FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) Submittal to: USVI Department of Planning and Natural Resources Division of Coastal Zone Management Director Marlon Hibbert Attn: Joy Santoli, Program Analyst Prepared for: Department of Health Justa E. Encarnacion, Commissioner 4006 Estate Diamond Christiansted, St. Croix 00820 Department of Human Services Averil George, Commissioner 3012 Golden Rock Christiansted, St. Croix 00820 Prepared by: Springline Architects, LLC Gilbert Laban, RA, Principal Jerry Traino, AIA, Principal Kristy Bardwell, RA, Project Manager 9713 Estate Thomas, Building 1, Suite 200 St. Thomas, USVI 00802 FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) TABLE OF CONTENTS I. LETTER SUMMARY II. LOCATION OF PROJECT III. PROJECT OBJECTIVES IV. PROJECT DESCRIPTION Summary of Proposed Activity a. Site Work/Provisions to Limit Soil Disturbance b. Method of Construction c. Self-sufficient Systems d. Renewables and Sustainability e. Provisions to Limit Community Impacts V. COASTAL ZONE POLICIES a. Regulatory Framework b. Project Introduction c. Coastal Zone Policies VI. ATTACHMENTS A. CONSISTENCY WITH OTHER REGULATIONS AND AGENCIES B. MITIGATION PLANS C. CD DRAWINGS (30%), REPORTS, PLANS, AND SURVEYS D. AGENCY APPROVALS E. PHOTOGRAPHS April 23, 2026 Marlon Hibbert, Director Department of Planning and Natural Resources, Division of Coastal Zone Management 4611 Tutu Park Mall Suite 300, 2nd Floor St. Thomas, VI 00802 Re: Federal Consistency Application, Knud Hansen Complex, ODR TASK #2020-03, ODR TASK #010-9- 101918, ODR TASK #010-8-101472 Dear Director Hibbert, On behalf of the Virgin Islands Department of Health (VIDOH) and the Department of Human Services (VIDHS), Springline respectfully submits the Federal Consistency Application documentation for the Knud Hansen Complex. The legal description of the project site is Estate Hospital Ground, Kings Quarter, St. Thomas. The work proposed under the referenced task orders includes: 1. Demolition of the Old Mental Health Building and associated parking area, including utilities 2. Demolition of the Knud Hansen Building, Generator, and Generator Storage Building, and construction of a new four-story office building, and concrete parking deck and surface parking 3. Demolition of the DOH Knud Hansen Tower Building, 1-story DOH Building, and existing cistern, and a tenant upfit of a DOH clinic on the 2nd floor of the newly constructed four-story office building Three existing buildings will remain: 1) DOH WIC; 2) Historic Building 1; 3) Historic Building 2. The long-term objective is to create a unified health and human services campus by consolidating divisions, including the newly constructed WIC facility and programs currently located at the John S. Moorehead Complex, into a single, modern structure that will replace the outdated facilities on-site. Design documents have progressed to 30% Construction Documents (CDs), 60% Demolition Documents. Enclosed is the Federal Consistency Application package, prepared in accordance with the Coastal Zone Management Act (CZMA) Section 307 of 1972 and 15 CFR Part 930, Subpart D. VIDOH and VIDHS, through this submission, affirms consistency with the applicable policies of the Virgin Islands Coastal Zone Management Act of 1978, 12 V.I.C. § 901 et seq. Sincerely, Jerry Traino, AIA REWC Principal NOVUS / SPRINGLINE ARCHITECTS INC FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 1 II. LOCATION OF PROJECT General Location Map US Virgin Islands November 5, 2025 KNUD HANSEN COMPLE X - Genera l Locati on Map MAP FOR REFERENCE ONLY NOT A LEGAL DOCUMENT US Virgin Islands makes no claims and no warranties, expressed or implied, concerning the validity or accuracy of the GIS data presented on this map. Geometry updated 06/2018 Data updated 06/2018 Print map scale is approximate. Critical layout or measurement activities should not be done using this resource. 1" = 8000 ft 1303 Hospital Ground, Hospital Kings Quarter, St. Thomas FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 3 II. LOCATION OF PROJECT Project Area Map/Project Latitude: 18.345318 and Longitude: -64.926076 Legal Description: Estate Hospital Ground, Kings Quarter, St. Thomas US Virgin Islands November 5, 2025 KNUD HANSEN COMPLE X - Projec t Area Map MAP FOR REFERENCE ONLY NOT A LEGAL DOCUMENT US Virgin Islands makes no claims and no warranties, expressed or implied, concerning the validity or accuracy of the GIS data presented on this map. Geometry updated 06/2018 Data updated 06/2018 Print map scale is approximate. Critical layout or measurement activities should not be done using this resource. 1" = 800 ft Project Location FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 5 II. LOCATION OF PROJECT Project Area Map - Estates US Virgin Islands November 5, 2025 KNUD HANSEN COMPLE X - Projec t Area Map - Estate s MAP FOR REFERENCE ONLY NOT A LEGAL DOCUMENT US Virgin Islands makes no claims and no warranties, expressed or implied, concerning the validity or accuracy of the GIS data presented on this map. Geometry updated 06/2018 Data updated 06/2018 Print map scale is approximate. Critical layout or measurement activities should not be done using this resource. 1" = 800 ft Project Location Estate Hospital Ground FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 7 II. LOCATION OF PROJECT Topographic Survey EXISTING CONDITIONS SURVEY C0.02 REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Schematic B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR PROJECT NUMBER 04/06/2026 04.03.2026 NDW CT 1303 Hospital Ground St. Thomas, US. Virgin Islands 00802 KNUD HANSEN COMPLEX 30% CONSTRUCTION DRAWINGS 470-23-49 010-9-101918 No. Description Date FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 9 III. PROJECT OBJECTIVES In accordance with 1) FEMA PW-4340-1072-USVI / GM# 101440 (PA), ODR Task Order #2020-03; 2) FEMA PW-4340-1361-USVI / GM# 101918 (PA), ODR Task Order #010-9-101918; and 3) FEMA PW-4340-1362-USVI / GM# 101472 (PA), ODR Task Order #010-8-101472, the Virgin Islands Department of Health (VI DOH) and Department of Human Services (VI DHS) are proposing to: 1) Demolish the Old Mental Health Building and associated parking area, including utilities 2) Demolish the Knud Hansen Building, Generator, and Generator Storage Building, construct a new four-story office building, and concrete parking deck and surface parking 3) Demolish the DOH Knud Hansen Tower Building, 1-story DOH Building, and existing cistern, and construct a tenant upfit for a DOH clinic on the 2nd floor of the newly constructed four-story office building The Knud Hansen complex, controlled by the Department of Human Services (DHS) and Department of Health (DOH), suffered severe damage during the 2017 hurricane and a portion of it remains unoccupied. Three existing buildings will remain: 1) DOH WIC; 2) Historic Building 1; 3) Historic Building 2. The proposed 3-story Old Mental Health building and parking area demolition will allow for construction of new surface parking with stalls (See Civil Site Plan) under ODR Task Order #010- 9-101918. The area to be stabilized, cleared and graded, will require excavation of the previously disturbed area to remove construction debris and demolished building foundation. A new underground stormwater retention system will be constructed in the footprint of the previous basement cistern. FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 10 The proposed 30,000 sf, 3-story Knud Hansen Building demolition will also include all building utilities down to soil, sidewalks, stairs and ramps, and existing generator. The new 76,497 sf building will be equipped with two chillers, one generator, a fire cistern, new utilities, a concrete parking deck and on-grade surface parking. The new DOH clinic, will be located on the 2nd floor of the newly constructed 4-story building and will include exam rooms, offices, infectious disease isolation rooms, utility spaces, and a break and conference room. The Knud Hansen Complex and the John S. Moorehead Complex – Old Hospital Yard are located on Parcel 2 Estate Hospital Ground, Kings Quarter, Charlotte Amalie, St. Thomas, USVI 00802. VISHPO concurred with 1) the proposed undertaking to demolish the Old Mental Health Building and 2) FEMA’s determination that the project will result in “no historic properties affected with conditions” on September 14, 2020. FEMA concluded their determination on September 1, 2020. The list of project conditions, the FEMA Section 106 Consultation, and VISHPO Concurrence, can be found in Attachment A. Knud Hansen Complex funding includes: Old Mental Health Building – VIDOH – FEMA-PA Building and Equipment - VIDHS – FEMA-PA Tower Replacement – VIDOH – FEMA-PA With the above funded projects, the ultimate goal for the community is to create a unified campus incorporating all health and human services divisions, including the newly built WIC facility and those located at the John S. Moorehead complex, through future construction of a single building to replace the three existing structures – Knud Hansen Complex Building, Tower, and Old Mental Health Building. See Attachment C. Master Plan. Pedestrian access, green spaces, vehicular