 Table 3-8. Summary of Analvtes Detected in Groundwater Above Remedial Action Levels at the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. RAL Well Parameter (ug/L) Designation Inorganic Compounds/Analvtes (continued) Copper TT MW-13D OHMW-4 Iron 300 Delegarde DW-1 Gassett** Harvey** DW-2 KFC-1 MW-1 MW-1D MW-2 MW-3 MW-4 MW-4D MW-5 MW-6R MW-7 MW-8 MW-9S MW-10 MW-10D MW-11D MW-12D MW-1 3 MW-1 3D MW-1 5 MW-1 7 MW-1 8 MW-1 9 MW-20 MW-20D MW-21D MW-24 MW-25 OHMW-1 OHMW-2 OHMW-3 OHMW-4 SW-2 SW-3 SW-4 SW-5 SW-6 SW-7 Tillett TT-1 TT-1D TT-2 TT-5 5/94 - 1370 41 20 J - 300 - - — - - - - - - - - - - 3760 1410 607 323 334 — — - - - -- - - - - - 338000 15700 1 54000 572000 - - - 18600 20300 J - 530 - - - . Concentration (ug/L) 6/94 1730 J - „ 1150 - - 3100 80000 J 25600 10500 19900 3830 7590 1440 5730 56900 44800 49700 - — - , - 3670 378000 5360 43500 68500 J 3420 J 23900 37800 19400 6890 30500 - — - — 14100 J 108000 J 5140 - — 1 4800 J - 7810 515 2320 1130 7/94 - - — - - 2500 - - - - — - - - - - - - - - - - - - - - — - - - - - - - - - - ' - - — - — - - - - — — See last page for footnotes. G:\APROJECT\TUTU\PR0013.037\DATA\MCl.XLS GERAGHTY & MILLER, INC. TUT OO7 2164 Page 6 of 9 Table 3-8. Summary of Analytes Detected in Groundwater Above Remedial Action Levels at the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. RAL Well Parameter (ug/L) Designation Inorganic Compounds/Analvtes (continued) Lead TT Gassett MW-1 MW-9S MW-1 8 MW-20 MW-20D OHMW-1 OHMW-2 OHMW-3 OHMW-4 SW-3 SW-7 SW-7FR Manganese 50 CHT-7D Delegarde Four Winds II » * Four Winds II FR*" Harvey*" DW-2 KFC-1 MW-1 MW-1D MW-2 MW-3 MW-4 MW-4D MW-5 MW-6R MW-7 MW-8 MW-9S MW-10 MW-10D MW-12D MW-1 3 MW-1 3D MW-1 5 MW-1 6 MW-1 7 MW-1 8 MW-1 9 MW-20 MW-20D MW-21D MW-24 MW-25 5/94 167 - 53.7 - - - 48.3 201 17.3 71.8- - - — 163 B - 267 620 - - -- - - - - - -- — — 2560 597 216 114 - . — — — - - - - - - — Concentration (ug/L) 6/94 — 27.1 J — 27.4 16 20 - - - - 143 70.8 93.8 J 282 - - - - - 1030 J 570 338 366 2540 1290 55.1 1080 736 453 2350 - - - — 110 20400 149 532 1550 3740 J 72.6 J 997 1140 402 215 982 7/94 — - - - - — - - - - - - -- .. - 125 119 - - - - - - - - - - - — - - - - — — — - - - -- - - - - - — See last page for footnotes. G:\APROJECT\TUTU\PR0013.037\OATA\MCL.XLS GERAGHTY & MILLER, INC. TUT OO7 Page 7 of 9 Table 3-8. Summary of Analytes Detected in Groundwater Above Remedial Action Levels at the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. RAL Parameter (ug/L) Inorganic Compounds/Analvtes (continued) Manganese (continued) 50 Mercury 2 Nickel 100 Thallium 2 Chloride 250,000 Total Dissolved Solids 500,000 Well Designation OHMW-1 OHMW-3 OHMW-4 SW-2 SW-3 TT-1 TT-1D TT-2 TT-4 TT-5 OHMW-1 MW-4D DW-2 MW-1 MW-2 MW-6R MW-7 MW-8 MW-10D MW-1 3D MW-1 7 OHMW-1 OHMW-3 OHMW-4 DW-1 MW-24 Eglinl*" Eglin III" Harvey** Matthias** MW-21D OHMW-1 OHMW-2 OHMW-3 Smith SW-5 CHT-3 CHT-6D CHT-7D Delegarde DW-1 DW-2 Eglin I"* Eglin III"* 5/94 5870 3180 13500 - - — — - - - 3.1 „ 374 - - - — 189 -- — 1120 J 1840 J 603 J __ - 269 368 . 294 - 354 332 351 335 378 _ — - 1440 - - 1180 1330 Concentration (ug/L) 6/94 - - — 943 J 6340 J 1710 1880 1220 957 1110 - 460 - 124 266 127 445 - 2050 140 - - - 2.4 B 2.1 B .. - - - 402 - - - . 1320 850 870 - 910 870 . -- 7/94 — -- - - - - - - - -- -- „ - - - - - - - - - - — -- _ -- _. -- 1700- - - - - - -- _ — - - - - -- — See last page for footnotes. G:\APROJECTVTUTU\PR0013.037\DATA\MCL.XLS GERAGHTY & MILLER, INC. TUT 007 2166 Page 8 of 9 /—\ Table 3-8. Summary of Analytes Detected in Groundwater Above Remedial Action Levels at the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. RAL Well Parameter (ug/L) Designation Inorganic Compounds/Analvtes (continued) Total Dissolved Solids (continued) 500,000 Four Windsl** Gassett** Harthman Race Track Harvey** KFC-1 La Place*' Matthias** MW-1 MW-1D MW-2 MW-3 MW-4 MW-4D MW-5 MW-6D MW-6R MW-7 MW-8 MW-9S MW-10 MW-12D MW-1 3 MW-1 3D MW-1 5 MW-1 7 MW-1 8 MW-1 9 MW-20 MW-20D MW-21D MW-22D MW-24 MW-25 OHMW-1 OHMW-2 OHMW-3 OHMW-4 Ramsay Smith SW-5 Nitrate (as N) (mg/L) 10,000 Gassett*" Harthman Race Track MW-1 MW-2 MW-1 3 MW-1 7 MW-24 Ramsay 5/94 _ 700 1100 ~ - 1360 - - - - - - - - - - - 830 790 640 - - - - - - — - - - -- - 354 1110 1290 1040 870 335 378 11.3 13.6 - - - - - 10 Concentration (ug/L) 6/94 __ - - - 1070 - 920 880 910 900 920 1180 810 840 910 760 920 '— - - 900 1520 990 870 800 1040 500 780 2260 1890 940 950 - - - - - - . „ — 12.4 15.9 10.6 22.7 13.3 — 7/94 1240 -- — 1190 - - - - - -- - - - - - - - - -- - - - — - - -- - - - - - - - - - - -- - -- „ — -- - - - -- — See last page for footnotes. G:\APROJECT\TUTU\PR0013.037\DATA\MCL.XLS GERAGHTY & MILLER, INC. TUT 007 2167 o Page 9 of 9 Table 3-8. Summary of Analytes Detected in Groundwater Above Remedial Action Levels at the Tutu Wells Site, St. Thomas, U.S. Virgin Islands. * Analytical results reported for total isomers (cis- and trans-) for 1,2-dichloroethene (1,2-DCE); RAL is for trans- isomer. ** Sample results were not validated. Not available. mg/L Milligrams per liter. ug/L Micrograms per liter. B The reported value was obtained from a reading that was less than the Contract Required Detection Limit (CRDL), but greater than or equal to the Instrument Detection Limit (IDL). J Estimated value. D Compound concentration was determined at a secondary dilution factor. RAL Remedial Action Level. TT Treatment technique. (Action Levels: Copper 1,300 ug/L, lead 15 ug/L). Values in parentheses are determined by the USEPA. USEPA U.S. Environmental Protection Agency. Note: RALs derived from Federal Drinking Water Standards. G:\APROJECTVTUTU\PR0013.037\DATA\MCL.XLS GERAGHTY & MILLER, INC. TUT 007 2.1&8 Table 4-1. Development and Screening of Technologies for Soil, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Page 1 of 2 General Response Action Remedial Technology Process Options Description Screening Comments No Action Institutional Controls Containment Treatment None Access restrictions Capping In-situ Not applicable Deed restrictions Capping Soil vapor extraction (SVE) Bioventing No action. Restrictions on property by limiting access and use of areas of contamination. Installation of low-permeable barrier over areas of contamination. Vacuum (extraction) wells that pull air from the soil to facilitate the removal of VOCs. Extraction and/or injection of air in soils to enhance biological degradation of BTEX and non-halogenated VOCs, and semi-VOCs. Required for consideration by NCP (comparison with other alternatives). Potentially applicable. Potentially applicable. Potentially applicable. Potentially applicable with only non- halogenated VOCs. o See last page for footnotes. Ki H- i> "0 GERAGHTY & MILLER, INC. Table 4-1. Development and Screening of Technologies for Soil, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Page 2 of 2 General Response Action Remedial Technology Process Options Description Screening Comments Removal Excavation Ex-situ Treatment Excavation and disposal Biopile/SVE (hSitieration Removal and disposal of contaminated soil. Excavated soils are stockpiled and mixed with nutrients and/or oxygen to enhance biodegradation. of f :- the il;r;e|tie|:!;$^j.is^|^ri;;;bi;.;:;:; •diJSj:^!^ as backfill; ^^.A^M^ Soils are and expps^I jt<> : extrernely JiigiB temperatures to volatilize vlGs. lnCirteratibrV:rt|ay place bri-site or ^ off -site ^ Potentially applicable. Potentially applicable. Kia bei cbst bhibitive. NCP National Contingency Plan. VOCs Volatile organic compounds. BTEX Benzene, toluene, ethylbenzene, and xylene. SVE Soil vapor extraction. II Option not retained for further analysis. GERAGHTY & MILLER, INC Table 4-2. Off-Gas Treatment Technology Evaluation, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Technology Advantages Disadvantages Thermal Oxidation (Thermox) High removal efficiencies (>99%) Low capital cost Low sensitivity to process condition changes Can process up to 70% LEL Effective in chlorinated solvent destruction Enables faster remediation High operating T (> 1,400°F) High insulation maintenance High metal fatigue due to high T May be limited to processing <25% LEL in future High fuel consumption Fire codes may make permitting difficult Catalytic Oxidation Low operating T « 1 ,250°F) Relatively safe-operates below 25% LEL No NOx formation Very low fuel costs Stainless steel interior Very little metal fatigue Effective heat recovery High destruction effectiveness with additional catalyst High capital cost Risk of catalyst poisoning/deactivation Reduced catalyst activity after 5 years Extends remediation time for highly-contaminated sites Need larger unit at high concentration due to dilution air Vapor Phase Granular Activated Carbon (VPGAC) Effective at low mass flows No external fuel requirements Easy to permit High removal efficiencies Very high cost at moderate/high mass flows Must maintain inlet stream <50% relative humidity Potential future liability from carbon disposal sites Transfers contaminate from vapor to solid - not destroyed Minimal effect on MTBE Sensitive to process condition changes Limited to < 25% LEL Desorbed by high blower outlet T/high heat of adsorption —1c -~! M j_t -•J > Less than. LEL Lower explosive limit. % Percent. F Farenheit. NOx Nitrogen oxide(s). T Temperature. MTBE Methyl tertiary butyl ether. OERAOHTY 8 MILLER, INC O Page 1 of 4 Table 4-3. Development and Screening of Technologies for Groundwater, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. General Response Action Remedial Technology Process Options Description Screening Comments No Action Institutional Controls None Access restrictions Not available Deed restrictions No action. Deeds for property in the area would include restrictions on wells. Required for consideration by NCP (comparison with other alternatives). Potentially applicable. Alternative water supply Public water supply Extension of existing water system to serve residences in contaminated plumes. Potentially applicable. Trucking water Delivery of potable water to serve residences. Potentially applicable. ;ii^|!|^P^i|!|i|^||||;il|||PI expense arid administrative difficultfes associated with constructibn of distiributidn piping. Collection/Containment Extraction Extraction wells Series of recovery wells to extract contaminated groundwater. Potentially applicable. c H O W h* Nl M Subsurface trains Not applicable due to shallow See last page for footnotes. GERAGHTY & MILLER, INC. O Page 2 of 4 Table 4-3. Development and Screening of Technologies for Groundwater, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. General Response Action Remedial Technology Process Options Description Screening Comments Collection/Containment ;|pi|;||jj|||| (continued) 118111111 Enhanced groundwater recovery Bedrock fracturing Treatment In-situ Vacuum enhance^ Air sparging Biosparging diameter and shallower depths^ ^^ Enhanced recovery of contaminated water through the detonation of explosives in the saturated zone. Enhanced recovery ; of cbhtarriinateidlv^ater through application i of vacuum at V extraction >ivells ;>: :i- • "• ; : •;'.;•.;• ••: •:•• .:."' '•" : Injection of air into saturated zone to strip VOCs from groundwater. Not alpplicabl^ due to Not iriiplementabte in bedrock; Potentially applicable in non-residential and/or open areas. Not applicable;: liirnitatibhs due to anisotrppic becirQck conditions. Potentially applicable. Injection of small amounts of air into the saturated zone to enhance the natural aerobic biodegradation of VOCs. The stripped VOCs are captured by an SVE system for further processing. Potentially applicable (properties with non-halogenated VOCs). See last page for footnotes. TUT 007 2173 GERAGHTY & MILLER, INC. Page 3 of 4 Table 4-3. Development and Screening of Technologies for Groundwater, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. General Response Action Remedial Technology Process Options Description Screening Comments Treatment (continued) Ex-situ Natural remediation Air stripping Granular activated carbon (GAC) Filtration Precipitation, floccu- lation, sedimentation Reverse osmosis Ion exchange UV oxidation/ reduction GAC fluidized bed system Attenuation and degradation Mixing large volumes of air with water in a packed column to promote transfer of VOCs to air. Adsorption ot contaminants onto activated carbon by passing water through carbon. Not cost effective at removing vinyl chloride. Filtering to remove solids. Processes for the removal of metals and solids. Membrane diffusion to remove metals and solids. Ionic species removal for metal. Redox reactions for organic removal. Combines fluidized bed technology with GAC. Reduction of constituent con- centrations through natural attenuation/degradation. See last page for footnotes. TUT 007 2174 Potentially applicable. Potentially applicable. Potentially applicable. Potentially applicable. Potentially applicable. Potentially applicable. Potentially applicable. Potentially applicable. Potentially applicable. GERAGHTY & MILLFR, INC Table 4-3. Development and Screening of Technologies for Groundwater, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Page 4 of 4 General Response Action Remedial Technology Process Options Description Screening Comments Discharge Off-site discharge Discharge to surface water Treated groundwater discharged to Turpentine Run. Potentially applicable; permitting- dependent. Not applicable; difficulties du^ to Treated groundwater used for Br$^^ ^ - implementability issues and high POTW Publicly owned treatment works. USVI-pPW U.S. Virgin Islands - Department of Public Works. Eliminated from further consideration in preliminary screening. NCP National Contingency Plan. VOC Volatile organic compound. O&M Operation and maintenance. SVE Soil vapor