2 | 4 | 5 | 6 7 RESTROO (15 ] Ok G © STORAGE OOOO REST &) OOOH & BOG (176) Roo K Ute OFFICE } | L, sy : ~ OFFice | T 4 >) 2 CORRIDOR > eta Y nN 4@, ol ©! SOE | | LL 1 © OFFICE (etl SL) OOO ojo LO, Zo y _ y 17 camnus 27 © ~~ o OFFICE OFFICE ojo) ee a ial OL “@—, 4o} © —_(_ CXOKAKD 4 Zar | OOOOO LA | $600 DOOD | < OFFICE Sm VESTIBULE — it . tat Sau - so tere Ay eat ° : LI <> 7 FIRST FLOOR DEMOLITION FLOOR PLAN +++} | 1a1.0 | 141.0 SCALE: 3/16"=1'-0" DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING WALL TO REMAIN eee [ TT | DEMOLITION NOTES LEGEND DEMOLITION NOTES ARE GENERAL FOR WORK TO BE DONE, SEE DEMOLITION PLAN FOR SPECIFIC WORK AREAS. REMOVE AND DISCARD EXISTING WINDOW. WINDOW TO BE REPLACED IN KIND USING MAHOGANY WOOD AND SIMILAR STAINLESS STEEL HARDWARE. REMOVE AND DISCARD EXISTING LIGHT FXTURES ON EXISTING CEILING AND WALLS, DISPOSE AS PER THE DIRECTION OF THE OWNER. (NOT APPLICABLE FOR CHANDELIERS) CHANDELIERS SHALL BE CLEANED AND RESTORED. REMOVE AND DISCARD ALL EXISTING REST ROOM PLUMBING FIXTURES AND CABINETRY. ALL WATER AND WASTE WATER LINES SHALL BE CAPPED FOR FUTURE USE. REMOVE AND DISCARD EXISTING DOOR, DOOR FRAME AND HARDWARE. EXISTING TRANSOM TO BE CLEANED PATCHED AND SANDED WHERE APPLICABLE. REMOVE EXISTING LOOSE PAINT FROM WALL AND PREPARE SURFACE TO RECEIVE A NEW COAT OF PAINT AND PRIMER. 4 | o © 9 oC, <> 5 REMOVE ALL AND DISCARD EXISTING FLOOR TILES AND PREPARE SURFACE TO RECEIVE NEW TILE. EXISTING CARPET TO BE REMOVED AND DISCARDED. PREPARE FLOOR TO RECEIVE NEW FLOORING. EXISTING SHEATHING ON FURRING STRIPS AND STUDS ON INTERIOR WALLS SHALL BE REMOVED AND DISCARDED UP TO TOP OF EXISTING CHAIR RAIL. FURRING STRIPS, STUD FRAMING AND AREA BEHIND SHALL BE CLEANED AND SANITIZED UP TO EXISTING CHAIR RAIL. REPLACE WITH NEW SHEATHING , BASEBOARDS AND CHAIR RAILS. EXISTING SHEATHING ON FURRING STRIPS AND STUDS ON INTERIOR WALLS SHALL BE REMOVED AND DISCARDED. FURRING STRIPS, STUD FRAMING AND AREA BEHIND SHALL BE CLEANED AND SANITIZED UP TO CEILING FROM FINISH FLOOR. REPLACE WITH NEW SHEATHING, CHAIR RAILS, BASEBOARDS AND CROWN MOLDING. REMOVE AND DISCARD EXISTING VCT FLOOR TILES AND ADHESIVE AS. EXISTING FIXTURES AND CASEWORK TO BE REMOVED AND DISCARDED. REMOVE AND DISCARD EXISTING CEILING SYSTEM. CLEAN AND SANITIZE ALL SURFACES BEHIND CEILING TO RECEIVE NEW SHEATHING AND CEILING MOLDINGS. (AC CONTRACTOR) TO REMOVE AND DISCARD ALL AIR CONDITIONING PIPING, INSULATION, AND EQUIPMENT AS REQUIRED TO ACCOMMODATE FOR NEW VARIABLE REFRIGERANT FLOW HVAC SYSTEM (UPGRADE). REMOVE AND DISCARD ALL EXPOSED UNUSED CABLE, SECURITY, AND TELEPHONE LINES. MAINTAIN EXISTING SYSTEMS IN USE. CLEAN, PATCH, SAND AND PREPARE EXISTING BASE BOARDS, CHAIR RAILS, AND CROWN MOLDINGS TO RECEIVE NEW PRIMER AND PAINT. CLEAN, PATCH, SAND AND PREPARE EXISTING RAILING AND POST ASSEMBLY TO RECEIVE NEW PRIMER AND PAINT. EXISTING WOOD SHUTTERS TO BE REMOVED DISCARDED AND REPLACED IN KIND. NEW HARDWARE SHALL BE STAINLESS STEEL. EXISTING WOOD SHUTTER TO BE CLEANED, PATCHEO AND SANDED TO RECEIVE NEW PAINT AND NEW STAINLESS STEEL HARDWARE. <> REMOVE PORTION OF EXISTING SITE STAIR DOWN TO STREET LEVEL TO ACCOMMODATE FOR THE NEW INSTALLATION OF A NEW HANDICAP CHAIR LIFT. REMOVE EXISTING ELEVATOR AND ALL OF ITS. COMPONENTS TO MAKE EXISTING STAIR CASE WHOLE TO A CONDITION PRIOR TO THE INSTALLATION OF THE ELEVATOR. 6 l EXISTING POOL EQUIPMENT TO BE REMOVED. ALL WATER SUPPLY LINES TO BE CAPPED EXISTING SECOND FLOOR VARIABLE REFRIGERATION FLOW HVAC SYSTEM SHALL BE REMOVED, RELOCATED, AND INSTALLED BY AC CONTRACTOR TO SECOND FLOOR UPPER COURT YARD. EXISTING WINDOW TO BE CLEANED, PATCHED, SANDED, AND REPAIRED. ALL HARDWARE TO BE REPLACED WITH STAINLESS STEEL HARDWARE. EXISTING RAILINGS AND COLUMN ASSEMBLY TO HAVE RUST NEUTRALIZED, REMOVED, AND PAINTED WITH A RUST INHIBITING PAINT. PORTIONS OF RAILINGS THAT HAVE ROT SHALL BE REPLACED IN KIND TO MATCH EXISTING MATERIAL AND PATTERN. REMOVE AND DISCARD ALL EXISTING WALL TILES . REMOVE EXISTING WALL AND EXCAVATE EARTH TO BE REMOVED TO ACCOMMODATE FOR NEW ELEVATOR . REMOVE AND DISCARD EXISTING CONCRETE STAIRS IN ITS ENTIRETY. EXISTING SECURITY CABINET TO BE REMOVED AND REPLACED IN KIND. B © © © © REMOVE PORTION OF EXISTING RAILING TO CREATE NEW GATE HANDICAP LIFT. EXISTING A.C. SPLIT SYSTEM TO BE REMOVED AND REPLACED WITH VARIABLE REFRIGERATION FLOW HVAC SYSTEM FOR FIRST FLOOR. EXCAVATE SHADED AREA BEHIND EXISTING MASS MASONRY WALL TO INSTALL DRAINAGE REVISIONS NO: | DATE: REMARKS. A\ 9/24/19 ADDENDUM 1 CONSULTANTS JDG Jaredian Design Group Architects, Engineers atc Contraction Manapoes St. Thomas, No.33 Dronningens Gade - Queen's Quarter Post Office Box 8218 U.S. Virgin Islands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowemetnet i ; i 2 i : i i : ST. REHABILITATION OF GOVERNMENT HOUSE ST. THOMAS 22 KONGENS GADE KINGS QUARTER THOMAS U.S.V.L. DATE DRAWN BY CHECKED BY. APPROVED BY 6/7/19 J.P.W. PROJECT NO. CONTRACT NO, 17-016 SHEET NO. TAO FIRST FLOOR DEMOLITION PLAN 1 2 3 4 5 6 7 (i BID ST) ALTERNATE 1 OE OE Oe ~ a“ ~N SS / y \ ee STORAGE | | po (1715) | | ! - +++ ] ! Cis) | STORAGE | ELEV. MACHINE ROOMGm) a Pump —— OFFICE | ; Cio] + | G0) “a OFFICE (a3) fa] —)] FO y 411 SMUR A r— ~ | ® OFFICE } <> i h_ AX CORRIDOR RRIDOR cy ae | @® CORRIDO + SMIUR SMLAR [2] —— See 7 | NEW WALL INFILL r 8” CONCRETE TO MATCH BLOCK INFILL EXISTING WALL Bs | FINISH Lf] / CONCRETE PLATFORM FOR LIFT i} U NEW HANDICAP | 1 => GORRIDOR OFFICE uFT —————_+" 5 LOBBY | | eo7 Z NEW FLOOR @ FINISHES ; THROUGHOUT RELOCATED GD oo po ers PARTITION ornce EXISTING FOUNTAIN —+ TO BE REFURBISHED (178) a) AND REDESIGNED BY (Crystal Fountains) 60 Snow Boulevard,Concord, ~ Uh) [W3] Pa Ontario,Canada J T =. co L4k483 SECURITY Telephone: (905)-660-6674 (1 Naa, —{W!] SECURITY OFFICE Gist) Fax: (905)-660-6916 e-mail: www.crystalfountains.com [15] “7 2 ‘epee \ REVISIONS wo: ATE. | REMARKS ADDENDUM 1 CONSULTANTS: Jaredian Design Group Archinect, Enginwers and Coneructon Arugars No 33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777 1600 fax 340 777 1601 e-mail: jaredian2@vipowernet.net THESE PLANS AND THE DESIGIS CONTAINED KEREIN ARE THE SOLE PROPERTY OF JAREDULM DESIGN GROUP THESE PLANS MA ES wre Tel oF SUBAECT LAREDIAK DESIEN GROUP TO ANY COST Of DAMA’ OR ANY ERROR OR OMISSION CONTAINED THEREIN REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST THOMAS U.S V) OATE 6/719 DRAWN BY CHECKEDBY JPW APPROVED AY = J. PW. PROVECT NO. 17-016 CONTRACT NO. — SHEET NO TALI aT ~[® Lo] ® : Z : I | ° r EXISTING RAILING Tr i \\porde H \/ } 1 aN. ! i A \ l | I an WS UP ONE RISER f - U U AH \ NI Le | NEW 8" CONCRETE SIDE WALL \ + \ yy SN GENERAL NOTES \ NEW CONCRETE DECK STRESS? TD EIRET FLOOR UI EVEL POURED TO LEVEL OF FIRST SEE SHEET A4.0 FOR DOOR. WINDOW AND ROOM FINISH SCHEDULES. FLOOR LEVEL. REINFORCED SEE SHEET A5.0 FOR WALL DETAILS WITH WIRE FABRIC INFILL AREA WITH CONCRETE CENTER NEW WINDOW ASSEMBLY IN EXISTING OPENING 6" THICK REINFORCED WITH WIRE FABRIC prerertndd TOP RAIL TO INSTALL NEW FLOOR FINISHES THROUGHOUT RE-SHEATH ALL EXISTING WALLS AND CEILINGS IDENTIFIED FOR FIRST FLOOR DEMOLITION WITH 5’8" WATER AND MOLD RESISTANT GYPSUM WALLBOARD | IDENIFIC ATION FLOOR P N CLEAN AND SANITIZE ALL WALLS AND WALL COMPONENTS FROM MOLD L Al PRIOR TO INSTALLATION OF NEW SHEATHING AND PAINT 1A. | 1A1.1 | SCALE: 3/16"=1'-0" ALL NEW BASEBOARDS, CHAIR RAILS AND CROWN MOLDINGS TO MATCH EXISTING PROFILES AND DESIGN 1 2 3 4 | 5 6 7 m Oo ~~ 2 © STORAGE/ PANTRY , (205) XOXO ee ee ee ee a & iy AIRWEUL RECEIVING | Ll REMOVE PORTION OF AND WALL TO ACCOMMODATE NEW ELEVATOR DINING ROOM (203) HOOOOOOD DA St 7 Ot KOEKKKKKD BALLROOM LUT 1 DEMOLITION NOTES LEGEND DEMOLITION NOTES ARE GENERAL FOR WORK T0 BI NE. SEE DEMOLITION PLAN FOR SPECIFIC WORK AREAS. coy REMOVE AND DISCARD EXISTING WINDOW. WINDOW TO BE REPLACED IN KIND USING MAHOGANY WOOD AND SIMILAR STAINLESS. STEEL HARDWARE. REMOVE AND DISCARD EXISTING LIGHT FIXTURES ON EXISTING CEILING AND WALLS. DISPOSE AS. PER THE DIRECTION OF THE OWNER. (NOT APPLICABLE FOR CHANDELIERS) CHANDELIERS. SHALL BE CLEANED AND RESTORED. REMOVE AND DISCARD ALL EXISTING REST ROOM PLUMBING FIXTURES AND CABINETRY. ALL WATER AND WASTE WATER LINES SHALL 8E CAPPED FOR FUTURE USE. REMOVE AND DISCARD EXISTING DOOR. DOOR FRAME AND HARDWARE. EXISTING TRANSOM TO BE CLEANED PATCHED AND SANDED WHERE APPLICABLE. REMOVE EXISTING LOOSE PAINT FROM WALL AND PREPARE SURFACE TO RECEIVE A NEWCOAT OF PAINT AND PRIMER. REMOVE ALL AND DISCARD EXISTING FLOOR TILES AND PREPARE SURFACE TO RECEIVE NEW TILE. EXISTING CARPET TO BE REMOVED AND DISCARDED. PREPARE FLOOR TO RECEIVE NEW FLOORING. oOo Oo 8 O SECOND FLOOR DEMOLITION FLOOR PLAN 2a1.0 | 241.0 SCALE: 3/16"=1'-0" - | BID if Pv ALTERNATE 1 er lke (~) O HANDICAP ra [\e gettSou 1 ween =F © f T ‘ Ne | AC ROOM ] Hl | C aN | I | — u | WY, / H LIBRARY 7 | & . | l | © i. | COURTYARD | > i! RECEPTIONIST /]] | \ a LEGAL y} | & \ ® f COUNCIL BUILDING ! / L] CaN : | ARKO RE RES : TAL 1 (aie) tat] |! t t i} o>) I = | | EXISTING FLOOR STRUCTURE EXISTING SHEATHING ON FURRING STRIPS AND STUDS ON INTERIOR WALLS SHALL BE REMOVED AND DISCARDED UP TO TOP OF EXISTING CHAIR RAIL. FURRING STRIPS, STUD FRAMING AND AREA BEHIND SHALL BE CLEANED AND SANITIZED UP TO EXISTING CHAIR RAIL. REPLACE WITH NEW SHEATHING . BASEBOARDS AND CHAIR RAILS. EXISTING SHEATHING ON FURRING STRIPS AND STUDS ON INTERIOR WALLS SHALL BE REMOVED AND DISCARDED. FURRING STRIPS, STUD FRAMING AND AREA BEHIND SHALL BE CLEANED AND SANITIZED UP TO CEILING FROM FINISH FLOOR. REPLACE WITH NEW SHEATHING. CHAIR RAILS. BASEBOARDS AND CROWN MOLDING. REMOVE AND DISCARD EXISTING VCT FLOOR TILES AND ADHESIVE AS. EXISTING FIXTURES AND CASEWORK TO BE REMOVED AND DISCARDED. REMOVE AND DISCARD EXISTING CEILING SYSTEM. CLEAN AND SANITIZE ALL SURFACES BEHIND CEILING TO RECEIVE NEW SHEATHING AND CEILING MOLDINGS. © A © (AC CONTRACTOR) TO REMOVE AND DISCARD ALL AIR CONDITIONING PIPING, INSULATION, AND EQUIPMENT AS REQUIRED TO ACCOMMODATE FOR NEW VARIABLE REFRIGERANT FLOW HVAC. SYSTEM (UPGRADE), & REMOVE AND DISCARD ALL EXPOSED UNUSED CABLE, SECURITY, AND TELEPHONE LINES MAINTAIN EXISTING SYSTEMS IN USE. CLEAN, PATCH, SAND AND PREPARE EXISTING BASE BOARDS. CHAIR RAILS, AND CROWN MOLDINGS TO RECEIVE NEW PRIMER AND PAINT. ® CLEAN, PATCH, SAND AND PREPARE EXISTING RAILING AND POST ASSEMBLY TO RECEIVE NEW PRIMER AND PAINT. EXISTING WOOD SHUTTERS TO BE REMOVED DISCARDED AND REPLACED IN KIND. NEW HARDWARE SHALL BE STAINLESS STEEL. (18> EXISTING WOOD SHUTTER TO BE CLEANED. PATCHED AND SANDED TO RECEIVE NEW PAINT AND NEW STAINLESS STEEL HARDWARE. (39> REMOVE AND DISCARD ALL EXISTING WOOD FLOORING. CLEAN AND PREPARE FLOOR SURFACE TO RECEIVE