PROPOSAL SITE PLAN Scale: 1" = 20 ft 1 PARK A PARK B o o o o o MH 19'-10"' Fence 20' Trailer, dive compressors Fuel Distribution hose Utility pole & lines Pedestrian gate Gate, vehicular Traffic flow Surface drainage High Voltage Street lamps Landscaped Property line Fire Station Sanitary ABBREVIATIONS S FS PL LS HV G P Gate F T 'B' 'A' ZONING: W-2, WATERFRONT · INDUSTRIAL BUILDING OFFSET TO INDUSTRIAL PROPERTY, ZERO FEET. · MINIMUM LOT, 20,000 SQ.FT., EFFECTIVE 10/72. Shed Roof STORAGE Shed 1 Story Office 1 Story EL No. 14 Concrete Slab PARCEL 15 S S S S Inlet Inlet Inlet Dumpst er Gravel Parking Inlet Inlet Planter Gravel Parking Gravel Parking Gravel Parking Gravel Parking PARCEL 16 P-Gate HV BULKHEA FLUSHING CHANNEL Gravel Parking HV HV HV HV G Gravel Parking HV Gate Planter MO PARCEL No. 161 ( Asphalt Parking ) MONSANTO MARINE TERMINAL Rip- Rap Asphalt Roadway Con cret e N46°33'51 50.66' N45°49'E 108.4' N32°09'16"E 103.27' N35°16'37"E 217.93' N00°00'00"E 39.92' N57°29'W 36.3' S57°29'E 22.1' N78°01'E 14.9' S81°12'E 25.0' N42°56'E 92.6' 27.4' N 22° 08' E 27.8' N54°14'54"W 275.07' S54 N34°58'E 92.3' S55°07'E 143.1' S35°40'W 89.7' S56°09'E 117.0' S33°26'W 160.6' N54°39'W 120.2' S33°34'W 86.2' S53°33'E 71.0' S32°50'W 84.8' S57°20'E 39.8' S34°13'W 105.5' HV Concretew Driveway SW HV R=19.0' L=59.7' R=41.38' L=55.17' 1 Story Frame Bldg Concrete Slab Foundation PARCEL 18 PARCEL 17 Storage Yard Asphalt Roadway 40' Wide PUBLIC ROAD R.O.W. 304 Sidewalk Inlet Gravel Parking Paver Bricks H2o Guy Frame Bldg MH Sanitary Sewer P-Gate Concrete Fire Lane PARCEL No. 168 4.04 Acres Culvert Iron Pipe Boundpost Rebar Boundpost Unmarked Point Survey Nail & Brass Washer LEGEND Picnic Table Picnic Table 2'-4"' Curb Guard Shack Guard Shack HV, CATV, Telephone Risers PROPOSAL SITE PLAN Scale: 1" = 50 ft 1 DISTURBANCE AREA MUST BE KEPT TO A MINIMUM. EVENT TENTS ADDITION ISLAND MAP SITE LOCATION MAP ESTATE SUB BASE ISLAND OF ST. THOMAS A T L A N T I C O C E A N C A R I B B E A N S E A MAGNETIC SHEET NO.: REVISIONS DATE 1/4 1/2 1INCH S C A L E : AS NOTED FILE NO: SHEET NAME: Date: Jun 18, 2025 File name: CBM-DD.vwx ENGINEER STAMP PAUL FERRERAS, P.E. P.O. BOX 600122 ST. THOMAS, USVI 00801 TEL: (340) 714-5435 FAX: (340) 777-5779 [ ] SCHEMATIC DESIGN [ ] DESIGN DEVELOPMENT [ X ] CZM SUBMITAL [ ] CONSTRUCTION DOCUMENT [ ] DPNR SUBMITAL [ ] REVISED DOCUMENT ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF CHRIS TAVERNIER. THE CONCEPTS, IDEAS DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED , DEVELOPED AND PRESENTED FOR USE ON THE SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WITHOUT EXPRESS WRITTEN CONSENT OF CHRIS TAVERNIER. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR REFERENCE PURPOSE ONLY. EXISTING MASONRY WALL WALL LEGEND POURED CONCRETE WALL SEE DETAIL FOR REINF. CMU W/ 1/2" PLASTER INTERIOR & 3/4" EXTERIOR STUDS @ 16" O.C. W/ 1/2" CEMENT BOARD WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DRAWINGS, ALL DIMENSIONS SHALL BE VERIFIED AT SITE ANY DISCREPANCIES SHALL BE RESOLVED WITH DESIGNER PRIOR TO CONSTRUCTION. ALL WORK SHALL BE PERFORMED BY LICENSED V.I. CONTRACTORS AND SUBS IN ACCORDANCE WITH THE 2018 UNIFORM BUILDING CODE (U.B.C.) AND/OR (C.A.B.O.) *WIND LOADS - "165 Mph" DOOR AND WINDOW DIMENSIONS ARE NOMINAL,. REFER TO MANUFACTURE'S SPECIFICATIONS FOR EXACT ROUGH-IN DIMENSION. CMU WALL DIMENSIONS ARE NOMINAL. DESIGN VALUES: CONCRETE: Fc=3000 PSI; AFTER 30 DAYS GUNITE CONCRETE: Fc=5000 PSI; AFTER 30 DAYS STEEL BARS Fy=60,000 PSI GRADE 60 LUMBER: SYP NO.1 .50 LBS PER CU. FT. RETENTION PROX. TO TERRAIN. .35 LBS PER CU. FT. RETENTION GENERAL NOTES: Tel/Fax: (340)227-8938:E-Mail: ctusvi00801@gmail.com @02 PCL.# 168 & 169 ESTATE SUB BASE ST. THOMAS, U.S.V.I. CROWN BAY MARINA C-1.0 Cover Sheet, Site Plan & Existing Floor Plan C-1.0 Cover Sheet, Site Plan & Existing Floor Plan SITE NOTES: EARTH CHANGE: SITE DISTURBANCE SHALL BE KEPT TO A MINIMUM AND LIMITED TO AREAS ONLY AFFECTED BY CONSTRUCTION. NATURAL SLOPES ARE TO BE RETAINED. STRUCTURES SHALL BE PLACED ON UNDISTURBED EARTH AS CUT. IF CLAY, SAND, ORGANIC OR OTHERWISE UNSTABLE CONDITIONS ARE ENCOUNTERED PLEASE CONSULT EITHER DESIGNER OR ENGINEER. ALL FILL SHALL BE SELECTED CRUSHED ROCK. RETAINING WALLS TO BE CONSTRUCTED AS PER PLAN. TREES SHALL BE RETAINED WHERE POSSIBLE AND PROTECTED DURING CONSTRUCTION. ALL TOP SOIL FROM AREAS DISTURBED SHALL BE SAVED AND RESPREAD AS FINAL GRADES ARE ESTABLISHED. LOW MAINTENANCE GROUND COVER SUCH AS (SUGGESTED PLANT LIST) SHALL BE PLANTED TO DISTURBED CUT AND FILL AS CONSTRUCTION ENDS AND FINAL GRADES ARE ESTABLISHED. SILT FENCES: INSTALL BELOW ALL DRAINAGE STRUCTURE OUTLETS. THEY SHALL BE INSTALLED ON UNDISTURBED SOIL AND SHALL RUN ALONG THE CONTOUR (LEVEL) OR SLIGHTLY DOWNHILL (1 TO 2%) AWAY FROM THE INCOMING SOURCE OF WATER. THE ENDS SHALL RUN UPHILL TO PREVENT WATER FROM ESCAPING, AND THUS FORM A TEMPORARY SEDIMENTATION AND FILTRATION POND. IF THE LOWER 6" OF THE FENCE CAN NOT BE BURIED IN A TRENCH 6X6", AS RECOMMENDED, DUE TO ROCK, THE FABRIC MAY BEC TURNED UPHILL AND SECURED WITH SPIKES AND WASHERS WHERE POSSIBLE AND THEN OVERLAID WITH 6" OF STONE. THE WOOD STAKES THAT HOLD UP THE FENCE SHOULD BE WELL SECURED IN THE GROUND AS WELL AS TIED BACK AT THE TOP TO PREVENT THE FENCE FROM OVERTURNING WHEN FILLED WITH WATER. PROJECT INFORMATION OWNER: CROWN BAY MARINA LP PCL.# 168 & 169 ESTATE SUB BASE 6 SOUTHSIDE QUARTER. ST. THOMAS, U.S. VIRGIN ISLANDS TAX ID.. NO.: 1-05204-0501-84 CZM NO.: CZT-47-83 P.W.D. DRWG. NO.: ZONING: W-1 PROPOSED USE: WATERFRONT LOT ACREAGE: (AC) N/A LOT ACREAGE: (SQ.FT.) N/A PERMITTED LOT OCCUPANCY % N/A (SQ.FT.) PERMITTED LOT OCCUPANCY N/A EXISTING AREAS SQUARE FOOT EXISTING BUILDING 59,000 SQ.FT. ASPHALT 75,498 SQ.FT. CONCRETE- PATHS/DOCK/ 48,663 SQ.FT. GREEN 33,668 SQ.FT. ADDITION AREAS PARK A. 1,450 SQ.FT. PARK B. 1,450 SQ.FT. TOTAL BUILDING: N/A PARKING / DRIVE: N/A BUILDING FOOTPRINT: N/A PRO'D. ROOF AREA N/A REQ'D CISTERN CAP.