movement, and parking will also be designed in a broader, shared style. FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 11 Demolition of the Old Mental Health building is the first step toward combining the Department of Health (DOH) and the Department of Human Services (DHS) within a single building on one site. DOH will focus on public health and healthcare services, while DHS addresses social services and welfare programs. By co-locating in one facility, on a previously developed parcel, DOH and DHS can streamline services for shared clientele, eliminating the need for clients to visit separate locations to address their needs. Additionally, consolidating infrastructure resources like cisterns, fire sprinkler pumps, emergency generators, battery backups, and power conditioning equipment can lead to cost savings and streamlined maintenance. Centralizing utility services into one utility court reduces redundancy and enhances operational effectiveness. All demolition activities will adhere to local permitting requirements and regulations. Hazmat testing, which is mandatory prior to demolition, has already been started for the Tower and Old Mental Health Building. Underground utilities investigation and documentation, Environmental Assessment, and Letter from the Department of Agriculture for tree removal are to be completed but are not yet started. A Temporary Utilities Plan, Stormwater Protection Plan, Hazardous Materials Abatement Plan, and Historic Structures stabilization plan will be prepared prior to permit and construction. IV. PROJECT DESCRIPTION Summary of Proposed Activity According to the FEMA EHP Letter dated 9/1/202, from V. Corbiere to Sean Krigger, VI SHPO, the Knud-Hansen Center (including the Tower) and the Mental Health Building “are both non- descript examples of post-WWII hospital building. With subsequent additions and changes in materials, neither building possesses character defining features unique building style, period, FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 12 or method of construction. The buildings are not the work of a master, do not display high artistic values and do not appear to be individually associated with an event or person significant in our past. Therefore, FEMA has determined that the Knud-Hansen Memorial Hospital and Mental Health Building are not eligible for listing in the National Register of Historic Places.” The project will include demolition of: • Old Mental Health Building and contiguous 50,000 sf parking area • Knud-Hansen Center • Generator building (with associated retaining wall) • Tower • 1-story DOH building • All building utilities The site will be cleared down to soil and debris hauled for proper disposal. Trees will be protected during demolition. All utilities to remain, including potable water and sanitary sewer services, will be capped. All existing, adjacent sidewalks, stairs, ramps, and railings will be demolished to grade. The 3-story Old Mental Health Building contains a lower level comprised predominantly of cisterns, but also houses electrical and other support equipment. The new 4-story office building will be constructed on previously disturbed land. The proposed building structure will be concrete and steel with impact-resistant glazing, membrane roof, and three elevators. The proposed cistern capacity solely for fire system use is 115,268 gallons. New on-site surface parking, parking stalls, curb and sidewalk are proposed. Other new site improvements such as retaining wall, lighting, and trash enclosure/compactor are also proposed. FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 13 • Installation of asphalt over the approximate 50,000 sf parking area per Civil Specifications • Striping of the parking area in a manner that maximizes available parking spaces and inclusion of handicap parking per Section 504 of the Rehabilitation Act of 1973 • Installation of required parking signage The site is currently connected to public utilities and will remain connected under the proposed development with new utility connections for water and electric (WAPA) and sanitary (WMA) are proposed. New potable water, sanitary sewer gravity, and fire water pipes are proposed. Stormwater piping and inlets are proposed on- and off-site to collect stormwater from surface parking areas, building roof, cistern overflow, and the lower and upper parking decks areas. A new concrete parking deck is proposed adjacent/connected to the 4-story office building. This total building square footage (concrete deck and building) is 119,565 sf. The total new surface and parking deck on-site spaces provided is 282 (total includes ADA parking). Four (4) off-street loading spaces are also provided. a. Site Work/Provisions to Limit Soil Disturbance The demolition strategy and expectations shall be outlined and included in the demolition permit submittal and coordinated between the owner, general contractor, and AHJ. These are a few possible contractor-provided dust and mud runoff controls: • Dust control o Regularly watering the excavation site to dampen surfaces o Barriers around excavation site to reduce wind • Mud runoff control o Aggregate stone at entrances (if needed) Options the General Contractor could consider and employ for on-site dust control during demolition and construction if deemed suitable and effective. Trackout Control Mat Point of Use Misters Watering Jets Blanketing Misting Blowers Watering Trailers Watering Trucks Typical Example of On-Site Dust Control during Demolition and Construction FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 14 o Rumble racks at site entrance o Wash down vehicles before exiting the jobsite o Daily washdown of construction site entrance and adjacent street The General Contractor will be responsible for maintenance and inspection of the gravel driveway and location and maintenance of equipment staging yards. Existing building potable water, sanitary sewer utilities, and other utilities will be field located and capped as required. The general contractor will coordinate and permit this work. Utility demolition will be coordinated with St. Thomas Water and Power Authority (WAPA) and Waste Management Authority (WMA) prior to construction. Contractor to use methods to demolish existing sewer pipe located below the building foundation and ensure continuation of flow throughout construction. Other items to be demolished include sidewalks, stairs, ramps, and railings, cistern, vegetation and trees, perimeter fencing and gates, and power poles. Anything of historic significance will be preserved. Site will be secured prior to any demolition activities with an 8-foot tall chain link fence with integrated wind and visual barrier. b. Method of Construction The contractor will fill void left from building demolition with appropriate fill and compaction with cut and fill. (See Civil Plans – Erosion Control Plan, C0.90). c. Self-sufficient Systems – Water The site functions on existing water systems – public and cistern water supply. The existing cistern in the Old Mental Health Building will be demolished. The existing site potable water and sanitary sewer lines will remain and new piping/piping connections and new lines will be installed with new construction. FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 15 d. Renewables and Sustainability On-site renewables The site is currently, and will remain, connected to the electric grid. During demolition, the contractor will maintain temporary power to the site and coordinate with the Owner and Utility. e. Provisions to Limit Community Impacts The existing land use adjacent to the Knud Hansen Complex is public recreation, multi- family senior housing, multi-family housing, and public buildings/services. The site is surrounded by developed land. The nearest residential building (Bethlehem House for the Homeless) from the Old Mental Health Building is located approximately 90 feet to the east, separated by parking and a driveway. The distance of this residential housing to the project site’s lot line is approximately 5 feet. Construction will be approximately 21 feet from the existing historic John S. Moorehead buildings. Repair and maintenance work will take place during the day between normal working hours of 7:30 AM to 4:00 PM. All standard provisions for construction vehicle traffic and tracking will be in place prior to start of construction. The contractor will implement the following measures to reduce noise and community impacts and promote safety: • Noise mitigation o No noise emitting work affecting the surrounding community shall be performed during designated quiet hours o Position noise emitting equipment away from site perimeter when possible o Avoid using pneumatic tools when possible o Install sound reduction kits on heavy machinery when possible FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 16 • Community Outreach o Formally notify community leaders ahead of construction activities and impacts to the community (street closures, rigging, large deliveries, etc.) o Post advisories near and around affected areas notifying community of upcoming work • Safety o Contractor will submit a specific