NEW WOOD FLOORING. a DEMOLITION SYMBOL LEGEND maaead | se | EXISTING WALL TO BE DEMOLISHED EXISTING WALL TO REMAIN > REMOVE AND DISCARD ALL EXISTING WALL TILES PREP WALL TO RECEIVE NEWPAINT OR NEWTILE SURFACE. ® CONTRACTOR SHALL REPOSITION AIR CONDITION DUCT, PIPES, COMMUNICATION CABLES, AND OBSTRUCTIONS TO ACCOMMODATE FOR 80" COOR ® REMOVE AND DISCARD EXISTING STAIRS. ® REMOVE AND DISCARD EXISTING PUMP AND AIR TANK REMOVE AND DISCARD EXISTING SUSPENDED CEILING IN ITS ENTIRETY. ® REMOVE EXISTING SKYLIGHT. EXCAVATE AND REMOVE BRICK PAVING TERRACE. ® REMOVE EXISTING WOOD DECKING. ® EXCAVATE SHADED AREA BEHIND EXISTING MASS MASONRY WALL TO INSTALL DRAINAGE. REMOVE EXISTING ELEVATOR, ® REMOVE AND EXCAVATE PORTION OF EXISTING PLANTER TO CREATE NEW STAIR. REMOVE BRICK RAILINGS AND FACING FROM STAIRWAY. ® REMOVE EXISTING TREE STUMP. EXISTING RAILINGS AND COLUMN ASSEMBLY TO HAVE RUST NEUTRALIZED, REMOVED. AND PAINTED WITH A RUST INHIBITING PAINT. PORTIONS OF RAILINGS THAT HAVE ROT SHALL BE REPLACED IN KIND TO MATCH EXISTING MATERIAL AND PATTERN. EXISTING WINDOW TO BE CLEANED, PATCHED, SANDED, AND REPAIRED. ALL HARDWARE TO BE REPLACED WITH STAINLESS STEEL EXISTING DOOR TO BE CLEANED, PATCHED, SANDED AND REPAIRED. ALL HAROWARE TO BE REPLACED WITH STAINLESS STEEL HARDWARE. CONTRACTOR TO CLEAN, PATCH, AND PAINT EXISTING JALOUSIES AND PROVIDE A NEW WINDOW SIMILAR TO WANDOWS IN THE CINNING. ROOM AREA. & REMOVE EXISTING BRICK PAVING DOWN TO CONCRETE ROOF. REVISIONS REMARKS \9/2a/e| ADDENDUM 1 m | r +. tt ttt tt tt tH Ht i CONSULTANTS: Jaredian Design Group s Archiects, Lnigneees and Congructian Managers No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowernet.net ‘THESE PLANS ADO THE DESIGNS CONTAINED HEREIN ARE Tat ‘SOLE PROPERTY OF JAREDIAN DESIGN GROUP, THESE ALAMS ra) FOR ANY ERROR OR OPISS:ON CONTAINED THEREIN REHABILITATION OF GOVERNMENT HOUSE ST. THOMAS 22 KONGENS GADE KINGS QUARTER ‘ST. THOMAS U.S.V.1. DATE: 6/7/19 DRAWN BY: B CHECKEDeY: J PW APPROVED BY: J_P.W. PROJECT N | 17-016 CONTRACT NO.: — SHEET NO.: / EXISTING WOOD FLOOR TO BE REPLACED IN ITS ENTIRETY SEE DETAIL 6 SHEET AS5.0 KITCHEN TO BE RENOVATED \ SEE KITCHEN DRAWINGS \ FOR DEMOLITION AND NEW | CONSTRUCTION rep es \ | I | a === f T | | |= fy CORRIDOR fea) Sa | AN | | : ; ( SY; : LIBRARY | CONCRETE | 1 RISERE i @) [215] j SLAB INFILL itt : ! NEW CONCRETE BLOCK E ' a | RAILINGS AND SUPPORT | I WALLS FOR STAIR. G@\ || boBBY RECEPTIONIST | | COURTYARD PAINTED PLASTER REPAIR (216 J | xk) \ h—— LEGAL Ht y ' EXISTING PLANTER | | cvevaTor __ KB TO BE RESTORED \. | COUNCIL BUILDING __ 4 | 4} Goss Ly G | alll ~~ a CD) |] |G | ; He - H EXISTING STAIR \ 1 oS ay 1 WAAR AAS S OFFICE OFFICE Gm) = 4! | Gia) al O [278] [219] a wee iy t x = | a Pi ptaAgdi{? fbi N rt | A x t—\y E { ; z / wi A DINING ROOM R = SS ~ _-* OPEN. Ly (_] —> ao i V4 PS RAILING INFILL TO n NN = MATCH EXISTING — A FOYER | N tJ SHADED AREA INDICATES NEW BRICK PAVING AND bd PN DRAINAGE MAT OVER (2) EXISTING CONCRETE SLAB 7 L 7 f MATCH EXISTING BRICK b LA a aa Q| wi} NEWIMPACT RESISTANT SKYLIGHT EXISTING WOOD FLOOR TO BE A REPLACED IN ITS ENTIRETY (8) SEE DETAIL 6 SHEET A5.0 PH receiuns resuge iH SECOND FLOOR 1 IDENTIFICATION FLOOR PLAN rn | ait] 2A1.1 | SCALE: 3/16°=1'-0° ik @ mu a (ae) (m™) a ED) i Ezy) &® @®) all a INSTALL NEW TOP GENERAL NOTES NEW PAINTED NEW PAINTED RAIL TO 3-6" HEIGHT HARDWOOD OY PORCH HARDWOOD ey), : .e 2 3. 4 5. SEE SHEET A4.0 FOR DOOR, WINDOW AND ROOM FINISH SCHEDULES. SEE SHEET AS.0 FOR WALL DETAILS CENTER NEW WINDOW ASSEMBLY IN EXISTING OPENING INSTALL NEW FLOOR FINISHES THROUGHOUT. RE-SHEATH ALL EXISTING WALLS AND CEILINGS IDENTIFIED FOR DEMOLITION WITH S/8" WATER AND MOLD RESISTANT GYPSUM WALLBOARD. REVISIONS: no,| DATE: | REMARKS A\ 9/24/0| ADDENDUM 1 CONSULTANTS: Jaredian Design Group Archtacts, Enginsers and Coretryction Managers No 33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowernet.net THESE PLANS AMO THE OESIGNS CONTAINED HEREIN ARE THE SOLE PROPERTY OF JAREDIAN CELIGH GROUP THESE PLAMS ett 4 FOR ANY ERROR OM OMISSION CONTAINED THERE REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST THOMAS USVI OATE 6/7/19 DRAWN BY. CHECKEDBY J P.W APPROVEDBY J PW PROJECT NO. 17-016 CONTRACT NO. — SHEET NO. 2A11 SECOND FLOOR IDENTIFICATION PLAN ~ woot ee re ee ” _—_ — pier 12-9 CEILING PENETRATION LEGEND EQUAL OPE N-G.W.B Olle [] KITCHEN EXHAUST HOOD EXHAUST FAN TRANE 4TVC0038C1000AA - TVR SELECT 38 MBH COMPACT 4-WAY CASETTE - 208-230/60/1/(AHRI/ETL CERTIFIED) - QTY: 16 p RECESSED, SURFACE, OR PENDANT MOUNTED DOWNLIGHT CEILING MOUNTED EXIT LIGHT WITH DIRECTIONAL ARROWS CEILING MOUNTED LIGHT FIXTURES | FLUORESCENT LIGHT FIXTURES (e) EXISTING CHANDELIER TO BE REFURBISHED & INSTALLED E.S. EXPOSED STRUCTURE N-G.W.B NEW GYPSUM WALL BOARD SEE SHEET A2.1 FOR CEILING DETAILS N-C.W.B CEMENT WALL BOARD EX. EXISTING CEILING REMAIN 19-0" pi i EQUAL EQUAL 19-0" a 4 EQUAL AG EQUAL EQUAL i _ EQUAL 12-0" 12-9" 1 SECOND FLOOR REFLECTIVE CEILING PLAN GENERAL NOTES 1. CONTRACTOR SHALL CENTER LIGHT FIXTURE IN ROOMS UNLESS NOTED OTHERWISE. 2. CONTRACTOR SHALL REFER TO ELECTRICAL DRAWINGS FOR LIGHTING FIXTURE SCHEDULES. 3. LIGHTS, AC DIFFUSERS, AND SUSPENDED GYPSUM CEILING SHALL BE INCLUDED AS PART OF THE BASE BID IN ROOMS 205,206 AND 207. 4. ROUTE ALL A/C REFRIGERANT PIPING TO CHILLER PAD ON THIRD FLOOR LEVEL. SEE DRAWING 3A1.18 FOR LOCATION OF CHILLER. GENERAL NOTES 1. THE V.1 GOVERNMENT OWNS TWO TRANE TVR CONDENSERS, MODEL NUMBER 4TVH0144C6000AA THAT ARE TO BE INCORPORATED INTO THE NEW AIR CONDITIONING SYSTEMS FOR THE FIRST AND SECOND FLOORS. THESE UNITS ARE CURRENTLY LOCATED AT GOVERNMENTS HOUSE ST. THOMAS. CONTRACTOR WILL COORDINATE WITH THE TRANE COMPANY OF PUERTO RICO FOR FINAL DESIGN / INSTALLATION OF THE FIRST AND SECOND FLOOR AIR CONDITIONING SYSTEMS. 2a1.3 | 2A1.3 4 SCALE: 3/16"=1'-0" | 5 REVISIONS NO: DATE REMARKS A\ 9/24 ADDENDUM 1 CONSULTANTS ID G Jaredian Design Group Architects, Enguneces and Construction Managers No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Istands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowemet.net REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.I. DATE: 6/7/19 DRAWN BY: CHECKEDBY: J PW APPROVEDBY = J.P.W, PROJECT NO. 17-016 CONTRACT NO. SHEET NO. 2A13 SECOND FLOOR REFLECTIVE CEILING e’-e" 2 3 4 5 EQ, EQ. \_pa-ory\y EF| CENTER Dx] Hl FY zie > EQ, » EQ. a f a LJ {| LN-G.w.B +€ ! 2 > N-G.W.B + N-G.W.B & ~€ wt F175 3 > i b 1d, |S a a 1 inl |, - ¢ a s \ N-G.W.B & 3 > | bl an ] nl y .¢ b i4 Slr i EQ, L 7-0" i i } ; € [EF] ¢ ¢ . EQ. | EQ. 3 [EF] WJ TO_ REMAIN 2 EXISTING CHASE 2nd FLOOR REFLECTED CEILING KITCHEN PLAN REVISIONS NO: DATE: REMARKS A\ o/24t@ ADDENDUM 1 GENERAL NOTES CONTRACTOR SHALL CENTER LIGHT FIXTURE IN ROOMS UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REFER TO ELECTRICAL DRAWINGS FOR LIGHTING FIXTURE SCHEDULES. LIGHTS, AC DIFFUSERS, AND SUSPENDED GYPSUM CEILING SHALL BE INCLUDED AS PART OF THE BASE BID . CONTRACTOR TO FOLLOW EXISTING CEILING MOLDING DESIGN FOR REPLACEMENT MOLDING ae a on oes CONSULTANTS ELECTRICAL SYMBOLS LEGEND LIGHT FIXTURE, SIZE AS SHOWN __] CEILING MOUNTED SURFACE FLUORESCENT APPROXIMATELY TO SCALE. 7] KITCHEN EXHAUST HOOD Tw EXTERIOR WEATHER PROOF WALL MOUNTED LIGHT FIXTURE OR WALL SCONCE Lox WALL MOUNTED INTERIOR LIGHT FIXTURE OR WALL SCONCE WI EXTERIOR WEATHER PROOF CEILING MOUNTED LIGHT FIXTURE sat CEILING MOUNTED LIGHT FIXTURE WEY POLE LIGHT [EF] © EXHAUST FAN () CHANDELIER TYPE LIGHT FIXTURE -- CEILING MOUNTED RECESSED LIGHT FIXTURE AIR CONDITION REGISTER AIR CONDITION RETURN | DG Jaredian Design Group Architects, Engincers and Conitruction Manages No.33 Dronningens Gade - Quesn's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowemetnet REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.1. DATE 6/7/19 DRAWN BY. CHECKEDBY §J.P.W APPROVED EY: J.P,W. 2M.3A |2A1.3A SCALE: 1/4"=1'-0° PROJECT NO. 47-016 CONTRACT NO. SHEET NO. 2A13A SECOND FLOOR KITCHEN PLAN REVISIONS T NO: | DATE: | REMARKS A\io/2ape) ADDENDA 1 | Pt — mal : — po | / J 4. 4 4 BID Srl o [7 T | ALTERNATE 1\ | pt | | HANDICAP REMALE +: +. 4 a es |} ||| Rescesom | ye 5 | = 3 T f : — + 7 COMMU. as 4. (203 KITCHEN ee | L \pgaappe C ROOM rt ‘| LH — | : . i if L r4t3 r- AX I il il 4 * 4 + J EB-2 |_| Fis)! = B — | | +. STORAGE ys Ra COURTYARD LOBBY RECEPTIONIST i) Jevevator BE _ i \ a ‘I ean tf al ‘. WI f yi OFFICE OFFICE Jaredian Design Group — Archhects, [ogee and Convirycion Managers \ | | | | | | | ( Up R . i | s+ CONSULTANTS 1 RISER 4 LIBRARY | i 3 [275) | | 1 | | | | | | | | | | | No.33 Dronningens Gade - Queen's Quarter E q E q Post Office Box 6218 / St. Thomas, U.S. Virgin Isiands 00804 telephone: 340.777.1600 fax: 340.777.1601 N Pa e-mail: jaredian2@vipowernet.net DINING ROOM 2-3 C2 wy, Zz B- 3) THESE PLANS AND THE DEWGNS CONTAICED KEREIN ANE THE SOLE PROPERTY OF JAREDIAN DELEON GROUP. THESE PLANS Ha SUBJECT JMEDUAN DESIGN GROUP TO ayy COST OA DAMAGES FOR ANY ERRCH OR CHIISLION CONTAINED THERE: C) REHABILITATION OF GOVERNMENT HOUSE NOTES: ST.THOMAS CIM” Se < ® Bi 1. EXISTING FIRE ALARM SYSTEM TO BE REPLACED IN KIND UTILIZING EXISTING RACEWAYS. EXISTING ALARM, PULL STATIONS, AND PANEL LOCATIONS TO BE REUSED 77 Nee GUARTER WITH NEW DEVICES. ST. THOMAS U.S.VI | | | : LIFE SAFETY SYMBOLS LEGEND EXIT LIGHT FIXTURE, TYPE AS NOTED. SHADING B 64x DENOTES LIGHTED FACE WITH DIRECTIONAL ARROW WHERE SHOWN. DRAWN BY. BALLROOM RECEIVING CHECKEDBY JPW APPROVED BY J PW. SMOKE DETECTOR W/ 120V SUPPLY VOLTAGE AND BACKUP S8ATTERY [ [ 1 [ PROJECT NO.: 17-016 WALL MOUNTED BATTERY PACK WITH NUMBER OF CONTRACT NO: HEADS AND TYPE AS NOTED . SHEET NO.: valle Y yet aj =i e Sibs. ABC CLASS FIRE EXTINGUISHER 2A14 SECOND FLOOR FIRE ALARM PANEL LIFE SAFETY PLAN PORCH EMERGENCY PULL STATION 1%; 1s 2 © LF MATCH LINE “2 - MATCH LING cote or - 17 -- -- + -- -- - -=- -- ——l fil! ) REMOVE PORTION OF +—_ a | Ss NAN OFFICE EXISTING FLOOR (18"X18") 1 --4 FOR HOOD EXHAUST STAIR eS if REMOVE ENTIRE STRUCTURE IN SHADED AREA DOWN TO FLOOR SLAB SECOND FLOOR COURTYARD BELOW OO HALLWAY * —n co) GOVERNOR'S © Od ASSISTANT OFFICE S TH \ 3 xf Boon \<>| (30s J —_ CORRIDOR | | CORRIDOR GOVERNOR'S [337] ASSISTANT OFFICE © [303] = > ORM eee GOVERNOR'S OFFICE KITCHEN [325] OFFICE (323) ALTERNATE 1 YS > 2 @) SY’ FIRST FLOOR COURTYARD LD, | | UY OFFICE (322) ERRERUUEROAESA > ROOM u ) v ~ (Q NY Ly Nena anna HH Li NLP Ni Be 10) Ss 4 + EXISTING BUILT IN GUTTER —h THIRD FLOOR DEMOLITION FLOOR PLAN SAI.OA JAI.OA SCALE: 3/16"=1'-0" DEMOLITION NOTES LEGEND “DEMOLITION NOTES ARE GENERAL FOR WORK TO BE DONE. SEE DEMOLITION PLAN FOR SPECIFIC WORK AREAS. REMOVE AND DISCARD EXISTING WINDOW. WINDOW 70 BE REPLACED IN KIND USING MAHOGANY