- N/A (15 GALS. PER ROOF SQ.FT.) EXTG. HSE. CISTERN CAP.: N/A PARKING SPACES REQ'D PKG. SPACES N/A PRO'D PKG. SPACE:- N/A TOTAL USED AREAS SQUARE FOOT BUILDING N/A PKG & PAVE.:- SITE IMPROVEMENT: PRO'D LOT COVERAGE %: MAX. LOT COVERAGE % N/A SOIL TYPE: SCOPE OF WORK: CONCRETE BASE FOR 5 TENT STRUCTURES 6.00 SUMMARY OF PROPOSED ACTIVITY a. DISCUSS PURPOSE OF PROJECT THE APPLICANT PROPOSES TO CONCRETE PADS FOR 5 MOVEABLE EVENT TENT STRUCETURES. b. DISCUSS THE PRESENCE AND LOCATION OF CRITICAL AREA(S) AND POSSIBLE TROUBLE SPOT(S) THE PROJECT IS LOCATED ON 2 PARK AREAS. c. DISCUSS PROPOSED METHOD OF LAND CLEARING SITE IS EXISTING CLEARED AND LANDSCAPED, ONLY AREAS DESIGNATED FOR PAD FOOTING SHALL FIRST BE HAND CLEARED & EXCAVATION . AREAS TO BE USED FOR FURTHER LANDSCAPING SHALL BE HAND CLEARED. d. DISCUSS PROVISIONS TO PRESERVE TOPSOIL AND LIMIT SITE DISTURBANCE THERE SHALL BE NO UNNECESSARY DISTURBANCE OF THE SOIL. ALL TOPSOIL SHALL BE STOCK PILED FOR FUTURE USE. REMOVE ONLY REQUIRED MINIMUM VEGETATION NECESSARY FOR THE BUILDING STRUCTURES ALL VEGETATION WHICH HAS BEEN REMOVED AS REQUIRED FOR LAND CLEARING SHALL BE REPLACED WITH GRASS GROUND COVER AND/OR SHRUB PLANTINGS. ALL MAJOR TREES ON SITE SHALL BE MAINTAINED AND PROTECTED. ANY MAJOR TREES OVER 4 INCHES CALIPER THAT ARE REMOVED SHALL BE REPLACED ELSEWHERE ON SITE OR BE REPLACED WITH TREES OF SIMILAR SPECIES. e. DISCUSS EROSION AND SEDIMENTATION CONTROL DEVICES TO BE IMPLEMENTED PROVIDE EARTH EROSION AND STABILIZATION CONTROLS, SUCH AS PLANTINGS AND BERMS, AND MAINTAIN THEM DURING AND AFTER COMPLETION OF CONSTRUCTION. PLACE BERMS AND SILT FENCE ACROSS THE ENTIRE LENGTH OF AREA OF SITE DISTURBANCE ALONG LOWEST CONTOUR AS PRACTICAL. f. SHOW SCHEDULE FOR CONSTRUCTION ACTIVITIES AND IMPLEMENTATION OF EROSION/ SEDIMENT CONTROL MEASURES 1. OBTAIN CZM & BUILDING PERMIT 2. START HAND CLEARING OF AREAS DESIGNATED FOR CONSTRUCTION OF STRUCTURES . 3. IMPLEMENT SILTATION BERMS AND SILT FENCES 4. START AND TEMPORARY FINISH CONSTRUCTION OF PATHWAY 5. START AND FINISH CONSTRUCTION CONCRETE PADS 6. FINISH CONSTRUCTION OF EVENT TENT STRUCTURES. g. DISCUSS THE MAINTENANCE OF EROSION AND SEDIMENT AND CONTROL MEASURES BERMS AND SILT FENCES WILL BE CHECKED AND MAINTAINED ON A REGULAR SCHEDULE. ANY LOOSE LINKS TO BE REPAIRED h. DISCUSS METHOD OF STORMWATER MANAGEMENT WATER RUNOFF WILL BE DIVERTED AROUND THE HOUSE ON EITHER SIDE BY SWALES CUT IN THE NEW TOPOGRAPHY. AS THE NEW TOPOGRAPHY MEETS THE ORIGINAL, THE STORMWATER RUNOFF WILL MEET EXISTING CONDITIONS AND EXIT THE SITE IN THE SAME MANNER AS BEFORE CONSTRUCTION. i. DISCUSS MAINTENANCE