& MILLER, INC. nvironmental Services Ground Water Engineering Hydrocarbon Remediation Education May 21, 1993 Caroline Kwan Project Manager U.S. Environmental Protection Agency Region n 26 Federal Plaza, Room 737 New York, NY 10278 Re: Summary of April 27 and 28, 1993 Meetings Concerning the Tutu Service Station Investigation in St. Thomas, U.S. Virgin Islands. Dear Ms. Kwan: On behalf of the Tutu Environmental Investigation Committee (TEIC), Geraghty & Miller, Inc. has prepared this letter to confirm the agreements reached at the April 27 and 28, 1993 meetings, at the Nisky Center in St. Thomas, U.S. Virgin Islands between representatives of the U.S. Environmental Protection Agency (USEPA), the U.S. Virgin Islands Department of Planning and Natural Resources (DPNR), and the TEIC. These meetings were held to discuss the USEPA's comments on the first draft of the Technical Memorandum n of the Tutu Service Station Investigation in St. Thomas which was submitted to the USEPA by TEIC on March 1, 1993. The USEPA's comments were provided in an April 20, 1993 letter from Ms. Carole Peterson, USEPA Chief, New York/Caribbean Superfund Branch II to Ms. Ana Gloria Ramos, Designated Coordinator for the TEIC. The following people attended these two meetings on behalf of the TEIC, which consists of Esso Standard Oil Co. and Texaco Caribbean Inc.: Ms. Ana Gloria Ramos (TEIC Coordinator), Mr. Daniel Nachman and Mr. Thomas Danahy (Geraghty & Miller, Inc. - Consultants for TEIC), and Mr. Jose Agrelot (Soil Tech, Inc. - Consultants for TEIC). Ms. Caroline Kwan (USEPA Project Manager), and Mr. Henning Moe (COM Federal Programs) attended both meetings on behalf of the USEPA. The April 27 meeting was also attended by Mr. Adrian Schottroff (DPNR), and Mr. Alberto Gutierrez (H+GCL Inc. - Consultants for Texaco). The April 28 meeting was also attended by Mr. Andrew Praschak (USEPA), Mr. Clifford Crooke (DPNR), Mr. Francis Torres (Goldman, Antonetti, Cordova, and Axtmayer), Mr. R. Scott McCay (Texaco), Mr. Otto Miguel Bustelo (Esso - In-House Legal Counsel), Ms. Nancy D'Anna (representing L'Henri Inc.), and Ms. Belinda Price (IT Corporation - Consultants forL'Henri). ^ N- It was agreed that Technical Memorandum II will be revised to incorporate the USEPA's comments and the revised memorandum will be submitted to the USEPA by May 24, 1993. TUT 006 1487 201 West Rissaic Street, 3rd Floor 'Rochelle Park, New Jersey 07662 • (201) 909-0700- FAX (201) 909-0567/0568 *64793* 64793 After this meeting, Mr. Andrew Praschak, USEPA attorney, provided additional comments to TEIC. His most notable comment was to identify the locations of all sampling locations when discussed in the text. In response to this comment, Section 4.0 Soil Quality, will be rewritten to discuss the soil results for each property individually. Due to the additional comments, the USEPA agreed to extend the submittal date of the revision of Technical Memorandum n to June 1, 1993. For ease of reference, the numbering of the comments in the USEPA's April 20, 1993 letter will be followed to summarize the items discussed and agreements reached at the April 1993 meetings. GENERAL COMMENTS Comment 1. Based on the maps, it appears that the upgradient extent of petroleum contamination can be delineated without the three additional wells proposed in the Technical Memo. However, one well might be warranted to the west of Western Auto, to establish whether that facility contributes to groundwater contamination. The locations of the proposed wells should be plotted on a map. Several questions remain as to the sources of chlorinated volatile organic compounds —^ (VOCs) in groundwater. There are apparently at least two sources of chlorinated VOCs at the ( site - one in the vicinity of the Curriculum Building and, possibly, Tillet Gardens; the second in the vicinity of O'Henri cleaners. A shallow well should be installed south of MW-12D to identify and delineate the southern extent of the VOCs plume to the northern extent of the VOCs plume and to ascertain if the northern and southern plumes are connected. Response 1. The locations for the proposed additional monitoring wells were field checked by the USEPA and TEIC representatives after the meeting on April 27, 1993. The proposed locations for the four additional shallow monitoring wells MW-15 through MW-18 are shown on Figures 1-1, 1-2, and 1-3 (enclosed). Comment 2. EPA has compared the analytical results of our split sample analyses with Geraghty & Miller (G&M's) results. All the split and PRP data compare within acceptable limits. 2. The USEPA analytical split samples "compare within acceptable limits." No response is necessary. GERAGHTY