extraction. GAC Granular activated carbon., UV Ultraviolet. RCRA Resource Conservation and Recovery Act. TSDF Treatment, storage and/or disposal facility. TUT 007 21.75 GERAGHTY & MILLER, INC. Table 4-4. Summary of Influent Concentrations and Maximum Contaminant Levels, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Parameters GRA2 Source Containment Wells Total Dissolved Concentration Concentration GRA3 Plume Containment Wells Total Dissolved Concentration Concentration GRA4 Source and Plume Containment Wells Total Dissolved Concentration Concentration • Background Water Quality Inorganics Turpentine Run<9> Maximum Contaminant Level Organic Constituents (uo/L) (1) Tetrachloroethene (PCE) 4970.00 Trichloroethene (TCE) 40.00 1,2-Dichloroethene (1,2-DCE) 360.00 NA NA NA 85.00 16.00 49.00 NA NA NA 2770.00 30.00 220.00 NA NA NA 5.OO 5.00 0.1 « Inorganic Constituents (mg/L) Iron 105.00 Magnesium 55.00 Manganese 1.50 Potassium 4.00 Sodium 280.00 Calcium 76.00 Hardness as CaCO3 NA Chloride 180.00 Total Dissolved Solids (TDS) NA NO 50.00 0.140 4.00 290.00 72.00 395 m NA 1100.00 0.15 33.00 0.05 5.00 336.00 37.OO NA 245.00 NA NO 36.00 0.050 6.00 370.00 39.00 230.00 NA 1260.00 205.00 115.00 5.00 45.00 289.00 90.00 NA 207.00 NA 0.18 38.00 0.034 5.00 314.00 47.00 310 (2) NA 1115.00 0.0 77 519.00 30.0 392.0 440.0 1,700 0.30 0.05 250 CT 500 Hl Recovery wells within catchment area include Recovery Well RW-1 (which is near existing Monitoring Well MW-12D), Recovery Wells RW-2 and RW-3 (which are near the Smith and Matthias Supply Wells), Recovery Well RW-4 (which is near Monitoring Well OHMW-4), and Recovery Well RW-5 (which is near monitoring well cluster MW-1 /MW-1 D). Data related to proposed Recovery Well RW-4 included historic water quality data from the Harvey Supply well. These data indicate a past PCE concentration at 7,600 parts per billion (ppb) or ug/L. Total/dissolved concentrations are based upon sample data collected from associated monitoring wells. in (2) 13) (41 (5) GRA NA NO ug/L mg/L Data refer to concentrations of individual volatile organic compound (VOC) constituents identified in groundwater samples. Hardness is a quantification of water quality as indicative of the presence of calcium carbonate (CaCO3). Value refers to Secondary Maximum Contaminant Levels. Value represents trans- isomer of 1,2-dichloroethene. Sodium and potassium were combined in reference document191. Water quality data taken from reference entitled "Water Records of U.S. Virgin Islands 1962-1969." Sample was recorded at the Mt. Zion Gauging Station on July 22, 1964 (U.S. Geological Survey 1973). Groundwater remedial alternative. Not applicable. Not detected above sample qualification limit. Not available. Micrograms per liter. Milligrams per liter. TUT 007 1176 GERAGHTY & MILLER, INC o Table 4-5. Summary of Estimated Impacted Soil Volumes, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Estimated Area of Depth to Bottom Thickness Volume of soils Volume of Soils Property Constituents of Impacted Soils of Impacted Soils Previously Remediated Requiring Excavation Concern (area, ft2) (feet) (feet) (cubic yards) (cubic yards) Curriculum Center BTEX, and 1,1,1 -TC A Ramsay Motors Benzene and ethylbenzene Texaco Tutu Service Station Benzene and ethylbenzene Tillett Gardens Manganese and PCBs Esso Tutu Service Station PCE, 1,1 -DCA, 1,2-DCE, BTEX Western Auto Benzene, toluene, and xylene O 'Henry Dry Cleaners PCE ft2 Square feet. [Al IB] 240 0.5 40'41 200 25 «) 26(6) 2g0 18) 2518' BO 171 190(8) 200(8) 150 440 460'91 400 (1) Soil removed during previous tank removals as part of early removal actions prior to (2) In some instances soil volumes that need to be excavated 5 5 4 2 9 8 12 9 9 6 7 2 8 FS. may Include soils that do not require [CJ 0.5 4 5 2 2 9 1 4 0 0 6 7 2 8 remediation or that (1) [D] 0 0 0 0 0 20 0 0 63 67 10 25 0 0 Total KAxB)/27] 5 gO) 37 4 2 97 7 22 0 0 33 114 34 119 482 Soil Volume Currently Requiring Remediation (cubic yards) (2) t(AxC)/27-D) 5 6 37 2 2 77 1 8 0 0 23 89 34 119 403 were previously remediated. Therefore, soil volumes requiring excavation may be different from those requiring remediation. (3) Includes volume of existing underground storage tank. (4) Estimated area based on area of impacted soils defined on Figure 4-2. (5) Area around individual impacted soil samples is assumed to be 5' x 5'. (6) Near north oil/water separator at Esso. (7) Includes soil samples B-101 and B-102 (see previous note5). (8) Assumes impacted soil removed with installation of new underground storage tanks prior to FS (9) Includes the 4-inch PVC pipe area at Four Winds Plaza near Western Auto. BTEX Benzene, toluene, ethylbenzene, and xylene. PCE Tetrachloroethene. 1,1 -DCA 1,1-Dichloroethane. 1 ,2-DCE 1 ,2-Dichloroethene(clsArans). 1,1,1-TCA 1,1,1-Trichtoroethane. PCBs Polychlorinated biphenyls. r,PR AOHTY £? MII I FR INC O Q Ki !«* ••"•I •••4 Table 4-6. Evaluation of No Action/Institutional Controls Technologies Option on Property-Specific Basis, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Properties Description Effectiveness Implementability Cost Screening Comments Curriculum Center Ramsay Motors Texaco Tutu Service Station Tillett Gardens Deed restrictions for soil and bedrock excavation and groundwater use. Deed restrictions for soil excavation and groundwater use. Deed restrictions for soil excavation and groundwater use. Deed restrictions for soil excavation and groundwater use. Some natural degradation would occur, but most of the contaminants volume would not be reduced. Limited effectiveness. Some natural degradation would occur; may be effective due to the comparatively low COC concentrations. Some natural degradation would occur, but most of the contaminants volume would not be reduced. Limited effectiveness. Contaminant volume would not be significantly reduced. Limited effectiveness. Easily implemented. Easily implemented. Easily implemented. Easily implemented. Low Retained. - Provides comparison for other options. - Required by NCP. Low Retained. - Provides comparison for other options. - Required by NCP. Low Retained. - Provides comparison for other options. - Required by NCP. Low Retained. - Provides comparison for other options. - Required by NCP. Western Auto Deed restrictions for soil excavation and groundwater use. Esso Tutu Deed restrictions for soil Service Station excavation and groundwater use. Some natural degradation would occur, but most of the contaminant volume would not be reduced. Limited effectiveness. Some natural degradation would occur, but most of the contaminant volume would not be reduced. Limited effectiveness. Easily implemented. Easily implemented. Low Retained. - Provides comparison for other options. - Required by NCP. Low Retained. - Provides comparison for other options. - Required by NCP. c O'Henry Deed restrictions for soil and Dry Cleaners bedrock excavation and groundwater use. Some natural degradation would occur, but most of the contaminant volume would not be reduced. Limited effectiveness. Easily implemented. Low Retained. - Provides comparison for other options. - Required by NCP. NCP National contingency plan. COC Constituents of concern. GERAGHTY & MILLER, INC. Table 4-7. Evaluation of Capping Technology Option on Property-Specific Basis, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Properties Description Effectiveness Implementability Cost Screening Comments Curriculum Center Install asphalt paving over impacted soil to reduce infiltration. Effective Easily implemented. Low Retained. - Capping can be effective in reducing infiltration; easily implemented. Ramsay Motors Remove and replace cracked concrete floor slab in maintenance garage. Effective Easily implemented. Low Retained. - Capping can be effective in reducing infiltration; easily implemented. Texaco Tutu Service Station Inspect and maintain existing concrete paving and replace if necessary. Effective Easily implemented. Low Retained. - Capping can be effective in reducing infiltration; easily implemented. Tillett Gardens Install asphalt paving over impacted soil to reduce infiltration and limit direct contact. Effective Easily implemented. Low Retained. - Capping can be effective in reducing infiltration; easily implemented. Western Auto Inspect and maintain existing concrete paving and replace if necessary. Effective Easily implemented. Low Retained. - Capping can be effective in reducing infiltration; easily implemented. Esso Tutu Service Station Inspect and maintain existing asphalt paving and replace if necessary. Effective Easily implemented. Low Retained. - Capping can be effective in reducing infiltration; easily implemented. —! r~ O'Henry Dry Cleaners Install asphalt paving over impacted soil to reduce infiltration. Effective Easily implemented. Low Retained. - Capping can be effective in reducing infiltration; easily implemented. '--J ••0 G:\APROJECT\TUTU\PR00137\DATA\EVALCAPP.XLS GERAGHTY & MIU.RR, INC Table 4-8. Evaluation of In-Situ SVE and Bioventing Technologies Option on Property-Specific Basis, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Properties Description Effectiveness Implementability Cost Screening Comments Curriculum Center In-situ SVE or bioventing in soil Potentially effective. Bioventing and in-situ SVE in bedrock. would not be effective for chlorinated VOCs. Implementable. High costs for bedrock. Costs would be prohibitively high for soil due to small volume. Retained for bedrock. Not retained for soil; not cost effective. Ramsay Motors In-situ SVE or bioventing in soil. Potentially effective. SVE and bioventing would be potentially effective for BTEX concentrations. Implementable. Moderate to high. Not retained. - Not cost effective due to building proximity. Texaco Tutu In-situ SVE or bioventing in soil. Potentially effective. SVE and Service Station bioventing would be potentially effective for BTEX concentrations. Implementable. Moderate to high. Retained. Tillett Gardens In-situ SVE or bioventing in soil. Not effective for manganese and PCBs. Not implementable. Not applicable. Not retained. - Not applicable for treatment of manganese and PCBs. Western Auto In-situ SVE or bioventing in soil. Not effective in tight clay formations. Implementable. Moderate to high. Esso Tutu In-situ SVE or bioventing in soil. Potentially effective. SVE and Service Station bioventing would be potentially effective for BTEX. Bioventing would not be effective due to the presence of chlorinated VOCs. Implementable. Moderate. Not retained. - Not effective in clay. Retained. O'Henry In-situ SVE or bioventing in soil Potentially effective. Bioventing would Dry Cleaners and in-situ SVE in bedrock. not be effective due to the presence of chlorinated VOCs. Implementable. Moderate. Retained. SVE Soil vapor extraction. PCBs Polychlorinated biphenyls. BTEX Benzene, toluent, ethylbenzene, and xylene. VOCs Volatile organic compounds. G:\APROJECT\TUTU\PR00137\DATA\EVINSITU.XLS GERAGHTY & MILLER, INC. Table 4-9. Evaluation of Ex-Situ SVE and Biopiles Technologies Option on Property-Specific Basis, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Properties Description Effectiveness Implementability Cost Screening Comments Curriculum Center Excavate soil and treat using ex-situ SVE or biopiles. Ramsay Motors Excavate soil and treat using ex-situ SVE or biopiles. Texaco Tutu . Excavate soil and treat using Service Station ex-situ SVE or biopiles. This technology will not be effective for unsaturated bedrock which may contain chlorinated VOCs or DNAPL. Potentially effective. Not implementable for Due to small volume bedrock. Implementable of soil, costs may be for soil. high. Potentially effective. Difficult to implement because UST is under building. Implementable. Due to small volume and location of soil, costs would be prohibitively high. Moderate to high. Retained for soil. - Not retained for bedrock. - Not effective or implementable for bedrock. Not retained. - Not cost effective. - Difficult to implement. Retained. Tillett Gardens Western Auto Excavate soil and treat using ex-situ SVE or biopiles. Excavate soil and treat using ex-situ SVE or biopiles. Not effective treatment for Not applicable, manganese or PCBs detected at Tillett property. May not be potentially effective due Implementable. to the type of soil being treated (clay). Not applicable. Costs would be prohibitively high due to presence of clay. Not retained. - Not applicable treatment for manganese and PCBs. Not retained. - Not cost effective. Esso Tutu Service Station O'Henry Dry Cleaners Excavate soil and treat using ex-situ SVE or biopiles. Excavate soil and treat using ex-situ SVE or biopiles. Potentially effective. Potentially effective. Implementable. Implementable. Moderate to high. Moderate to high. Retained. Retained. SVE Soil vapor extraction. VOCs Volatile organic compounds. DNAPL Dense non-aqueous phase liquids. PCBs Polychlorinated biphenyls. UST Underground storage tank. TUT OO7 C:\APROJECTVrUTU\PR00137\DATA\EVAXSITU.XLS GERAGHTY & MILLER, INC. Table 4-10. Evaluation of Excavation and Off-Site Disposal Technology Option on Property-Specific Basis, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Properties Description Effectiveness Implementability Cost Screening Comments Curriculum Center Ramsay Motors Excavate soil, containerize, and ship off-site for disposal. Hazardous waste disposal may be necessary. Excavate soil, containerize, and ship off-site for disposal. Hazardous waste disposal may be necessary. Very effective at removing impacted soil. Bedrock would not be addressed. Very effective at removing impacted soil. Implementable for soil. Not High implementable for bedrock. Implementable for soil. High Difficult to implement