WOOD AND SIMILAR STAINLESS STEEL HARDWARE. ® REMOVE AND DISCARD EXISTING LIGHT FIXTURES ON EXISTING CEILING AND WALLS. DISPOSE AS PER THE DIRECTION OF THE OWNER. (NOT APPLICABLE FOR CHANDELIERS) CHANDELIERS. SHALL 8E CLEANED AND RESTORED. & REMOVE AND DISCARD ALL EXISTING REST ROOM PLUMBING FIXTURES AND CABINETRY. ALL WATER AND WASTE WATER LINES SHAL( BE CAPPED FOR FUTURE USE. &} REMOVE AND DISCARD EXISTING DOOR, DOOR FRAME AND HARDWARE. EXISTING TRANSOM TO BE CLEANED PATCHED AND SANDED WHERE APPLICABLE. co) REMOVE EXISTING LOOSE PAINT FROM WALL AND PREPARE SURFACE TO RECEIVE A NEW COAT OF PAINT AND PRIMER. <> REMOVE ALL AND DISCARD EXISTING FLOOR TILES AND PREPARE SURFACE TO RECEIVE NEW TILE. EXISTING CARPET TO BE REMOVED AND DISCARDED. PREPARE FLOOR TO RECEIVE NEW FLOORING. EXISTING SHEATHING ON FURRING STRIPS AND STUDS ON INTERIOR WALLS SHALt BE REMOVED AND DISCARDED UP TO TOP OF EXISTING CHAIR RAIL. FURRING STRIPS, STUD FRAMING AND AREA BEHIND SHALL BE CLEANED AND SANITIZED UP TO EXISTING CHAIR RAIL. REPLACE WATH NEW SHEATHING , BASEBOARDS AND CHAIR RAILS. EXISTING SHEATHING ON FURRING STRIPS AND STUDS ON INTERIOR WALLS SHALL BE REMOVED AND DISCARDED. FURRING STRIPS, STUD FRAMING AND AREA BEHIND SHALL BE CLEANED AND SANITIZED UP TO CEILING FROM FINISH FLOOR. REPLACE WITH NEW SHEATHING, CHAIR RAILS, BASEBOARDS AND CROWN MOLDING. REMOVE AND DISCARD EXISTING VCT FLOOR TILES AND ADHESIVE AS. EXISTING FIXTURES AND CASEWORK TO BE. REMOVED AND DISCARDED. REMOVE AND DISCARD EXISTING CEILING SYSTEM. CLEAN AND SANITIZE ALL SURFACES BEHIND CEILING TO RECEIVE NEW SHEATHING. AND CEILING MOLDINGS. (AC CONTRACTOR) TO REMOVE AND DISCARD ALL AIR CONDITIONING PIPING, INSULATION, AND EQUIPMENT AS REQUIRED TO ACCOMMODATE FOR NEW VARIABLE REFRIGERANT FLOW HVAC SYSTEM (UPGRADE). REMOVE AND DISCARD ALL EXPOSED UNUSED CABLE, SECURITY, AND TELEPHONE LINES. MAINTAIN EXISTING SYSTEMS IN USE. & CLEAN, PATCH, SAND AND PREPARE EXISTING BASE BOARDS, CHAIR RAILS, AND CROWN MOLDINGS TO RECEIVE NEW PRIMER AND PAINT. (16> CLEAN, PATCH. SAND AND PREPARE EXISTING RAILING AND POST ASSEMBLY TO RECEIVE NEW PRIMER AND PAINT. EXISTING WOOD SHUTTERS 70 BE REMOVED DISCARDED AND REPLACED IN KIND. NEW HARDWARE SHALL BE STAINLESS STEEL. EXISTING WOOD SHUTTER TO BE CLEANED. PATCHED AND SANDED TO RECEIVE NEW PAINT AND NEW STAINLESS STEEL HARDWARE. & REMOVE AND DISCARD ALL EXISTING WOCD FLOORING. CLEAN AND PREPARE FLOOR SURFACE TO RECEIVE NEW WOOD FLOORING, REMOVE AND DISCARD ALL EXISTING WALL TILES PREP WALL TO RECEIVE NEW PAINT OR NEW TILE SURFACE. CONTRACTOR SHALL REPOSITION AIR CONDITION OUCT, PIPES, COMMUNICATION CABLES, AND OBSTRUCTIONS TO ACCOMMODATE FOR 80" DOOR ® REMOVE AND DISCARD EXISTING STAIRS EXISTING WINDOW TO BE CLEANED, PATCHED, SANDED. AND REPAIRED. ALL HARDWARE TO BE REPLACED WTH STAINLESS STEEL HARDWARE. REMOVE AND DISCARD EXISTING SUSPENDED CEILING IN ITS ENTIRETY. REMOVE BRICK RAILINGS AND FACING FROM STAIRWAY. ® REMOVE EXISTING ELEVATOR. REMOVE AND EXCAVATE PORTION OF EXISTING PLANTER TO CREATE NEW STAIR. REMOVE AND DISCARD EXISTING WINDOW AND: SHUTTER, DEMOLITION SYMBOL LEGEND = | 7 EXISTING WALL TO BE DEMOLISHED EXISTING WALL TO REMAIN | REVISIONS REMARKS: oraara ACOENDUM 1 2 +t dt = 4 ++} |. = Po + + t+ + + at a = ti J + +: 4 +- t- 4 = +. {__t. tL 4 + + 4 + +. a + +- 4 }—_} + LE 4 B + + dt 4 i CONSULTANTS Jaredian Design Group Archtinds, Engjemes and Corruct on Margen No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowernet.net THESE FLAW AND THE DESICIGS CONTAINED HEREN ANE THE SOLE PROPERTY OF SAREDIAN CEGN GROUP. THESE PLANS Ha ve WITHOUT THE WRITTEN PERSHSSI0N OF JAREDIAN DESIGN GROW. UMAUTHOMIZED USE TEA Chast Fon pGATION. THE USE 6Y on THESE PART THEREOF SHALL NOT Iie aby BAY FOR ANE ERROR OA COHSSEON CONTAINED THEREIN REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.E. DATE! 6/7/19 ORAWN BY: CHECKEDBY: §=J PW APPROVED BY: = J.P.W. PROJECT NO.: 17-016 | CONTRACT NO. SHEET NO.: BID ALTERNATE 2 4 / E / [ , + LAUNDRY ; AD TO BUILDING TAUNDRY A + STORAGE BATH [332 ] STORAGE (34) aS & \ (335) \ _ ! Y } : \ | 4 a | | \ WALKWAY I WALKWAY (330) HUNT ‘ ROOM ||| <1] CISTERN AND RES TH LSE = EQUIPMENT PAD E] L328) Roou C323] D — OFFICE REMOVE EXISTING a STAIRS AND PLANTERS AS SHOWN | | OFFICE OFFICE I } . | ee ee ee oP a I 4 Reta SS -- -- - - -- -=- -- -- - -- ~ = a L -- Sir Tt el | | EXISTING WALL TO REMAIN FLOOR. REPLACE WITH NEW SHEATHING, CHAIR RAILS, BASEBOARDS AND CROWN MOLDING. ® REMOVE AND DISCARD EXISTING PUMP AND AIR TANK >> REMOVE AND DISCARD EXISTING VCT FLOOR TILES AND ADHESIVE AS. REMOVE AND DISCARD EXISTING SUSPENDED CEILING IN ITS ENTIRETY. EXISTING FIXTURES AND CASEWORK TO BE REMOVED AND DISCARDED. ® REMOVE EXISTING STAIRS AND PLANTERS AS SHOWN. 1 THIRD FLOOR DEMOLITION FLOOR PLAN 3a1.08 | 3A1.08 SCALE: 3/16"=1'-0" DEMOLITION SYMBOL LEGEND came EXISTING WALL TO BE DEMOLISHED DEMOLITION NOTES LEGEND DEMOLITION NOTES ARE GENERAL FOR WORK TO BE DONE. SEE DEMOLITION PLAN FOR SPECIFIC WORK AREAS. REMOVE AND DISCARD EXISTING WINDOW. WINDOW TO BE REPLACED IN KIND USING. MAHOGANY WOOD AND SIMILAR STAINLESS STEEL HARDWARE. ® REMOVE AND DISCARD EXISTING LIGHT FIXTURES ON EXISTING CEILING AND WALLS. DISPOSE AS PER THE DIRECTION OF THE OWNER. (NOT APPLICABLE FOR CHANDELIERS) CHANDELIERS SHALL BE CLEANED AND RESTORED. REMOVE AND DISCARD ALL EXISTING REST ROOM PLUMBING FIXTURES AND CABINETRY. ALL WATER AND WASTE WATER LINES SHALL BE CAPPED FOR FUTURE USE. REMOVE AND DISCARD EXISTING DOOR. DOOR FRAME AND HARDWARE. EXISTING TRANSOM TO. BE CLEANED PATCHED AND SANDED WHERE APPLICABLE. REMOVE EXISTING LOOSE PAINT FROM WALL AND PREPARE SURFACE TO RECEIVE A NEWCOAT OF PAINT AND PRIMER. REMOVE ALL AND DISCARD EXISTING FLOOR TILES AND PREPARE SURFACE TO RECEIVE NEW TILE. EXISTING CARPET TO BE REMOVED AND DISCARDED. PREPARE FLOOR TO RECEIVE NEW FLOORING. EXISTING SHEATHING ON FURRING STRIPS AND STUDS ON INTERIOR WALLS SHALL BE REMOVED AND DISCARDED UP TO TOP OF EXISTING CHAIR RAIL. FURRING STRIPS, STUD FRAMING AND AREA BEHIND SHALi BE CLEANED AND SANITIZED UP TO EXISTING CHAIR RAIL. REPLACE WITH NEW SHEATHING , BASEBOARDS AND CHAIR RAILS. 7 4 © © © & EXISTING SHEATHING ON FURRING STRIPS AND STUDS ON INTERIOR WALLS SHALL BE REMOVED AND DISCARDED. FURRING STRIPS, STUD FRAMING AND AREA BEHIND SHALL BE CLEANED AND SANITIZED UP TO CEILING FROM FINISH REMOVE AND DISCARD EXISTING CEILING SYSTEM. CLEAN AND SANITIZE ALL SURFACES BEHIND CEILING TO RECEIVE NEW SHEATHING AND CEILING MOLDINGS. (AC CONTRACTOR) TO REMOVE AND DISCARD ALL AIR CONDITIONING PIPING, INSULATION, AND EQUIPMENT AS REQUIRED TO ACCOMMODATE FOR NEW VARIABLE REFRIGERANT FLOW HVAC SYSTEM (UPGRADE). REMOVE AND DISCARD ALL EXPOSED UNUSED CABLE, SECURITY, AND TELEPHONE LINES. MAINTAIN EXISTING SYSTEMS IN USE. & CLEAN, PATCH. SAND AND PREPARE EXISTING BASE BOARDS, CHAIR RAILS, AND CROWN MOLDINGS TO RECEIVE NEW PRIMER AND PAINT. CLEAN, PATCH, SAND AND PREPARE EXISTING RAILING AND POST ASSEMBLY TO RECEIVE NEW B PRIMER AND PAINT. EXISTING WOOD SHUTTERS TO BE REMOVED DISCARDED AND REPLACED IN KIND. NEW HARDWARE SHALL BE STAINLESS STEEL. EXISTING WOCD SHUTTER TO BE CLEANED, PATCHED AND SANDED TO RECEIVE NEW PAINT AND NEW STAINLESS STEEL HARDWARE. & REMOVE AND DISCARD ALL EXISTING WOOD FLOORING. CLEAN AND PREPARE FLOOR SURFACE TO RECEIVE NEW WOOD FLOORING. REMOVE AND DISCARD ALL EXISTING WALL TILES PREP WALL TO RECEIVE NEW PAINT OR NEW TILE SURFACE. CONTRACTOR SHALL REPOSITION AIR CONDITION DUCT, PIPES, COMMUNICATION CABLES, AND OBSTRUCTIONS TO ACCOMMODATE FOR 80" ® REMOVE AND DISCARD EXISTING STAIRS. REVISIONS f NO: | DATE: | REMARKS AN sfaatel ADDENDUM 1 - + tf + + + , 1 a i + + + + CONSULTANTS Jaredian Design Group Archnacts, Engnens and Coneruciun Managers No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin islands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowernet.net THESE PLANE ANG THE DESIGNS CONTAINED HEREIN ARE THE SOLE PROPERTY OF AAREDIAN DESIGN GROUP. THESE PLAS Ma WOT BE REPROOUCED Wt ERTS REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V). OATE 6/7/19 DRAWN BY CHECKEDBY J PW APPROVEDBY = J.PLW. — PROJECT NO.: 17-016 CONTRACT NO.: j SHEET NO.: erence EXISTING RAILING LAT RAD H/C KD O =| FIRST FLOOR 4 5 y, I a — =r == -- — xr == == = -“s / Jy t 33 NNN SS OFFICE | KITCHEN =] | . Tore & ; ——7 a N | | | \ | rr = | BID \ | ALTERNATE 1\_ | a ee / | ke | N | SECOND FLOOR EI n | COURTYARD | N : OFFICE \ I 4 7 \ | Lf | | | \ i | \ l N | ~ ~ | | SS a OFFICE ~J CA) (A) = [322] | NEW MASONRY RAILINGS a) | AND SUPPORT WALLS — | FOR STAIR. PAINTED OEFICE A PLASTER REPAIR f J | Porc Cat] LETT 1 THIRD FLOOR IDENTIFICATION FLOOR PLAN 3A1.1A] JA1.1A SCALE: 3/16°=1'-0" Eafe tt J =e + i—+- + I—_} + ie + — + b+ + = + + + = + = + + + = a -—+ + ae + ph + + - CONSULTANTS. Jaredian Design Group Archnaxts, [ngineees and Coretsuctun Masagers No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St Thomas, U.S. Virgin Islands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowernet.net THESE PLANS AND THE DESIGNS CONTAINED HEREIN ARE THE DURECT JAREDRAN DESIGN GROUP TO ANY COST Of DAMAGES. FOR ANT ERROR OR OHIIELION CONTAINED THEREIN REHABILITATION OF GOVERNMENT HOUSE ST. THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.). DATE 6/7/19 DRAWN BY: CHECKEDBY JPW APPROVED BY: J. P.W. PROJECT NO.: 17-016 CONTRACT NO.: eae NO.: SALIA THIRD FLOOR IDENTIFICATION PLAN BID ALTERNATE 2 ~ “oo ee TE EE MATCH LINE STORAGE (335) | 3 | 4 6 7 6 76.0 A ne AO = 8 5 \ ; TRANE CONDENSER - Sp 4TVHO144C6000AA- QTY: 4 CONCRETE \ < BLOCK INFILL /| BATA UTTER? = CHILLER SERVES FIRST FLOOR storace / \_esbSSebe ait / Cast A sy, TRANE CONDENSER - CONCRETE { 7 4TVHO115C6000AA- QTY: 5 [334] BICCKINETH SERVES SECOND FLOOR Po ata | 7 7} | \ t i yp WALKWA 7 WALKWAY sb \ Ny risers C330) TN CISTERN AND \ a (e) EQUIPMENT PAD is Md NAASAAAAANAN FFI NEW CONCRETE taza} [ PLATFORM AND STAIRS N STAIR IN SHADED AREA OFFICE - . N N ® » [L_] r - == on 3 — ~= -= -= ob =o aN =~ L.-— MATCH LINE 3ai.9]3A1.18] SCALE: 3/16°=1"-0" 3 4 6 7 REVISIONS no: | DATE: REMARKS [AN 9/24710| ADDENDUM 1 { oT |__|. + a + -_—— + }+—}- + = + = + | | + + el | I | || CONSULTANTS Jaredian Design Group Archtacts, Ergjewers and Conmeucton Managers No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777. 