site safety plan and Job Hazard Analysis prior to construction o Daily safety toolbox meetings o All deliveries and activities outside the construction perimeter will be accompanied by designated flagmen to safeguard pedestrians and vehicular traffic o Safety permitter will be established when active construction work is required outside the construction site to safeguard pedestrians and vehicular traffic FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 17 V. COASTAL CONSISTENCY WITH COASTAL ZONE POLICIES a. Regulatory Framework This document provides the US Virgin Islands with the Virgin Islands Department of Health (VIDOH) and Department of Human Services (VIDHS) consistency determination, data, and information required under the Coastal Zone Management Act (CZMA) Section 307 of 1972 and 15 CFR Part 930, sub-part D, for the Knud Hansen Complex damaged during the 2017 hurricane. In accordance with the CZMA, VIDOH and VIDHS is demonstrating consistency with the US Virgin Islands Policies (USVI) of the most recent Virgin Islands Coastal Zone Management Act of 1978, 12 V.I.C § 901. VIDOH is requesting the US VI Department of Planning and Natural Resources’ (DPNR) acknowledgement and concurrence with this consistency determination. b. Project Introduction The VIDOH/VIDHS Knud Hansen Complex is located on the island of St. Thomas, Estate Hospital Ground, Kings Quarter, Latitude 18.345318, Longitude -64.926076. The site is not located in the Tier 1 coastal zone. The site is located in Flood Hazard Zone X. The following FEMA scope of work is in response to damage caused to the Knud Hansen Complex during the 2017 hurricane: 1) Demolish the Old Mental Health Building and associated parking area, including utilities 2) Demolish the Knud Hansen Building, Generator, and Generator Storage Building, construct a new four-story office building, and concrete parking deck and surface parking 3) Demolish the DOH Knud Hansen Tower Building, 1-story DOH Building, and existing cistern, and construct a tenant upfit for a DOH clinic on the 2nd floor of the newly constructed four-story office building. FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 18 The ultimate goal for the community is to create a unified campus incorporating all health and human services divisions, including the newly built WIC facility and those located at the John S. Moorehead complex, through future construction of a single building to replace the three existing structures – Knud Hansen Complex Building, Tower, and Old Mental Health Building. c. Coastal Zone Policies: The following eleven policies are set forth in the Virgin Islands Code Title Twelve Conservation, Chapter 21 § 903 (b). POLICY (1) protect, maintain, preserve and, where feasible, enhance and restore, the overall quality of the environment in the coastal zone, the natural and man-made resources therein, and the scenic and historic resources of the coastal zone for the benefit of residents of and visitors of the United States Virgin Islands; The project site is not located in the Tier 1 coastal zone. However, the proposed construction work will be conducted within the regulatory framework of all required, applicable permits. During construction site operations will be carried out with minimal impact to the environment and in conformance with best management practices. The developed project site will be redeveloped and conditions are in place to protect existing historic resources. POLICY (2) promote economic development and growth in the coastal zone and consider the need for development of greater than territorial concern by managing: (1) the impacts of human activity and (2) the use and development of renewable and nonrenewable resources so as to maintain and enhance the long-term productivity of the coastal environment; The project site is located outside the Tier 1 coastal zone. The VIDOH/VIDHS separately funded projects will lead to the overall redevelopment of the existing Knud Hansen Complex. The new building and associated parking and utilities will be constructed on previously disturbed land. A much-needed comprehensive health and social services campus will be placed back in operations for public use once again. FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 19 Site operations will be regulated to minimize human impacts. POLICY (3) assure priority for coastal-dependent development over other development in the coastal zone by reserving areas suitable for commercial uses including hotels and related facilities, industrial uses including port and marine facilities, and recreation uses; The project is not located in the Tier 1 coastal zone. The project is centrally located in Estate Hospital Ground, situated away from coastal hazards and outside mapped flood hazards. POLICY (4) assure the orderly, balanced utilization and conservation of the resources of the coastal zone, taking into account the social and economic needs of the residents of the United States Virgin Islands; These FEMA funded plans will consolidate the DHS/DOH health and social services into one building within a redeveloped Knud Hansen Complex. The site is currently connected to public water, sewer, and power. New site utility connections are proposed to accommodate the proposed new construction. The repair of this facility will allow a now unusable facility to be put back into service for public use. POLICY (5) preserve, protect and maintain the trust lands and other submerged and filled lands of the United States Virgin Islands so as to promote the general welfare of the people of the United States Virgin Islands; No work is proposed on trust, or submerged and filled lands. POLICY (6) preserve what has been a tradition and protect what has become a right of the public by insuring that the public, individually and collectively, has and shall continue to have the right to use and enjoy the shorelines and to maximize public access to and along the shorelines consistent with constitutionally-protected rights of private property owners; FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 20 The existing Knud Hansen Complex buildings, located in Estate Hospital Ground, will be demolished to make way for future site improvements on a previously developed parcel. The site is not located within the Tier 1 coastal zone. POLICY (7) promote and provide affordable and diverse public recreational opportunities in the coastal zone for all residents of the United States Virgin Islands through acquisition, development and restoration of areas consistent with sound resource conservation principles; The project site will utilize an existing facility located in Estate Hospital Ground therefore leaving existing and future coastal sites for public recreation and conservation initiatives. POLICY (8) conserve ecologically significant resource areas for their contribution to marine productivity and value as wildlife habitats, and preserve the function and integrity of reefs, marine meadows, salt ponds, mangroves and other significant natural areas; A site Environmental Assessment will be prepared and all site work will proceed in conformance with rules and regulations for the protection of identified natural resources. The site is not located in a Coastal Barrier Resources unit, a wetland, or an essential fish habitat. The project does not modify or effect a waterway/body of water or a wild and scenic river. POLICY (9) maintain or increase coastal water quality through control of erosion, sedimentation, runoff, siltation and sewage discharge; Best management practices will be in place during demolition and construction to protect water quality and comply with USVI regulations. Requirements are in place during construction to protect water quality. Site disturbance will be just under 4 acres. The site is currently connected and will remain connected to public sewer. FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 21 POLICY (10) consolidate the existing regulatory controls applicable to uses of land and water in the coastal zone into a single unified process consistent with the provisions of this chapter, and coordinate therewith the various regulatory requirements of the United States Government; This project is funded through the FEMA, Public Assistance Grant, uses Federal dollars, and therefore requires compliance with the Coastal Zone Management Act and is subject to a Federal Consistency Determination. Along with this Federal Consistency Determination administered by the US Virgin Islands DPNR, Coastal Zone Management, the VIDOH and VIDHS will demolish the existing Knud Hansen Complex building and parking areas, and construct a new building and surface and deck parking in accordance with the National Historic Preservation Act, Coastal Zone Management Act, and the Resource Conservation and Recovery Act, and all US Virgin Islands laws, regulations, and policies consistent with these Federal programs, most notably Virgin Islands Code Title Twelve Conservation, Chapter 21 § 903 (b). POLICY (11) promote public participation in decisions affecting coastal planning conservation and development. The Federal Consistency Determination requires a public hearing and comment