because impacted soils are under building. Retained for soil. Not retained for bedrock. - Not implementable. Not retained. - Difficult implementation and high cost due to building overlying UST. Texaco Tutu Service Station Tillett Gardens Western Auto Esso Tutu Service Station O'Henry Dry Cleaners Excavate soil, containerize, and ship off-site for disposal. Hazardous waste disposal may be necessary. Excavate soil, containerize, and ship off-site for disposal. Hazardous waste disposal may be necessary. Excavate soil, containerize, and ship off-site for disposal. Hazardous waste disposal may be necessary. Excavate soil, containerize, and ship off-site for disposal. Hazardous waste disposal may be necessary. Excavate soil, containerize, and ship off-site for disposal. Hazardous waste disposal may be necessary. Very effective at removing impacted soil. Very effective at removing impacted soil. Implementable for soil. High Retained. Implementable for soil. Very effective at removing Implementable for soil, impacted soil. Very effective at removing impacted soil. Very effective at removing impacted soil. Bedrock would not be addressed. Implementable for soil. Implementable for soil. Not implementable for bedrock. High Not retained. - Not cost effective due to small volume of soil. High Retained. High Retained. High Retained. C o UST Underground storage tank. GERAGHTY & MILLER. INC. O Table 4-11. Summary of Proposed Pumping Rates for New Recovery Wells, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Groundwater Remedial Alternative Proposed Containment Wells RW-1 RW-2 RW-3 RW-4 RW-5 Total Containment Wells Supply Wells with POETs Esso Source Control Texaco Source Control GRA2 Source Containment and POETs (gpm) - - — 20 35 55 15 10 30 110 GRA3 Plume Containment (gpm) 15 15 15 - ~ 45 • 10 30 85 Pumoina Scenarips GRA4 Source and Plume Containment (gpm) 15 15 15 20 35 100 — 10 30 140 ** Pumping scenarios should not exceed safe yield of catchment area of 118 gpm. Estimated pumping rates are based on available site data. Final pumping rates will be based on pilot studies and initial operations data. * * Source control at the two service stations is assumed to be of short duration, ranging from 3 to 7 years. gpm Gallons per minute. GRA Groundwater remedial alternative. POET Point of entry treatment. No pumpages. G:\APROJECT\TUTU\PfW013.037\DATA\SUMPMP1 .XLS GERAGHTY & MILLER, INC. TUT 007 2183 Table 4-12. Summary of Potential POET Supply Well Installations for GRA 2, Tutu Wells Site, U.S. Virgin Islands. POET Supply Well GRA 2 Average Flow Rate (gpm) GRA 2 Design Flow Rate (gpm) Contaminants of Concern Design Concentration (ppb) Maximum Contaminant Limit (ppb) Proposed Treatment Four Winds 1 10 10 1 ,2-Dichloroethene 64 GAC Unit Steele 1.25 10 1,2-Dichloroethene 100 GAC Unit La Place 1.25 10 1,2-Dichloroethene 95 GAC Unit Matthias 1.25 10 1,2-Dichloroethene Trichloroethene 15 6 5 5 GAC Unit Smith 1.25 Total Average Flow (gpm) 15 Total Average Flow (gpd) 21,600 10 1,2-Dichloroethene Tetrachloroethene Trichloroethene 39 19 110 5 5 5 GAC Unit •_' Xi CO POET Point of entry treatment. GRA Groundwater remedial alternative. gpm Gallons per minute. ppb Parts per billion. GAC Granular activated carbon. gpd Gallons per day. GERAGHTYff MILLER, INC o Table 4-13. Half-Lives of Chlorinated Compounds in Groundwater, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Chlorinated Compounds PCE TCE Vinyl chloride 1,2-DCE Range of Half-Lives in Groundwater 1 to 2 years 10.7 months to 4.5 years 2 months to 7.9 years 2 months to 7.9 years Average Half-Lives in Groundwater 1 .5 years 2.7 years 4.0 years 4.0 years Half-lives taken from Howard and others (1991). These half-lives are estimated scientific judgments based on published data for field or laboratory test results for aerobic degradation. PCE Tetrachloroethene TCE Trichloroethene 1,2-DCE 1,2-Dichloroethene (includes both cis- and trans-isomers). G:\APROJECT\TUTU\PR0013.037\DATA\HLFLIVES.XLS "H 'T fH'Y"? '"•'• 'I SS^ GERAGHTY & MILLER, INC. u ' "d-' Table 4-14. Estimated Natural Degradation Rates for Groundwater Contaminants, Tutu Well Site, St. Thomas, U.S. Virgin Islands. Chlorinated Compound Assumed Initial Concentration (ug/L) Concentration After One Half-Life (ug/L) Concentration After Two Half-Lives (ug/L) Concentration After Three Half-Lives (ug/L) USEPA MCL and Estimated Time to Achieve MCL Using Maximum Half-Lives PCE 1.2-DCE TCE Initial Total (2.0 years max.) 58.8 29.4 (1.5 years ave.) (1.0 year min.) (7.9 years max.) 29.4 14.7 (4.0 years ave.) (0.167 year min.) (4.5 years max.) 11.8 5.9 (2.7 years ave.) (0.89 year min.) 100.0 (4.0 years max.) 14.7 (3.0 years ave.) (2.0 years min.) (15.8 years max.) 7.35 (8.0 years ave.) (0.334 year min.) (9.0 years max.) 2.95 (5.4 years ave.) (1.78 years min.) (6.0 years max.) 7.35 (4.5 years ave.) (3.0 years min.) (23.7 years max 3.65 (12.0 years ave. (0.501 year min. (13.5 years max 1.475 (8.1 years ave, (2.67 years min. (7.10 years max.) 5.0 (5.33 years ave.) (3.56 years min.) (0 years max.) 70/100" (0 years ave.) (0 years min.) (5.58 years max.) 5.0 (3.34 years ave.) (1.10 years min.) H xj CD 0- Half-lives for groundwater contaminants are from Howard and others (1991). Initial concentration was assumed to be 100 ug/L, which represents maximum concentration that may not be captured by proposed recovery wells. The ratio of chlorinated compounds detected at the Matthias Supply Well were used to calculate a total concentration of 100 ug/L. Concentration variations due to formation of breakdown products are not included. MCL Maximum contaminant level. PCE Tetrachloroethene. 1,2-DCE 1,2-Dichloroethene. TCE Trichloroethene. MCLs for cis-1,2-DCE (70 ug/L) and trans-1,2-DCE (100 ug/L). max. Maximum, ave. Average, min. Minimum. ug/L Micrograms per liter. G:\APROJECTYTUTU\PR0013.037\DATA\NATOEGRD .XLS GERAGHTY & MILLER, INC. H C O ,-, •-.j Table 4-15. Range of Values for Travel-Time and Natural Degradation of Tetrachloroethene, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Range of Travel-Time Calculation Maximum Average Minimum Groundwater Hydraulic Conductivity (feet per day) 2.82 1.92 1.02 Effective Porosity 0.14 0.2 0.4 Groundwater Flow Velocity (feet per day) 1.39 0.661 0.176 Estimated Time to Achieve MCL for PCE 7. 10 years (2,592 days) 5.33 years (1,945 days) 3.56 years (1,299 days) Length of Downgradient Migration (feet) 3,603 1,286 229 Time to achieve MCL is based on half-lives for groundwater contaminants are from Howard and other (1991). Initial concentration was assumed to be 100 micrograms per liter (ug/L) total VOCs, which represents maximum concentration that may not be captured by proposed recovery wells. The ratio of chlorinated compounds detected at the Matthias Supply Well were used to calculate a total concentration of 100 ug/L. Assumed initial concentration of PCE is 58.8 ug/L. PCE Tetrachloroethene. MCL Maximum contaminant level. VOCs Volatile organic compounds. 03 Nj GERAGHTY & MILLER, INC o Table 5-1. Evaluation of NCP Criteria for Soil Remedial Alternatives, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Overall Compliance • Reduction Protection of with Long-Term of Toxicity, Human Health Anticipated Effectiveness Mobility, Short-Term Description and Environment ARARs and Permanence and Volume Effectiveness Implementability SRA 1: Unfavorable Unfavorable Unfavorable No Action/ Institutional Controls SRA 2: Favorable Unfavorable Moderately Institutional Controls/ Favorable Capping SRA 3: Favorable Favorable Favorable Institutional Controls/ Capping/ln-Situ SVE/ Excavation and Off-Site Disposal SRA 4: Favorable Favorable Favorable Institutional Controls/ Capping/Ex-Situ SVE/ Excavation and Off-Site Disposal SRA 5: Favorable Favorable Favorable Institutional Controls/Capping/ Excavation and Off-Site Disposal Unfavorable Favorable Favorable Unfavorable Moderately Moderately Favorable Favorable Favorable Favorable Moderately Favorable Favorable Moderately Moderately Favorable Favorable Favorable Favorable Moderately Favorable U.S. Virgin Islands Community Cost Acceptance * Acceptance * Favorable Moderately Favorable Moderately -- Favorable Moderately Favorable Moderately Favorable NCP National Contingency Plan. ARARs Applicable or relevant and appropiate requirements. * Acceptance criteria will be assessed following comment on the Remedial Investigation and Feasibility Study (RI/FS) Reports and proposed plan. SRA Soil remedial alternative. Unfavorable Medium specific-term indicating the alternative does not address the goal adequately. Moderately Favorable Medium specific-term indicating an acceptable level of comfort based on U.S. Environmental Protection Agency (USEPA) guidance. Other alternatives may address the goal more effectively. IT: Favorable Medium specific-term indicating an acceptable level of satisfaction of goals, based on USEPA guidance. — I SVE Soil vapor extraction. O vj W CO CO n37\r>ATA\PSTR61 XIS GERAGHTY & MILLER, INC Table 5-2. Evaluation of NCR Criteria for Groundwater Remedial Alternatives, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Description Overall Protection of Human Health and Environment Compliance with Anticipated ARARs Long-Term Effectiveness and Permanence Reduction of Toxicity, Mobility, and Volume Short-Term Effectiveness Implementability Cost U.S. Virgin Islands Acceptance * Community Acceptance " GRA 1: No Action/ Institutional Controls Unfavorable Unfavorable Unfavorable Unfavorable Favorable Favorable Favorable GRA 2: Unfavorable Favorable Institutional Controls/ Source Containment/ POET Systems/Treatment Discharge GRA 3: Favorable Favorable Institutional Controls/ Plume Containment/ Treatment/Discharge GRA 4: Favorable Favorable Institutional Controls/ Source and Plume Containment/ Treatment/Discharge Unfavorable Moderately Moderately Moderately Moderately Favorable Favorable Favorable Favorable Favorable Favorable Moderately Favorable Favorable Moderately Favorable Moderately Favorable Moderately Favorable Moderately Favorable Moderately Favorable Moderately Favorable NCP ARARs * GRA Unfavorable Moderately Favorable Favorable POET National Contingency Plan. Applicable or relevant and appropiate requirements. Acceptance criteria will be assessed following comment on the remedial investigation and feasibility study (RI/FS) report and proposed plan. Groundwater remedial alternative. Medium specific-term indicating the alternative does not address the goal adequately. Medium specific-term indicating an acceptable level of comfort based on U.S. Environmental Protection Agency (USEPA) guidance. Other alternatives may address the goal more effectively. Medium specific-term indicating an acceptable level of comfort based on USEPA guidance. Point-of-entry treatment. CO •JTi GERAGHTY & MILLER. INC. o Table 5-3. Cost Estimate - SRA 1 (No Action/Institutional Controls), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY UNIT UNIT COST TOTAL COST CAPITAL COSTS Deed Restrictions L.S. $10,000 Subtotal Administration & Legal Costs (20%) Contingency (25%)__________ TOTAL CAPITAL COST - TREATMENT $10,000 $10,000 $2,000 $2,500 $14,500 TOTAL CAPITAL COST - SRA 1 GRAND TOTAL - SRA 1 SAY $15,000 $15,000 SRA Soil remedial alternative. L.S. Lump sum. Source (design assumptions) of capital costs is presented in Appendix C. g:\aprojeot\tutu\prO013.037\data\SR A1 CST.XLS GERAGHTY & MILLER, INC. TUT OO7 219O Page 1 of 2 Table 5-4. Cost Estimate - SRA 2 (Institutional Controls/Capping), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY UNIT UNIT COST TOTAL COST CAPITAL COSTS Deed Restrictions Pavement Restoration & Capping Curriculum Center Ramsay Motors Texaco Tutu Service Station Tillett Gardens Esso Tutu Service Station Western Auto O'Henry Dry Cleaners L.S. $10,000 27 4O 25 3 41 117 44 TOTAL CAPITAL COST - SRA 2 TOTAL CAPITAL COST - SCP AT ESSO (In-Situ SVE) TOTAL CAPITAL COST - SCP AT TEXACO (In-Situ SVE) TOTAL CAPITAL COST - SRA 2 AND SCPs O&M (ANNUAL) COSTS - SRA 2 Pavement & Cap Maintenance (Sealing, patching) $10,000 S.Y. C.Y. S.Y. S.Y. S.Y. S.Y. S.Y. Subtotal $20 $400 $20 $20 $20 $20 $20 Administration & Legal Costs (20%) Engineering Design (10%) Construction Supervision (15%) Contingency (25%) TOTAL CAPITAL COST - rE) SVE) SAY $540 $16,000 $500 $60 $820 $2,340 $880 $31,140 $6,228 $3,114 $4,671 $7,785 $52,938 $53,000 $53,000 $150,000 $135,000 $338,000 Curriculum Center Ramsay Motors Texaco Tutu Service Station Tillett Gardens Esso Tutu Service Station Western Auto O'Henry Dry Cleaners 27 370 25 3 41 117 44 S.Y. S.Y. S.Y. S.Y. S.Y. S.Y. S.Y. Subtotal $3 $1 $3 $3 $3 $3 $3 Administration & Legal Costs (15%) Contingency (25%) TOTAL ANNUAL O&M COST O&M (ANNUAL) PRESENT Pavement & Cap Replacement WORTH - SRA 1 2, YEAR 30 (3% discount L.S. rate) $16,060 O&M PRESENT WORTH - SRA 2, YEAR 15 (3% discount rate) TOTAL O&M PRESENT WORTH - SRA 2 SAY $81 $370 $75 $9 $123 $351 $132 $1,141 $171 $285 $1,597 $31,310 $16,060 $10,309 $41,619 $42,000 S:\APROJECTVrUTU\PR0013.03 7\DATA\SRA2CST.XLS GERAGHTY & MILLER, INC. TUT 007 2191 Page 2 of 2 Table 5-4. Cost Estimate - SRA 2 (Institutional Controls/Capping), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS O&M (ANNUAL) COSTS SCP at Esso SCP at Texaco QUANTITY (TO YEAR 5) - SCPs 1 1 UNIT L.S. L.S. UNIT COST $20,000 $67,000 TOTAL COST $20,000 $67,000 O&M (ANNUAL) PRESENT WORTH - SCPs, YEAR 5 (3% discount rate) $398,434 TOTAL O&M PRESENT WORTH - SCPs (In-Situ SVE) • SAY $399,000 TOTAL O&M PRESENT WORTH - SRA 2 AND SCPs $441,000 GRAND TOTAL - SRA 2 $95,000 GRAND TOTAL - SRA 2 AND SCPs $779,000 L.S. Lump Sum. C.Y. Cubic yard. S.Y. Square yard. SRA Soil remedial alternative. SCP Source control plan. O&M Operation and maintenance. Source (design and O&M assumptions) used