1600 fax: 340.777.1601 e-mail: jaredian2@vipowernet.net THESE PLANS AND THE DEMGHS CONTAINED HEREIN ake THE SOLE PROPERTY OF JAREOIAN DESIGN CROP. THESE PLANS ma IN OF WLJECT JAMEDLAM DESIGN GROUP TO ANY COST OR DAMAGES FOR AMY ERRCH OM COHISSION CONTAINED THEREIN REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.). ORAWH BY: CHECKEDBY: J PW APPROVEDBY: = J.P.W. PROJECT NO.: 17-016 CONTRACT NO.: SHEET NO.: 3AL1B THIRD FLOOR IDENTIFICATION PLAN 1 MATCHLINE —--— RK wl a Nu be & J wu wn ao 33°10" OFFICE MATCH LINE a ( | HALLWAY L315 J COWN 16'-6" | Lye Ni LA GOVERNOR'S ASSISTANT OFFICE 15'-10" CORRIDOR [304 ] TK. — 3 | 4 | 5 | 6 —+ > ontetaiateeaieietenetatatataaatataatanatan 7 tl bs | hao a | - -= = r/< = -_— = = S| i AAAAAAANAAANS OFFICE l =) | KITCHEN Bl ——) + ‘ N) [325] ; | { | i i> rm | N " BID N ———— ALTERNATE 1 | N SECOND FLOOR | N 1 COURTYARD | ba OFFICE SSX (323) “ | | \ Sg SS55555 = OFFICE 1] (322) \ 16’-8° I py Oo OFFICE = ral ee , SN - a Oe | y FIRST FLOOR 6-0" COURTYARD 25’-5’ | BATH zt ROOM 1 GOVERNOR'S OFFICE 24'-6* 15’-6" If ° CJ — HL i Kd be ae awe aes 44 ht 1h MoT | ST a é I ROOF! Lo | | | L z, 2 3 | 4 THIRD FLOOR 1 DIMENSION FLOOR PLAN 3a1.24| 3AT.2A SCALE: 3/16"=1'-0" REVISIONS: NO: | care: | REMARKS '9/24/%0| ADDENDUM 1 ;_| it : pj _ : + = 4. Bal | {___t +. +. 4 +4: ~ +. + 4. + + + — + fo aes + + + — + i + + CONSULTANTS Jaredian Design Group ‘Archhaxts, Engineers and Coneructon slaagers No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340,777. 1600 fax: 340.777.1601 e-mail: jaredian2@vipowernet.net THESE PLANE AND THE DESIGN CONTAINED HEREIN ARE THE SOLE PROPERTY OF JARED:AN DESIEM GROUP. THERE PLANS rus THESE PLANS OF ANY WUBJECT JANEDIAM BEMGN GROUP TO ANY COS! FOR ANT ERROR OR GMISSION CONTAINED THEREIN: REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.I. DRAWN BY CHECKED8Y JPW APPROVEDBY: J PW = PROJECT NO.: 17-016 | CONTRACT NO.: SHEET NO.: SA12A THIRD FLOOR DIMENSION PLAN —$+ 1 2 3 5 6 7 To BID ALTERNATE 2 ISS / 4 L | gat CHILLER 1gtt \S ( LAUNDRY ly 5 15-8" STORAGE ~. [332] ly oF STORAGE iS ROOM Ig t | = ——-—-—8---—-— | Sa al \ — 1, WALKWAY / | ! oN WALKWAY DOWN TTh tices [330] , [AH.UNI ~ tH o1--—--- tee) — yo io ASEM es / E> SS x OFFICE [ me N Caza] eee N KITCHEN Hl (| X 4 | | I I MATCHLINE - 77 7 a “ “ 7 “7 me 7 “ 7 7 me ~~ MATCH LINE THIRD FLOOR 1 DIMENSION FLOOR PLAN 31.28] 3A1.28| SCALE: 3/16"=1'-0" \ 1 1/2" GAL. 1 1/2” GALV. PIPE HAND RAIL mre HAND RAIL #4 AT 12" O.C ” NEW 8” CMU = an #3 AT 12" 0.C Wa a At 2 6” CONCRETE lo 41" Za Lip sus #5 AT 12” OC 7 ‘|| 7 RISERS EXISTING aay ae a NEW 8” CMU = “ . WALL 10 5'-6" . EXISTING FLOOR #4 AT 12” OC SLAB AND STAIRS . #4 AT 12" OC ie 3 STAIR SECTION 2__| ENLARGED STAIR PLAN 301.28] 341.28] SCALE: 3/8"=1'-0" 3A1.28| 31.28 SCALE: 3/8"=1'-0° 1 2 3 5 6 7 REVISIONS NO: | DATE: REMARKS aa |A\ rear] ADDENDUM 1 +—. ++. I—-; + — +- b+ + + + b+ +. J+ + b+ + + - + + +. + pt + po + + + PE + + + + Pt + CONSULTANTS: Jaredian Design Group Archihacts, Engineers and Corevction Managers No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777. 1600 fax: 340.777.1601 e-mail: jaredian2@vipowernet.net THESE PLANS AMD THE DESIGIT CONTAINED KEREIW ARE THE. SOLE PROOERTY OF JAREDIAN CETIGN GROUP, THESE PLANT ra) FOR ANY ERROR OR CHISTION CONTAINED THEREIN REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.I. CATE 6/719 DRAWN BY CHECKEDBY = J PW APPROVED BY. JPW. PROJECT NO.: 17-016 CONTRACT NO.: a SHEET NO.: 3A1.2B EQ. 10’-0° 10’-0° EQ, MATCH LINE MATCH LINE EQ. 7-5" | EQ, EQ. , EQ 7 EQ. 5'-0° EQ. N-G.W.B g’~4) | a 8’-0" N-G.W.B 9- oh 5/-8* EQ. 6’-0" 6'-0° EQ. EX. K x \ N-G.W.B XK x EX. EX. x EX. CENTER J EX. P 3 Q), 5’-0" i CENTER / 1 CEILING PENETRATION LEGEND CEILING GRILLE, REGISTER FOR RETURN OR EXHAUST AIR EXHAUST FAN CEILING SUPPLY DIFFUSER RECTANGULAR OR SQUARE RECESSED, SURFACE, OR PENDANT MOUNTED FLUORESCENT FIXTURE SEE FIXTURE SCHEDULE RECESSED, SURFACE, OR PENDANT MOUNTED DOWNLIGHT CEILING MOUNTED EXIT LIGHT WITH DIRECTIONAL ARROWS CEILING MOUNTED LIGHT FIXTURES FLUORESCENT LIGHT FIXTURES EXISTING CHANDELIER TO BE REFURBISHED & INSTALLED EXPOSED STRUCTURE NEW GYPSUM WALL BOARD SEE SHEET A2.1 FOR CEILING DETAILS CEMENT WALL BOARD EXISTING CEILING REMAIN Ges p2@[lee ¢nnan DUCT OF KITCHEN EXHAUST HOOD TO ROOF GENERAL NOTES 1. CONTRACTOR SHALL CENTER LIGHT FIXTURE IN ROOMS UNLESS NOTED OTHERWISE. 2. CONTRACTOR SHALL REFER TO ELECTRICAL DRAWINGS FOR LIGHTING FIXTURE SCHEDULES. 3. REMOVE EXISTING 3ERD FLOOR A/C SYSTEM IN ITS ENTIRELY & INFILL EXISTING OPENINGS THIRD FLOOR REFLECTIVE CEILING PLAN 3A1,3A | 3A1.34 SCALE: 3/16"=1'-0" REVISIONS NO: | DATE: REMARKS CONSULTANTS Jaredian Design Group Architects, Engineers and Construction Managers No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Isiands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowemet.net THESE PLANS AND THE DESIGHS CONTAINED HEREIN ANE THE AN OESIEN GROUP. THESE PLANS MAM i i REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.1. abe 6/7/19 DRAWN BY. CHECKEDBY J PW APPROVED BY: J.P.W, — PROJECT NO.: 17-016 CONTRACT NO.: SHEET NO.: SAI3A THIRD FLOOR REFLECTIVE CEILING BID No away (3B OFFICE CHILLER PAD (337) MATCH LINE THIRD FLOOR 1 REFLECTIVE CEILING PLAN JA1.3B | SA1.3B) SCALE: 3/16"=1'-0" CEILING PENETRATION LEGEND ” “MATCH LINE — CEILING GRILLE, REGISTER FOR RETURN OR EXHAUST AIR EXHAUST FAN CEILING SUPPLY DIFFUSER RECTANGULAR OR SQUARE RECESSED, SURFACE, OR PENDANT MOUNTED FLUORESCENT FIXTURE SEE FIXTURE SCHEDULE RECESSED, SURFACE, OR PENDANT MOUNTED DOWNLIGHT @¢8 RAN CEILING MOUNTED EXIT LIGHT WITH DIRECTIONAL ARROWS. CEILING MOUNTED LIGHT FIXTURES 4 C_] FLUORESCENT LIGHT FIXTURES 2 3 () EXISTING CHANDELIER TO BE REFURBISHED & INSTALLED ES. EXPOSED STRUCTURE N-G.W.B NEW GYPSUM WALL BOARD SEE SHEET A2.1 FOR CEILING DETAILS N-C.W.B CEMENT WALL BOARD GENERAL NOTES CONTRACTOR SHALL CENTER LIGHT FIXTURE IN ROOMS. UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REFER TO ELECTRICAL DRAWINGS FOR LIGHTING FIXTURE SCHEDULES. LIGHTS, AC DIFFUSERS, AND SUSPENDED GYPSUM CEILING SHALL BE INCLUDED AS PART OF THE BASE BID iN ROOMS. 205.206 AND 207. | +. + + t$—f}—$-—+- +4} +4 + + + CONSULTANTS Jaredian Design Group Archhacts, [nga and Corwruction sinagers No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Isiands 00804 telephone: 340.777. 1600 fax: 340.777.1601 e-mail: jaredian2@vipowernet.net THESE PLANT AND THE DESIGNS CONTAINED HEREIN ARE THE SOLE PROPERTY OF JAREDIAN DESIGN GROUP. THESE PLAMS rt we PERCUSSION OF ‘SHALL HOT SUBJECT JANEDLAN DESIGN GHOUP TO AMT COST OR DAMAGES FOR ANY ERRCH OM OMISSION CONTAINED THEREIN REHABILITATION OF GOVERNMENT HOUSE ST. THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.I. DATE: 6/7/19 DRAWN BY: CHECKEDAY J. PW APPROVED BY J.P_W, PROJECT NO.: 17-016 CONTRACT NO.: SHEET NO.: 3A13B THIRD FLOOR REFLECTIVE CEILING 1 MATCH LINE CY SN CWS CYS CYS Cy NY oy) 2 3 4 ! 5 6 7 OO TN MATCH LINE == - aie - -- - — (is - <-- -- ol [\@ NAASSNARASS | oT N STAIR | | 2) | | KITCHEN |LU (| | OFFICE — N (a5) || | N Fr “| | | l | N \ “| N BID | N | ALTERNATE 1 SECOND FLOOR | N i COURTYARD = WN la | P| | | | \ | \ l l CVS OY) OW YD Pox _ | A, ~~—------+ ~{F4 OFFICE | I — (322) | ae REST ROOM omy | X i) I ad | ‘el C= i £ OFFICE 1 OFFICE (321) passer (310) = | = =) | oy DOWN i —_ eS HALLWAY @ \ ( CLOSET Los i | J | LI ] LIFE SAFETY SYMBOLS m + @ LEGEND EXIT LIGHT FIXTURE, TYPE AS wy Gx NOTED. SHADING DENOTES GOVERNOR'S FIRST FLOOR UGHTED FACE WITH LA asSeyEnt OE Sice COURTYARD DIRECTIONAL ARROW WHERE 1 SHOWN. [ I SMOKE DETECTOR W/ 120V SUPPLY VOLTAGE AND BACKUP BATTERY } iw ASSISTANT OFFICE 4 &2) EB-2 TYPE AS NOTED —e GOVERNOR'S q] Sibs. ABC CLASS FIRE ‘ ss {| orrice é EXTINGUISHER a ROOM —amlld:«Ss* FIRE ALARM PANEL (| RE i ° ° ° EMERGENCY PULL STATION 7 | I HLH Hat LH LAL NL NL NN LL —s oF NOTES: r 1. EXISTING FIRE ALARM SYSTEM TO BE REPLACED IN KIND | UTILIZING EXISTING RACEWAYS. EXISTING ALARM, PULL = LJ STATIONS, AND PANEL LOCATIONS TO BE REUSED WITH | | J NEW DEVICES. L yy 1 LIFE SAFETY PLAN 3a14a]3A144] SCALE: 3/16"=1'-0" | 2 | 3 4 5 6 | 7 | REVISIONS NO: | DATE: [ REMARKS CONSULTANTS Jaredian Design Group Archtacts, Engioecrs and Convracton Maragers No.33 Oronningens Gade - Queen's Quarter Post Office Box 6218 St Thomas, U.S. Virgin Islands 00804 telephone: 340.777 1600 fax: 340.777.1601 e-mail: jaredian2@vipowernet.net THESE PLANS ANO THE DESIGHS CONTAINED HEREIN ANE THE TOLE PROPERTY OF JAREDIAN DETIGN 6ROUP REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS US V/ DATE: 67/9 DRAWN BY: CHECKEOBY: J PW APPROVED BY: J.P.W. PROJECT NO 17-016 CONTRACT NO: a SHEET NO SAL4A THIRD FLOOR LIFE SAFETY PLAN BID ALTERNATE 2 MATCH LINE — REVISIONS REMARKS ae + b+ + + + Roe + - + == + + + E+ 7 + . * + } + + + + bo + |. 4. + - a + ae + CONSULTANTS, Jaredian Design Group ‘Archhects, Engineers aed Condeuetion Margen: No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St Thomas, U.S. Virgin islands 00804 telephone: 340.777.1600 fax: 340.777.1601 @-mail: jaredian2@vipowernet.net THESE PLANS ANO THE DESIGNS CONTAINED HEREIN ARE THE ‘SOLE PROPERTY OF JAREDIAN DESIGN GROUP, THESE FLAWS Ma FOR ANY ERROR OR OMISSION CONTAINED THEREIN REHABILITATION OF GOVERNMENT HOUSE ST. THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.I. SHADING DATE: 6/7/19 DRAWN BY: CHECKEDBY: J PW APPROVED BY: J. P.W, PROJECT NO.: 17-016 CONTRACT NO.: == SHEET NO.: 3A1.48 THIRD FLOOR E | | H l CHILLER STORAGE | [335 ] ROOM PAD (333 Y LAUNDRY = STORAGE 32] x 8 A x " | ll: ® | ® | \ \ watkway |, D \ WALKWAY DOWN 1, ers | a Set === re -7- = Ce) SERENE RD E44 p= | 7 SANNAAASAN OFFICE l SS TE) N STAIR [324] —— N = OFFICE || ——| N — = -- -- 2 nw ele -- -- -- -- — — = == mx -- MATCH LINE Cc THIRD FLOOR 1 LIFE SAFETY PLAN 301.48] 301.48] SCALE: 3/16°=1"-0" LIFE SAFETY SYMBOLS LEGEND B EXIT LIGHT FIXTURE, TYPE AS NOTED. x DENOTES LIGHTED FACE WITH DIRECTIONAL ARROW WHERE SHOWN. SMOKE DETECTOR W/ 120V SUPPLY VOLTAGE AND BACKUP BATTERY sn WALL MOUNTED BATTERY PACK WITH NUMBER OF = HEADS AND TYPE AS NOTED EB-2 Slbs. ABC CLASS FIRE EXTINGUISHER NOTES: a) FIRE ALARM PANEL A 1. EXISTING FIRE ALARM SYSTEM TO BE REPLACED iN PULL STATIONS. AND PANEL LOCATIONS TO Be ReUSeO EMERGENCY PULL STATION WATH NEW DEVICES. 1 2 3 | 4 5 6 NLLC. 1 2 | 3 4 5 ROOM FINISH SCHEDULE ROOM FLOOR | BASE WALL CEILING NO NAME NORTH EAST SOUTH WEST REMARKS MATL _[FIN| MATL|FIN| MATL | FIN | MATL | FIN] MATL | FIN | MATL | FIN | MATL | FIN HEIGHT | FIRST FLOOR 100 PORCH SEE PLANS 101 SECURITY OFFICE MT | MT| B2 |PNT| GWB |PNT! GWB [PNT| GWB |PNT| GWB |PNT| GWB |PNT| MATCH EXISTING 102 FEMALE RESTROOM MT T | B1 |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| MATCH EXISTING TILE WAINSCOT 103 MALE RESTROOM T T | B1_ |PNT| GWB |PNT| GwB |PNT| GWB [PNT| GWB |[PNT| GWB |PNT| MATCH EXISTING TILE WAINSCOT 104 CORRIDOR T T | 82 |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| MATCH EXISTING 105 ELEVATOR LIFT T T | 82 |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNTj MATCH EXISTING 106 ELEVATOR MACHINE ROOM EX. |€X.