period. This project will go through the Federal Consistency Review process and final Federal Consistency determination. FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 22 ATTACHMENTS FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 23 ATTACHMENT A. CONSISTENCY WITH OTHER REGULATIONS AND AGENCIES a. FEMA Letter, Section 106 Consultation, V. Corbiere to S. Krigger, dated 9/1/2020 and VISHPO Concurrence dated 9/14/2020 b. Hazardous/Solid Waste Disposal (work by Suffolk Construction Company) VISHPO CONCURRENCE: Department of Health Headquarters Property Location: 18.345318, -64.926076 Undertaking: Build-out of Temporary Offices and Demolition of (former) Mental Health Building FEMA Project: PW-4340-1072-USVI / GM# 101440 (PA) FEMA’s Determination of Effect: The proposed undertaking at the (former) Mental Health Building and Knud-Hansen Tower will result in No Historic Properties Affected with conditions pursuant to 36 CFR 800.4(d)(1). The proposed undertaking at the Dr. John S. Moorehead Municipal Hospital Complex will result in No Adverse Effect to Historic Properties with conditions pursuant to 36 CFR 800.5(b). Architectural Conditions: • The wood-grained paneling proposed to replace wood tongue and groove ceiling in the ca.1900 Moorehead Hospital buildings must match appearance, scale, and profile(s) of the original. • All other historic building and structure repairs and replacements undertaken at the Dr. John S. Moorehead Municipal Hospital Complex shall follow applicable Secretary of the Interior Guidelines for Preserving, Rehabilitating, Restoring and Reconstructing Historic Buildings and USVI Preservation Guidelines. Archaeological Conditions: • Prior to conducting repairs/replacement, applicant must identify the source and location of fill material and provide this information to FEMA. If the borrow pit is privately owned, or is located on previously undisturbed land, or if the fill is obtained by the horizontal expansion of a pre-existing borrow pit, FEMA consultation with the State Historic Preservation Officer will be required. Failure to comply with this condition may jeopardize FEMA funding; verification of compliance will be required at project closeout. • If human remains or intact archaeological deposits are uncovered, work in the vicinity of the discovery will stop immediately and all reasonable measures to avoid or minimize harm to the finds will be taken. The applicant will ensure that archaeological discoveries are secured in place, that access to the sensitive area is restricted, and that all reasonable measures are taken to avoid further disturbance of the discoveries. The applicant’s contractor will provide immediate notice of such discoveries to the applicant. The applicant shall contact the Virgin Islands State Historic Preservation Office and FEMA within 24 hours of the discovery. Work in the vicinity of the discovery may not resume until FEMA has completed consultation with SHPO, Indigenous Population, and other consulting parties as necessary. In the event that unmarked human remains are encountered during permitted activities; all work shall stop immediately, and the proper authorities notified. • Any changes to the approved scope of work will require submission to, and evaluation and approval by, the SHPO and FEMA prior to initiation of any work, for compliance with Section 106. • According to 36 CFR § 800.1, Federal agencies should consider alternatives to avoid, minimize or mitigate any adverse effects on historic properties. FEMA proposes minimization measures to include use of specialized construction techniques to limit impacts to archaeological resources. These minimization techniques are as follows: 1. Track mounted heavy equipment must be placed on hard surfaces (asphalt, concrete, compacted gravel); if track mounted heavy equipment is located on soils or grass covered areas, the use of protective pads or steel plates is required to minimize below ground disturbance within the APE. 2. No work shall commence in wet soils. VISHPO CONCURRENCE: Department of Health Headquarters Property Location: 18.345318, -64.926076 Undertaking: Build-out of Temporary Offices and Demolition of (former) Mental Health Building FEMA Project: PW-4340-1072-USVI / GM# 101440 (PA) FEMA’s Determination of Effect: The proposed undertaking at the (former) Mental Health Building and Knud-Hansen Tower will result in No Historic Properties Affected with conditions pursuant to 36 CFR 800.4(d)(1). The proposed undertaking at the Dr. John S. Moorehead Municipal Hospital Complex will result in No Adverse Effect to Historic Properties with conditions pursuant to 36 CFR 800.5(b). Date: September 14, 2020 As proposed, VISHPO __X_ concurs ___ does not concur with FEMA’s determination of effect. If no consulting parties object to this finding within the 15-day review period (per Stipulation I.D.2.b. of USVI Programmatic Agreement), the project may proceed as proposed unless resources are discovered during project implementation, pursuant to 36 CFR 800.13. Sean L. Krigger Director/Deputy State Historic Preservation Officer Department of Planning and Natural Resources Virgin Islands State Historic Preservation Office U.S. Department of Homeland Security FEMA Region II / DR 4335-4340 Joint Recovery Office 4500 Sunny Isle Shopping Center Unit 37, 38 Christiansted, VI 00820 September 1, 2020 Sean L. Krigger Director/Deputy State Historic Preservation Officer Department of Planning and Natural Resources Virgin Islands State Historic Preservation Office 5064 Forts Straede 1, Kongens Quarter Charlotte Amalie, Virgin Islands 00802 Subject: Section 106 Consultation Project Number: PW-4340-1072-USVI / GM# 101440 (PA) Sub-recipient: Virgin Islands Department of Health/St. Thomas Undertaking: Build-out of Temporary Offices and Demolition of (former) Mental Health Building (GPS: 18.345318, -64.926076) Dear Mr. Krigger, The Federal Emergency Management Agency (FEMA) will be providing funds authorized under the Robert T. Stafford Disaster Relief and Emergency Assistance Act, P.L. 93-288, as amended, in response to major Disaster Declaration FEMA-4340-DR-USVI, dated September 20, 2017. FEMA is conducting Section 106 Consultation for the above-referenced project in accordance with 36 CFR Part 800 and Stipulation II.D. Standard Project Review of FEMA’s Virgin Islands Programmatic Agreement executed on July 14, 2016. Undertaking The proposed undertaking is to build out interior spaces in the ca. 1900 Dr. John S. Moorehead Municipal Hospital Complex (Moorehead Hospital) and adjacent Knud-Hansen Tower, part of the 1953 Knud-Hansen Memorial Hospital (now Knud-Hansen Center), into usable modern temporary office space for Department of Health (DOH) staff while their permanent spaces are being repaired from storm damage. This undertaking will also include the demolition of the approximately 15,000 Square Foot (SF) (former) Mental Health Building/Long-Term Care Facility (Mental Health Building) in order to construct an approximately 50,000 SF parking lot. The build-out of the interior spaces to provide interim office functionality will require abatement of mold and asbestos-containing materials (ACM), installation of all new electrical elements (i.e. electrical service, panels, receptacles, switches, light fixtures and other terminal devices), as well as fire alarms, internet wiring and data/voice outlets. The proposed build-out involves the interiors 2 of twelve individual buildings that include the Knud-Hansen Tower and the Moorehead Hospital (See Figures 2 and 3). They are as follows: • Building 1 – Knud-Hansen Tower (GPS: 18.34564 -64.92647) built ca. 1950s or 1970s (Photos 8 – 12) • Building 2 (C) – Moorehead Hospital Chemical Storage Building (GPS: 18.34490 - 64.92619) built ca. 1900 (Photo 15) • Building 3 (D) – Moorehead Hospital Storage Building (GPS: 18.34517 -64.92615) built ca. 1900 (Photo 17 and 18) • Building 4 (D-1) – Moorehead Hospital Payroll Building (GPS: 18.34509 -64.92622) built ca. 1900 (Photo 16 and 17) • Building 5 (E) - Moorehead Hospital Director Building (GPS: 18.34529 -64.92613) built ca. 1900 (Photo 19) • Building 6 (F)- Moorehead Hospital Communicable Disease Admin Building (GPS: 18.34541 -64.92613) built ca. 1900 (Photo 20) • Building 7 (G) - Moorehead Hospital Environmental Health Building (GPS: 18.34514 - 64.92603) built ca. 1900 (Photos 21, 22) • Building 8 (H) - Moorehead Hospital Vital Statistics Building (GPS: 18.34536 -64.92585) built ca. 1900 (Photos 23, 24) • Building 9 (I) - Moorehead Hospital Communicable Disease Clinic, Generator Building (GPS: 18.34508 -64.92577) built ca. 1900 (Photos 25 and 26) • Building 10 (J) - Moorehead Hospital H.I.T. Building (GPS: 18.34478 -64.92570) built ca. 1900 (Photo 27) • Building 11 (K) - Moorehead Hospital Maintenance Building (GPS: 18.34503 -64.92562) built ca. 1900 (Photo 28) • Building 12 (L) - Moorehead Hospital Women’s Resource Center Building (GPS: 18.34525 -64.92557) built early 1950s. (Photos 26 and 29) Activities associated with the building demolition will require clearing and grubbing of vegetation (small trees and shrubs) and removal of demolition debris from the approximately 15,000 SF building