SCHEDULE OF STORMWATER FACILITIES NOT APPLICABLE: THERE WILL BE NO STORMWATER FACILITIES BUILT, THUS NONE TO MAINTAIN. NO MAINTENANCE. J. DISCUSS METHOD OF SEWAGE DISPOSAL AN ENGINEERED SEPTIC SYSTEM WILL BE UTILIZED. THE SYSTEM WILL USE A CONSTRUCTED OSDS FOR SEEPAGE ON-SITE. o o o o o o o o o EXISTING TRAILER BBQ 40FT PAVED 20FTX20FT PROPOSED PARK A FLOOR PLAN Scale: 1/4" = 1'-0" 1 20'-0" 20'-0" COLUMN PAD FOUNDATION FTG1 A-1.0 TENT STRUCTURE BY MANUF. PICNIC TABLE & UMBRELLA COVER PAVER ON SAND BASE SHEET NO.: REVISIONS DATE 1/4 1/2 1INCH S C A L E : AS NOTED FILE NO: SHEET NAME: Date: Jun 18, 2025 File name: CBM-DD.vwx ENGINEER STAMP PAUL FERRERAS, P.E. P.O. BOX 600122 ST. THOMAS, USVI 00801 TEL: (340) 714-5435 FAX: (340) 777-5779 [ ] SCHEMATIC DESIGN [ ] DESIGN DEVELOPMENT [ X ] CZM SUBMITAL [ ] CONSTRUCTION DOCUMENT [ ] DPNR SUBMITAL [ ] REVISED DOCUMENT ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF CHRIS TAVERNIER. THE CONCEPTS, IDEAS DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED , DEVELOPED AND PRESENTED FOR USE ON THE SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WITHOUT EXPRESS WRITTEN CONSENT OF CHRIS TAVERNIER. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR REFERENCE PURPOSE ONLY. EXISTING MASONRY WALL WALL LEGEND POURED CONCRETE WALL SEE DETAIL FOR REINF. CMU W/ 1/2" PLASTER INTERIOR & 3/4" EXTERIOR STUDS @ 16" O.C. W/ 1/2" CEMENT BOARD WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DRAWINGS, ALL DIMENSIONS SHALL BE VERIFIED AT SITE ANY DISCREPANCIES SHALL BE RESOLVED WITH DESIGNER PRIOR TO CONSTRUCTION. ALL WORK SHALL BE PERFORMED BY LICENSED V.I. CONTRACTORS AND SUBS IN ACCORDANCE WITH THE 2018 UNIFORM BUILDING CODE (U.B.C.) AND/OR (C.A.B.O.) *WIND LOADS - "165 Mph" DOOR AND WINDOW DIMENSIONS ARE NOMINAL,. REFER TO MANUFACTURE'S SPECIFICATIONS FOR EXACT ROUGH-IN DIMENSION. CMU WALL DIMENSIONS ARE NOMINAL. DESIGN VALUES: CONCRETE: Fc=3000 PSI; AFTER 30 DAYS GUNITE CONCRETE: Fc=5000 PSI; AFTER 30 DAYS STEEL BARS Fy=60,000 PSI GRADE 60 LUMBER: SYP NO.1 .50 LBS PER CU. FT. RETENTION PROX. TO TERRAIN. .35 LBS PER CU. FT. RETENTION GENERAL NOTES: Tel/Fax: (340)227-8938:E-Mail: ctusvi00801@gmail.com @02 PCL.# 168 & 169 ESTATE SUB BASE ST. THOMAS, U.S.V.I. CROWN BAY MARINA A-1.0 Proposed Park Floor Plan layout PAVED 11FTX20FT PAVED 10FTX10FT PAVED 10FTX10FT PAVED 10FTX10FT PROPOSED PARK B FLOOR PLAN Scale: 1/4" = 1'-0" 2 20'-0" 11'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" COLUMN PAD FOUNDATION FTG1 A-1.0 TENT STRUCTURE BY MANUF. COLUMN PAD FOUNDATION TENT STRUCTURE BY MANUF. TENT STRUCTURE BY MANUF. 2'-0" #5 BARS @ 6" O.C. BOTH WAYS #5 DOWEL EA. VERT. BAR COLUMN PIER W/ #3 TIES @ 5" O.C 6X6 WOOD POST COLUMN BASE SIMPSON CB66 W/ (2) 5/8" Ø BOLTS AND #5 TIES 12" 12" MIN. GRADE 3" PIER FTG DETAIL Scale: 3/4" = 1'-0" 10 STONE PAVER DETAIL Scale: 3/4" = 1'-0"