{ B2 |PNT| GWB |PNT| Gwe [PNT| GWB {PNT| Gwe |PNT| GWB |PNT| MATCH EXISTING 107 STORAGE EX. EX.| B2 |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| MATCH EXISTING 108 CORRIDOR c C | B2_ |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| MATCH EXISTING 109 PUMP ROOM EX. |&X.] B2 |PNT| GWB |PNT/ GwB [PNT| GWB |PNT| GWB |PNT| GwB |PNT| MATCH EXISTING 110 STORAGE EX. EX.| EX. |PNT| GWB |PNT| GWB |PNT; GWB |PNT| GWB |PNT| GWB |PNT] MATCH EXISTING REFINISH EXISTING FLOOR 111 OFFICE EX. | €X.[ B2 |PNT) GWB |PNT| GwB |PNT| Gwe /PNT| GwB [PNT| GWB |PNT| MATCH EXISTING REFINISH EXISTING FLOOR 112 CORRIDOR EX. [| &X.| B2 [PNT] GWB |PNT| GWB [PNT] GwB |PNT! GwB [PNT] GWB |PNT| MATCH EXISTING REFINISH EXISTING FLOOR 113 OFFICE EX. | EX. B2 |PNT] Gwe |PNT| GwB |PNT| GWB |PNT| GwB |PNT| GwB [PNT] MATCH EXISTING REFINISH EXISTING FLOOR 114 OFFICE EX. |&X.| B2 |PNT| GWB |PNT] GwB [PNT| GWB [PNT] GWB [PNT| GWB |PNT| MATCH EXISTING REFINISH EXISTING FLOOR 115 STORAGE EX. | EX.| 82 |PNT| GWB |PNT| GWB |PNT| GwB |PNT| GwB [PNT| GWB /PNT| MATCH EXISTING REFINISH EXISTING FLOOR 116 STORAGE EX. | €X.[ B2 {PNT| GWB [PNT| GwB |PNT| GWB |PNT| GWB [PNT| GWB |PNT| MATCH EXISTING REFINISH EXISTING FLOOR 117 OFFICE MT | MT| B2 |PNT| GWB |PNT| GwB |PNT| GwB |PNT| Gwe |PNT| GwB [PNT] MATCH EXISTING REFINISH EXISTING FLOOR 118 OFFICE MT | MT| B2_ |PNT| Gwe |PNT| GwB {PNT| Gwe |PNT| GwWB [PNT] GWB [PNT] MATCH EXISTING REFINISH EXISTING FLOOR 119 SECURITY OFFICE MT | MT| B2_ |PNT] GWB {PNT| GWB [PNT] GWB |PNT| GWB [PNT] GWB |PNT| MATCH EXISTING REFINISH EXISTING FLOOR 120 VESTIBULE MT | MT|{ B2 [PNT] GwB [PNT] GWB |PNT| GWB /PNT| GWB [PNT| GwB [PNT| MATCH EXISTING REFINISH EXISTING FLOOR 121 LOBBY MT | MT| 82 |PNT] GWB [PNT| GWB |[PNT| GWB |PNT| GWB |PNT| GWB |PNT| MATCH EXISTING REFINISH EXISTING FLOOR SECOND FLOOR 200 PORCH HW /HW SEE PLANS 201 RECEIVING HW |HW| B2 GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT MATCH EXISTING 202 BALLROOM HW [HW[ B2 GWB |PNT| GWB |PNT| Gwe |PNT| GWB |PNT MATCH EXISTING 203 DINING ROOM HW [HW| B2 GWB |PNT| GWB |PNT| GWB |PNT| GWB [PNT MATCH EXISTING 204 FOYER HW [HW] B2 GWB |PNT| GWB |PNT| Gws |PNT| GWB |PNT MATCH EXISTING 205 ELEVATOR 206 STORAGE T T | B2 GWB |PNT| GwWB |PNT| Gwe [PNT| GWB |PNT MATCH EXISTING 207 208 REST ROOM T T | B2 GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| MATCH EXISTING 209 COMMUNICATIONS ROOM T T | B2 GWB |PNT| GWB |PNT| GWB [PNT| GWB |PNT MATCH EXISTING 210 KITCHEN T T | B2 GWB |PNT| GWB |PNT| GwWB |PNT| GWB [PNT| GwWB |PNT| MATCH EXISTING 211 COURTYARD INTERIOR FINISHES NOT INCLUDED 212 FEMALE RESTROOM INTERIOR FINISHES NOT INCLUDED 213 MALE RESTROOM INTERIOR FINISHES NOT INCLUDED 214 AC ROOM INTERIOR FINISHES NOT INCLUDED 215 LIBRARY INTERIOR FINISHES NOT INCLUDED 216 RECEPTIONIST INTERIOR FINISHES NOT INCLUDED 217 LOBBY INTERIOR FINISHES NOT INCLUDED 218 OFFICE INTERIOR FINISHES NOT INCLUDED 219 OFFICE INTERIOR FINISHES NOT INCLUDED 220 CORRIDOR INTERIOR FINISHES NOT INCLUDED 222 HANDICAP RESTROOM INTERIOR FINISHES NOT INCLUDED NLC. NOT INCLUDED FLOOR BASE WALL CEILING rele. One B-1 TE MT RE ee cows GYPSUM BOARD c CARPET B-2 WOOD WITH ROUTED EDGES- cmu CONCRETE MASONRY UNIT CONC. CONCRETE MATCH EXISTING cwa CEMENT WALL BOARD cT CARPET TILE vee VINYL COVE BASE GWB ‘GYPSUM WALL BOARD PNT. PAINTED FINISH T PORCELAIN TILE PNT PAINTED FINISH HW HARD WOOD PNT PAINTED FINISH BB PLYWOOD BEAD BOARD SHEATHING AcT ACOUSTIC CELING TLE ut MARBLE TILE EMW EXISTING MASONRY WALL Es EXPOSED STRUCTURE NOTE. 1. BMISTING MOLDINGS AND WAINSCOTS TO BE REPLACED IN KIND AS PER THE BID SCHEDULE AND EXUSTING DETAL 1 2 3 4 5 REVISIONS NO: | DATE: REMARKS [A\ ‘9724/19 ADDENDUM 1 CONSULTANTS Jaredian Design Group 7 Architect, Engineers and Construction Managers No.33 Dronningens Gade - Queen's Post Office Box 6218 Quarter St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777.1600 fax: 340.777.1601 @-mail: jaredian2@vipowemet.net ey i ; i H i 5 i QO abit i He Fall i | i z i ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.I. REHABILITATION OF GOVERNMENT HOUSE DATE: 6/7/19 ORAWNBY = R.O.P B CHECKEDBY JPW APPROVEDBY. J.PLW. PROJECT NO 17-016 CONTRACT NO SHEET NO. A4.0 SCHEDULES REVISIONS NO: | DATE: REMARKS A\|or24/19 ADDENDUM 1 CONSULTANTS D Jaredian Design Group Aschiteets, Engincars and Construction Managers No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowemetnet 1 2 3 4 5 ROOM FINISH SCHEDULE ROOM FLOOR | BASE WALL CEILING MATL | FIN] MATL |FIN| MATL | FIN | MATL | FIN | MATL | FIN| MATL | FIN] MATL] FIN| HEIGHT THIRD FLOOR 300 GOVERNOR'S OFFICE c C | B2 |PN1| GWe [PNT] GWe [PNT] GWB [PNT] GWB [PNT] GWB [PNT] EX. 301 BATHROOM T T | Bi T | GWB |PNT| GWB |PNT| GWB |PNT| GWB ;PNT; GWB |PNT| EX. TILE WAINSCOT 302 RESTROOM T T ] Bi T | GWB |PNT| GWB |PNT| GWB |PNT/ GWB |PNT/| GWB |PNT| EX. TILE WAINSCOT 303 GOVERNOR'S ASSISTANT OFFICE c C | B2_ |PNT| GWB |PNT} GWB j|PNT;} GWB |PNT} GWB |PNT| GWB |PNT| EX. 304 CORRIDOR c C | B2 |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT! EX. 305 CLOSET T T | B2_ |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| EX. 306 BATHROOM tT | 7+] B81 | T [Gwe [PNT| Gwe [PNT] Gwe [PNT| Gwe [PNT] Gwe [PNT[ EX. TILE WAINSCOT 307 CLOSET T T | 82 |PNT| GWB |PNT| GWB |PNT/ GWB |PNT| GWB |PNT| GWB |PNT| EX. 308 GOVERNOR'S ASSISTANT OFFICE EX. EX.| B1 |PNT| GWB |PNT]} GWB |PNT| GWB |PNT/ GWB |PNT| GWB |PNT| EX. REFINISH EXISTING FLOOR 309 CLOSET EX. [&x] B1 [PNT] Gwe [PNT| Gwe [PNT|[ GwB [PNT| GWB [PNT| GwB [PNT] EX. REFINISH EXISTING FLOOR 310 OFFICE c C | B1_ |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB /|PNT| EX. REFINISH EXISTING FLOOR 311 RESTROOM T | tT | B1 | T [Gwe [PNT| Gwe [PNT| Gwe [PNT] Gwe [PNT| Gwe [PNT[ EX. TILE WAINSCOT 312 CORRIDOR c [c[ B82 [PNT] Gwe [PNT| Gwe ([PNT| GwB [PNT| Gwe |PNT| GWB |PNT| EX. 313 CLOSET Ex. [ex] 82 [PNT| Gwe [PNT| Gwe [PNT|[ Gwe [PNT| Gwe [PNT| Gwe [PNT| EX. REFINISH EXISTING FLOOR 314 CORRIDOR c c ] 62 [PNT] GWB [PNT| GwB /PNT| Gwe [PNT] GwB [PNT| GwB [PNT] EX. 315 HALLWAY Hw |[Hw| B2 [PNT GwB [PNT| Gwe [PNT| Gwe [PNT| Gwe [PNT| Gwe |[PNT| EX. 316 OFFICE c c | B2_ |PNT| GwB [PNT| GwB [PNT| GWB |PNT| GwB [PNT| GWB [PNT| EX. 317 KITCHEN T T | 82 [PNT| Gwe [PNT] Gwe [PNT| Gwe [PNT] GwB |PNT| GWB [PNT] 8-0" 318 ELEVATOR Gwe |PNT| Gwe [PNT] Gws [PNT| GWB [PNT 319 OFFICE T B2 |PNT| GWB {PNT| GWB |PNT| GWB |PNT| GWB |PNT| GWB |PNT| 87-0" ELEVATOR MANUFACTURER 320 RESTROOM T Bi | T [Gwe [PNT| Gwe [PNT| Gwe [PNT| GWB [PNT| Gws |PNT| 8-0" TILE WAINSCOT 321 PORCH 322 OFFICE SEE PLANS 323 OFFICE INTERIOR FINISHES NOT INCLUDED 324 OFFICE INTERIOR FINISHES NOT INCLUDED 325 KITCHEN INTERIOR FINISHES NOT INCLUDED 326 STAIR INTERIOR FINISHES NOT INCLUDED 327 RESTROOM INTERIOR FINISHES NOT INCLUDED 328 AIR HANDLER UNIT ROOM INTERIOR FINISHES NOT INCLUDED 329 CISTERN AND EQUIPMENT PAD 330 WALKWAY 331 CHILLER PAD 332 LAUNDRY T | TY] B2 {PNT Gwe jPNT| Gwe [PNT/ Gwe [PNT| GwB [PNT] EX. [PNT] EX. 333 BATHROOM T | 7] 82 [PNT] Gwe [PNT| Gwe [PNT| Gwe [PNT| Gwe [PNT| EX. [PNT| EX. 334 STORAGE T | 71] B2_ [PNT Gwe [PNT| Gwe |PNT| Gwe [PNT| Gwe [PNT] EX. [PNT] EX. 335 STORAGE T | 7] 82 |PNT| Gwe [PNT| Gwe [PNT| Gwe [PNT| GWB [PNT| EX. [PNT] EX. 336 WALKWAY EX. [PNT| EX. 337 CORRIDOR EX. [&x.] B2 [PNT] GwB [PNT| Gwe [PNT| Gwe [PNT| GwB [PNT] EX. |[PNT| EX. NLC, NOT INCLUDED FLOOR BASE WALL CEILING cone. cOneneTE B-1 TLE “ POREELAN TILE GWB «GYPSUM BOARD c CARPET B-2 WOOD WITH ROUTED EDGES~ cMu CONCRETE MASONRY UNIT CONC. CONCRETE MATCH EXISTING cwe CEMENT WALL BOARD cT CARPET TILE ves VINYL COVE BASE cwe GYPSUM WALL BOARD PNT. PAINTED FINISH T PORCELAIN TILE PNT PAINTED FINISH HW HARD waon PNT PAINTED FINISH BB PLYWOOD BEAD BOARD SHEATHING act ACOUSTIC CEILING TILE EMW EXISTING MASONRY WALL ES EXPOSED STRUCTURE NOTE. 1. STING MOLDINGS AND WAINSCOTS TO BE REPLACED IN KIND AS PER THE BID SCHEDULE AND BOSTING DETAIL REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.SV.I. DATE 6/7/19 ORAWNBY: —-R.O.P CHECKED BY JPW APPROVEDBY: J_P.W. ~~ PROJECT NO 17-016 CONTRACT NO. SHEET NO. A4.1 SCHEDULES 1 | 2 3 | 4 | 5 6 7 REVISIONS NO:| DATE: REMARKS [A\ 9/249. ADDENDUM 1 AMERICAN STANDARD 36" LONG VESSEL SINK (ADA 74 ll W.C. ADA TYPE AN COMPLAINT) BY SCARABEO __| —_ 36” LONG VESSEL SINK | | | (ADA COMPLAINT) BY \ SCARABEO —~ AMERICAN STANDARD THRESHOLD —! \ -—W.C. ADA TYPE E \ A | THRESHOLD T-3't Y 7=3't Cina (oy @ VZZZZZZA___ 4 TonsuLTaNTs T ie r- we 2 2 \ a ~ THRESHOLD ° ° 4 Z 4 |, Li | a | 26" LONG VESSEL SINK ENLARGED PLAN ENLARGED PLAN D (ADA COMPLAINT) BY AMERICAN STANDARD SCARABEO WC. ADA TYPE 2__| REST ROOM 208 3_| BATHROOM 306 46.0 |A6.0 | SCALE: 3/8” =1'-0" 16.0 [a0 | scale: 3/6” =1"-0 ENLARGED PLAN 1 REST ROOM 102 AND 103 Jaredian Design Grou DG BI P 46.0 [46.0 | SCALE: 3/8" =1'-0" maT) Artes an sd Cans ag No.33 Dronningens Gade - Queen's Quarter Past Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 vernal jaredanz@vipowemet nat AMERICAN STANDARD Eee pero smeneenenehe en us m W.C. ADA TYPE 39" LONG DROP IN SINK © |) sarc wececarmen ces ; (ADA COMPLAINT) BY Paty cana seater 4 as pp Zino" CASEWORK \ oN T rl ooo _\ { y _)\ REHABILITATION OF 7 TT GOVERNMENT HOUSE 4 ch ae 7 + ST.THOMAS % wy) 3-6 NS (wn) }— INFILL _| | sHowe to COUNTER TO j 22 KONGENS GADE Zz A al j MATCH SINK \ / 19'<3" 36" LONG VESSEL SINK gfNGS QUARTER: ; #9 \ 7 (ADA COMPLAINT) BY a EEm _ se ee J \ _N 7 \ 30" / SCARABEO —— eo 6 (we | /\7 (70) 8 ° ® . DATE 6/719 Yo \ 4 \ > \ a | cs) DRAWN BY | A (170) 5 TA AMERICAN STANDARD \ Aaron ,; Er A text8 jis W.C. ADA TYPE ENLARGED PLAN B [Venccrcosr pw ‘yy 7 a 6_| BATHROOM 333 a ak - L 46.0 |A6.0 | SCALE: 3/8” =1'-0" APPROVED BY: J.P.W. — (BID ALTERNATE 2) PROJECT NO: Ut-t a a rT TT Avi TT TT al \ y, THRESHOLD \ — 17-016 T-3" 10'-6" \ - : “ NOTES: = 36” LONG VESSEL inc) AMERICAN STANDARD PARTIMGN Celle wits rm rT SHEET NO.: THRESHOLD (ADA COMPLAINT) BY W.C_ADA TYPE FRAMELESS 3/4" GLASS 1. CONTRACTOR SHALL PURCHASE AND INSTALL ALL A6 6) SCARABEO FIXTURES WITH THE REQUIRED ACCESSORIES FOR THE : ENLARGED PLAN FIXTURE TO FUNCTION FOR ALL OF THE BATHROOMS. REST ROOM ENLARGED PLAN 5 REST Re OM Sil 2. ALL SINKS SHALL HAVE CHROME FINISH SCARABEO ELEVATIONS AB.0 jA6.0 SCALE: 3/8” =1'-0" BRAND, P-TRAP ,POP UP WATER STOP WITH OVER FLOW, 4 REST ROOM 301 AND 302 AND ANGLE VALVES WITH SUPPLY LINES FOR PARTICULAR MODEL 46.0 |A6.0 | SCALE: 3/8” =1'-0" 1 | 2 l 3 l 5 6 | u | 1 2 3 4 5 | 6 7 | revaion NO: DATE: REMARKS NEW 36” DOUBLE OVEN (BY OWNER) COMMERCIAL EXHAUST HOOD NEW COMMERCIAL REFRIGERATOR 6x6 TILES WITH 2° _ MODEL: (SUB-ZERO BORDER TILE ee aE REFRIGERATOR AND FREEZER) QUARTZ COUNTER TOP 15.0 NEW 36” COOKTOP (BY OWNER) AND BACKSPLASH WITH HOOD ABOVE NEW COMERCIAL (BY OWNER) DISH WASHER (BY OWNER) NEW COMMERCIAL cooardew PROVIDE GREASE MAHOGANY RAISED E REFRIGERATOR AND HOOD ABOVE DISH Wi TRAP FOR NEW PANEL AND GLASS ~ a FREEZER OER COMMERCIAL DISH DOORS ‘ \ HT / < | lA (BY OWNER) WASHER AND Ne L i \ ~ ¢ SINK QUARTZ COUNTER TOP SPS OTIS Sy 00 @ 00. 