footprint. This also involves removal of the concrete foundation (1-foot depth), footings (2 feet depth), sidewalk, and surrounding asphalt parking lot. Parking lot construction activities would include excavation to approximately 1 foot below grade level (BGL) of building foundation and asphalt parking lot. The concrete footings would require excavation to approximately two feet BGL. Upon completion of the demolition, site grading and placement of 5,633 square yards of Geotech fabric will be placed in the excavated area and overlain with new aggregate. The new 3 aggregate base will require placing, grading and compaction of approximately 50,000 SF x 3 inches depth (500 cubic yards) of new aggregate base. The proposed asphalt will be applied over the 50,000 SF to a depth of 4 inches and the parking lot will be completed with striped parking areas and signage (Figure 5). The items in the scope of work identified below are either in-kind replacement or repairs that meet existing Tier II Allowances described in Appendix B of the Programmatic Agreement executed July 14, 2016 and include: • Replacement/repair of damaged floors, ceiling tiles/grid, walls, light fixtures: B.1.a. • Cleaning of surfaces for mold remediation: B.1.b. • Replacement of damaged vinyl composition floor tile (VCT) and ACM mastic: B.1.d. • Refinish and painting of interior walls: B.1.e. • Use of portable de-humidification systems: B.1.f. • Replacement/retrofit of ventilation and electrical systems: B.3.a • Replacement of fire alarms: B.3.c. • Replacement of blanket insulation: B.7.b. The following scope of work items are not covered by existing Programmatic Allowances and is the subject of this consultation: • Demolition of a structure over 45 years of age and construction of a parking lot in its place • Replacement of wood tongue and groove wooden ceilings with wood-grained paneling in all the ca.1900 Moorehead Hospital buildings (Photo 30 shows ceiling example) Area of Potential Effects (APE) Pursuant to 36 CFR 800.4(a)(1), the Area of Potential Effects (APE) is defined as the geographic area(s) within which the undertaking may directly or indirectly affect historic resources. Based on the proposed scope of work, FEMA has determined that the APE for this undertaking includes the areas around the (former) Mental Health Building, the Knud-Hansen Memorial Hospital, and the Dr. John S. Moorehead Municipal Hospital Complex (Figure 1). There will be ground disturbance associated with the Mental Health Building demolition and subsequent parking lot construction in its place. Identification and Evaluation Architecture The Dr. John S. Moorehead Municipal Hospital Complex was built by the Danish government c. 1900. It consists of eleven one-story buildings resting on concrete slab foundations (with the exception of Building 10 (J) which has a basement) and topped with corrugated metal hipped roofs. Buildings are generally faced with local bluestone and feature brick window and door trim and quoins. The exception to this is Building 4 (D-1) which has what appears to be concrete or stone lintels and quoins. Windows that are visible are a mix of replacements including single-light sliding windows and one-over-one double-hung windows, most featuring wood shutters. Visible doors are a mix of modern replacement and paneled wood doors with a single light with most featuring wood shutters. A central courtyard with mature mahogany trees serves as a focal point (Photos 13, 14). All buildings facing the courtyard have added shed-roof concrete porches extending the length of the building supported by wood posts with wood balustrades. It is unknown 4 when the porches were added, but they do not appear in a historic photograph of the courtyard (Photo 31). Despite some additions and alterations over time, the 1900s complex is still an excellent example of Danish Colonial architecture. It is currently occupied by the Department of Health for use as storage. The Knud-Hansen Tower is four-story steel-frame building with parged concrete-block infill, paired and triple fixed single-light aluminum-frame windows, aluminum-framed glass doors, and a flat roof. A metal staircase and balustrade accessed through metal fire doors on each story serves as a fire escape on the west elevation. The tower was built as part of the (former) Knud-Hansen Memorial Hospital; information provided by the applicant’s representative states the tower was built in the 1950s, but it’s possible it was part of a hospital expansion that took place in the late 1960s or early 1970s.1 (Photos 8-10) The (former) Mental Health Building is a non-descript two-story steel-frame building with parged concrete-block infill and a flat roof. It features a wrap-around caged-in catwalk on the south, east, and north elevations, fixed single-light aluminum-frame windows, and metal doors. (Photos 1-7) The first hospital was constructed under Danish rule on the island of St. Thomas in 1743. At the time, there was a considerable amount of disease and death due to the tropical climate and influx of diseases from America, Africa and Europe. The Danes went on to create a public health care system based on the Danish hierarchical pyramid model made up of public, military and private- practicing doctors, hospitals, pharmacies and midwives with the royal district doctor at the top. This system was in place between 1755-1800 and its primary purpose was to take care of the Euro- Caribbean population’s needs. This is with the exception of the health of the far-larger population of enslaved laborers, which was taken care of by plantation doctors in private practice and by the a health care system on the plantations; this part of the health care system was also subject to the oversight of the royal district doctor. After the emancipation in 1848, the health care service for the population of now free Afro-Caribbean workers did not get better, but worse since nobody wanted to pay for the system. This resulted in a decline in the number of doctors, and medical discoveries that were made in the second half of the 1800s ultimately did not reach the USVI.2 Finding historical record of public healthcare after 1900s has been challenging and is therefore spotty. A hospital complex built by the Danish government on the subject property, ca. 1900, came to be known as the Municipal Hospital. Buildings were constructed of native bluestone and had a rectangular courtyard filled with mahogany trees serving as the focal point. In addition to operating as a hospital, the facility also functioned as a nursing school where the doctors taught the nurses; the first graduating class of nurses was in 1919.3 When the U.S. acquired the territory in 1917, U.S. Navy nurses established a more formal 3-year training course at the hospital.4 1 The Congressional Record Extensions of Remarks, p. 30552, September 19, 1973. https://www.govinfo.gov/content/pkg/GPO-CRECB-1973-pt23/pdf/GPO-CRECB-1973-pt23-6-3.pdf, accessed August 21, 2020 2 https://www.virgin-islands-history.org/en/history/colonial-power/health-and-the-health-care-system/ accessed August 26, 2020 3 https://web.archive.org/web/20171014181401/http://www.visnaus.org/MainMenu/About-VISNA/Bylaws/VISNA- Bylaws.pdf accessed August 27, 2020 4 The Congressional Record Extensions of Remarks, p. 30552, September 19, 1973. https://www.govinfo.gov/content/pkg/GPO-CRECB-1973-pt23/pdf/GPO-CRECB-1973-pt23-6-3.pdf accessed August 21, 2020 5 After the United States acquired the USVI in 1917, the U.S. Navy served as territory administrator until 1931 when the Department of the Interior assumed oversight. Dr. Knud Knud-Hansen was a prominent Danish doctor during this time and, despite being dismissed along with many Danish doctors after the transfer, continued working until shortly before his death in 1951. One of his successors, Dr. John S. Moorehead began planning for a new 126-bed hospital adjacent to the 1900s hospital complex due to the bad repair of the buildings. The Knud-Hansen Memorial Hospital was dedicated in 1953 and the 1900s hospital buildings were transitioned for use primarily as out-patient clinics.5 According to an account by a former nurse at the hospital, the new hospital expanded sometime prior to 1973, although is it unknown exactly how, where, and when. It’s possible the Mental Health Building was constructed during this time to reflect developments being made in the mental health care field.6 This is supported by an article in the Interamerican Journal of Psychology which mentions architectural drawings being made in fiscal year 1965-66 for new mental health centers in the Virgin Islands.7 Since the construction of the Knud-Hansen Memorial Hospital, the 1900s hospital complex was used primarily for storage and offices, and was eventually given the name the Dr. John S. Moorehead Municipal Hospital Complex. Once the Roy L. Schneider (current) hospital opened in 1982, the memorial hospital became the Knud-Hanson Center and serves as DOH headquarters.8 The John S. Moorehead Municipal Hospital Complex is an excellent example of a grouping of Danish Colonial architecture and use of native materials and setting. It is one of few remaining government hospitals in