S. HRG. 115–492 HURRICANE RECOVERY EFFORTS IN PUERTO RICO AND THE U.S. VIRGIN ISLANDS HEARING BEFORE THE COMMITTEE ON ENERGY AND NATURAL RESOURCES UNITED STATES SENATE ONE HUNDRED FIFTEENTH CONGRESS FIRST SESSION NOVEMBER 14, 2017 ( Printed for the use of the Committee on Energy and Natural Resources Available via the World Wide Web: http://www.govinfo.gov HURRICANE RECOVERY EFFORTS IN PUERTO RICO AND THE U.S. VIRGIN ISLANDS U.S. GOVERNMENT PUBLISHING OFFICE WASHINGTON : 28–093 2019 S. HRG. 115–492 HURRICANE RECOVERY EFFORTS IN PUERTO RICO AND THE U.S. VIRGIN ISLANDS HEARING BEFORE THE COMMITTEE ON ENERGY AND NATURAL RESOURCES UNITED STATES SENATE ONE HUNDRED FIFTEENTH CONGRESS FIRST SESSION NOVEMBER 14, 2017 ( Printed for the use of the Committee on Energy and Natural Resources Available via the World Wide Web: http://www.govinfo.gov (II) COMMITTEE ON ENERGY AND NATURAL RESOURCES LISA MURKOWSKI, Alaska, Chairman JOHN BARRASSO, Wyoming JAMES E. RISCH, Idaho MIKE LEE, Utah JEFF FLAKE, Arizona STEVE DAINES, Montana CORY GARDNER, Colorado LAMAR ALEXANDER, Tennessee JOHN HOEVEN, North Dakota BILL CASSIDY, Louisiana ROB PORTMAN, Ohio LUTHER STRANGE, Alabama MARIA CANTWELL, Washington RON WYDEN, Oregon BERNARD SANDERS, Vermont DEBBIE STABENOW, Michigan AL FRANKEN, Minnesota JOE MANCHIN III, West Virginia MARTIN HEINRICH, New Mexico MAZIE K. HIRONO, Hawaii ANGUS S. KING, JR., Maine TAMMY DUCKWORTH, Illinois CATHERINE CORTEZ MASTO, Nevada BRIAN HUGHES, Staff Director PATRICK J. MCCORMICK III, Chief Counsel ISAAC EDWARDS, Senior Counsel MARY LOUISE WAGNER, Democratic Staff Director SAM E. FOWLER, Democratic Chief Counsel DAVID GILLERS, Democratic Senior Counsel (III) C O N T E N T S OPENING STATEMENTS Page Murkowski, Hon. Lisa, Chairman and a U.S. Senator from Alaska ................... 1 Cantwell, Hon. Maria, Ranking Member and a U.S. Senator from Wash- ington .................................................................................................................... 15 WITNESSES Rossello´ Nevares, Hon. Ricardo, Governor, Commonwealth of Puerto Rico ....... 17 Mapp, Hon. Kenneth E., Governor, United States Virgin Islands ...................... 125 Walker, Hon. Bruce J., Assistant Secretary, Office of Electricity Delivery and Energy Reliability, U.S. Department of Energy ......................................... 136 Jackson, Major General Ed, Deputy Commanding General, Civil and Emer- gency Operations, U.S. Army Corps of Engineers ............................................. 149 Ramos, Ricardo, Executive Director, Puerto Rico Electric Power Authority ...... 187 Rhymer, Sr., Julio A., Executive Director and Chief Executive Officer, Virgin Islands Water and Power Authority ................................................................... 194 Roma´n Morales, Jose´, Acting Chairman, Puerto Rico Energy Commission ....... 200 Jaresko, Natalie, Executive Director, Financial Oversight and Management Board for Puerto Rico .......................................................................................... 213 ALPHABETICAL LISTING AND APPENDIX MATERIAL SUBMITTED Cantwell, Hon. Maria: Opening Statement ........................................................................................... 15 Clean Energy Business Network: Statement for the Record ................................................................................. 288 Institute for a Competitive and Sustainable Economy in Puerto Rico: Letter for the Record ........................................................................................ 290 Jackson, Major General Ed: Opening Statement ........................................................................................... 149 Written Testimony ............................................................................................ 151 Responses to Questions for the Record ........................................................... 252 Jaresko, Natalie: Opening Statement ........................................................................................... 213 Written Testimony ............................................................................................ 215 Responses to Questions for the Record ........................................................... 286 Manchin III, Hon. Joe: Article by Frances Robles for The New York Times dated November 12, 2017, entitled, ‘‘The Lineman Got $63 an Hour. The Utility Was Billed $319 an Hour.’’ ................................................................................... 176 Mapp, Hon. Kenneth E.: Opening Statement ........................................................................................... 125 Written Testimony ............................................................................................ 128 Responses to Questions for the Record ........................................................... 239 USVI—Cost Summary ..................................................................................... 292 Page IV Mapp, Hon. Kenneth E.—Continued USVI—Request for Disaster Recovery Support ............................................. 293 USVI—Summary of Tentative CDL Estimates .............................................. 296 AECOM Summary of Preliminary Damage Assessments for Task Orders 001 thru 004, dated November 13, 2017 ..................................................... 297 Murkowski, Hon. Lisa: Opening Statement ........................................................................................... 1 Photo of a solar field in Puerto Rico ............................................................... 3 Photo of hurricane impact on solar panels in a field in the U.S. Virgin Islands ............................................................................................................ 5 Photo of damage to apartment buildings in St. Thomas, USVI ................... 7 Photo showing the blue tarps in Puerto Rico ................................................. 9 Photo showing a road taken out by a landslide in Barranquitas, Puerto Rico ................................................................................................................. 11 Photo of wind turbines in Southeast Puerto Rico .......................................... 13 Ramos, Ricardo: Opening Statement ........................................................................................... 187 Written Testimony ............................................................................................ 190 Questions for the Record .................................................................................. 257 Rhymer, Sr., Julio A.: Opening Statement ........................................................................................... 194 Written Testimony ............................................................................................ 196 Responses to Questions for the Record ........................................................... 260 Roma´n Morales, Jose´: Opening Statement ........................................................................................... 200 Written Testimony ............................................................................................ 202 Responses to Questions for the Record ........................................................... 261 Rossello´ Nevares, Hon. Ricardo: Opening Statement ........................................................................................... 17 Written Testimony ............................................................................................ 20 Questions for the Record .................................................................................. 235 Thomas USAF Group: Letter for the Record ........................................................................................ 326 VOCES: Statement for the Record ................................................................................. 328 Walker, Hon. Bruce J.: Opening Statement ........................................................................................... 136 Map of Puerto Rico Electric Power Authority Electric System Operation Division—Transmission Lines 115 kV–230 kV .......................................... 137 Chart of Palo Seco Generation Plant outlining the installation of tem- porary generators by the U.S. Army Corps of Engineers .......................... 139 Photos showing transmission towers on mountainous terrain ..................... 141 Photo showing damaged transmission towers ............................................... 144 Written Testimony ............................................................................................ 146 Responses to Questions for the Record ........................................................... 