4 AND BACKSPLASH \ MH 4) 2. a [0 }t MAHOGANY RAISED * —_ : - : £ a 0000 7 “ NEW WINE PANEL DOORS \ = aes a COOLER ( / —_ 4 — : Jf ; oie, (BY OWNER) RN — -, UNDER J fo COUNTER fF / \ j — : ! a - \ D a: DOUBLE OVEN FF?) a (BY OWNER) a — 2 | KITCHEN ELEVATION ie, COOKTOP (BY OWNER) AB. [6.1 SCALE: 1/2°=1'-0" YT tT tid tf it UP Jaredian Design Group Architects, Engineers and Construction Maicpes No.33 Dronningens Gade - Queen's Quarter 1] ENLARGED PLAN KITCHEN 317 hon, gh mance 6.1 |A6.1 | SCALE: 3/8" =1'-0" e-mail: jaredian2@vipowemet net CROWN MOLDING SEE DETAIL 3 ON SHEET i i g é i i E A50 LAM TOL CORTASATHN, TE OE BY 0 PRE ee mn 2 Fis ona Sat Crises nee BORDER TILE REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS ~T 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.1. QUARTZ COUNTER TOP / L / DATE 6/79 NOTES: AND BACKSPLASH \ Fr TTP , ; NI | Ss Sa Ks en Se jj jj 4 + | DRAWN BY 1. CONTRACTOR SHALL PROVIDE SHOP MAHOGANY RAISED S — — ci — — B DRAWINGS FOR REVIEW TO MAKE SURE PANEL DOORS \ CHECKED BY J.P.W DESIGN INTENT IS MET. TAIN 2 = P< \ . / “ \ * a APPROVEDBY. J PW. 2. CONTRACTOR MUST COORDINATE WITH Q > : OWNER PRIOR TO THE CONSTRUCTION \ \ 4 . _ FABRICATION OF ALL KITCHEN CASEWORK S \ = Z PROJECT NO TO OBTAIN ALL THE REQUIREMENTS FOR \ I 17-016 THE APPLIANCES THAT WILL BE SELECTED x BY THE OWNER _| CONTRACT NO. ; OTHER. WASHER MODEL: LOW (BY OWNER) A6 1 3, ALL KITCHEN FIXTURES BY OWNER ree) ime CONAITER . (BY omen) 3__| KITCHEN ELEVATION KITCHEN PLAN/ as.1 [A6.1| SCALE: 1/2"=1'-0" ELEVATIONS 1 2 3 4 5 7 6 | 7 | revisions CROWN MOLDING SEE _—— — DETAIL 3 ON SHEET AN 9/24/19 ADDENDUM 1 A5.0 si EXISTING HARDWARE FOR JALOUSIE EXISTING JALOUSIE TRANSOM, EXISTING HARDWARE FOR JALOUSIE iB LOWER AND WINDOW AND EXTERIOR SHUTTER DOOR ITS FRAME AND EXTERIOR WINDOW AND EXTERIOR SHUTTER UPPER CABINETS SHALL BE REPLACED WITH SHUTTER SHALL BE SHALL BE REPLACED WITH = STAINLESS STEEL HARDWARE REFURBISHED BY THE USE OF STAINLESS STEEL HARDWARE NEW COMMERCIAL SIDE WOOD FILLER, SANDING, AND BY SIDE rere NEW PAINT AND FREEZER (BY OWNER EXISTING JALOUSIE WINDOW, ITS EXISTING UALOUSIE WINDOW, ITS , EXISTING HARDWARE FOR JALOUSIE , NEW COMMERCIAL Nav COMERCW. FRAME AND EXTERIOR SHUTTER WINDOW AND EXTERIOR SHUTTER FRAME AND EXTERIOR SHUTTER STOVE TOP & Nat wee SHALL BE REFURBISHED BY THE SHALL BE REPLACED WITH SHALL BE REFURBISHED BY THE RANGE-B BURNERS sige USE OF WOOD FILLER, SANDING, STAINLESS STEEL HAROWARE USE OF WOOD FILLER, SANDING, (BY OWNER) i ( ER) AND NEW PAINT AND NEW PAINT I \ ] , NEW COMMERCIAL DISH WASHER MODEL: LOW ; y marr TEMPERATURE UNDER COUNTER ® sent DISHWASHER) (BY OWNER B=: 4\ -----+@@86| --1- oom A\ ©0060 | > gun | MAHOGANY RAISED \| ea “ yy | PANEL DOORS Ss & * OL a CONSULTANTS y | +——PROVIDE GREASE 6x6 TLES WT 2" . + ¥ 7 TRAP FOR NEW x , , . . yy | 2 oN wae COMMERCIAL DISH BORDER TILE — “ LO S ° %Z | = A /| = ASR ND NY “ —— —— _ a 2 ———] SINK QUARTZ COUNTER TOP 4 T rd | r—V AND BACKSPLASH SS ———S—— —— y | Cy, s +. T T oo T | + T | + T fp fff fd ——o T es T oo T + 4 | = —— a = Lo Y a |= EE] Ge) ee] ee) Ty | [Z4 Nf 7} = = = = : Va ” . < a . 5 x J x : 2 y/ \ ~ . - a . “7 —— —— AG zs LE 5 | a IDG Jaredian Design Group ew vom | f ] ' NEW BASE SEE DETAIL 3 —=“z/'“: CONVECTION /MICROWAVE AL I. 2 KITCHEN ELEVATION ON SHEET AS.0 No.33 Dronningens Gade - Queen's Quarter hy a PROVIDE NEW TRIM SEE Post Office Bax 6218 OVEN (BY OWNER) | UP a / A6.2 |A6.2 SCALE: 1/2°=1'-0° DETAIL #5 ON SHEET St. Thomas, U.S. Virgin Islands 00804 : j _— f telephone: 340.777.1600 fax: 340.777.1601 | \ 3 RISER/ SQ 45.0 e-mail: jaredian2@vipowemet.net y \ EW LOWER ATES | x. CROWN HOLDING = Fon AM ENRGR On CURSION COSTAMED TERED a UPPER CABINETS ia ee 15.0 y+ \ REHABILITATION OF FOOD PREPARATION a |_| | FOOD " WHOCANY RAISED GOVERNMENT HOUSE OGANY ST.THOMAS xz | / PANEL DOORS % $ D ° a COMMERCIAL STOVE 22 KONGENS GADE ¥ N rb LJ / EXHAUST HOOD KINGS QUARTER 4 rr | L Y z GY ST. THOMAS U.S... Bee fi] Y / L2 MAHOGANY RAISED | pS rc » fy 6x6 TILES WITH 2° / \ Y a BORDER TILE meaner | \ % Y LAZLLE. 2 LZ) La eM COUNTER CHECKED BY J.P. | . Z TOP W/ 4” BACK \ ? ,, SPLASH APPROVEDBY J. P.W. y J Y ©0 00 00 00 VW NOTES: SST a FIXED PANEL 17-016 o Y] 1. CONTRACTOR SHALL PROVIDE SHOP SOMIRAETHG? Z DRAWINGS FOR REVIEW TO MAKE SURE . \ Y, DESIGN INTENT IS MET. l \_I LZ 2. CONTRACTOR MUST COORDINATE WITH SHEET NO: 1 KITCHEN PLAN OWNER PRIOR 10 THE CONSTRUCTION A6 2 manne . \ FABRICATION OF ALL KITCHEN CASEWORK " AG.2 |A6.2 SCALE: 3/8"=1'-0 OR MONT peered a W/ TO OBTAIN ALL THE REQUIREMENTS FOR THE APPLIANCES THAT WILL BE SELECTED KITCHEN PLAN/ er One (WOLF C48S-8) BY THE OWNER ELEVATIONS 3. ALL KITCHEN FIXTURES BY OWNER 46.2 |A6.2 SCALE: 1/2°=1'-0" 1 2 | 3 4 | 5 | 6 7 | SPLASH 6x6 TILES WITH 2” : | _ BORDER TILE NAH QUARTZ COUNTER = TOP W/ 4” BACK NE= 6x6 TILES WITH 2° BORDER TILE QUARTZ COUNTER ———— TOP W/ 4” BACK SPLASH MAHOGANY RAISED PANEL AND GLASS DOORS LI L l CROWN MOLDING SEE DETAIL 3 ON SHEET 45.0 NEW COMMERCIAL FREEZER MODEL: (SUB-ZERO 36F ALL FREEZER) (BY OWNER) NEW COMMERCIAL REFRIGERATOR MODEL: (SUB-ZERO 36R ALL REFRIGERATOR) (BY OWNER) 1 KITCHEN ELEVATION 46.3 |A83 SCALE: 1/2"=1"-0" CONVECTION OVEN AN MICROWAVE. IN MAHOGANY CASE WORK MODEL: (JennAir) (BY OWNER) MAHOGANY RAISED PANEL DOORS + Jl in ry J o a) in FIXED PANEL REVISIONS NO: | DATE: REMARKS |A\ 9/249 ADDENDUM 1 CONSULTANTS NOTES: 1. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR REVIEW TO MAKE SURE DESIGN INTENT IS MET. CONTRACTOR MUST COORDINATE WITH OWNER PRIOR TO THE CONSTRUCTION FABRICATION OF ALL KITCHEN CASEWORK TO OBTAIN ALL THE REQUIREMENTS FOR THE APPLIANCES THAT WILL BE SELECTED BY THE OWNER 3. ALL KITCHEN FIXTURES BY OWNER | DG Jaredian Design Group Architects, Engineers and Construction Manages No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777.1800 fax: 340.777.1601 e-mail: jaredian2@vipowematnet ‘THESE PLUMS AND THE OESIGHS CONTAINED HEREW ARE THE ‘SOLE PROPERTY OF JAREDIAN DESIGN GROUP THESE PLANS MAW GT BE REPRODUCED WITHOUT THE WRITTEN PERPISSION OF SAREDULN DESIGN GROUP UNAUTHORIZED USE SHALL UVITE A CLAIM FOR COMPEMSATION. THE USE BY ANY PERSON Of Film OF] ‘THESE PLUMS OR ANY PANT THERECE SHALL NOT IN ANY WAY SUBJECT JAMEDIAN DESIGN GROUP TO ANY COST OR DAMAGES. FOR ANY ERROR OR CHISSION CONTAINED THEREN. REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.L DATE 6/719 DRAWN BY CHECKEDBY. J. PW APPROVEDEY: J.P.W. PROJECT NO 17-016 CONTRACT NO SHEET NO A6.3 KITCHEN ELEVATIONS 1 2 3 | 4 5 6 | 7 | REVISIONS RESTROOM ACCESSORIES SCHEDULE A siege abot cr 7 3s ITEM DESCRIPTION maNuFAcTURER) = MODEL FINISH REMARKS a . De & GRAB BAR Zz t*+ ° rE , -_ =e ® MIRROR WITH MAHOGANY FRAME | r | | 0 : | E E Ss 2| ® | tRoucH vant SINK “AR FF. FF. FF. Fo = ® | PROTECTIVE PIPE COVER LAVATORY GRAB BARS GRAB BARS HOLDER € = fon — 2” ROPE MOLDING \ 7 q , 1 4B" MAX. (FORWARD REACH) 54” WAX. (SIDE WATER CLOSET TYPICAL FIXTURE O__| MOUNTING HEIGHTS FF. FF. WALL SWITCH SOAP DISH A7.0 |A7.0 SCALE: NTS ~~ 6'-0" / L {1 1 \ TT Or~' SL im i fa Re ATA Pi LJ \ a 2"ROPE MOLDING(TYPICAL) WALL(TYPICAL) F+0" 1__| RESTROOM 102 AND 103 ELEVATION 12X24 TILE 2" ROPE MOLDING a7.0 |47.0 | SCALE: 3/8" =1'-0" FIXED / GLASS PANEL 8’—0" eos ) | 12X24 TILED WALL RESTROOM 301 ELEVATION A7.0 |A7.0 SCALE: 3/8” =1'-0" RESTROOM ACCESSORIES. 1. CONTRACTOR SHALL INSTALL WOOD BLOCKING IN WALLS AT THE CORRECT HEIGHT FOR ALL | 437 Whe om \ aoe tuso wat S 2__| RESTROOM 102 AND 103 ELEVATION 3 RESTROOM 208 ELEVATION 2" ROPE a MOLDING(TYPICAL) 2"ROPE 4 RESTROOM 208 ELEVATION | MOLDINGCTYPICAL) s—— 12X24 TILED WALL. CONSULTANTS Jaredian Design Group Architects, Engineers ard Construction Managors No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowemet.net ‘TWESE PLANS AND THE DESIGNS CONTAINED HEREN ARE THE FOR ANY ERROR OR CHISSION CONTA! z A7.0 ]A7.0 | SCALE: 3/8" =1'-0" 47.0 {47.0 | SCALE: 3/8” =1'-0" | / oe 2” ROPE MOLDING 12X24 TILED WALL = eal =7 3 IN < » —— 12X24 TILED WALL 6__| RESTROOM 301 ELEVATION 7 RESTROOM 302 ELEVATION a7.0 [47.0 | SCALE: 3/8" =1'-0" y a 2° ROPE MOLDING 2" ROPE | [MOLDING anc, vane, RESTROOM 302 ELEVATION 47.0 |47.0 | SCALE: 3/8” =1'-0" 7.0 | 47.0 SCALE: 3/8" =1'-0" A7.0 |A7.0 SCALE: 3/8" =1'-0" B A REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.I. DATE; 6/7/19 DRAWN BY CHECKEDBY J. PW APPROVEDBY: J_P.W. pe PROJECT NO. 17-016 CONTRACT NO A7.0 REST ROOM ELEVATIONS 1 2 3 4 | r71 = eo te 36° De = q a ad q =—-z fq, fo 13!) is FR OFF. FF. FF. TOLET PAR LAVATORY GRAB BARS GRAB BARS HOLDER 18° & = fe) : a . as « 5 z * . T re 3 | FF FF ——_ FF. F ew F. SAP i F. TYPICAL WATER CLOSET FIXTURE O__| MOUNTING HEIGHTS A70 147.0 SCALE: N.S =~ + Ae yy ne NT LS 2°ROPE H / MOLDING(TYPICAL) ~\ 12X24 TILED WALL(TYPICAL) _~ ] 2"ROPE MOLDING(TYPICAL) rT REVISIONS NO:| DATE: REMARKS RESTROOM ACCESSORIES SCHEDULE A\ 9/24" ADDENDUM 1 MODEL ITEM DESCRIPTION MANUFACTURER; = MODE FINISH REMARKS .O GRAB BAR ® | MIRROR WITH MAHOGANY FRAME ® | _ rRouen vanry sink | PROTECTIVE PIPE COVER RESTROOM ACCESSORIES. 1. CONTRACTOR SHALL INSTALL WOOD BLOCKING IN WALLS AT THE CORRECT HEIGHT FOR ALL OO Of HUI \ oAZ L_____ 12X24 TILED 2" ROPE MOLDING-——— [° "3 ~ — + V | coh al aa HE 0” & g ld @H (wes TILED WALL(TYPICAL) CONSULTANTS IDG Jaredian Design Group Architects, Engineers ard Condinxtion Managers No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Islands 00804 telephone: 340.777.1600 fax: 340.777.1601 email: jaredian2@vipowemet net i A i g i : i 5 i WALL(TYPICAL) 1__| RESTROOM 306 ELEVATION 2 __| RESTROOM 306 ELEVATION 3 | RESTROOM 311 ELEVATION 4 | RESTROOM 311 ELEVATION az [A714 | SCALE: 3/8” =1'-0" avi |A71 | SCALE: 3/8" =1'-0" nia [aa | SOME: 3/8" =1'-0" wrt [ara | SCALE: 3/8" =1-0" ok | FIXED GLASS PARTITION K 12'-0" Va _,2'4o” # . fh FIXED GLASS 3 yA\ 2" ROPE MOLDING > y | | Zz V 5 __| RESTROOM 311 ELEVATION 6 | BATHROOM 333 ELEVATION 7__| BATHROOM 320 ELEVATION A714 |A7.1 | SCALE: 3/8” =1'-0" av.1 |a7-1 | SCALE: 3/8” =1'-0" ATA ja7.1 SCALE: 3/8” =1'-0" 1 2 3 4 5 6 7 REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.I. DATE: 6/7/19 DRAWN BY CHECKEDBY J. PW APPROVEDBY. J.P.W. PROJECT NO. 17-016 CONTRACT NO SHEET NO. AT.1 REST ROOM ELEVATIONS ELECTRICAL GENERAL NOTES 10. 