for cost estimates is presented in Appendix C. G:\APROJECT\TUTmPfl0013.037\DATA\SRA2CST.XLS GERAGHTYS? MILLER, INC. TUT O07 2192 Page 1 of 3 Table 5-5. Cost Estimate - SRA 3 (Institutional Controls/Capping/In-Situ SVE [Soil and Bedrockl/Excavation and Off-Site Disposal), Tutu Walls Site, St. Thomas, U.S. Virgin Islands. v ITEMS CAPITAL COSTS Deed Restrictions Pavement Restoration & Capping Ramsay Motors Tillett Gardens Curriculum Center Excavation Off-Site Disposal Site Restoration Excavated soil sample analysis Western Auto Excavation Off-Site Disposal Site Restoration Excavated soil sample analysis In-Situ SVE Systems Curriculum Center (in bedrock) O'Henry Dry Cleaners(in soils) O'Henry Dry Cleaners(in bedrock) *\ QUANTITY UNIT 1 L.S. 40 C.Y. 3 S.Y. 5 C.Y. 5 C.Y. 5 C.Y. 1 EA. 181 C.Y. 146 C.Y. 181 C.Y. 9 EA. 1 L.S. 1 L.S. 1 L.S. Subtotal Administration & Legal UNIT COST $10,000 $400 $20 $70 $2,230 $50 $1,500 $70 $2,230 $50 $1,500 $170,000 $50,000 $130,000 Costs (20%) Engineering Design (10%) Construction Supervision (15%) TOTAL CAPITAL COST - SRA 3 TOTAL CAPITAL COST - SCP AT ESSO (In-Situ SVE) TOTAL CAPITAL COST - SCP AT TEXACO (In-Situ SVE) TOTAL CAPITAL COST - SRA 3 AND SCPs O&M (ANNUAL) COSTS (TO YEAR 5) - SRA 3 Pavement & Cap Maintenance (Sealing, patching) Ramsay Motors Tillett Gardens In-Situ SVE Systems Curriculum Center (in bedrock) O'Henry Dry Cleaners(in soils) O'Henry Dry Cleaners(in bedrock) V Contingency (25%) TOTAL CAPITAL COST 370 S.Y. 3 S.Y. 1 L.S. 1 L.S. 1 L.S. Subtotal Administration & Legal Contingency (25%) TOTAL ANNUAL O&M _ SAY $1 $3 $35,OOO $14,500 $35,000 Costs (15%) COST TOTAL COST $10,000 $16,000 $60 $350 $11,150 $250 $1,500 $12,670 $325,580 $9,050 $ 1 3,500 $170,000 $50,000 $130,000 $750,110 $150,022 $75,011 $112,517 $187,528 $1,275,187 $1,276,000 $1,276,000 $150,000 $135,000 $1,561,000 $370 $9 $35,000 $14,500 $35,000 $84,879 $12,732 $21 ,220 $118,831 (continued on next page) G:\APfl OJECT\TUTU\PR0013;037\DATMSRA3CST.XLS GERAGHTY & MILLER, INC. TUT 007 2193 Page 2 of 3 Table 5-5. Cost Estimate - SRA 3 (Institutional Controls/Capping/In-Situ SVE [Soil and Bedrockl/Excavation and Off-Site Disposal), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY UNIT UNIT COST TOTAL COST O&M (ANNUAL) COSTS (TO YEAR 5) - SRA 3 (continued) O&M (ANNUAL) PRESENT WORTH - SRA 3, YEAR 1 to 5 (3% discount rate) $544,208 O&M (ANNUAL) COSTS (YEAR 6 TO 30) - SRA 3 Pavement & Cap Maintenance (Sealing, patching) Ramsay Motors Tiliett Gardens In-Situ SVE Systems Curriculum Center (in bedrock) O'Henry Dry Cleaners(in bedrock) 370 S.Y. $1 3 S.Y. $3 1 L.S. $35,000 1 L.S. $35,000 Subtotal Administration & Legal Costs (15%) Contingency (25%) TOTAL ANNUAL O&M COST O&M (ANNUAL) PRESENT WORTH - SRA 3, YEAR 6 to 30 (3% discount rate) _ EQUIPMENT INSTALLATION. AND MATERIAL REPLACEMENT - SRA 3 /-•— v lajor Equipment Minor Equipment Pavement & Cap Replacement (Ramsay Motors & Tiliett only) 1 L.S. $160,000 O&M PRESENT WORTH (Year 1 5) (3% discount rate) 1 L.S. $5,000 O&M PRESENT WORTH (Years 5, 10, 15, 20, 25) (3% discount rate) 1 L.S. $16,060 O&M PRESENT WORTH (Year 15) (3% discount rate) $370 $9 $35,000 $35,000 $70,379 $10,557 $17,595 $98,531 $1,479,983 $160,000 $102,704 $5,000 $16,400 $16,060 $10,309 TOTAL O&M PRESENT WORTH - SRA 3 O&M (ANNUAL) COSTS (TO YEAR 5) - SCPs SCP at Esso SCP at Texaco L.S. L.S. $20,000 $67,000 $2,154,000 $20,000 $67,000 O&M (ANNUAL) PRESENT WORTH - SCPs, YEAR 5 (3% discount rate) TOTAL O&M PRESENT WORTH - SCPs (In-Situ SVE) /"""-""OTAL O&M PRESENT WORTH - SRA 3 AND SCPs SAY GRAND TOTAL - SRA 3 GRAND TOTAL - SRA 3 AND SCPs G:\APnOJECT\ TOTU\PR0013.O37\OATA\SRA3CST.XLS $398,434 $399,000 $2,553,000 $3,430,000 $4,114,000 GERAGHTY & MILLER, INC. TUT 007 2194 Page 3 of 3 Table 5-5. Cost Estimate - SRA 3 (Institutional Controls/Capping/In-Situ SVE (Soil and Bedrockl/Excavation and Off-Site Disposal), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. .«>*>4"S. Lump sum. NA. Each. ,Y. Square yard. C.Y. Cubic yard. SVE Soil vapor extraction. O&M Operation and maintenance. SRA Soil remediation alternative. SCP Source control plan. Source (design and O&M assumptions) used for cost estimates is provided in Appendix C. G:\APROJECT\TUTU\PR0013.O37\DAT AVSR A3CST .XLS GERAGHTY & MILLER, INC. TUT 007 219! Table 5-6. Cost Estimate - SRA 4 (Institutional Controls/Capping/Ex-Situ SVE/ln-Situ SVE/Excavation and Page 1 of 3 On-Site Disposal), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS CAPITAL COSTS Deed Restrictions Pavement Restoration & Capping Ramsay Motors Tillett Gardens Western Auto Excavation Off-Site Disposal Site Restoration Excavated soil sample analysis Ex-Situ SVE Systems Curriculum Center O'Henry Dry Cleaners In-Situ SVE Systems Curriculum Center (in bedrock) O'Henry Dry Cleanerstin bedrock) QUANTITY UNIT 1 L.S. 40 C.Y. 3 S.Y. 181 C.Y. 146 C.Y. 181 C.Y. 9 EA. 1 L.S. 1 L.S. 1 L.S. 1 L.S. Subtotal Administration & Legal UNIT COST $10,000 $400 $20 $70 $2,230 $50 $1,500 $10,000 $35,000 $170,000 $130,000 Costs (20%) Engineering Design (10%) Construction Supervision (15%) Contingency (25%) TOTAL CAPITAL COST - TOTAL CAPITAL COST - SRA 4 TOTAL CAPITAL COST - SCP AT ESSO (In-Situ SVE) TOTAL CAPITAL COST - SCP AT TEXACO (In-Situ SVE) TOTAL CAPITAL COST - SRA 4 O&M (ANNUAL) COSTS (YEARS Pavement & Cap Maintenance (Sealing, patching) Ramsay Motors Tillett Gardens Ex-Situ SVE Systems Curriculum Center O'Henry Dry Cleaners In-Situ SVE Systems Curriculum Center (in bedrock) O'Henry Dry Cleanerstin bedrock) TOTAL (ANNUAL) O&M COSTS AND SCPs 1 AND 2) - SRA 4 370 S.Y. 3 S.Y. 1 L.S. 1 L.S. 1 L.S. 1 L.S. Subtotal Administration & Legal Contingency (25%) (YEARS 1 AND 2) - SRA 4 $1 $3 $12,000 $12,000 $35,000 $35,000 Costs (15%) TOTAL COST $10,000 $16,000 $60 $12,670 $325,580 $9,050 $13,500 $10,000 $35,000 $170,000 $130,000 $731,860 $146,372 $73,186 $109,779 $182,965 $1,244,162 $1,245,000 $150,000 $135,000 $1,530,000 $370 $9 $12,000 $12,000 $35,000 $35,000 $94,379 $14,157 $23,595 $132,131 (continued on next page) G:\APROJECT\TUTU\PR0013.037\DATA\SRA4CST.XLS GERAGHTY & MILLER, INC. TUT O07 2196 Table 5-6. Cost Estimate - SRA 4 (Institutional Controls/Capping/Ex-Situ SVE/ln-Situ SVE/Excavation and page 2 of 3 On-Site Disposal), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY UNIT UNIT COST TOTAL COST O&M (ANNUAL) COSTS (YEARS 1 AND 2) - SRA 4 (continued) O&M PRESENT WORTH (Years 1 and 2) $252,832 (3% discount rate) O&M (ANNUAL) COSTS (YEARS 3 TO 30) - SRA 4 Pavement & Cap Maintenance (Sealing, patching) Ramsay Motors Tillett Gardens In-Situ SVE Systems Curriculum Center (in bedrock) O 'Henry Dry Cleaners(in bedrock) TOTAL (ANNUAL) O&M COSTS (YEARS 370 S.Y. 3 S.Y. 1 L.S. 1 L.S. Subtotal Administration & Legal Contingency (25%) 3 TO 30) - SRA 4 $1 S3 $35,000 $35,000 Costs (15%) O&M PRESENT WORTH (Years 3 to 30) $370 $9 $35,000 $35,000 $70,379 $10,557 $17,595 $98,531 $1,742,715 (3% discount rate) EQUIPMENT INSTALLATION. AND MATERIAL REPLACEMENT - SRA 4 Major Equipment 1 L.S. $160,000 $160,000 O&M PRESENT WORTH (Year 15) $102,704 (3% discount rate) Minor Equipment 1 L.S. $5,000 $5,000 O&M PRESENT WORTH (Years 5, 10, 15, 20, 25) $16,400 (3% discount rate) Pavement & Cap Replacement 1 L.S. $16,060 $16,060 O&M PRESENT WORTH (Years 15) $10,309 (3% discount rate) TOTAL O&M PRESENT WORTH - SRA 4 $2,125,000 N O&M (ANNUAL) COSTS (TO YEAR 5) - SCPs JH SCP at Esso 1 L.S. $20,000 $20,000 ,„ SCP at Texaco 1 L.S. $67,000 $67,000 O O&M (ANNUAL) PRESENT WORTH - SCPs, YEAR 5 (3% discount rate) $398,434 5 TOTAL O&M PRESENT WORTH - SCPs (In-Situ SVE) SAY $399,000 H TOTAL O&M PRESENT WORTH - SRA 4 AND SCPs $2,524,000 G:\APROJECT\TUTU\PR0013.037\DATA\SRA4CST.XLS GERAGHTY & MILLER, INC. Table 5-6. Cost Estimate - SRA 4 (Institutional Controls/Capping/Ex-Situ SVE/ln-Situ SVE/Excavation and page 3 of 3 On-Site Disposal), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY UNIT UNIT COST TOTAL COST GRAND TOTAL - SRA 4 GRAND TOTAL - SRA 4 AND SCPs $3,370,000 $4,054,000 L.S. Lump sum. EA. Each. C.Y. Cubic yard. S.Y. Square yard. O&M Operations and maintenance. SVE Soil vapor extraction. SRA Soil Remedial alternative. SCP Source control plan. Source (design and O&M assumptions) used for cost estimates is presented in Appendix C. G:\APROJECT\TUTU\PR0013.037\DATA\SRA4CST.XLS GERAGHTY & MILLER, INC. TUT OO7 2198 Page 1 of 3 Table 5-7. Cost Estimate - SRA 5 (Institutional Controls/Capping/In-Situ SVE [Bedrockl/Excavation and Off-Site Disposal), Tutu Wells Site, St. Thomas, U.S.Virgin Islands. ITEMS QUANTITY CAPITAL COSTS Deed Restrictions 1 Excavation 305 Off-Site Disposal 270 Site Restoration 305 Excavated soil sample analysis 1 6 In-Situ SVE Systems Curriculum Center (in bedrock) 1 O'Henry Dry CleanersOn bedrock) 1 PAVEMENT RESTORATION & CAPPING Ramsay Motors 40 Tillett Gardens 3 TOTAL CAPITAL COST - SRA 5 TOTAL CAPITAL COST - SCP AT ESSO (In-Situ SVE) TOTAL CAPITAL COST - SCP AT TEXACO (In-Situ SVE) TOTAL CAPITAL COST - SRA 5 AND SCPs O&M (ANNUAL) COSTS - SRA 5 In-Situ SVE Systems Curriculum Center (in bedrock) 1 O'Henry Dry Cleaners (in bedrock) 1 UNIT UNIT COST LS. $10,000 C.Y. $70 C.Y. $2,230 C.Y. $50 EA. $1,500 L.S. $170,000 L.S. $130,000 C.Y. $400 S.Y. $20 Subtotal Administration & Legal Costs (30%) Engineering Design (10%) Construction Supervision (15%) Contingency (25%) TOTAL CAPITAL COST - SAY LS. $35.000 LS. $35.000 TOTAL COST $10,000 $21,350 $602,100 $15,250 $24,000 $170,000 $130,000 $16,000 $60 $988,760 $296,628 $98,876 $148,314 $247,190 $1.779.768 $1,780,000 $150,000 $135,000 $2,065,000 $35,000 $35,000 (continued on next page) G:\APROJECT\TUTU\PR0013.037\DATA\SRA6CST.XLS GERAGHTY & MILLER, INC. TUT 007 2199 Page 2 of 3 Table 5-7. Cost Estimate - SRA 5 (Institutional Controls/Capping/ln-Situ SVE [BedrockJ/Excavation and Off-Site Disposal), Tutu Wells Site, St. Thomas, U.S.Virgin Islands. ITEMS QUANTITY UNIT UNIT COST TOTAL COST O&M (ANNUAL) COSTS - SRA 5 (continued) Pavement & Cap Maintenance (Sealing, patching) Ramsay Motors Tillett Gardens O&M PRESENT WORTH EQUIPMENT INSTALLATION. AND MATERIAL Major Equipment Minor Equipment Pavement & Cap Replacement 370 S.Y. $1 3 S.Y. $3 Subtotal Administration & Legal Costs (1 5%) Contingency (25%) TOTAL ANNUAL O&M COST - SRA 5, YEAR 30 (3% discount rate) REPLACEMENT 1 L.S. $160,000 O&M PRESENT WORTH (Year 1 5) (3% discount rate) 1 L.S. $5,000 O&M PRESENT WORTH (Years 5, 10, 15, 20, 25) (3% discount rate) 1 L.S. $16,060 O&M PRESENT WORTH (Year 1 5) (3% discount rate) $370 $9 $70,379 $10,557 $17,595 $98,531 $1,931,239 $160,000 $102,704 $5,000 $16,400 $16,060 $10,309 TOTAL O&M PRESENT WORTH - SRA 5 O&M (ANNUAL) COSTS (TO YEAR 51 - SCPs SCP at Esso SCP at Texaco L.S. L.S. $20,000 $67,000 O&M (ANNUAL) PRESENT WORTH - SCPs, YEAR 5 (3% discount rate) TOTAL O&M PRESENT WORTH - SCPs (In-Situ SVE) SAY $2,061,000 $20,000 $67,000 $398,434 $399,000 TOTAL O&M PRESENT WORTH - SRA 5 AND SCPs $2,460,000 G:\APHOJECTVrUTU\PHOO13.037\DATA\SRA6CST.XLS GERAGHTY & MILLER, INC. TUT • Page 3 of 3 Table 5-7. Cost Estimate - SRA 5 (Institutional Controls/Capping/ln-Situ SVE [Bedrockl/Excavation and Off-Site Disposal), Tutu Wells Site, St. Thomas, U.S.Virgin Islands. ITEMS QUANTITY UNIT UNIT COST TOTAL COST GRAND TOTAL - SRA 5 $3,841,000 GRAND TOTAL - SRA 5 AND SCPs $4,525,000 L.S. Lump sum. EA. Each. S.Y. Square yard. C.Y. Cubic yard. SVE Soil vapor extraction. O&M Operation and maintenance. SCP Source control plan. SRA Soil remediation alternative. Source (design and O&M assumptions) used for cost estimates is provides in Appendix C. x**"""*'N, 6:\APROJECT\TUTU\PROO13.037\DATA\SRABCST.XLS GERAGHTY & MILLER, INC. TUT °°7 22C>1 Table 5-8. Cost Estimate - GRA 1 (No Action/Institutional Controls), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY UNIT UNIT COST CAPITAL COSTS Deed Restrictions 1 L.S. $10,000 Subtotal Administration & Legal Costs (20%) Contingency (25%) TOTAL CAPITAL COST - TREATMENT TOTAL COST $10 $10 $2, $2, $14 ,000 ,000 000 500 ,500 TOTAL CAPITAL COST - GRA 1 SAY O&M (ANNUAL) COSTS Groundwater Monitoring 2 Sample rounds/year $32,000 Subtotal Administration & Legal Costs (15%) Contingency (25%) TOTAL ANNUAL O&M COST O&M PRESENT WORTH, YEAR 30 (3% discount rate) TOTAL O&M PRESENT WORTH - GRA 1 $15 $64 ,000 ,000 $64,000 $9,600 $16,000 $89,600 $1,756,196 $1,757,000 GRAND TOTAL - GRA 1 $1,772,000 GRA Groundwater remedial alternative. L.S. Lump sum. O&M Operation and maintenance. Source (design and O&M assumptions) for cost estimates is provided in Appendix C. G:\APROJECT\TUTU\PR0013.037\DATA\GRA1CST.XLS GERAGHTY & MILLER, INC. TUT 007 22O2 Table 5-9. Cost Estimate - GRA 2 (Institutional Controls/Source Containment/POET Systems/Treatment/ Pa0e 1 ot 3 Discharge), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS CAPITAL COSTS Deed Restrictions Site Preparation/Mobilization Well Decommissioning Site Acquisition Groundwater Extraction System Recovery Well Installation Submersible Pumps (installed) 4"-6" Double-Walled PVC Pipe (installed, with leak detection) Pre-Treatment (PO4) Low Profile Air Stripper (installed) Thermal Oxidizer (installed, if required) Liquid Phase Carbon Treatment System (installed, if required) Process Pumps Piping (installed) Discharge Pumps Piping (installed) Treatment Building (installed) Electric Electric Panel and Plant Wiring Conduit to Wells POET Systems (includes new well pump) GAC Unit (1-10 gpm) General Contractor QUANTITY 1 1 12 1 2 2 2,300 1 1 1 1 4 200 2 50 600 1 2,300 5 1 UNIT L.S. LS. EA. L.S. EA. EA. LF. L.S. LS. L.S. L.S. EA. L.F. EA. L.F. S.F. L.S. L.F. EA. L.S. Subtotal UNIT COST $10,000 $40,000 $1,000 $25,000 $38,000 $6,000 $65 $15,000 $25,000 $185,000 $35,000 $5,000 $10 $10,000 $30 $60 $50,000 $2 $5,000 $80,000 Administration & Legal Costs (20%) Engineering Design (10%) Construction Supervision (15%) Contingency (25%) TOTAL CAPITAL COST - GRA 2 TOTAL CAPITAL COST - SCP AT ESSO TOTAL CAPITAL COST - SCP AT TEXACO TOTAL CAPITAL COST - TREATMENT TOTAL COST $10,000 $40,000 $12,000 $25,000 $76,000 $12,000 $149,500 $15,000 $25,000 $185,000 $35,000 $20,000 $2,000 $20,000 $1,500 $36,000 $50,000 $4,600 $25,000 $80,000 $823,600 $164,720 $82,360 $123,540 $205,900 $1,400,120 $1,401,000 $100,000 $865,000 TOTAL CAPITAL COST - GRA 2 AND SCPs $2,366,000 G:\APROJECT\TUTU\PROO13.O37\DATA\GRA2CST.XLS GERAGHTY & MILLER, INC. TUT OO7 Table 5-9. Cost Estimate - GRA 2 (Institutional Controls/Source Containment/POET Systems/Treatment/ Page 2 of 3 Discharge), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS O&M (ANNUAL) COSTS - GRA 2 Groundwater Monitoring Electricity (Avg) Chemical Usage (PO4) Supplemental Fuel (Propane) Carbon Replacement Carbon Replacement (POET) System Operation (one person - full time) POET System Monitoring (Avg) Treatment System Monitoring (Avg) O&M PRESENT WORTH EQUIPMENT REPLACEMENT - GRA 2 Major Equipment Replacement Minor Equipment Replacement TOTAL O&M PRESENT WORTH - GRA 2 QUANTITY UNIT UNIT COST 2 Sample rounds/year $32,000 240,000 j Kilowatt-hour $0.10 1 L.S. $10,000 1 L.S. $25,000 2,000 Pounds of carbon $6 1,000 Pounds of carbon $6 1 L.S. $35,000 60 EA. $1,000 12 EA. $1,000 Subtotal Administration and Legal Costs (15%) Contingency (25%) TOTAL ANNUAL O&M COST - GRA 2, YEAR 30 (3% discount rate) 1 L.S. $260,000 O&M PRESENT WORTH (Year 15) (3% discount rate) 1 L.S. $25,000 O&M PRESENT WORTH (Years 5, 10, 15, 20, 25) (3% discount rate) TOTAL COST $64,000 $24,000 $10,000 $25,000 $12,000 $6,000 $35,000 $60,000 $12,000 $248,000 $37,200 $62,000 $347,200 $6,806,000 $260,000 $166,894 $25,000 $81,998 $7,055,000 O&M (ANNUAL) COSTS (TO YEAR 5) - SCPs SCP at Esso SCP at Texaco 1 L.S. $6O,000 1 L.S. $101,000 TOTAL ANNUAL O&M COST O&M PRESENT WORTH - SCPs, YEAR 5 (3% discount rate) TOTAL O&M PRESENT WORTH - GRA 2 AND SCPs GRAND TOTAL - GRA 2 GRAND TOTAL - GRA 2 AND SCPs $60,000 $101,000 $161,000 $738,000 $7,793,000 $8,456,000 $10,159,000 G:\APROJECTVTUTU\PR0013.037\DATA\GRA2CST.XLS GERAGHTY & MILLER, INC. TUT OO7 2204 Table 5-9. Cost Estimate - GRA 2 (Institutional Controls/Source Containment/POET Systems/Treatment/ Page 3 of 3 Discharge), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY UNIT UNIT COST TOTAL COST L.F. Linear feet. S.F. Square feet. L.S. Lump Sum. EA. Each. gpm Gallons per minute. POET Point-of-Entry Treatment. GAC Granular Activated Carbon. PO4 Orthophosphates. O&M Operation and maintenance. PVC Polyvinyl chloride. SCP Source control plan. GRA Groundwater remedial alternative. Source (design and O&M assumptions) for cost estimates is provided in Appendix C. G:\APROJECT\TUTU\PRO013.O37\DATA\GRA2CST.XLS GERAGHTY & MILLER, INC. TUT OO7 22O5 Page 1 of 3 Table 5-10. Cost Estimate - GRA 3 (Institutional Controls/Plume Containment/Treatment/ Discharge), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY CAPITAL COSTS Deed Restrictions 1 Site Preparation/Mobilization 1 Well Decommissioning 17 Site Acquisition 1 Groundwater Extraction System Recovery Well Installation 3 Submersible Pumps (installed) 3 4"-6" Double-Walled PVC Pipe 3,300 (installed, with leak detection) Pre-Treatment (PO4) 1 Low Profile Air Stripper (installed) 1 Thermal Oxidizer (if required, installed) 1 Liquid Phase Carbon Treatment System (if required, installed) 1 Process Pumps 4 Piping (installed) 200 Discharge Pump 2 Piping (installed) 50 Treatment Building (installed) 600 Electric Electric Panel and Plant Wiring 1 Conduit to Wells 3,300 General Contractor 1 UNIT L.S. L.S. EA. L.S. EA. EA. L.F. L.S. L.S. L.S. L.S. EA. L.F. EA. L.F. S.F. L.S. L.F. L.S. Subtotal UNIT COST $10,000 $40,000 $1,000 $25,000 $38,000 $6,000 $65 $15,000 $25,000 $185,000 $35,000 $5,000 $10 $10,000 $30 $60 $50,000 $2 $90,000 Administration & Legal Costs (20%) Engineering Design (10%) Construction Supervision (1 Contingency (25%) 5%) TOTAL CAPITAL COST - TREATMENT TOTAL CAPITAL COST - GRA 3 TOTAL CAPITAL COST - SCP AT ESSO TOTAL CAPITAL COST - SCP AT TEXACO TOTAL COST $10,000 $40,000 $17,000 $25,000 $114,000 $18,000 $214,500 $15,000 $25,000 $185,000 $35,000 $20,000 $2,000 $20,000 $1,500 $36,000 $50,000 $6,600 $90,000 $924,600 $184,920 $92,460 $138,690 $231,150 $1,571,820 $1,572,000 $100,000 $865,000 TOTAL CAPITAL COST - GRA 3 AND SCPs $2,537,000 Q:\APROJECT\TUTU\PR0013.037\DATA\GRA3CST.XLS GERAGHTY & MILLER, INC. TUT 007 2206 Table 5-10. Cost Estimate - GRA 3 (Institutional Controls/Plume Containment/Treatment/ Discharge), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY UNIT UNIT COST Page 2 of 3 TOTAL COST O&M (ANNUAL) COSTS - GRA 3 Groundwater Monitoring Electricity (Avg) Chemical Usage (PO4) Supplemental Fuel (Propane) Carbon Replacement System Operation (one person - full time) Treatment System Monitoring (Avg) 2 Sample rounds/year 270,000 Kilowatt-hour 1 L.S. 1 L.S. 2,000 Pounds of carbon 1 L.S. 12 EA. $32,000 $0.10 $10,000 $25,000 $6 $35,000 $1,000 EQUIPMENT REPLACEMENT - GRA 3 Major Equipment Replacement Minor Equipment Replacement TOTAL O&M PRESENT WORTH - GRA 3 O&M (ANNUAL) COSTS (TO YEAR 5) - SCPs SCP at Esso 1 SCP at Texaco 1 L.S. L.S. $60,000 $101,000 TOTAL ANNUAL O&M COST O&M PRESENT WORTH, YEAR 5 (3% discount rate) TOTAL O&M PRESENT WORTH - GRA 3 AND SCPs $64,000 $27,000 $10,000 $25,000 $12,000 $35,000 $12,000 Subtotal Administration and Legal Costs (15%) Contingency (25%) TOTAL ANNUAL O&M COST !TH, YEAR 30 (3% discount rate) 1 L.S. $260,000 O&M PRESENT WORTH (Year 15) (3% discount rate) 1 L.S. $49,035 O&M PRESENT WORTH (Years 5, 10, 15, 20, 25) (3% discount rate) $185,000 $27,750 $46,250 $259,000 $5,077,000 $260,000 $166,894 $49,035 $160,830 $5,405,000 $60,000 $101,000 $161,000 $738,000 $6,143,000 GRAND TOTAL GRA 3 $6,977,000 G:\APROJECT\TUTU\PR0013.037\DATA\GRA3CST.XLS GERAGHTY & MILLER, INC. TUT 007 2207 Page 3 of 3 Table 5-10. Cost Estimate - GRA 3 (Institutional Controls/Plume Containment/Treatment/ Discharge), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY UNIT UNIT COST TOTAL COST GRAND TOTAL - GRA 3 AND SCPs ______________________________________________$8,680,000 L.F. Linear feet. S.F. Square feet. L.S. Lump Sum. EA. Each. PVC Polyvinyl chloride. PO4 Orthophosphates. O&M Operation and maintenance. SCP Source control plan. GRA Groundwater remedial alternative. Source (design and O&M assumptions) for cost estimates is provided in Appendix C. G:\APROJECTVUmj\PR0013.037\DATA\GRA3CST.XLS GERAGHTY & MILLER, INC. ' U'' °°7 22°8 Page 1 of 3 Table 5-11. Cost Estimate - GRA 4 (Institutional Controls/Source and Plume Containment/Treatment/ Discharge), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY CAPITAL COSTS Deed Restrictions 1 Site Preparation/Mobilization 1 Well Decommissioning 17 Site Aquisition 1 Groundwater Extraction System Recovery Well Installation 5 Submersible Pumps (installed) 5 4"-6" Double-Walled PVC Pipe 5,200 (installed, with leak detection) Pre-Treatment (PO4) 1 Low Profile Air Stripper (installed) 1 Thermal Oxidizer (if required, installed) 1 Liquid Phase Carbon Treatment System (if required, installed) 1 Process Pumps 4 Piping (installed) 200 Discharge Pump 2 Piping (installed) 50 Treatment Building (installed) 600 Electric Electric Panel and Plant Wiring 1 Conduit to Wells 5,200 General Contractor 1 UNIT L.S. L.S. EA. L.S. EA. EA. L.F. L.S. L.S. L.S. L.S. EA. L.F. EA. L.F. S.F. L.S. L.F. L.S. Subtotal UNIT COST $10,000 $40,000 $1,000 $25,000 $38,000 $6,000 $65 $25,000 $40,000 $250,000 $50,000 $5,000 $10 $10,000 $30 $60 $70,000 $2 $125,000 Administration & Legal Costs (20%) TOTAL CAPITAL COST - GRA 4 TOTAL CAPITAL COST - SCP AT ESSO TOTAL CAPITAL COST - SCP AT TEXACO TOTAL CAPITAL COST - GRA 4 AND SCPs G:\APROJECT\TUTU\PR0013.037\DATA\GRA4CST.XLS Engineering Design (10%) Construction Supervision Contingency (25%) TOTAL CAPITAL COST - GERAGHTY & MILLER, INC. (15%) TREATMENT TUT O07 TOTAL COST $10,000 $40,000 $17,000 $25,000 $190,000 $30,000 $338,000 $25,000 $40,000 $250,000 $50,000 $20,000 $2,000 $20,000 $1,500 $36,000 $70,000 $10,400 $125,000 $1,299,900 $259,980 $129,990 $194,985 $324,975 $2,209,830 $2,210,000 $100,000 $865,000 $3,175,000 2209 J\ Page 2 of 3 Table 5-11. Cost Estimate - GRA 4 (Institutional Controls/Source and Plume Containment/Treatment/ Discharge), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS O&M (ANNUAL) COSTS Groundwater Monitoring Electricity (Avg) Supplemental Fuel (Propane) Chemical Usage (PO4) Carbon Replacement System Operation (one person - full time) Treatment System Monitoring (Avg) QUANTITY UNIT UNIT COST 2 Sample rounds/year $32,000 470,000 Kilowatt-hour $0.10 1 L.S. $38,000 1 L.S. $10,000 3,000 Pounds of carbon $6 1 L.S. $35,000 12 EA. $1,000 Subtotal Administration & Legal Costs (15%) Contingency (25%) TOTAL ANNUAL O&M COST O&M PRESENT WORTH, YEAR 30 (3% discount rate) EQUIPMENT REPLACEMENT - GRA 4 Major Equipment Replacement Minor Equipment Replacement TOTAL O&M PRESENT WORTH - GRA O&M (ANNUAL) COSTS (TO YEAR 5) - SCP at Esso SCP at Texaco 1 L.S. $365,000 O&M PRESENT WORTH (Year 15) (3% discount rate) 1 L.S. $63,490 O&M PRESENT WORTH (Years 5, 10, 15, 20, 25) (3% discount rate) 4 SCPs 1 L.S. $60,000 1 L.S. $101,000 TOTAL ANNUAL O&M COST O&M PRESENT WORTH - SCPs, YEAR 5 (3% discount rate) TOTAL O&M PRESENT WORTH - GRA 4 AND SCPs TOTAL COST $64,000 $47,000 $38,000 $10,000 $18,000 $35,000 $12,000 $224,000 $33,600 $56,000 $313,600 $6,147,000 $365,000 $234,294 $63,490 $208,241 $6,590,000 $60,000 $101,000 $161,000 $738,000 $7,328,000 GRAND TOTAL - GRA 4 $8,800,000 G:\APROJECT\TUTU\PR0013.037\DATA\GRA4CST.XLS GERAGHTY & MILLER, INC. TUT OO7 221C Page 3 of 3 Table 5-11. Cost Estimate - GRA 4 (Institutional Controls/Source and Plume Containment/Treatment/ Discharge), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY UNIT UNIT COST TOTAL COST GRAND TOTAL - GRA 4 AND SCPs_______________________________________________$10,503,000 L.F. Linear feet. S.F. Square feet. L.S. Lump Sum. EA. Each. PVC Polyvinyl chloride. GRA Groundwater remedial alternative. PO4 Orthophosphates. O&M Operation and maintenance. SCP Source control plan. Source (design and O&M assumptions) for cost estimates is provided in Appendix C. G:\APROJECT\TUTU\PH0013.037\DATA\GRA4CST.XLS GERAGHTY & MILLER, INC. 'Ul °°7 221i ^ap^ Table 5-12. Cost Comparison of Remedial Alternatives, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Remedial Alternative SRA 1 SRA 2 and SCPs SRA 3 and SCPs SRA 4 and SCPs SRA 5 and SCPs GRA 1 GRA 2 and SCPs GRA 3 and SCPs GRA 4 and SCPs Capital Cost $15,000 $338,000 $1,561,000 $1,530,000 $2,065,000 $15,000 $2,366,000 $2,537,000 $3,175,000 Present Worth O& M - $441,000 $2,553,000 $2,524,000 $2,460,000 $1,757,000 $7,793,000 $6,143,000 $7,328,000 Total Cost $15,000 $779,000 $4,114,000 $4,054,000 $4,525,000 $1,772,000 $10,159,000 $8,680,000 $10,503,000 SRA Soil remedial alternative. SCPs Source control plans for the Texaco and Esso properties. GRA Groundwater remedial alternative. O&M Operations and maintenance. G:\APROJECT\TUTU\PRO013.037\DATA\TB612CST.XLS GERAGHTY^ MILLER, INC. 'Ul °°7 22i2 Table 5-13. Summary of Comparative Analysis of Preferred Remedial Alternatives for Soil and Groundwater, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. NCP Criteria Preferred Remedial Alternatives Soil Groundwater Protection of human health SRA 3 and GRA 4 and the environment. SRA 4 Compliance with ARARs. SRA 3 and GRA 4 SRA 4 Short-term effectiveness. SRA 2 GRA 2 Long-term effectiveness. SRA 3 and GRA 4 SRA 4 Reduction of toxicity, SRA 4 GRA 4 mobility, or volume. Implementability SRA 3 and GRA 3 SRA 4 Cost SRA 2 GRA 3 NCP National contingency plan. SRA Soil remedial alternative. GRA Groundwater remedial alternative. ARARs Applicable or relevant and appropriate requirements. G:\APROJECTVTUTU\PROO13.037\d4t.