St. Thomas and is significant for its architecture as well as its contribution to healthcare and nursing education. Although the setting has been slightly compromised with the construction of the Knud-Hansen Memorial Hospital in 1953, the presence of the more modern hospital building conveys the continued history and progression of healthcare in the USVI. The Moorehead Hospital Complex continues to retain its integrity of location, materials, design, workmanship, feeling and association; therefore, FEMA has determined the Moorhead Hospital Complex is potentially eligible for listing in the National Register under Criterion A and C. The Knud-Hansen Memorial Hospital (now Knud-Hansen Center) and (former) Mental Health Building are both non-descript examples of post-WWII hospital building. With subsequent additions and changes in materials, neither building possesses character defining features unique to a clear building style, period, or method of construction. The buildings are not the work of a master, do not display high artistic values and do not appear to be individually associated with an 5 Danish West Indian Society Newsletter, October 1976. Vagn Dyssel, Episodes from the Evolution of the Health Service in the former Danish West Indies, page 7-13. https://web.archive.org/web/20171014173607/http:/www.dwis.dk/images/Dokumenter/Medlemsblade/DVS-1976-3- OKTOBER.pdf accessed August 21, 2020 6 The Congressional Record Extensions of Remarks, p. 30552, September 19, 1973. https://www.govinfo.gov/content/pkg/GPO-CRECB-1973-pt23/pdf/GPO-CRECB-1973-pt23-6-3.pdf, accessed August 21, 2020 7 Interamerican Journal of Psychology, vol. 34, No. 2. Patricia Rhymer Todman, Eldra Shulterbrandt and the Development of Public Mental Health Services in the US Virgin Islands, p. 24 (15). file:///C:/Users/rjohns76/Downloads/28434202.pdf accessed August 27, 2020 8 Historical Perspective on Health and Health Care in the US Virgin Islands https://webcache.googleusercontent.com/search?q=cache:ommlgATisAEJ:https://www.usvihazardmitigationplan.or g/new-page-46+&cd=41&hl=en&ct=clnk&gl=vi accessed August 27, 2020 6 event or person significant in our past. Therefore, FEMA has determined that the Knud-Hansen Memorial Hospital and (former) Mental Health Building are not eligible for listing in the National Register of Historic Places. Archaeology A review of archaeological site maps and archaeological site data provided by the VISHPO did not identify any known archaeological sites within a 0.25-mile radius of the ground disturbance/demolition APE. A portion of the National Register of Historic Places-listed Charlotte Amalie Historic District boundary is located approximately 0.20 miles south of the APE (Figure 4). The USDA soil layer data characterizes the area as Urban land -Cinnamon Bay Complex (UcC), 0 to 12 percent slopes. The map unit comprises 80 percent of urban land which is disturbed soils from prior development activities. Based upon the extensive ground disturbance associated with the proposed demolition and parking lot construction at this site, it has been determined that there is low to no potential for the APE (yellow) to contain intact archaeological resources. Determination of Effect Based on VISHPO maps and historic property research and identification the undertaking to demolish the (former) Mental Health Building and build out office space in the Knud-Hansen Tower will result in No Historic Properties Affected with conditions. The undertaking to build out office space at the Dr. John S. Moorehead Municipal Hospital Complex will result in No Adverse Effect to Historic Properties with conditions. To ensure that FEMA-funded activities will not adversely affect cultural or archaeological resources, FEMA is placing the following conditions on the project for the treatment of historic properties and fortuitous finds or unexpected discoveries during ground disturbing activities within the project area: Architectural Conditions: • The wood-grained paneling proposed to replace wood tongue and groove ceiling in the ca.1900 Moorehead Hospital buildings must match appearance, scale, and profile(s) of the original. • All other historic building and structure repairs and replacements undertaken at the Dr. John S. Moorehead Municipal Hospital Complex should follow applicable Secretary of the Interior Guidelines for Preserving, Rehabilitating, Restoring and Reconstructing Historic Buildings and USVI Preservation Guidelines. Archaeological Conditions: • Prior to conducting repairs/replacement, applicant must identify the source and location of fill material and provide this information to FEMA. If the borrow pit is privately owned, or is located on previously undisturbed land, or if the fill is obtained by the horizontal expansion of a pre-existing borrow pit, FEMA consultation with the State Historic Preservation Officer will be required. Failure to comply with this condition may jeopardize FEMA funding; verification of compliance will be required at project closeout. 7 • If human remains or intact archaeological deposits are uncovered, work in the vicinity of the discovery will stop immediately and all reasonable measures to avoid or minimize harm to the finds will be taken. The applicant will ensure that archaeological discoveries are secured in place, that access to the sensitive area is restricted, and that all reasonable measures are taken to avoid further disturbance of the discoveries. The applicant’s contractor will provide immediate notice of such discoveries to the applicant. The applicant shall contact the Virgin Islands State Historic Preservation Office and FEMA within 24 hours of the discovery. Work in the vicinity of the discovery may not resume until FEMA has completed consultation with SHPO, Indigenous Population, and other consulting parties as necessary. In the event that unmarked human remains are encountered during permitted activities; all work shall stop immediately, and the proper authorities notified. • Any changes to the approved scope of work will require submission to, and evaluation and approval by, the SHPO and FEMA prior to initiation of any work, for compliance with Section 106. • According to 36 CFR § 800.1, Federal agencies should consider alternatives to avoid, minimize or mitigate any adverse effects on historic properties. FEMA proposes minimization measures to include use of specialized construction techniques to limit impacts to archaeological resources. These minimization techniques are as follows: 1. Track mounted heavy equipment must be placed on hard surfaces (asphalt, concrete, compacted gravel); if track mounted heavy equipment is located on soils or grass covered areas, the use of protective pads or steel plates is required to minimize below ground disturbance within the APE. 2. No work shall commence in wet soils. FEMA requests concurrence with this determination of effect within fifteen (15) calendar days. Should you have any questions or need additional information please contact Rebecca Johnson, SOI-qualified Historic Preservation Specialist at rebecca.a.johnson@fema.dhs.gov or (202) 769- 6008.; or Virginia Corbière at virginia.corbiere@fema.dhs.gov or (202) 805-6764. Sincerely, Virginia Corbière Environmental and Historic Preservation Advisor DR-4335 and 4340-USVI Cc: Eboni Powell, Administrative Specialist, VI SHPO David M. Brewer, Senior Archaeologist, VI SHPO Attachment: SHPO Concurrence document 8 Figure 1: APE of Knud Hansen and Moorehead Hospital Complex Figure 2: Knud Hansen and Moorehead Complex aerial site plan 9 Figure 3: Moorehead Complex Site Plan 10 Figure 4: Known historic and archaeological sites within .25 mile of demolition APE Figure 5: Proposed parking lot footprint (approximate) 11 Photo 1: Mental Health Building south elevation and junction with Knud-Hansen complex Photo 2: Mental Health Building south elevation 12 Photo 3: Mental Health Building southeast elevation Photo 4: Mental Health Building east elevation 13 Photo 5: Mental Health Building north elevation Photo 6: Mental Health Building interior 14 Photo 7: Mental Health Building interior 15 Photo 8: Knud-Hansen Tower west elevation 16 Photo 9: Knud-Hansen Tower west elevation Photo 10: Knud-Hansen Tower north elevation 17 Photo 11: Knud-Hansen Tower interior Photo 12: Knud-Hansen Tower interior 18 Photo 13: Moorehead Hospital courtyard looking NE showing buildings G, H, and I Photo 14: Moorehead Hospital courtyard looking south 19 Photo 15: Moorehead Hospital Building 2 (C) – Chemical Storage Photo 16: Moorehead Hospital Buildings 3 and 4 (D and D-1) – Payroll and Storage 20 Photo 17: Moorehead Hospital Building 4 (D-1) – Payroll Photo 18: Moorehead Hospital Building 3 (D) – Storage 21 Photo 19: Moorehead Hospital Building 5 (E) – Director’s Building 22 Photo 20: Moorehead Hospital Building 6 (F) – Communicable Disease Admin. Photo 21: Moorehead Hospital Building 7 (G) – Environmental Health looking north 23 Photo 22: Moorehead Hospital Building 7 (G) – Environmental Health looking west Photo 23: Moorehead Hospital Building 8 (H) – Vital Statistics 24 Photo 24: Moorehead Hospital Building 8 (H) – Vital Statistics looking west Photo 25: Moorehead Hospital Building 9 (I) – Communicable Disease Clinic 25 Photo 26: Moorehead Hospital Building 9 (I) – Communicable Disease Clinic (with Building 12 (L) to the left and Building 10 (J) to the right in the background) Photo 27: Moorehead Hospital Building 10 (J) – H.I.T. Building looking SE 26 Photo 28: Moorehead Hospital Building 11 (K) – Maintenance Photo 29: Moorehead Hospital Building 12 (L) – Women’s Resource Center west elevation 27 Photo 30: Moorehead Hospital Building interior ceiling Photo 31: Historic View of Moorehead Hospital Building/Courtyard (unknown source and date) FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 24 ATTACHMENT B. MITIGATION PLANS a. Asbestos • Old Mental Health Building • Hospital (pending) • Tower P. O. Box 308744, St. Thomas, USVI 00803 Tel. (340) 642-6665 www.onsitepr.com E n v i r o n m e n t a l R e s t o r a t i o n S p e c i a l i s t s ASBESTOS CONTAINING MATERIALS SURVEY THE KNUD HANSEN TOWER BUILDING 1303 HOSPITAL GROUND CHARLOTTE AMALIE, ST. THOMAS, USVI Prepared for: Ms. Bria D. James DOH Healthcare Project Manager Division of Project Management & Capital Projects VI Department of Health St. Croix, USVI April 8th, 2024 ASBESTOS CONTAINING MATERIALS SURVEY THE KNUD HANSEN TOWER BUILDING 1303 HOSPITAL GROUND CHARLOTTE AMALIE, ST. THOMAS USVI Prepared for: ON-SITE ENVIRONMENTAL, INC. Prepared by: INTEGRATED GLOBAL SOLUTIONS APRIL 8, 2024 Table of Contents I. Summary II. Introduction III. General Background IV. National Emissions Standards for Hazardous Air Pollutants (NESHAP) V. Project Identification/Description VI. Methods of Building Inspections VII. Sampling Methods VIII. Inspection Results IX. Conclusions X. Conditions, Limitations and Disclaimer XI. Appendixes Appendix I. Accreditations Appendix II. General View of Inspected Structures Appendix III. Laboratory Analysis Report Appendix IV. Summary of Asbestos Positive Results Appendix V. Positive ACM Presence Pictures I. Summary An environmental survey for Asbestos Containing Materials (ACM) was conducted by Integrated Global Solutions under contract by On-Site Environmental, Inc. on April 8, 2024, for The Knud Hansen Tower Building. Four (4) story building located at 1303 Hospital Ground, Charlotte Amalie, St. Thomas USVI. The purpose of this survey included sampling and physical evaluations of suspicious ACM material and to identify ACM on the structure scheduled for demolition or renovation. This survey report can help owners develop a plan for eliminating any asbestos hazards that were found and may aid in establishing ongoing asbestos containing materials maintenance and re-evaluation program, if needed. ASBESTOS WERE FOUND IN SAMPLED MATERIALS AT THE TIME OF THE SURVEY. SEE APPENDIX IV FOR DETAILS. II. Introduction An environmental survey for Asbestos Containing Materials (ACM) was conducted by Integrated Global Solutions under contract by On-Site Environmental, Inc. on April 8, 2024, for The Knud Hansen Tower Building. Four (4) story building located at 1303 Hospital Ground, Charlotte Amalie, St. Thomas USVI. The asbestos investigation was conducted by Miguel A. Cortés Santiago an AHERA Certified Asbestos Building Inspector (License number ASB-0523-0231-SI) III. General Background Asbestos was used in the construction industry from 1900 to 1989. It is still used today in various products. The health effects of asbestos have been studied since the 1930’s. More health studies have been conducted in asbestos than any other natural substance. The mere presence of asbestos containing materials does not necessarily constitute a health hazard. However, when these materials become disturbed from building renovation, maintenance, or other everyday activity that allows fibers to be released into the environment, then a potential hazard does exist. The relationship between exposure level and health risk is very complex. Although this relationship is not completely understood, asbestos exposure has been associated with various types of lung diseases including a debilitating disease called asbestosis; a rare cancer of the chest called mesothelioma; and cancers of the esophagus, stomach, colon and other organs. Asbestos is not fatal; it is, however, incurable. One who has it cannot breathe easily and physical activity becomes limited. Mesothelioma is 100% fatal, as there is no cure. These diseases can be directly linked to the mineral of asbestos in the particle form that can be found in the lining of the lung and stomach, since the body cannot absorb these minerals. Tests have determined that asbestos can cause cancer, but scientists disagree on the amount of asbestos fibers that must be inhaled to cause cancer. The nose filters out all visible particles. Therefore, only microscopic fibers are the ones who cause the problem. Studies indicate different health effects resulting from exposure to chrysolite asbestos versus exposure to amphibole form of asbestos. The latter, which include tremolite, amosite, anthophyllite and crocidolite have more significant health impact than chrysolite. Some scientists’ studies concluded that the dimensions of the fiber which ones enter in the lung area, resulting in cancer. Long, thin fibers, greater than 8 microns in length and less than 0.25 microns in diameter show the highest potential of cancer development. IV. National Emissions Standards for Hazardous Air Pollutants (NESHAP) The EPA’s rules concerning the application, removal and disposal of ACM, as well as manufacturing, spraying and fabricating of ACM were issued under the asbestos NESHAP regulation, under the 40 CFR 61 Subpart M on October 30, 1997. The asbestos NESHAP regulation governs asbestos demolition and renovation projects in all facilities. The NESHAP rule usually requires owners or operators to have all friable ACM removed before the building is demolished and may require its removal before renovation. If friable ACM shall be disturbed, the NESHAP rule may require appropriate work practice, or procedures for emission control. The rules state that any ACM which may become friable poses a potential hazard that should be addressed. A revised NESHAP ruling released on November 20, 1990 (effective on February 20, 1991) which includes the responsibility of the owner, or operator, to “prior to commencement of the demolition or renovation, thoroughly inspect the affected facility or part of the facility where demolition or renovation operation will occur for the presence of asbestos, including Category I and Category II non-friable ACM” (40 CFR Part 61, National Emission Standard for Hazardous Air Pollutants, Asbestos NESHAP revision, Final Rule, November 20, 1990). V. Project Description / Identification This project consists of ACM survey for The Knud Hansen Tower Building. Four (4) story building located at 1303 Hospital Ground, Charlotte Amalie, St. Thomas USVI. VI. Method of Building Inspection The visual inspection was conducted according to the condition of ACM in that location and the potential for material disturbance. The assessment scheme followed the recommendations by EPA as a result of the Asbestos Hazard Emergency Response Act and outlined in the 40 CFR Part 763.88 dated October 30, 1987, and amended by 40 CFR Part 61, NESHAP (40 CFR Part 61, National Emission Standard for Hazardous Air Pollutants, Asbestos NESHAP revision, Final Rule, November 20, 1990). The functional space was visited and visually inspected to identify the location of any suspected ACM. An assessment was then made of the friability of suspected ACM by touching the material to determine if it could be pulverized, crumbled or reduced to powder by hand pressure. Upon completion of the suspect material and grouped into “homogenous sampling areas”, i.e., areas which are uniform by color, texture, construction/application date and general appearance. ACM was categorized as follow: 1. Category I, non-friable containing materials (ACM). This includes asbestos containing packings, gaskets, resilient floor covering and asphalt roofing products containing more than 1% asbestos. 2. Category II, non-friable ACM. This includes any materials, excluding Category I non- friable ACM containing more than 1% asbestos, that when dry cannot be crumbled, pulverized or reduced to powder by hand pressure. 