11. ALL WORK SHALL COMPLY BOTH WITH THE LATEST V.I. AND NATIONAL ELECTRICAL CODES. CONTRACTOR SHALL OBTAIN ALL ELECTRICAL PERMITS REQUIRED FOR THE ELECTRICAL PORTION OF THE JOB. CONTRACTOR SHALL COORDINATE THE CONNECTION BETWEEN EXISTING UTILITY COMPANY POWER LINES AND THE NEW CONSTRUCTION. ALL SMOKE DETECTORS SHALL BE HARDWIRED WITH A DEDICATED UNSWITCHED 120V POWER SUPPLY WITH BATTERY BACKUP AND SHALL COMPLY WITH SECTION 316 OF CABO CODE. THE ELECTRICAL CONTRACTOR SHALL WIRE ALL LIGHTING FIXTURES, WIRING DEVICES AND EQUIPMENT TO PANEL ‘LRP’. THE ELECTRICAL CONTRACTOR SHALL INSTALL A SINGLE KWH METER FOR THIS BUILDING AS INDICATED ON THE BUILDING "ELECTRIC & TELEPHONE SERVICE DIAGRAM PLAN. THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE LOCAL UTILITY COMPANIES FOR THE NECESSARY SERVICE REQUIREMENTS. THE FIXTURE SYMBOLS SHOWN ON THE DRAWING ARE GENERIC AND REPRESENT THE TYPE OF LIGHT SOURCE INTENDED FOR USE. THE OWNER SHALL SELECT THE FIXTURES AND COORDINATE STYLE, FINISH, COLOR AND LAMP REQUIREMENTS WITH THE GENERAL CONTRACTOR. WHERE MORE THAN ONE (1) SWITCH ARE INSTALLED AT THE SAME LOCATION, PROVIDE A COMMON COVERPLATE. PROVIDE A 40 GALLON 240V 1—PHASE WATER HEATER FOR THE BUILDING. COORDINATE LOCATION WITH OWNER AND WITH ARCHITECT'S DRAWINGS. THE ELECTRICAL CONTRACTOR SHALL SUBMIT ALL EQUIPMENT SHOP DRAWINGS TO ARCHITECT FOR HIS REVIEW PRIOR TO PURCHASING. PROVIDE FURRED OUT WALL TO RECEIVE ELECTRICAL PENETRATIONS WHERE THEY OCCUR AT CISTERN AND OTHER RETAINING WALLS. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE PLUMBING AND GENERAL CONTRACTOR TO PROVIDE THE REQUIRED ACCESS PANEL IN THE WALL AS RECOMMENDED BY THE MANUFACTURER OF THE WHIRLPOOL TUB ONCE IT iS SELECTED BY THE OWNER. PROVIDE SEPARATE WALL SWITCHES FOR FAN AND FAN LIGHTS AT COMMON LOCATION. ELECTRICAL CONTRACTOR SHALL PERFORM ALL POOL LIGHTING AND RELATED EQUIPMENT WORK AS PER ARTICLE 680 OF THE NEC AND ALL LOCAL AUTHORITIES HAVING JURISDICTION. REPLACMENT LIGHT FIXTURES TO MATCH EXISTING TYPE AND DESIGN. ACCEPTIBLE MANUFACTURES INCLUDE : 4 JighTtoLER . PROGRESS . CRESCENT TIMELY . HUBBELL . PRESCOLITE mMoOOwW> 5 | 6 7 AFF ABOVE FINISHED FLOOR LTG LIGHTING AMP or A AMPERE MAX MAXIMUM e CONDUIT MIN MINIMUM CB CIRCUIT BREAKER MTD MOUNTED CKT CIRCUIT # NUMBER COMB COMBINATION Pp POLE PB PUSH BUTTON cu OeTECTOR PH or @ PHASE Disc Osco NET QTY casts . a rCTRICAL REC RECEPTACLE LECT aiet eevee REQD REQUIRED EM EMERGENCY SCHED SCHEDULE EQ EQUIPMENT STA STATION EQUIP EQUIPMENT sw SWITCH EXIST EXISTING TELE TELEPHONE FA. FIRE ALARM TEMP TEMPERATURE FIXT FIXTURE TYP TYPICAL FLR FLOOR Vv VAPOR-TIGHT FLUOR FLUORESCENT W WATTS FU FUSE w/ WITH GND or GRD GROUND w/O WITHOUT INCAND INCANDESCENT wP WEATHERPROOF REVISIONS NO: | DATE: REMARKS A\ 924/19| ADDENDUM 1 CONSULTANTS ELECTRICAL SYMBOLS LEGEND 120V, 20 AMP GROUNDED RECEPTACLE 120V, 20 AMP GROUNDED RECEPTACLE W/ INTEGRAL GROUND—FAULT INTERRUPTING PROTECTION WEATHERPROOF 120V GROUND—FAULT RECEPTACLE 120V, 20 AMP GROUNDED ISOLATED GROUND RECEPTACLE 120V, 20 AMP. GROUNDED RECEPTACLE FOR WASHING MACHINE 120V, 20 AMP. GROUNDED RECEPTACLE FOR PUMP 240V, 1—PHASE 50 AMP. COOK—TOP OR OVEN OUTLET 240V, 1—PHASE 50 AMP. CONVECTION OVEN OUTLET 240V, 1—PHASE 30 AMP. ELECTRIC WATER HEATER OUTLET 240V, 1—PHASE 40 AMP. COMBINATION WASHER/DRYER OUTLET 120V, 20 AMPS RECEPTACLE FOR DISHWASHER 120V, 1—PHASE 15AMP. HOOD & IGNITION OUTLET SINGLE POLE ,SINGLE THROW SWITCH THREE WAY LIGHT SWITCH SINGLE POLE ,SINGLE THROW SWITCH, LETTER DENOTED LIGHT CONTROL DIMMER SWITCH CHANDELIER TYPE LIGHT FIXTURE POLE LIGHT EXTERIOR WEATHERPROOF BRACKET FIXTURE WITH INTEGRAL MOTION SENSOR SMOKE DETECTOR W/ 120V SUPPLY VOLTAGE AND BACKUP BATTERY RN X@ 90% e@ p2eegge Se 9 2 8808 f(r ov ondtag || ‘TT = PANELBOARD CEILING MOUNTED SURFACE FLUORESCENT LIGHT FIXTURE, SIZE AS SHOWN APPROXIMATELY TO SCALE. EXTERIOR WEATHER PROOF WALL MOUNTED LIGHT FIXTURE OR WALL SCONCE WALL MOUNTED INTERIOR LIGHT FIXTURE OR WALL SCONCE EXTERIOR WEATHER PROOF CEILING MOUNTED LIGHT FIXTURE CEILING MOUNTED LIGHT FIXTURE CEILING MOUNTED RECESSED LIGHT FIXTURE SINGLE POLE MOTOR RATED SWITCH WITH THERMAL OVERLOAD ELEMENT. SAFETY DISCONNECT SWITCH, RATING AS CODE DETERMINED BY EQUIPMENT SERVED. F—FUSED; UF— UNFUSED CONCRETE PAD MOUNTED CONDENSER UNIT. WALL MOUNTED AIR HANDLER UNIT. COMMUNICATION BOX BLANK WALL PLATE THERMOSTAT FIRE EMERGENCY PULL STATION CABLE TV OUTLET WITH EMPTY CONDUIT PROVISIONS =) Jaredian Design Group Architects, Engineers and Construction Managees No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Isiands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowemet.net ju if nt FLH i agge ta i fi iy ii REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.VI. DATE 6/7/19 DRAWN BY. CHECKED BY JPW APPROVEDBY: J.P.W. ————— PROJECT NO.: 17-016 CONTRACT NO.: SHEET NO.: E0.0 ELECTRICAL NOTES @ & JUNCTION BOX SERVING EQUIPMENT NOTED HON ELECTRICAL SERVICE FOR NEW ACCESSIBLE LIFT/WATER PROOF FOR OUTSIDE. N REPRESENTS NEW FIXTURE OR ELECTRICAL ITEM SMOKE DETECTOR W/ 120V SUPPLY VOLTAGE AND ) Backup BATTERY ABBREVIATIONS ATS — AUTOMATIC TRANSF. SW. MW — MICROWAVE REF. — REFRIGERATOR VT — VAPORTIGHT NOTE: A.F.F. — ABOVE FINISH FLOOR WP — WEATHERPROOF COORDINATE EQUIPMENT ELECTRICAL LOADS WITH OWNER AND ARCHITECT N. - ALL SYMBOLS W/ADD PRIOR TO PURCHASE OF PANELBOARDS AND ASSOCIATED CIRCUIT BREAKERS. (N) SYMBOL REPRESENTS A NEW FEATURE 5 | 6 7 | EDGE SOFFIT EL ‘OR 21’-6" 13'-4" TO EXISTING CONDENSER TRANE 4TVH0144C6000AA 28’-11° GENERAL NOTES HVAC GENERAL NOTES 1. THE V.1 GOVERNMENT OWNS TWO TRANE TVR CONDENSERS, MODEL NUMBER 4TVH0144C6000AA THAT ARE TO BE INCORPORATED INTO THE NEW AIR CONDITIONING SYSTEMS FOR THE FIRST AND SECOND FLOORS. THESE UNITS ARE CONTRACTOR WILL COORDINATE WITH THE TRANE COMPANY OF PUERTO RICO FOR FINAL DESIGN / INSTALLATION OF THE FIRST AND SECOND FLOOR AIR CONDITIONING SYSTEMS. CURRENTLY LOCATED AT GOVERNMENTS HOUSE ST. THOMAS. PEN TO OVE N-G.W.B Rs ‘“111__) N-G.W.B N-G.W.B g 7, Sp z wo "73 MECHANICAL LEGEND yore ra mi , erst 1 5 | Be = Ww SAAN Vd EXHAUST FAN i= REFRIGERANT LINE CEILING GRILLE, REGISTER FOR RETURN OR EXHAUST AIR TRANE 4TVB007C1000AA - TVR SELECT 7 MBH COMPACT 4-WAY CASETTE - 208-230/60/1/(AHRVETL CERTIFIED) - QTY: 19 .B NEW GYPSUM WALL BOARD SEE SHEET A2.1 FOR CEILING DETAILS GENERAL NOTES on * ie x See ¢ uN x N-G N-GWB N-G.W.B_ N-6.W.B _] 1 | 14’-10° / 18/11" |, 9-8 > 3. 4 FIRST FLOOR 1 MECHANICAL PLAN 11.3] 141.3] SCALE: 3/16"=1'-0" 6. 7. . CONTRACTOR TO FOLLOW EXISTING CEILING MOLDING DESIGN . UNLESS NOTED, MATCH EXISTING LAYOUT FOR CONTRACTOR SHALL CENTER LIGHT FIXTURE IN ROOMS UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REFER TO ELECTRICAL DRAWINGS FOR LIGHTING FIXTURE SCHEDULES. LIGHTS, AC DIFFUSERS, AND SUSPENDED GYPSUM CEILING SHALL BE INCLUDED AS PART OF THE BASE BID FOR REPLACEMENT MOLDING REPLACEMENT FIXTURES ROUTE ALL A/C REFRIGERANT PIPING TO CHILLER PAD ON THIRD FLOOR LEVEL. SEE DRAWING 3A1.1B FOR LOCATION OF CHILLER. CONTRACTOR SHALL PROVIDE POWER TO EACH CEILING MOUNTED 4 WAY HVAC CASSETTE FROM NEAREST ELECTRICAL PANEL 10 " THE WORK THAT IS TO GE OONE UNDER THIS HEADING INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS AND EQUPWENT, PERMITS, FEES, INSPECTIONS, TESTS, INSURANCE, ETC, REQUIRED FOR THE OWPLETION OF THE AIR CONDIROMING SYSTEM SHOWN ON ORAWNGS AND/OR LISTED BELOW CONTRACTOR SHALL VERIFY SPACE CONDITIONS AND O'MENSIONS ANO SHALL COORDINATE WORK WITH ALL OTHER TRADES AT JOBSITE PRIOR TO FABRICATION ANO INSTALLATION OF DUCTWORK. heal pun a COORDINATED WITH OTHER TRADES TO AVO INTERFERENCE WITH PROGRESS OF CONSTRUCTION AND IN STRICT COMPLIANCE WITH ALL APPLICABLE CODES AND STANDARDS. ALL WORK SHALL GE DOME IN ACCORDANCE WITH THE LATEST EDITION GF THE INTERNATIONA, BUILDING CODE AND ALL LOCAL CODES AND ORDINANCES, WARRANTY 1. FULLY WARRANT ALL MATERIALS, EQUIPWENT AND WORKMANSHIP FOR ONE (1) YEAR FROM OATE OF ACCEPTANCE. 2. EXTEND ALL NANUFACTURER'S WARRANTIES TO CWNER, INCLUDING EXTENDED WARRANTIES ON HVAC EQURPMENT. FIVE (5) YEAR COMPRESSOR (MATERIAL ONLY). 4. COORDINATE ALL BUILDING STANCARD REOUREMENTS ‘PROR TO Bid. SUGNIT SHOP DRAWINGS OF ALL MATERIALS AND EGU‘PWENT FOR APPROVAL PRIOR TO FABRICATION, ALL QUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE C\MENSICNS. AR DISTRIBUTION SHALL BE AS SCHEDULED ON THE CRAMNGS OR APPROVED EQUAL. QUCTWORK FABRICATE AND ERECT ALL DUCTWORK IN ACCORDANCE TO ASHRAE AND SMACNA HVAC DUCT CONSTRUCTION STANDARCS (METAL AND FLEXIBLE) SHEETMETAL OUCTWORK AND FITTINGS SHALL BE SWACNA LOW PRESSURE CONSTRUCTION WITH SEAL CLASS & SEAMS AND JOWNTS: INCLUDE DOUBLE=TH:CKNESS TURNING VANES, MANUAL CAMPERS, FLOBLE CONNECTORS, ACQUSTIC LINING, AND OTHER ee is CON . ALL, METAL RECTANGULAR: DUCTWORK SHALL GE 45 DEGREE TAP TAKE-OFF FITTINGS. SUPPLY AR DUCT SHALL BE INSULATED WITH MINERAL FIGER BLANKET WWSULATION 1 1/2” INCHES THICK AND 1.5 18/CU. FT NOMINAL DENSITY, INSULATION SHALL BE SECURE WITH ADHESIVE AND INSULATION PINS PER MANUFACTURER'S RECOMNENDATIONS 4. FUBQBLE DUCTS SHALL BE INDEPENDENTLY aan FROM THE STRUCTURE AND CONNECTED WITH PLASTIC DRAW BANOS TIGHTENED WITH MANUFACTURER'S TOOLS. KE-OFFS FROM RIGD DUCTWORK TO GE SPIN-iy FITRNGS PROVIDED WITH TWIST RONGS, BUTTERFLY QAMPERS, QUADRANT OPERATORS AND INSULATION GUARD. FLEXIBLE QUCTS SHALL BE UMITED TO A MAXIMUM OF 10°-0" STRAGHT LENGTHS PER RUN OUT. FLEXIBLE DUCTS SHALL GE ATCO RUBBER 070 OR EQUAL, 1-1/2" THICK INSULATION WITH A NIN, R-VALUE OF 6.0 ANO RATED AT 10" W.C. FOR SIZES THROUGH 12° LEXIE QUCTS SHALL BE UL. USTED AND MEET 25/50 FLAME AND SMOKE TEST IN ACCORDANCE WITH NFPA 255. FLEXIBLE DUCTS ARE NOT PERMITTED IN ROOMS WITHOUT CERINGS. 5. CONTRACTOR SHALL INSPECT ALL EXISTING AR DUCTS TO BE RE-USED AND SHALL MAKE ANY NECESSARY REPARS TO ACHIEVE ICT SYSTEM. ANY CUCT QAMAGED CAUSING AR SEALED, e 1, ATER INST: SERVICING AND EQUIPMENT [S OPERATIONAL, CHECK ALL EQUIPMENT AND PERFORM START UP lf ACCORDANCE wt THE MANUFACTURER'S INSTRUCTIONS. + q = ie : 5 8 aoe 3 MERCURY HOURS WITH PUMP OFF. GREAK VACUUM WITH OPERATING REFRIGERANT 3, BALANCE AR SYSTEM TO DELIVER AR Are AT GACH OUTLET WINKN 10% USING AABC TESTS AND PROCEDUA! 