\COMPPnE.XLS TUT 007 GERAGHTY & MILLER, INC. H C K! TUTU WELLS SITE >l*sXr$\ f ^ ^Wi^O^^fc^ r \ LT'- ^tj:^. VTA* s£r /$ *f ^,-^r= * •w: 1M|;>-^-1^ j SS//^ ^-vse1-^^- SOURCE: USGS-EASTERN ST. THOMAS, VIRGIN ISLANDS, 1954 (PHOTOREVISED - 1982) GERAGHTY & MILLER, INC. Services A Heidemif Company SITE LOCATION TUTU WELLS SITE ST. THOMAS, U.S. VIRGIN ISLANDS FIGURE 1-1 TUT OO7 2215 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 1-2 PROPERTY LOCATIONS (Page: TUT 007 2216) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 2-1 BASE MAP WITH TOPOGRAPHIC CONTOURS (Page: TUT 007 2217) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 2-2 OVERBURDEN THICKNESS (Page: TUT 007 2218) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 2-3 GROUNDWATER CONTOUR MAP SHALLOW WELLS, MAY 23 TO 24, 1994 (Page: TUT 007 2219) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18TH FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 2-4 GROUNDWATER CONTOUR MAP DEEP BEDROCK WELLS, MAY 23 TO 24, 1994 (Page: TUT 007 2220) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 4-1 SOIL IMPACTED WITH BTEX AND VOCS ABOVE SOIL SCREENING LEVELS CURRICULUM CENTER (FORMER LAGA FACILITY) (Page: TUT 007 2221) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 4-2 SOIL IMPACTED WITH BTEX ABOVE SOIL SCREENING LEVELS RAMSAY MOTORS (Page: TUT 007 2222) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 ERA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 4-3 SOIL IMPACTED WITH BTEX ABOVE SOIL SCREENING LEVELS TEXACO TUTU SERVICE STATION (Page: TUT 007 2223) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 4-4 SOIL IMPACTED WITH PCBS AND MANGANESE ABOVE USEPA RISK ASSESSMENT VALUES TILLETT GARDENS (Page: TUT 007 2224) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 4-5 SOIL IMPACTED WITH BTEX ABOVE SOIL SCREENING LEVELS ADJACENT TO THE WESTERN AUTO FACILITY (Page: TUT 007 2225) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 4-6 SOIL IMPACTED WITH BTEX AND VOCS ABOVE SOIL SCREENING LEVELS ESSO TUTU SERVICE STATION (Page: TUT 007 2226) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 4-7 SOIL IMPACTED WITH VOCS ABOVE SOIL SCREENING LEVELS O'HENRY DRY CLEANERS (Page: TUT 007 2227) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #650t4 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 4-8 CAPTURE ZONES OF PROPOSED SOURCE CONTROL PLANS FOR BTEX CONSTITUENTS (Page: TUT 007 2228) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION 11 SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 4-9 PROJECTED CAPTURE ZONES FOR GROUNDWATER REMEDIAL ALTERNATIVE GRA 4 (Page: TUT 007 2229) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18 TH FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #650t4 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 4-10 GENERALIZED COMBINED CAPTURE ZONES (Page: TUT 007 2230) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 4-11 SCHEMATIC OF GROUNDWATER TREATMENT OPTION FOR DISCHARGE TO SURFACE WATER (Page: TUT 007 2231) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE 5-1 CONCEPTUAL LAYOUT OF PROPOSED GROUNDWATER REMEDIES (Page: TUT 007 2232) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 IP APPENDIX A SUMMARY OF DESIGN ASSUMPTIONS FOR POTABLE WATER DISCHARGE COST ESTIMATE GERAGHTY & MILLER, INC. "UT APPENDIX A SUMMARY OF DESIGN ASSUMPTIONS FOR POTABLE WATER DISCHARGE COST ESTIMATE To evaluate the cost for selecting discharge option for potable use, the various design assumptions for potable treatment and discharge for Groundwater Remedial Alternative 4 (GRA 4) are presented below. A detailed cost estimate for potable discharge for GRA 4 is presented in Table A-l. Estimated costs are based on means cost estimating data, vendor information, and engineering experience. The accuracy of such cost estimates is in conformance with current USEPA guidance (+50 percent to -30 percent). Comparison of the cost for potable discharge with the discharge to surface water option for GRA 4 demonstrates that the potable use discharge option is much more costly. Because the potable use discharge option is not cost-effective and it may be difficult to implement, this discharge option was not used in the assembly of GRAs in this FS Report. DESIGN ASSUMPTIONS FOR GROUNDWATER EXTRACTION SYSTEMS 1. Design assumptions for deed restrictions, mobilization, well decommissioning, and groundwater extraction systems are the same as for the discharge to surface water. DESIGN ASSUMPTIONS FOR SITE ACQUISITION 1. Cost of property purchase for treatment area and for obtaining right-of-ways for recovery wells. Property required is assumed to be two times greater for a potable (approximately 1.5 acres) vs. non-potable (approximately 0.75 acre) application. DESIGN ASSUMPTIONS FOR GROUNDWATER TREATMENT SYSTEM 1. Chemical treatment for potable use assumed to be ion exchange (for inorganic solids removal). Cost assumes all components necessary to run ion exchange unit. GERAGHTY & MILLER, INC. TUT °°7 A-2 Component sizing is based on estimated flow rates. Backwash from the ion exchange is assumed to be discharged to the publicly-owned treatment works (POTW) (+ 1,200 gallons/day). 2. Sand niters are assumed to be dual media type with 4 gallon per minute/square foot (gpm/sf) application rate, based on estimated flow. A portion or all of the backwash (if required) will be recovered to the head of the plant. 3. For GRA 2 and GRA 3, a 5,000-gallon sludge holding tank (thickener) for process waste from ion exchange and potentially a portion of backwash effluent (if required) is assumed. For GRA 4, an 8,000-gallon tank and appurtenances are assumed. 4. For GRA 2 and GRA 3, the nitric acid feed for pH adjustment is estimated at a maximum of 2 gallons per day (gpd), if needed, and includes all associated appurtenances. For GRA 4, the nitric acid feed for pH adjustment is estimated at a maximum of 3 gpd, if needed, and includes all associated appurtenances. 5. The low-profile air stripper is a tray aeration unit with blower, controls, and appurtenances. The unit costs are based on vendor quotes, based on the estimated groundwater quality for each GRA and the estimated flow rate. Based on the preliminary VOC concentrations, one stripper is assumed to be sufficient to treat the groundwater. 6. The thermal oxidizer, if required, is assumed to be a 1,000-standard cubic feet per minute (scfrn) unit for GRA 2 and GRA 3, with fan, controls, and appurtenances. For GRA 4, a 2,000-scfrn unit is assumed with all associated appurtenances. Preliminary calculations indicate that air treatment associated with the groundwater treatment system is not required for any of the GRAs considered. Final design g:^project\lutu'>pr0013.037VeportsUppa.doc GERAGHTY & MILLER, INC. A-3 evaluations may vary; therefore, thermal oxidation for treatment of air discharge is included. 7. Liquid phase granular activated carbon (GAC) treatment is provided as a back-up "polishing unit," in case the air stripper malfunctions. For GRA 2 and GRA 3, GAC units were assumed to be two 2,000-pound units in parallel, with a permanent installation. For GRA 4, GAC units are assumed to be configured in the same manner except 3,000-pound units in parallel would be used. By-pass piping can be provided to minimize carbon use. 8. Process pumps are assumed to be centrifugal pumps rated as follows: • GRA 2 (four) 2-horsepower (hp) pumps, piping and appurtenances. • GRA 3 (four) 2-hp pumps, piping and appurtenances. • GRA 4 (four) 5-hp pumps, piping and appurtenances. Potable use includes a backup pump. 9. Discharge pumps are assumed to be vertical turbine pumps rated as follows: • GRA 2 (two) 2-hp pumps, piping and appurtenances. • GRA 3 (two) 2-hp pumps, piping and appurtenances. • GRA 4 (two) 5-hp pumps, piping and appurtenances. Potable use includes a backup pump. 10. A holding tank is assumed to be aboveground, welded steel construction with concrete foundation, level measuring devices, and appurtenances. The tank is sized to provide approximately 1 day storage based on the estimated flow rate capacity of the facility. g:\aproject\tutu'^r0013.03TTepot1«\appa.(k)C TUT OO7 '79;-:;-7 — GERAGHTY & MILLER, INC. O A-4 11. A distribution tank, assumed to be an elevated welded steel tank with concrete foundation, level measuring devices, and appurtenances, sized to provide approximately 2 days' storage based on the estimated flow rate capacity of the facility. 12. The treatment building is sized to accommodate major equipment components of the treatment facility. The cost includes labor and equipment, and butler type building set on a poured concrete foundation. 13. Lump sum cost for electrical includes Motor Control Center (MCC), starters, electric service and connections, controls and control panel, leak detection, and remote dial out. Electrical conduit will go to each well for the submersible pumps and use the same trench as the extraction piping (it is assumed that no emergency back up power will be provided). 14. It is assumed that for GRA 3 and GRA 4, water will continue to be supplied as it is now, by rainwater cisterns or by trucking water. Operation & Maintenance (O&M) Assumptions for GRAs 1. Electrical costs are for the well pumps, blowers, and process and discharge pumps associated with the treatment units. An allowance for building heating and lighting is also included. The power usage is estimated to be equivalent to 62 hp, operating 24 hours a day plus 25 percent. Cost estimates been made utilizing an average price of electricity per kilowatt hour of $ 0.10. 2. Chemical usage based influent groundwater quality and estimated influent flow rate, and vendor quotation. Storage is not provided because the product is delivered in storage containers. g:\aproject\tutu\pr0013.03T«porU\appa.doc TUT OO7 22:"'S GERAGHTY & MILLER, INC. A-5 3. Carbon replacement is assumed to be minimal due to the redundancy provided by the air stripper. For GRA 4, it is assumed that one unit change-out every year (3,000 Ibs) will be performed. 4. Supplemental fuel for Therm-Ox is assumed to be propane. For the 1,000-scfm unit, 10,000 therms/year (equivalent to 100,000 BTUs per year) at Sl.OO/therm is assumed, and 15,000 therms/year is assumed for the 2,000-scfrn unit. 5. System operation assumes one full-time person for the treatment facility and effluent monitoring. 6. System monitoring is expressed as a sampling average annually. It is assumed that 30 samples will be collected to monitor quality for potable use (1 sample every 2 weeks plus 4 will be required for compliance monitoring). Additional samples will be collected and tested by the operator using a portable gas chromatograph (GC) on average of two samples per week. ASSUMPTIONS FOR EQUIPMENT INSTALLATION AND MATERIAL REPLACEMENT 1. Major equipment replacement entails complete replacement of process equipment such as air strippers, portable GC, GAC, and ion exchange units, and 10 percent of the storage tanks' capital cost (for painting and maintenance) 2. Minor equipment replacement entails replacing pumps and blowers, etc., every 5 years (10 percent of chemical treatment and electrical costs, 5 percent of groundwater recovery systems [includes well pumps and treatment building], SO percent for discharge and process pumps and piping). g:\aproject\tutu\pi0013.037Veports\appa.doc "n n~ or)"7 •".><-.»"•.;• •••-• GERAGHTY & MILLER, INC. Table A-1. Estimated Cost of Potable Discharge Option for GRA 4 (Institutional Controls, Source and Plume Containment, page 1 of 2 Treatment, and Discharge), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS CAPITAL COSTS Deed Restrictions Site Preparation/Mobilization Well Decommissioning Site Acquisition Groundwater Extraction System Recovery Well Installation Submersible Pumps (Installed) 4"-6" Double-Walled PVC Pipe (Installed, with Leak Detection) Chemical Treatment (Ion Exchange) Low Profile Air Stripper (Installed) Thermal Oxidizer (If required, installed) Sand Filters with Backwash Pump Liquid Phase Carbon Treatment System (If required. Installed) Sludge Handling Equipment Process Pumps Piping (Installed) Discharge Pump Piping (Installed) pH Adjustment System Holding Tank (144,000 gallons, installed) Elevated Distribution Tank (290,000 gallons, installed) Treatment Building (Installed) Portable GC Analyzer Electric Electric Panel and Plant Wiring Conduit to Wells General Contracting QUANTITY 1 1 17 1 5 5 5,200 1 1 1 1 1 1 4 400 2 100 1 1 1 1,600 1 1 5,200 1 UNIT L.S. L.S. EA. L.S. EA. EA. L.F. L.S. L.S. L.S. L.S. L.S. L.S. EA. L.F. EA. L.F. LS. LS. L.S. S.F. LS. L.S. L.F. LS. Subtotal UNIT COST $10,000 $25,000 $1,000 $25,000 $38,000 $6,000 $65 $85,000 $40,000 $250,000 $70,000 $50,000 $20,000 $5,000 $10 $10,000 $30 $10,000 $180,000 $725,000 $60 $20,000 $100,000 $2 $240,000 Administration & Legal Costs (20%) TOTAL CAPITAL COST - GRA 4 Engineering Design (10%) Construction Supervision Contingency (25%) TOTAL CAPITAL COST - (15%) TREATMENT TOTAL COST $10,000 $25,000 $17,000 $25,000 $190,000 $30,000 $338,000 $85,000 $40,000 $250,000 $70,000 $50,000 $20,000 $20,000 $4,000 $20,000 $3,000 $10,000 $180,000 $725,000 $96,000 $20,000 $100,000 $10,400 $240,000 $2,578,400 $515,680 $257,840 $386,760 $644,600 $4,383,280 $4,384,000 G:\APROJECT\TUTU\PR0013.037\DATA\GRA4ACST.XLS GERAGHTY & MILLER, INC. TUT 224O Table A-1. Estimated Cost of Potable Discharge Option for GRA 4 (Institutional Controls, Source and Plume Containment, page 2 of 2 Treatment, and Discharge), Tutu Wells Site, St. Thomas, U.S. Virgin Islands. ITEMS QUANTITY UNIT UNIT COST O&M (ANNUAL) COSTS Groundwater Monitoring 2 Sample rounds/year $32,000 Electricity (Avg) 511,000 Kilowatt-hour $0.10 Supplemental Fuel (Propane) 1 L.S. $15,000 Carbon Replacement 3,000 Pounds of Carbon $6 Chemical Usage 1 L.S. $10,000 Sludge Disposal (non-hazardous) 350 C.Y. $350 System Operation 1 L.S. $35,000 (One person - full time) Treatment System Monitoring (Avg) 30 EA. $1,000 GC Chemical Buffer Solutions and Equipment 1 L.S. $5,000 Subtotal Administration & Legal Costs (10%) Contingency (25%) TOTAL ANNUAL O&M COST O&M PRESENT WORTH, YEAR 30 (3% discount rate) EQUIPMENT REPLACEMENT Major Equipment Replacement 1 L.S. $365,500 O&M PRESENT WORTH (Year 1 5) (3% discount rate) Minor Equipment Replacement 1 L.S. $87,740 O&M PRESENT WORTH (Years 5, 10, 15, 20, 25) (3% discount rate) TOTAL O&M PRESENT WORTH - GRA 4 GRAND TOTAL - GRA 4 L.F. Linear feet. S.F. Square feet. L.S. Lump Sum. EA. Each. gpm Gallons per minute. GAC Granular Activated Carbon. PO4 Orthophosphates. O&M Operation and maintenance. GC Gas-Chromatography. Note: Refer to Appendix C for source (design and O&M assumptions) for cost estimates. TOTAL COST $64,000 $51,100 $15,000 $18,000 $10,000 $122,500 $35,000, £ $30,000 $5,000 $350,600 $35,060 $87,650 $473,310 $9,277,065 $365,500 $234,600 "V- $87,740 $287,774 $9,800,000 $14,184,000 ' «? G:\APROJECT\TUTU\PR0013.037\DATA\GRA4ACST.XLS GERAGHTI~& MILLER, INC. TUT OO7 241 EPA REGION II SCANNING TRACKING SHEET DOC ID #65014 DOC TITLE/SUBJECT: TUTU WELLS SUPERFUND SITE FIGURE A-1 SCHEMATIC OF GROUNDWATER TREATMENT OPTION FOR POTABLE USE (Page: TUT 007 2242) THIS DOCUMENT IS OVERSIZED AND CAN BE LOCATED IN THE ADMINISTRATIVE RECORD FILE AT THE SUPERFUND RECORDS CENTER 290 BROADWAY, 18™ FLOOR NEW YORK, NY 10007 II APPENDIX B SUMMARY OF CAPTURE ZONE ANALYSES GERAGHTY & MILLER, INC. IUl yo/ k::'"44 APPENDIX B SUMMARY OF CAPTURE ZONE ANALYSES CAPTURE ZONE ANALYSIS FOR THE TEXACO TUTU SERVICE STATION SOURCE CONTROL PLAN For the purposes of this FS Report the following assumptions for the proposed Source Control Plan for the Texaco Tutu