243 (1) HURRICANE RECOVERY EFFORTS IN PUERTO RICO AND THE U.S. VIRGIN ISLANDS TUESDAY, NOVEMBER 14, 2017 U.S. SENATE, COMMITTEE ON ENERGY AND NATURAL RESOURCES, Washington, DC. The Committee met, pursuant to notice, at 9:33 a.m. in Room SD–366, Dirksen Senate Office Building, Hon. Lisa Murkowski, Chairman of the Committee, presiding. OPENING STATEMENT OF HON. LISA MURKOWSKI, U.S. SENATOR FROM ALASKA The CHAIRMAN. Good morning, everyone. The Committee will come to order. We are here this morning to review ongoing recovery efforts in Puerto Rico and the U.S. Virgin Islands (USVI) in the wake of Hur- ricanes Irma and Maria as well as efforts to rebuild the electric grids on those islands in a smarter and, hopefully, a more resilient manner. We are now over two months removed from when Hurricane Irma devastated St. Thomas and St. John on September 6, and it has been nearly 60 days since Hurricane Maria hit St. Croix and Puerto Rico. It was just a little over a week ago that Senator Cas- sidy, Senator Franken and I, along with Senator Carper, who was just here, and Senator Harris as well as some of our House col- leagues, visited both St. Thomas and Puerto Rico. I want to thank both Governor Rossello´ and Governor Mapp for your hospitality and the time you gave us during that visit. It was incredibly important, I think, for all of us to see, to be on the ground, and to be hearing directly from you and those you are working with. I know that some other members of our Committee have traveled to Puerto Rico previously, and I thank them for that as well. What I think we certainly observed is that the destruction is still very, very evident. When you consider the totality of the recovery work that still needs to be done, I think in a word it can be said that it is ‘‘overwhelming.’’ It is one of those ‘‘where do you even begin’’ moments, and I think we certainly felt that in Puerto Rico. We felt that in the USVI. I mentioned when we were in Puerto Rico that I have seen my share of natural disasters, but really nothing like this. Nothing like the scale that you see when you see an entire island that has been devastated. As we had an opportunity to be up in the air and fly over some of the impacted areas in Puerto Rico, it seemed like we never left 2 an area that had not been, not only hit, but devastated in terms of the impact. We have put some posters up on the dais here. Over to my left here is a solar field that we flew over in Puerto Rico. You can see, closer to the front, the panels that remained intact and, while the resolution is not that good, the impact to the arrays in the back. It just looked like somebody smashed through them. [The information referred to follows:] r : . - x cc . a : : = t ee 2 at a Ay su? z iS i ‘ ‘ a a eS se _ “ - = As 8S as 7 ie 4 th * EM a f + / ‘ oy a a FS . : ne : \ i “ i SN ' ae a : x y x 1 Ny fr ny m: \ a x 1 i y me iS ue A ‘ RNG oi ( . i a t ‘ Sl if ce A ms es i on e ag nh ‘ i ef a a iH F j aR i i. ie we AG * y 4 ‘ a oe ms ey \ ae s x 2 a ws x a MY Me . ac ay i a = ‘i 4 ‘ : wi au ‘ 4 Ne a a x ‘ = _ ‘ a wh a t NM << ‘ x > ~ y * i 4 In front of Senator Cantwell, here, are solar panels—a field we saw when we were in the USVI driving by, but again seeing the impact there. [The information referred to follows:] a . a = e . se : - ce = —— : a ee ~ c _ c _ - _ = mn - _ - 4 o - — = \ . | a. oo “ . . S x . } . | = cc . cc . 2 . a = . - . a ~ : . : . . . ¥ . iS S a a - = : . uo o / Ke a \ . . = a . os a ee ne oO - ans . i a“ a _ . . ‘ ra aS A a x co oS x > “ a ae “ a a nN a x - \ ANS \ ne k in t We cs . ‘ 4 x iN aN ae x x ih < ve Ni ‘ : : o x Res $ . " ‘ i : Fs \ ‘ i : : : i aN \ ok i i ‘ aN a ‘ xi eg me / ‘i 0 in ‘ n 4 A ‘ ae : oe md ‘ 4 3, i ae uh « 3 “i ie © = a * . “ \ 4 . : SS ; s Oe ae ms a = = _. » = 5 = 2 \ ae i 2 : 6 Right below Senator Cortez Masto, there is a picture of some apartments that we drove by in St. Thomas, where the buildings had been blasted through from one side to the other—so a clean sweep through these apartment buildings. It was just extraor- dinary. [The information referred to follows:] = ee = Et ~ . oS ey P su - a = = R = . 250 i < . . ce : ue : = +1 a < a ah a) : aa ie . ae : : . 8 : . a a : a = ay ny i . . ae a i . S S Se = . 