4, TAG ALL EQUIPMENT, SWITCHES AND CONTROLS WITH PERMANENT UBELS REFRIGERANT PIPING SHALL BE TYPE | HARD OR SOFT CRAWN, COPFER TUBING, CLEANED AND DEHYDRATED FOR REFRIGERANT USE. SIZES AS PER AR CONOMONNG EQUPMENT MANUFACTURER'S RECOMMENTATICNS, FOAMED INSTALLED ON PIPING BEFORE ASSEMBLY. NO SPUT INSULANON WL EE ACCEPTABLE. SEAL JOINTS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. CONTRACTOR SHALL INSPECT EXISTING AC SYSTEM LOCATED WTHN THE SCOPE OF WORK AND ADMSE THE OWNER OF GENERAL CONDITIONS. CONSULTANTS. Architects, Engincers and Conatruction Managers | JD G Jaredian Design Group No.33 Dronningens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Istands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaradian2@vipowermet.net ile aie Tie essai Cont cies serie GROUF THESE Paves MAY PERNSSION OF 5 | 3 i a age ii ie r GR FIRM OF OF SHALL WOT WN ANY WAY SRA To AY COBT OR DAMAGES CONTAINED: i ; i g i REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V.1 DATE 6/7/19 DRAWN BY. CHECKEDBY, §=J.P\W APPROVED BY: J.P_W, PROJECT NO 17-016 CONTRACT NO SHEET NO ~ wor ae ee - HVAC _ GENERAL NOTES MECHANICAL LEGEND anew REFRIGERANT LINE C—] 48" KITCHEN EXHAUST HOOD BROAN ELITE 61000 SERIS-900 CFM OR EQUIVALENT-DUCT UP TO 3RD FLOOR ROOF. [EF] EXHAUST FAN TRANE 4TVC0038C1000AA - TVR SELECT 38 MBH COMPACT 4-WAY CASETTE - 208-230/60/1/(AHRI/ETL CERTIFIED) - QTY: 16 N-G.W.B NEW GYPSUM WALL BOARD SEE SHEET A2.1 FOR CEILING DETAILS 2 3 4 OO TTA N \ =< \ TO CONDENSERS =~ | TRANE 4TVH0115C6000AA (QTY. 4) & EXISTING TRANE 4TVH0144C6000AA i] I ] | ] I I I } } q | € € | 12-0" zw EQUAL I pres ~"e seeeenenneens ns: | g | Se (NS I, Z N-G.W.B 3 OPE 7a ee ‘ ©) at aa [EE] g Q ir - — * z 4 g g AANAAAAAS z g | i | ~¢ l | Z| | g an een One z | I I | 3 ! 3 | | | 4 EF EF aa LJ | _] EQUAL a EQUAL |, EQUAL 12-0" +z" | EQUAL ¢ € € SECOND FLOOR 1 MECHANICAL PLAN 2M1.3 | 21.3 | SCALE: 3/16°=1'-0" GENERAL NOTES 1. CONTRACTOR SHALL CENTER LIGHT FIXTURE IN ROOMS UNLESS NOTED OTHERWISE. 2. CONTRACTOR SHALL REFER TO ELECTRICAL DRAWINGS FOR LIGHTING FIXTURE SCHEDULES. 3. LIGHTS, AC DIFFUSERS, AND SUSPENDED GYPSUM CEILING SHALL BE INCLUDED AS PART OF THE BASE BID IN ROOMS 205,206 AND 207. 4. ROUTE ALL A/C REFRIGERANT PIPING TO CHILLER PAD ON THIRD FLOOR LEVEL. SEE DRAWING 3A1.1B FOR LOCATION OF CHILLER. 5. CONTRACTOR SHALL PROVIDE POWER TO EACH CEILING MOUNTED 4 WAY HVAC CASSETTE FROM NEAREST ELECTRICAL PANEL GENERAL NOTES 1. THE V.1 GOVERNMENT OWNS TWO TRANE TVR CONDENSERS, MODEL NUMBER 4TVH0144C6000AA THAT ARE TO BE INCORPORATED INTO THE NEW AIR CONDITIONING SYSTEMS FOR THE FIRST AND SECOND FLOORS. THESE UNITS ARE CURRENTLY LOCATED AT GOVERNMENTS HOUSE ST. THOMAS. CONTRACTOR WILL COORDINATE WITH THE TRANE COMPANY OF PUERTO RICO FOR FINAL DESIGN / INSTALLATION OF THE FIRST AND SECOND FLOOR AIR CONDITIONING SYSTEMS. 10. UNDER THIS HEADING INCLUDES Tee THAT IS TO BE OONE AL VATERIALS AND EQUIPMENT. DRAWNGS ANO/OR LISTED BELOW, eatery SHALL VERFY SPACE CONDTIONS AND O'MENSIONS TE WORK WITH ALL OTHER TRADES AT JOBSITE pe TO FABRICATION ANO INSTALLATION OF DUCTWORK. ALL WORK SHALL BE COORQWATED WITH OTHER TRADES 10 AVOID ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDMON OF ORD! THE INTERNATIONAL BUILOING CODE AND ALL LOCAL CODES AND INANCES, WARRANTY Ls 2 FULLY WARRANT ALL MATERIALS, EQUIPMENT AKO WORKMANSHP FOR ONE (1) YEAR FROM DATE OF ACCEPTANCE, EXTEND ALL MANUFACTURER'S WARRANTIES TO CWNER, INCLUDING EXTENDED WARRANTIES ON HVAC EQURPMENT. FIVE (5) YEAR COMPRESSOR (MATERIAL ONLY). COORDINATE ALL BUILING STANDARD REQUIREMENTS PRIOR TO 610. SUBMIT SHOP DRAWINGS OF ALL MATERIALS AND EGLIPMENT FOR APPROVAL PRIOR TO FABRICATION, ALL QUCT SIZES SHOWN OM DRAWINGS ARE CLEAR INSIDE O/MENSIGNS. AR OR DISTRIBUTION SHALL GE AS SCHEDULED ON THE ORAMNGS APPROVED EQUAL. FABRICATE AND ERECT ALL OUCTWORK IN ACCORDANCE TO ASHRAE AND SMACNA HVAC DUCT CONSTRUCTION STANDAROS (METAL AND FLEMIBLE) SHEETMETAL DUCTWORK AND FITTINGS SHALL B& SMACNA LOW PRESSURE CONSTRUCTION WITH SEAL CLASS B SEAMS AND JOWNTS INCLUDE DOUGLE-THICKNESS TURNING VANES, MANUAL CAMPERS, CONNECTORS, ACQUSTIC LINING, AND CTHER SHEET METAL OPPOSED GLADE CONSTRUCTION, ALL METAL RECTANGULAR OUCTWORK SHALL GE 45 DEGREE TAP TAKE-OFF FITTINGS. 3. SUPPLY AR DUCT SHALL BE INSULATED WITH MINERAL FIBER BLANKET WSULATION 1 1/2” INCHES THICK AND 1.5 16/CU, FT NOMINAL DENSITY. INSULATION SHALL BE SECURE WITH ADHESIVE AND INSULATION PINS PER MANUFACTURER'S RECOMMENDATIONS. FLEXIBLE DUCTS SHALL BE INDEPENDENTLY SUPPORTED FROM THE SONNECTED WITH PLASTIC DRAW BANOS 070 OR EQUAL, 1~ 1/2° THICK INSULATION WITH A it. R-VALUE OF 6.0 ANO RATED AT 10° WC, FOR SIZES THROUGH 12°. FLEXIBLE QUCTS SHALL BE UL LISTEOL AND IMEETIZS/30:7UME #0500 ESTs INACCOROANCE WITLI PA 2590 Fc ARE NOT CONTRACTOR SHALL INSPECT ALL EXISTING AR OUCTS TO BE RE-USED AND SHAUL MAKE ANY NECESSARY REPAIRS TO ACHIEVE AN AR TIGHT DUCT SYSTEM. ANY CUCT CAMAGED CAUSING AR LEAKS UST BE SEALED CHECK TESL START. ADJUST. BALANCE AND INSTRUCHONS INSTALLATION, SERVICING AND CT il 3S OPERATIONAL, 1, AFTER ANS! IN ACCORDANCE scaler EQUIPMENT AND PERFORN START UP WITH THE MANUFACTURER'S INSTRUCTIONS. HOURS WITH PUMP OFF. BREAK VACUUM WITH OPERATING REFRIGERANT. 3. BALANCE AR SYSTEM TO DELIVER AR QUANTITIES AT EACH OUTLET WITHIN 10% USING AABC TESTS AND FROCEDURES 4. TAG ALL EQUIPMENT, SWITCHES AND CONTROLS WITH PERMANEN' UBELS. REVISIONS NO: DATE: REMARKS | A\ 9/24/19 ADDENDUM 1 CONSULTANTS Jaredian Design Group Architects, Enguncers and Construction Mamagors No.33 Dronningans Gade - Queen's Quarter Post Office Box 6218 St. Thomas, U.S. Virgin Istands 00804 telephone: 340.777.1600 fax: 340.777.1601 e-mail: jaredian2@vipowemet.net ti i 4 i H te eee Ht iF HH il REHABILITATION OF GOVERNMENT HOUSE ST.THOMAS 22 KONGENS GADE KINGS QUARTER ST. THOMAS U.S.V\, DATE 6/7/19 DRAWN BY. CHECKEDBY JPW APPROVED BY. J.P,W, PROJECT NO. 17-016 CONTRACT NO SHEET NO. 2M13 SECOND FLOOR MECHANICAL PLAN 7 REVISIONS NO: DATE REMARKS AN 9/24fto ADDENDUM 1 24'-7° MATCH LINE 7 * MATCH LINE t I HVAC GENERAL NOTES bins 1. THE WORK THAT |S TO BE OONE UNDER THIS HEADING INCLUDES EQ. L 10’-0 EQ. THE FURNISHING OF ALL LABOR, MATERIALS AND EQUIPMENT, PERWITS, FEES, INSPECTIONS,TESTS, INSURANCE, ETC. REQUIRED FOR THE OMPLETION OF THE AIR CONOMIONING SYSTEM SHOWN ON DRAWINGS ANO/OR LISTED BELOW. 2 CONTRACTOR SHALL VERIFY SPACE CONDITIONS AND O:MENSIONS AND SHALL COORDINATE WORK WITH ALL OTHER TRADES AT JOSSITE PRIOR TO FABRICATION AND INSTALLATION OF DUCTWORK. E TO NEW CONDENSER 5 ML woRK SUL BE cooRoNUTED wT OTR TRADES 10 WOO 50") 5b TRANE 4TVH0144C6000AA COMPLUNCE WITH ALL APPLICABLE CODES AND STANDARDS. 4. AML WORK SHALL GE DONE IN ACCORDANCE WITH THE LATEST EOMTON pel eaten na tien CODE AND ALL LOCAL CODES AND WARRANTY g’-4" 7 V- 7 ; g’-4F i 11’-4° 8-0" t 11’-8° wa EF 1, FULLY WARRANT ALL MATERIALS, EQUIPMENT AND WORKMANSHIP — FOR ONE (1) YEAR FROM OATE OF ACCEPTANCE. CONSULTANTS 2, EXTEND ALL MANUFACTURER'S WARRANTIES TO CWNER, INCLUDING WARRANTIES ON HVAC EQUIPMENT. FIVE (5) YEAR F GENERAL NOTES COMPRESSOR MATERA. 08}, CONTRACTOR SHALL COORDINATE ALL BUILONG STANDARD ip 1. THE CONTRACTOR WILL COORDINATE WITH THE TRANE REQURENENTS PRIOR TO 8D. ~ COMPANY OF PUERTO RICO FOR FINAL DESIGN / INSTALLATION 1 ee nee ca xt —=—T—r-{_ OF THE FIRST AND SECOND FLOOR AIR CONDITIONING APRA PORTH FRGATORIT Rome ae — ; SYSTEMS. 8. ALL DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE CIMENSIGNS D 11'-0° Oe B° HAAN 10-4" ‘ a aro OR APPROVED EQUAL 10, pucTwoRK 1. FABRICATE ANG ERECT ALL DUCTWORK IN ACCORDANCE TO ASHRAE 4 r 9. AR OISTRIBUTION SHALL BE AS SCHEDULED ON THE ORAWINGS | g’-3° 1 = 3" 7'-10° SHEETMETAL OUCTWORK AND FITTINGS SHALL BE SMACRA LOW DCE Jaredian Design Group [eo] DUCT OF KITCHEN EXHAUST HOOD TO ROOF PRESSURE CONSTRUCTION WITH SEAL CLASS B SEAMS AND JOINTS _I | — ACCESSORIES FOR THE PROJECT VOLUME DAMPERS TO SE OF No.33 Dronningens Gade - Queen's Quarter EA Mover rvosiveus OPPOSED BATE CONSTRUCTION. AL BRANCH CCAMECTN SECT Pod! Ofles Bax 213 . METAL RECTANGULAR DUCTWORK SHALL GE 45 DEGREE TAP St. Thomas, U.S. Virgin islands 00804 TAKE-OFF FITTINGS. telephone: 340.777.1600 fax: 340.777.1601 i: Jaredian2 inet CEILING SUPPLY DIFFUSER . SUPPLY AIR DUCT SHALL BE INSULATED WITH MINERAL FIBER oma | @vpowemetn N= BLANKET INSULATION 1 1/2° INCHES THICK ANO 1.5 LB/CU. FT RECTANGULAR OR SQUARE NOMNAL DENSITY. INSUL Jer SHALL BE SECURE WITH j Krall ‘THECE PLIUG AMD THE DESIENS CONTAINED HEREN ARE THE ANO INSULATION PINS PER MANUFACTURER'S RECOWNENDATIO! EPRORLCES WITHOUT 36" KITCHEN EXHAUST HOOD eine heds ws “ Cc SUREDIAN CESIOM GHD IMAUINORTED USE BULL WATE A : ACCUREX MODEL XRRS OR EQUIVALENT 4. FLENBLE DUCTS SHALL BE INDEPENDENTLY SUPPORTED FROM THE {fet to ta ant TENET se + nt wanaeat Soma veal anle fot net TIGHTENEO FOR ANY ERROR OM CHLSESION CONTAINED THEREDK, q Ul aso de TOOLS. TAKE= UCTWORK 6-5" op 7-10 p4 ~~) REFRIGERANT LINE TO BE SPNAW FITTINGS PROADED WH TheT RAGS, BUTTERY DAMPERS, QUADRANT OPERATORS AND INSULATION GUARD, FLOOBLE OUCTS SHALL BE UMITED TO A MAXIMUM OF 10°-0" STRAGHT = LENGTHS PER RUN QUT, FLEMBLE DUCTS SHALL BE ATCO RUBBER eee eon Or Pa 6'-8° @Q a 4'-2" r 4 Te | 8’-3° ; fe gg ff ef : 4'-10" | 11’-0° 4’-9° 070 OR EQUAL, 1-1/2" THICK RISULATION WITH A MIN. R-VALUE GOVERNMENT HOUSE GF 6.0 AND RATED AT 10° W.C. FOR SIZES THROUGH 12°. FLEXIBLE ST.THOMAS DUCTS SHALL SE U.L LISTED AND MEET 25/50 FLAME AND SMOKE TEST IN ACCORDANCE WITH NFPA 255. FLD DUCTS ARE NOT _| PERMITTED IN ROOMS WITHOUT CERINGS. 22 KONGERS GAE RA . CONTRACTOR SHALL INSPECT ALL BUSTING AR DUCTS TO BE KINGS QUARTER GENERAL NOTES CONTRACTOR SHALL MSPECT AL EXSTING A DUCTS 10 BE anne WE AN NR TIGHT DUCT SYSTEM. ANY CUCT CAMAGED CAUSING Al 1, CONTRACTOR SHALL CENTER LIGHT FDCTURE IN ROOMS UMS MUST BF SEAED. D AR UNLESS NOTED OTHERWISE. — —. 2, CONTRACTOR SHALL REFER TO ELECTRICAL DRAWINGS 1S. CHECK. TEST. START. ADJUST. BALANCE AND INSTRUCTIONS FOR LIGHTING FIXTURE SCHEOULES. DRAWN BY. *-11" 4-74 1. INSTALLATION, AND PMENT iS 01 i’-11 —t 7 le 3. REMOVE EXISTING 3ERD FLOOR A/C SYSTEM IN ITS ENTIRETY em AL FONE NTE Peto na W cela & INFILL EXISTING OPENINGS WITH THE MANUFACTURER'S INSTRUCTIONS. B CHECKED BY = J.P.W z HOLD FOR 25 HOURS. LOW SOE TO 130 PSIG MOLD FOR 2 = % HOURS, AFTER TESTING, EVACUATE SYSTEM TO 28 INCHES OF APPROVED BY: J.P.W. EF} MERCURY GAUGE PRESSURE WITH VACUUM PUMP. HOLD FOR 24 HOURS WITH PUMP OFF. BREAK VACUUM WITH OPERATING ix ; 17-1" / REFRIGERANT. PROJECT NO. 3. BALANCE AR SYSTEM [0 DELNER AR blac AT GACH OUTLET 17-016 WITHIN 10% USING AABC TESTS AND FRI CONTRACT NO. 4, TAG ALL EQUIPMENT, SWITCHES AMO CONTROLS WITH PERMANENT —S - LABELS. 7-11" 3'-3" $ ~ + $ $ 8 2 $ r. $ $ $ 7-4" w $ $ $ $ 8 > < $ r § 2 fo 0’ nnnnnannAh 2 be 9-1 13’-6" * f fg a cu | So cel . oS 1 . p-. SHEET NO. 12. REFRIGERANT PIPING SHALL BE TYPE L HARD OR SOFT DRAWN, COPPER TUBING, CLEANED AND OEHYDRATEO FOR REFRIGERANT USE. SIZES AS PER AR CONDTION.NG EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. REFRIGERANT SUCTION PIPING SHALL BE INSULATED WITH 1/2° THICK FOAMED RUBBER INSULATION, FIRE RETARDANT TYPE. INSULATION SHALL BE INSTALLED ON PIPING BEFORE ASSEMALY. NO SPLIT INSULATION WILL 8E T__| THIRD FLOOR MECHANICAL PLAN Sa Se Oe sci smears 3M13 | 3M1.3} SCALE: 3/16°=1'-0" 13. CONTRACTOR SHALL INSPECT BUSTING AC SYSTEM LOCATEC MTHN THE SCOPE OF WORK AND ADMSE THE OWNER OF GENERAL CONDITIONS.