3. Friable asbestos materials. This includes any material containing more than 1% asbestos that, when dry, can be crumbled, pulverized or reduced to powder by hand pressure. Physical hazard assessment was performed based on AHERA regulations. This protocol provides separate analysis for three types of materials: surfacing, thermal insulation and miscellaneous. However, this protocol does not provide a means for relative ranking of individual hazards within the category. Therefore, a separate analysis was performed to assess hazard ranking which could be used for this type of material. The hazard assessment combines the level of potential disturbance with the current condition of ACM to indicate overall hazard potential. The rankings of potential hazards range from 1-most hazardous to 7-least hazardous. The highest rank is reserved for ACM, which is significantly damaged. A review of the definition of “significant damage” reveals that the definitions are designed to identify ACBM, which is so extensively damaged or deteriorated, that requires immediate corrective action. Hazard rank 2-4 reflects ACBM, which is damaged as defined AHERA, with rank 2 indicating a “potential for significant damage” and rank 3 indicating a “potential for damage”. Hazard ranks 5-7 are reserved for ACBM currently in good condition, but with a range in the likelihood for future disturbance. VII. Sampling Methods An asbestos survey was conducted for suspected ACM for The Knud Hansen Tower Building. Four (4) story building located at 1303 Hospital Ground, Charlotte Amalie, St. Thomas USVI. VIII. Conclusions ASBESTOS WERE FOUND IN SAMPLED MATERIALS AT THE TIME OF THE SURVEY. IT IS RECCOMENDED TO HIRE THE SERVICES OF AN ASBESTOS ABATEMENT LICENSE ENTITY TO REMOVED THE BLACK MASTIC HAZARD AND PRESENT TO THE REGULATOR, VI DPNR A WORK PLAN. IX. Conditions, Limitations and Disclaimer Integrated Global Solutions has performed this Asbestos Containing Materials Survey in a thorough and professional manner consistent with commonly accepted industry standards. The preparer cannot guarantee and does not warrant this evaluation has identified all adverse environmental factors and/or conditions affecting this property on the date of the survey. The results reported and conclusions reached by the preparer are solely for the benefit of the owner. The results and opinions in this report, based solely on the conditions found at the property on the date of the survey, are valid only on that date. The preparer assumes no obligation to advise the owner of any changes in any real or potential lead base paint hazards all this facility beyond the date of the survey. APPENDIX I. ACCREDITATIONS APPENDIX II. GENERAL VIEW OF INSPECTED STRUCTURE APPENDIX III. LABORATORY ANALYSIS REPORT APPENDIX IV. SUMMARY OF ASBESTOS POSITIVE RERSULTS 6,000 Notes Asbestos found in black mastic Asbestos found in black mastic Asbestos found in black mastic Asbestos found in black mastic Sample ID STT-040924-HA1-01 STT-040924-HA1-02 STT-040924-HA1-03 STT-040924-HA1-04 AESI AESI AESI AESI PLM PLM PLM PLM IGS IGS IGS IGS Apr-9-24 Apr-9-24 Apr-9-24 Apr-9-24 Chrysotile No No No No >1%-10% >1%-10% >1%-10% >1%-10% All Floor All Floor All Floor All Floor Elevator Lobby Room 907 Room 904 Room 806 3 Four Three Three Two 3 4 3 Floor Tiles/ Cream Floor Tiles/ Cream Floor Tiles/ Cream Floor Tiles/ Cream Knud Hansen Tower Bldg Consultant Method Lab Knud Hansen Tower Bldg Knud Hansen Tower Bldg Knud Hansen Tower Bldg Location Approx Quantity (SF) Sample Content Asbestos Type Friable Sample Date Location Material Type/ Color Material Texture Asbesto Results (%) Floor Designation Material Location Smooth Smooth Smooth Chrysotile Chrysotile Chrysotile Smooth APPENDIX V. POSITIVE ACM PRESENCE PICTURES FLOORS 2, 3, 4; VYNIL FLOOR TILES WITH BLACK MASTIC; CREAM; APPROX. 6,000 SF FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 25 ATTACHMENT C. CD DRAWINGS, REPORTS, PLANS, AND SURVEYS • OLD MENTAL HEALTH BUILDING – 60% DEMOLITION DRAWINGS • KNUD HANSEN DHS BUILDINGS AND EQUIPMENT – 60% DEMOLITION DRAWINGS • KNUD HANSEN DOH TOWER – 60% DEMOLITION DRAWINGS • KNUD HANSEN BUILDINGS & EQUIPMENT – 30% CONSTRUCTION DOCUMENTS • KNUD HANSEN DOH TOWER – 30% CONSTRUCTION DOCUMENTS FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 26 ATTACHMENT D. AGENCY APPROVALS • DPNR o Applications to be Submitted:  Building (Commercial Building Permit) • Demolition (includes Hazardous Material Review) • Earth Change • TPDES  Coastal Zone Management • Federal Consistency o Pre-Application Meeting – Mtg. Held 2/11/2026 o Federal Consistency Determination • VI Fire and Emergency Medical Services o Applications to be Submitted:  Plan Review/Approval • Waste Management (during construction Owner/GC will coordinate) o Approvals Not Yet Received  Public Sewer Connection • Department of Public Works o Applications to be Submitted:  Driveway Permit  Road Excavation Permit FEDERAL CONSISTENCY APPLICATION SUBMITTAL PACKAGE ODR TASK #2020-03 ODR TASK #010-9-101918 ODR TASK #010-8-101472 US VIRGIN ISLANDS KNUD HANSEN COMPLEX MENTAL HEALTH BUILDING DEMOLITION AND PARKING AREA (DOH) BUILDING AND EQUIPMENT (DHS) TOWER REPLACEMENT (DOH) P a g e | 27 ATTACHMENT E. PHOTOGRAPHS Existing Conditions X X X GENERAL DEMOLITION NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEETS G005-G007 FOR PICTURES OF EXISTING CONDITIONS. EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH OLD MENTAL HEALTH BUILDING SCOPE DOH KNUD HANSEN TOWER SCOPE (FUTURE PHASE - SCOPE NOT NOTED IN THIS DRAWING SET) DHS KNUD HANSEN BUILDING SCOPE (FUTURE PHASE - SCOPE NOT NOTED IN THIS DRAWING SET) TEMPORARY CONSTRUCTION FENCING KEYPLAN REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER G005 10/27/2025 JT TKB 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 OLD MENTAL HEALTH BUILDING DEMOLITION REFERENCE PHOTOS 60% DEMOLITION DRAWINGS 470-21-34 2020-03 10.15.25 No. Description Date 5 4 5 3 1 2 6 4 3 1 2 6 X X X GENERAL DEMOLITION NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEETS G005-G007 FOR PICTURES OF EXISTING CONDITIONS. EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH OLD MENTAL HEALTH BUILDING SCOPE DOH KNUD HANSEN TOWER SCOPE (FUTURE PHASE - SCOPE NOT NOTED IN THIS DRAWING SET) DHS KNUD HANSEN BUILDING SCOPE (FUTURE PHASE - SCOPE NOT NOTED IN THIS DRAWING SET) TEMPORARY CONSTRUCTION FENCING KEYPLAN REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER G006 10/27/2025 JT TKB 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 OLD MENTAL HEALTH BUILDING DEMOLITION REFERENCE PHOTOS 60% DEMOLITION DRAWINGS 470-21-34 2020-03 10.15.25 No. Description Date 3 4 3 1 2 1 2 4 X X X GENERAL DEMOLITION NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEETS G005-G007 FOR PICTURES OF EXISTING CONDITIONS. EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH OLD MENTAL HEALTH BUILDING SCOPE DOH KNUD HANSEN TOWER SCOPE (FUTURE PHASE - SCOPE NOT NOTED IN THIS DRAWING SET) DHS KNUD HANSEN BUILDING SCOPE (FUTURE PHASE - SCOPE NOT NOTED IN THIS DRAWING SET) TEMPORARY CONSTRUCTION FENCING KEYPLAN REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER G007 10/27/2025 JT TKB 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 OLD MENTAL HEALTH BUILDING DEMOLITION REFERENCE PHOTOS 60% DEMOLITION DRAWINGS 470-21-34 2020-03 10.15.25 No. Description Date 1 4 5 3 2 4 5 3 1 2 X X X KEYPLAN 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. GENERAL DEMOLITION NOTES EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D005 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E DEMOLITION REFERENCE PHOTOS 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 01 01 13 DHS KNUD HANSEN BUILDING - NORTH FACADE (B) DHS KNUD HANSEN BUILDING - NORTH FACADE (A) DHS KNUD HANSEN BUILDING - EAST FACADE (C) DHS KNUD HANSEN BUILDING - EAST FACADE (D) 01 13 DHS KNUD HANSEN BUILDING - EAST FACADE AERIAL DHS KNUD HANSEN BUILDING - SOUTH FACADE (I) DHS KNUD HANSEN BUILDING - SOUTH FACADE (H) DHS KNUD HANSEN BUILDING - SOUTH FACADE (G) DHS KNUD HANSEN BUILDING - EAST FACADE (E) DHS KNUD HANSEN BUILDING - WEST FACADE AERIAL DHS KNUD HANSEN BUILDING - WEST FACADE (J) 01 01 01 01 13 01 01 01 01 02 02 02 02 B A C D E G H I J K DHS KNUD HANSEN BUILDING - HEADSTART PLAYGROUND (D) 13 01 # KEYNOTES - DEMOLITION # DESCRIPTION 01 DEMOLISH EXISTING BUILDING TO PROVIDED EXTENTS INCLUDING ROOF STRUCTURE, EXTERIOR AND INTERIOR WALLS, WINDOWS, DOORS, FLOORS AND FLOOR SLABS, ALL BUILDING UTILITIES: PIPING, DUCTWORK, ELECTRICAL, FIXTURES AND DEBRIS DOWN TO SOIL (TYPICAL) 02 DEMOLISH EXISTING SIDEWALKS, STAIRS, RAMPS, AND RAILINGS TO GRADE 13 MAINTAIN HISTORIC STRUCTURE No. Description Date X X X KEYPLAN 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. GENERAL DEMOLITION NOTES EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D006 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E DEMOLITION REFERENCE PHOTOS 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR # KEYNOTES - DEMOLITION # DESCRIPTION No. Description Date X X X KEYPLAN GENERAL DEMOLITION NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D005 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DOH TOWER DEMOLITION REFERENCE PHOTOS 60% DEMOLITION DRAWINGS 470-23-50 010-8-101472 10/15/2025 CONTEXTUAL AERIAL, DOH KNUD HANSEN TOWER NORTH FACADE, DOH KNUD HANSEN TOWER SOUTHEAST FACADE, DOH KNUD HANSEN TOWER SOUTH FACADE, DOH KNUD HANSEN TOWER EAST FACADE, DOH KNUD HANSEN TOWER WEST FACADE, DOH KNUD HANSEN TOWER WEST FACADE & ROOF, DOH KNUD HANSEN TOWER WEST FACADE & ADJACENT STRUCTURES, DOH KNUD HANSEN TOWER ADJACENT STRUCTURES, DOH KNUD HANSEN TOWER SOUTHWEST FACADE, DOH KNUD HANSEN TOWER BETWEEN HISTORIC STRUCTURE & TOWER, DOH KNUD HANSEN TOWER WEST FACADE STAIR TOWER, DOH KNUD HANSEN TOWER # KEYNOTES - DEMOLITION # DESCRIPTION 01 DEMOLISH EXISTING BUILDING TO PROVIDED EXTENTS INCLUDING ROOF STRUCTURE, EXTERIOR AND INTERIOR WALLS, WINDOWS, DOORS, FLOORS AND FLOOR SLABS, ALL BUILDING UTILITIES: PIPING, DUCTWORK, ELECTRICAL, FIXTURES AND DEBRIS DOWN TO SOIL (TYPICAL) 07 DEMOLISH EXISTING ELEVATOR SHAFT 09 DEMOLISH EXISTING METAL STAIR STRUCTURE TO GRADE 09 09 07 01 01 01 No. Description Date