Service Station were used to calculate the potential capture zone for the proposed extraction wells. These assumptions are based on the aquifer characteristics presented in the RI report (Geraghty & Miller, Inc. 1995) and the proposed Source Plan prepared by Erler and Kalinowsky, Inc. (EKI) (1995a). The proposed extraction wells for source control near the Texaco Tutu Service Station include the following: • Proposed Texaco Extraction Well TEW-1 will replace Monitoring Well TT-1 (at the Texaco Tutu Service Station); • Proposed Texaco Extraction Well TEW-2 will be located approximately 25 feet west of Monitoring Well MW-7 (at the Vitelco Property). In addition, a third shallow Texaco Extraction Well TEW-3 is proposed at the Texaco Tutu Service Station as a contingency if proposed Texaco Extraction Well TEW-1 cannot obtain the desired capture. Deep extraction wells TEW-ID, TEW-2D, and TEW-3D are also proposed for groundwater monitoring and possibly pumping, if necessary, to achieve capture throughout the vertical extent of groundwater contamination. TUT OO7 2245 GERAGHTY & MILLER, INC. B-2 The well screens for the proposed extraction wells TEW-1 and TEW-2 would be placed at 170 feet to 140 feet msl (EKI 1995a). For groundwater modeling, EKI selected the elevation of 90 feet msl as the base of the aquifer (i.e., approximate saturated thickness of 72 feet) based on the projected maximum depth of benzene, toluene, ethylbenzene, and xylene (BTEX) contamination. This depth would be the designed maximum depth for capture of contaminants. EKI (1995b) prepared a capture zone analysis based on numerical modeling of groundwater flow. The predicted capture zone for the combined effect of pumpage from the two proposed primary shallow Texaco Extraction Wells TEW-1 (at 20 gpm) and TEW-2 (at 10 gpm) was prepared by EKI (1995b) and is shown on Figure 4-8. CAPTURE ZONE ANALYSIS FOR THE ESSO TUTU SERVICE STATION SOURCE CONTROL PLAN For the purposes of this FS Report, the following assumptions for the proposed Source Control Plan for the Esso Service Station were used to calculate the potential capture zone for the proposed extraction wells. These assumptions are based on the aquifer characteristics presented in the RI report (Geraghty & Miller, Inc. 1995), the well selection and estimated pumping rates from Forensic Environmental Services, Inc. (FES) (1995), and the proposed Source Control Plan prepared by FES. The proposed extraction wells for source control at the Esso Tutu Service Station include the following: Monitoring Well SW-1, Monitoring Well SW-7, Monitoring Well CHT-3, and Monitoring Well MW-9. Existing monitoring wells are proposed to be used as extraction wells for the Esso Tutu Service Station. FES prepared and plotted the results of capture zone analyses for the four proposed extraction wells based on an aquifer thickness of 50 feet. This depth would be the designed maximum depth for the capture of BTEX contaminants. For the purpose of this FS Report, the predicted capture zones of the four proposed primary shallow extraction wells are shown on Figure 4-8. 2246 GERAGHTY & MILLER, INC. B-3 SITE-WIDE CAPTURE ZONE ANALYSIS The dimensions of the capture zones for potential Recovery Wells RW-1, RW-2, RW-3, RW-4, and RW-5 under the pumping scenario for GRA 4 were calculated using Equation 1 described below. The capture zones and locations of the recovery wells are shown on Figure 4-9. Equation 1: y = (Q/(2 71 TI) arctan (y/x) (USEPA 1991 c) where y = Distance from the center axis of the capture zone to the edge, in feet. x = Distance from the recovery well along the axis of the capture zone to the downgradient edge, in feet. Q = Pumping rate of recovery well, in gallons per day (gpd). T = Transmissivity of the formation, in gpd/foot. I = Local hydraulic gradient. (I = change in hydraulic head/change in distance.) To adequately plot the capture zones, three dimensions are needed: W0 The width of the capture zone in the immediate vicinity of the recovery well. Xo The distance from the well to the downgradient extent of the capture zone. W The maximum width of the capture zone, upgradient of the recovery well. Solving Equation 1 for the above parameters, the following equations were obtained: Equation 2: W0 - Q/(2 TI), and (USEPA 1987, 1991c) Equations: Xo= Q/(27CTI) (USEPA 1987, 1991 c) GERAGHTY & MILLER, INC. fUF °O/ B-4 Using Equation 2, the pumping rate of the recovery well was calculated with the following equation: Q = W0 (2TI) where W0 is measured on Figure 4-9. T is obtained from the results of nearby pumping tests; I is calculated from the groundwater contours shown on Figure 4-9. The variables used to solve for the dimensions of capture zones are listed in Table B-l. Equation 3 was used to calculate the distance X,. where Q is the pumping rate obtained from Equation 2, and T and I were the variables described above. Due to the high calculated pumping rate necessary for capture, two adjacent recovery wells, Recovery Wells RW-2 and RW-3, were proposed for the capture of the southern plume of chlorinated volatile organic compounds (VOCs). ;ffc- • The optimum spacing of the pumping wells was calculated with the following equation: Equation 4: D = Q/(2 71TI) using the variables in Table B-l, Q = 6.68 ft3/ min T= 0.14 ft2/ min I = 0.079 D = 96.6 feet. g:\aproject\tutu\PR0013.037\reports\captzone.doc GERAGHTYcS? MILLER, INC. TUT °°7 224S Table B-1. Values Used to Determine Capture Zones and Pumping Rates of Proposed Pumping Wells, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Capture Zone Estimated Hydraulic Pumping Pumping Downgradient Recovery Width (W0) Transmissivity (T) Gradient (1) Rate (Q) Rate (Q) Dimension (XJ Well Location (feet) (ft2/min) (ft3/min) (gpm) (feet) Esso Tutu Service Station - Source Control Plan MW-9 26.9 0.024 0.0426 0.33 2.5 SW-7 26.9 0.024 0.0426 0.33 2.5 SW-1 26.9 0.024 0.0426 0.33 2.5 CHT-3 , 26.9 0.024 0.0426 0.33 2.5 •«' *™".)| •»«*-. Site-Wide Recbverv Wells RW-1 Toe of northern plume 170 0.14 0.04 1.9 14.3 RW-2 and RW-3 Toe of southern plume 260 0.14 (assumed) 0.079 (assumed) 5.75 43 RW-4 LAGA/Curriculum Center 250 0.14 0.033 2.31 17.5 RW-5 O'Henry Dry Cleaners 211 0.14 0.079 5.2 35 Capture zone analyses for Texaco Extraction Wells TEW-1 and TEW-2 prepared by Erler & Kalinowski, Inc. (EKI, 1995b). ftz/min Square feet per minute. ft3/min Cubic feet per minute, gpm Gallons per minute. 8.6 8.6 8.6 8.6 54.1 82.8 79.6 75.4 '--I •-G GERAGHTY & MILLER. INC APPENDIX C SUMMARY OF DESIGN ASSUMPTIONS FOR SOIL AND GROUNDWATER REMEDIATION COST ESTIMATES GERAGHTY & MILLER, INC. fUT °07 2251 O APPENDIX C SUMMARY OF DESIGN ASSUMPTIONS FOR SOIL AND GROUNDWATER REMEDIATION COST ESTIMATES Note: Estimated costs are based on Means Cost Estimating Data, vendor information, and engineering experience. The accuracy of such cost estimates is in conformance with current U.S. Environmental Protection Agency (USEPA) Guidance (+50 percent to -30 percent). SOIL COST ASSUMPTIONS FOR DEED RESTRICTIONS 1. Deed Restrictions for soils are as described in SRA 1, and include estimated costs for filing and application fees. Administrative and legal fees are included in a separate line item. DESIGN ASSUMPTIONS FOR CAPPING (ALL SITES) 1. 6-inch thick, compacted gravel base. 2. For areas where there is pavement currently in place, installation will match existing conditions. 3. 3-inch thick layer of bituminous paving with seal coat. 4. At Ramsay Motors, it is assumed that complete replacement of concrete floor will be required (4-inch thick slab on grade, 6-inch by 6-inch welded wire mesh reinforcement, formed and in place). The cap will be formed concrete which is GERAGHTY & MILLER, INC. C-2 typically estimated by the cubic yard (CY). This is different that the estimated costs for pavement capping which is estimated based on the area to be capped in square yards (SY). 5. Estimated costs for pavement installation assumes that paving is completed at the same time; under one paving contract. 6. Operation and maintenance (O&M) consists of inspection for cap integrity and, if necessary, application of surface treatments to improve the effectiveness of asphalt caps. 7. Complete replacement of each cap is assumed at year 15. DESIGN ASSUMPTIONS FOR EXCAVATION AND OFF-SITE DISPOSAL (SRA 5) 1. Administrative, legal and engineering cost percentages are higher for this SRA (when compared to other SRAs) due to the increased regulatory requirements and administrative duties associated with the transport of hazardous material. Engineering design includes work plan preparation, implementation plan and permitting. Administrative and legal fees include tracking of manifests, filing, contracting with haulers and disposal facilities, and an allowance for legal fees related to the remedial action. 2. Excavation areas and volumes based on Table 4-5. 3. Cost to excavate includes labor and equipment, and excavation support (e.g., sheet piling) where needed. 4. Cost of disposal assumes off-island disposal to southeast, United States. Includes transport, freight, and disposal. g:\aproject\tutu\prOO 1 3 .037Veports\FeasAppC.doc GERAGHTY & MILLER, INC. C-3 5. Site restoration includes importing clean backfill from a local source, compaction, and restoration to or near current conditions. 6. It is assumed that one land disposal restriction (LDR) testing sample will be required for every 20 cubic yards (CY) of soil excavated. 7. It is assumed that no O&M will be required after completion of the excavation and disposal SRA. DESIGN ASSUMPTIONS FOR m-SITU SOIL VAPOR EXTRACTION (SVE) General Assumptions (for all properties) 1. Administrative and legal fees include filing, contracting with consultants and vendors, and an allowance for legal fees related to the remedial action. Engineering design fees include pilot testing, work plan preparation, design of SVE system and preparation of an implementation plan and permitting. Construction fees include environmental monitoring and construction observation. 2. Separate line items are provided for soil source control plans (SCPs) at Texaco Tutu Service Station and Esso Tutu Service Station. These estimates are lump sum amounts which represent the total estimated costs of the SCPs (including engineering design, administrative and legal costs). These estimates are based on independent consultant estimates taken from SCP designs currently being formulated and are included for informational purposes. 3. SCPs are assumed to be in operation for 5 years. g:\aproject\tutu\pr0013.037Veports\FeasAppC.doc GERAGHTY & MILLER, INC. TUT • C-4 Curriculum Center (in Bedrock) (Assumes 30-Year Operation Life) 1. Site characterization of potential DNAPL locations. 2. Three-SVE wells to ± 60 feet below land surface (bis) (into bedrock). (20 standard cubic feet per minute [scfrn] shall be evacuated from each well [total 60 scfin]). 3. One-5 horsepower (hp) blower with filter and moisture knockout and temporary enclosure (skid mounted). 4. 500 linear feet of trenching (2-feet wide x 4-feet deep). 5. 500 linear feet of 4-inch diameter PVC pipe. 6. Trenching includes excavation, backfill, and compaction, and bedrock removal (assumes 50 percent rock removal and restoration). 7. Thermal oxidizer (Therm-Ox) for vapor phase treatment (100 scfrn unit). Where ex-situ SVE is applied, Therm-Ox proposed will have sufficient capacity to treat both air flow rates (100 scfrn-60scfrn = 40scfrn). No vapor treatment of hydrochloric acid is assumed. 8. Cost for air permit and modeling, if necessary. 9. O&M costs: • Electrical for blower and Therm-Ox $4,500/year (45,000 kW-hr/yr @ $0.10/kW-hr). • System operator $12,000/year. g:\aproject\tutu\prOO 13.037\reports\FeasAppC.doc TUT OO7 -?75f< GERAGHTY & MILLER, INC. C-5 • Air sampling (assumes 26 samples/year @ $500/sample). • Supplemental fuel (propane) (5,000 therms/year @ $ 1.0/therm). O'Henry Dry Cleaners (in Bedrock) (Assumes 30-Year Operation Life) 1. Site characterization of potential DNAPL locations. 2. Three-SVE wells to ± 40 feet below land surface (bis) (into bedrock). 3. One-5 horsepower (hp) blower with filter and moisture knockout and temporary enclosure (skid mounted). 4. 200 linear feet of trenching (2-feet wide x 4-feet deep). 5. 200 linear feet of 4-inch diameter PVC pipe. 6. Trenching includes excavation, backfill, and compaction. 7. Therm-Ox for vapor phase treatment (100 scfm unit) where in-situ and ex-situ SVE is applied it is assumed that the unit proposed will have adequate capacity (100 scfin - 20 scfm = 80 scfm). A new unit is proposed when combined with excavation and disposal 8. Cost for air permit and modeling, if necessary. g:\aproject\tutu\pr0013.037Veports\FeasAppC.doc GERAGHTY & MILLER, INC. TUT °07 2256 C-6 9. O&M costs: • Electrical for blower and Therm-Ox $4,500/year (45,000 kW-hr/yr @ $0.10/kW-hr). • System operator $12,000/year. • Air sampling (assumes 26 samples/year @ $500/sample). • Supplemental fuel (propane) (5,000 therms/year @ $ 1.0/therm). O'Henry Dry Cleaners (in Soils) (Assumes 5-Year Operation Life) 1. One-SVE well ± 20 feet bis. 2. One-2-hp blower with filter and moisture knockout on skid, and temporary enclosure (skid mounted). 3. Blower skid placed adjacent to SVE well (minimal piping and trenching). 4. Vapor phase treatment is assumed to utilize the Therm-Ox unit proposed for in-situ treatment of bedrock. 5. Cost for air permit, if needed. 6. O&M costs: • Added electrical cost for the additional blower $ 2,500/year (25,000 kw-hr/yr @ $ 0.10/kw-hr). Other costs for O & M are included for the in-situ SVE system that is installed for bedrock. g:\aproject\tutu\pr0013.037\reports\FeasAppC.doc GERAGHTY^ MILLER, INC. TUT °°7 2257 C-7 • Soil compliance sampling (assumes 4 samples/year TCL VOCs and sampling equipment ($3,000/sample). Texaco Tutu Service Station (In Soils) (Assumes 5-Year Operation Life) 1. Based on SCP and estimated costs prepared by Erler and Kalinowski, Inc. Esso Tutu Service Station (In Soils) (Assumes 5-Year Operation Life) 1. Based on SCP and estimated costs prepared by Forensic Environmental, Inc. DESIGN ASSUMPTIONS FOR EX-SITU SVE (By Property) General Assumptions (for all properties) 1. Administrative and legal fees include filing, contracting with consultants and vendors, and an allowance for legal fees related to the remedial action. Engineering design fees include pilot testing, work plan preparation, design of SVE system and preparation of an implementation plan and permitting. Construction fees include environmental monitoring and construction observation. 2. A 2-year operating period is assumed. 3. Excavation areas and volumes based on Table 4-5. 4. Cost to excavate includes labor and equipment, excavation support [e.g., sheet piling] where needed. g:\aprojecl\tutu\pr0013.037\reports\FeasAppC.doc GERAGHTY & MILLER, INC. TUT °07 225S C-8 5. Excavated soil will be stockpiled in prepared areas (e.g., plywood enclosure with SVE piping and liner installation). It is assumed that sufficient area is available at each property. 6. Vapor emissions will be treated with Therm-Ox units, if required. 7. SVE piping and blower sized for each stockpiled area (2-hp blower with and moisture knockout [skid], temporary enclosure and 100 linear feet of perforated piping). 8. Site restoration includes using treated excavated soil as compacted backfill and pavement restoration, if required. 9. O&M consists of electrical costs for the blowers and Therm-Ox unit. Soil sampling of stockpiled soil (four composite, every 6 months). 10. O&M costs: • Soil sampling of stockpiled soil (assumes eight samples/year @ $l,500/sample). 11. The estimated cost to install ex-situ SVE at the Curriculum Center and existing ex-situ at OHenry assumes the treatment system associated with the in-situ SVE treatment system for bedrock will be used. An additional blower and piping will be added for the ex-situ treatment. O&M costs associated with air treatment are included under costs for O&M for in-situ SVE system in bedrock. g:\aprojed\tutu\pr0013.037\reports\FeasAppC.doc GERAGHTYfi? MILLER, INC. TUT °°7 2259 Q C-9 ASSUMPTIONS FOR EQUIPMENT INSTALLATION AND MATERIAL REPLACEMENT 1. Major equipment replacement entails complete replacement of Therm-Ox units at the Curriculum Center and OHenry dry cleaners. 2. Minor equipment entails complete replacement of blower and appurtenances at the Curriculum Center and OHenry dry cleaners. GROUNDWATER General Assumptions (for all properties) 1. Administrative and legal fees include filing, contract negotiations, and an allowance for legal fees related to the remedial action. Engineering design fees include pilot testing, work plan preparation, design of groundwater collection and treatment system, and preparation of an implementation plan and permitting. Construction fees include environmental monitoring and construction observation. 2. Separate line items are provided for groundwater source control plans (SCPs) at Texaco Tutu Service Station and Esso Tutu Service Station. These estimates are lump sum amounts which represent the total estimated costs of the SCPs (including engineering design, administrative and legal costs). These estimates are based on independent consultant estimates taken from SCP designs currently being formulated; and are included for informational purposes. 3. SCPs are assumed to be in operation for 5 years. g:\aproject\Uitu\pr0013.037\reports\FeasAppC.doc GERAGHTY & MILLER, INC. IUI °°7 226° C-10 DESIGN ASSUMPTIONS FOR DEED RESTRICTIONS 1. Deed Restrictions for groundwater are as described in GRA 1, and include estimated costs for filing and application fees. 2. The monitoring program assumes sampling and analysis of 15 wells and analyzing for TCL VOCs, semi-annually. DESIGN ASSUMPTIONS FOR SITE PREPARATION/MOBILIZATION 1. Site preparation, mobilization includes grading for access roads, treatment building, and access to recovery wells. DESIGN ASSUMPTIONS FOR WELL DECOMMISSIONING 1. Wells will be decommissioned by using locked well seals to prevent use and to allow access only for sampling. DESIGN ASSUMPTIONS FOR SITE ACQUISITION 1. Cost of property purchase for treatment area, and obtaining right-of-ways for recovery wells. Property required is assumed to be approximately 0.75 acre. DESIGN ASSUMPTIONS FOR GROUNDWATER EXTRACTION SYSTEMS 1. Recovery well installation includes drilling, material (black steel casing, stainless steel screen, etc.), well development, and well head enclosure. Depth of wells is assumed to be 150 feet into bedrock. g:\aprojeot\tutu\pr0013.037\reports\FeasAppC.doc TUT 007 2261 GERAGHTY & MILLER, INC. C-ll 2. Cost for piping includes labor and equipment for trenching and backfilling. Assumes open trench installation. Preliminary piping layouts are mainly beneath existing roads for easier access approval and implementation. Minimal rock excavation is assumed. 3. Well pumps are assumed to be as follows: • GRA 2 (two) 4-hp submersible pumps and appurtenances. • GRA 3 (three) 4-hp submersible pumps and appurtenances. • GRA 4 (five) 4-hp submersible pumps and appurtenances. DESIGN ASSUMPTIONS FOR GROUNDWATER TREATMENT SYSTEM 1. Pre-treatment consists of a chemical sequestering unit for the addition of orthophosphates with pumps to prevent the deposition of solids in the low-profile air stripper. Sequestering systems are based on estimated flow rates and include chemical pumps and piping. Chemical storage is not provided (included in delivery price) because product is delivered in storage containers. 2. The low profile air stripper is assumed to be a tray aeration unit with blower, controls, and appurtenances. The unit costs are based on vendor quotes, based on the estimated groundwater quality for each GRA and the estimated flow rate. Based on the preliminary VOC concentrations, it is assumed one stripper is sufficient to treat the groundwater. 3. The Therm-Ox, if required, is assumed to be a 1,000-scfm unit for GRA 2 and GRA 3, with fan, controls, and appurtenances. For GRA 4, a 2,000-scfm unit is assumed with all associated appurtenances. Preliminary calculations indicate that air treatment associated with the groundwater treatment system is not required for g:\aproject\tutu\pr0013.037\reports\FeasAppC.doc GERAGHTY^ MILLER, INC. TUT °°7 C-12 any of the GRAs considered. Final design evaluations may vary; therefore, thermal oxidation for treatment of air discharge is included. 4. Liquid phase granular activated carbon (GAC) treatment is provided as a back-up "polishing unit", in case the air stripper malfunctions. For GRA 2 and GRA 3, GAC units were assumed to be two 2,000-pound units in parallel, with a permanent installation. For GRA 4, GAC units are assumed to be configured in the same manner except 3,000-pound units in parallel would be used. By-pass piping can be provided to minimize carbon use. 5. Process pumps (including standbys) are assumed to be centrifugal pumps rated as follows • GRA 2 (four) 2-hp pumps, piping and appurtenances. • GRA 3 (four) 2-hp pumps, piping and appurtenances. • GRA 4 (four) 5-hp pumps, piping and appurtenances. 6. Discharge pumps (including standbys) are assumed to be vertical turbine pumps rated as follows: • GRA 2 (two) 2-hp pumps, piping and appurtenances. • GRA 3 (two) 2-hp pumps, piping and appurtenances. • GRA 4 (two) 5-hp pumps, piping and appurtenances. 7. The treatment building is sized to accommodate major equipment components of the treatment facility. The cost includes labor and equipment, and butler type building set on a poured concrete foundation. 8. Lump sum cost for electrical includes an allowance for a Motor Control Center (MCC), starters, electric service and connections, controls and control panel, leak g:\aproject\tutu\pr0013.037\reports\FeasAppC.doc GERAGHTY6? MILLER, INC. TUT °°7 2263 C-13 detection and remote dial out. Electrical conduit will go to each well for the submersible pumps and use the same trench as the extraction piping (no emergency back up). 9. For GRA 2, the POETs are residential size (10 gallons per minute [gpm] max flow rate), installed with pump and ejector piping. It is assumed that minimal upgrades to electrical wiring are required. 10. It is assumed that water continues to be supplied as it is now, by cisterns or by trucked water. O&M Assumptions GRAs 1. Electrical costs are for the well pumps, blowers, process and discharge pumps associated with the treatment units. It also includes an allowance for building heating and lighting. The following power usage assumptions have been made utilizing an average price of electricity per kilowatt hour of $ 0.10. • GRA 2 - 29-hp equivalents full time (+/-25 %). • GRA 3 - 33-hp equivalents full time (+/- 25 %). • GRA 4 - 57-hp equivalents full time (+/- 25 %). 2. Chemical usage based influent groundwater quality and estimated influent flow rate, and vendor quotation. Storage is not provided because product is delivered in storage containers. 3. Carbon replacement is assumed to be minimal due to the redundancy provided by the air stripper. For GRA 2 and GRA 3, one unit changeout every year (2,000 Ibs) and for GRA 4, one unit changeout every year (3,000 Ibs). g:\aproject\tutu\pr0013.037Veports\FeasAppC.doc TUT O07 2264 GERAGHTY & MILLER, INC. C-14 4. Supplemental fuel for Therm-Ox assumed to be propane. 25,000 therms/year at $LOO/therm is assumed for the 1,000 scfm unit and 38,000 for the 2,000 scfin unit is assumed. 5. For GRA 2, it is assumed the POET systems will use an average of 200 Ibs. GAC/year. 6. System operation assumes one full-time person for the treatment facility effluent monitoring and POET system monitoring. 7. System monitoring is expressed as sampling average annually. It is assumed that 12 samples per year are analyzed for permit compliance monitoring. For POET systems, one sample per month per installation is assumed, or 60 samples per year. 8. O&M costs for the SCPs were provided as lump sum and assumed to operate for five years. ASSUMPTIONS FOR EQUIPMENT INSTALLATION AND MATERIAL REPLACEMENT > 1. Major equipment replacement entails complete replacement of process equipment such as air strippers, POETs, GAC units, and Therm-Ox. 2. Minor equipment replacement entails replacing pumps and blowers, etc., every 5 years (10 percent of chemical treatment, air stripper, and electrical costs, 5 percent of groundwater recovery systems [includes well pumps and treatment building]), 50 percent discharge and process pumps and piping). gi\aproject\tutu\pr0013.037Veports\FeasAppC.doc TUT 007 2265 GERAGflTY & MILLER, INC. 1I APPENDIX P LIST OF ACRONYMS AND ABBREVIATIONS GERAGHTY& MILLER, INC. TUT °°7 2267 Page 1 of 2 Table D-1. Acronyms and Abbreviations Used, Feasibility Study, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Acronym or Abbreviation Meaning AOC ARAB AST BNAs BTEX CERCLA CG COCs DCA DCCA 1,2-DCE DNAPL DPNR FS ft/day GAC gal/day/ft gal/day/ft2 GC gpm GRA HI HQ HRS HSL IRM LDR LNAPL MCL MCLG mg/kg mg/L MTBE NCP PCB PCE POET POTW ppb PRG PRPs PVC Administrative Order by Consent. Applicable or Relevant and Appropriate Requirements. Aboveground storage tank. Base/neutral and Acid extractable compounds. Benzene, toluene, ethylbenzene, and xylenes. Comprehensive Environmental Response, Compensation and Liability Act. Cleanup Goal. Constituents of Concern. 1,1 -dichloroethane. U.S. Virgin Islands Department of Conservation and Cultural Affairs (Precursor to DPNR). 1,2-dichloroethene. Dense non-aqueous phase liquid. U.S. Virgin Islands Department of Planning and Natural Resources. Feasibility Study. Feet per day. Granular activated carbon. Gallons per day per foot. Gallons per day per square foot. Gas chromatograph (or Chromatography). Gallons per minute. Groundwater Remedial Alternative. Hazard Index. Hazard Quotient. Hazardous Ranking System. Hazardous Substance List. Interim Remedial Measure. Land Disposal Restrictions. Light, non-aqueous phase liquid Maximum Contaminant Level. Maximum Contaminant Level Goal. Milligrams per kilogram. Milligrams per liter. Methyl tertiary-butyl ether. National Contingency Plan. Polychlorinated biphenyl. Tetrachloroethene (or perchloroethylene). Point-of-Entry Treatment. Publicly-Owned Treatment Works. Parts per billion. Preliminary Remedial Goal. Potentially Responsible Parties. Polyvinyl chloride. G:\APROJECT\TUTU\PRO013.036\DATAVACRONYMS.XLS GERAGHTY & MILLER, INC. TUT 007 Page 2 of 2 Table D-1. Acronyms and Abbreviations Used, Feasibility Study, Tutu Wells Site, St. Thomas, U.S. Virgin Islands. Acronym or Abbreviation .Meaning RAL RAO RCRA Rl RO RW SCP SRA SSL SVE TAL TAT TBC TCA TCE TCL TDS TEIC TPH TSDF ug/kg ug/L USEPA UST USVI VC VIHA VOCs WAPA Remedial Action Level. Remedial Action Objective. Resource Conservation and Recovery Act. Remedial Investigation. Reverse osmosis. Recovery Well. Source Control Plan. Soil Remedial Alternative. Soil Screening Level. Soil vapor extraction. Target Analyte List. Technical Assistance Team. To-Be-Considered material. 1,1,1 -trichloroethane Trichloroethene. Target Compound List. Total dissolved solids. Tutu Environmental Investigation Committee. Total petroleum hydrocarbons. Treatment, Storage, and/or Disposal Facility. Micrograms per kilogram. Micrograms per liter. U.S. Environmental Protection Agency. Underground storage tank. U.S. Virgin Islands. Vinyl chloride. Virgin Islands Housing Authority. Volatile organic compounds. Water and Power Authority. Q:\APROJECT\TUTU\PR0013.038\DATA\ACHONVMSJCLS GERAGHTY & MILLER, INC. TUT OO7 2269