3 ‘ @ ot BS = ~ = ue : x 8 an “ HA . a ee ~ i ee " a < TES | fe o 4 * = eS a x = . ie Mi : | —— d = a s is - ) “ = i we x Sy Ss SS SN cents ce x < AY i a ae < oN iS Zi a ay Re a whe ih eS ene « ct Bs ii) a a co iy a a es < ay ow BS e e oo ay 4 i « : x : . x AN a ES a a . \ x ‘ x " < : ae x x AG ms A Bs ey = x ce ss ws RS < Sin att S = on eS x cS ss c a is & Y - ay a i 5 ‘ ‘ RS mM ; A ae = « “ “ i : SA zi in ae ‘ is AG } i Ny ee ase A i wal So Se = 3 i \ it se . ae aN \ a & ee of a u ‘ la ie aN 4 i S . © & ‘* sae ARS Soa > . 2. « ‘ . ‘ s at os & i = ® 3 ¥ q hy ‘ at = te <4 : = oS ne < = aN S eS — aS = . ~ © aes 5 = a xX AS : a s} = 3 ‘ ? . = = ia "e oe . . ~ ne = S aS - & ay a mS “ — x = : = . - > = . - Ss < 4 . < . e . - ‘ - - - ~ - = . - < = 2 - » = = Se << AS . - — . ~ . - - — - - - . — = a S08 — 8 Below Senator Heinrich there, you can see some of the devasta- tion again in Puerto Rico. The blue tarps are certainly coming to be a symbol of the devastation that we see post-hurricane, not just here in the Caribbean, but certainly as we have seen the devasta- tion following Harvey in Houston and in Florida. I think you can see just how these properties have been impacted in a way, and in a manner, that is just, again, devastating. [The information referred to follows:] 4 ss 3 4 < x u oe A Ts a a an \ rl . SS xe MS nae a a it Tha NG : ae 4 x are oh cate An \ R ey eee Nh iS ay) * oe es 3 “ 4 i Rw ie ae i a eh + S t Ne ae A \* Te ¥ & a ae = i - ee: ae a \ x a a 10 Below Senator Franken is an area that we toured where the road had been taken out by landslide. Not only did we see this par- ticular scene, but another area where the only access to some 200 roads had been cutoff by horrible landslides, stranding homes on the other side. We had an opportunity to visit with a young woman whose home was on the other side and she had not been able to visit her home since the hurricane had happened—a very, very touching story, one that I think all of us will remember for a long time. [The information referred to follows:] 11 . = = me : = = - ee . - 28, J . = ae me Y x . =" of < SS ~ S 2 N ne . cr at = . nS ww x ‘ i ‘ a MG ue ag Ss i Cn . AS ee is “ ss Ay % a “ if ‘ Ne . Ae NG ‘ a = ¥ a ‘at NG £ We oh uy . a ——et ‘ ee ar uh my ea ~ — Sia ‘ . OG ey, x : re oy % " " is cy eal a ‘J as ey a ¥ i a eu Sa. SN s ie Nt x - as iy ‘ a eS ‘ a8 A “i A ve & ao ey Sy ie S sq th 4 fi RAR y “ ‘ ie es iY ee \ ms e J e © BSCE a i, i AN oh a ae oN = ‘ae nate [ * Ss i. 4 NA EY — ‘ « : = “ Se ee ney ‘ * = S 2 & a 5 a . Re x & y . = a s: 2 y - wy 4 =3 < oh Ae o nN mal . FR " = ae AG ne eS s o = = ne = < = . ee = a & a ~ 3 aS & Pee, a — on o . = a . ¥. < a i e a tat of < Bes = = x & = o = So eh = a a = “ ae © 12 But I think we also recognize that while we were in Puerto Rico looking at the damage from the landslides and appreciating that, particularly in the interior where you have such mountainous areas, this is still the rainy season. And with the number of trees that have been taken down, the slope stability during the rainy months is very uncertain. The damage that we are seeing today may not be the damage that we are dealing with in days and weeks from now knowing that more can happen. So again, very, very, very sobering. And when you look at this and realize that these pictures were taken just last week, it is clear evidence that there is much, much, much to do. [The information referred to follows:] 13 i FSG = < i ~ . . = . ee : . . o ay oo x = = = - e ie : at me . = 4 ‘ ‘ = ¥ a = A : x 4 & ‘ . - . f . . x a a i : . . . - : ~ — . : . . a : a . = \ < 4 : S . ae y . i ce < a an ‘ S s : & ‘ a - y e oy 4 ~ 2 S a a iS & a0 : ae a i = 4 ny - Be ve : ut i x 3 RN ae a e a i ‘ . uae a oe ‘ ~ A SS ‘ * ‘ 4 a ‘ = : i te ‘ a o * i a i x a a ‘ & \ NN i ‘ 3 Mh a oe ‘ ii x ya 4 oS y a i my ‘ yt & : ‘ i a a nt x s ae is ‘N = a ‘i © “ 1 i ‘i i ty * y \ es ial es * ‘ ! N i ty ee ey ag { ‘ a i i ~ a oe “ Nor ‘ cass . as x 4 “ ‘i » vr 0 x 4 \ ae y ‘ a i ry ; a ‘es, i : z ne ‘ r . : N as Ns % ¥ . s A “ ve a a: : a es He an ie 2 is a HA a e y \. sf e . \ Mi < < q yy pS ‘ y ss < on : a ey a 3 Y ay i \ a S « a e o . at : Ss S S N ‘ o a oS a cee < rh 4 x wy a si f is = eo n “ a . a © Kee . “ Ke . os < + x Wy - A 4 < 2 4 © ‘ “ a : - . = < - ‘ ne . “ : 2 as : 4 ~ ag ‘ ~ . a : es : < 4 e < = . . . = = < S . ‘ oS at = . a a a = : 5 : : x a aS . - 7 x : . . : - i = = . - a . i . a . : i . . s - eos u iv a a : > 2 a : “= : . = . . . . - . = Z = _ . = = . ‘ c = = - . 2 = ~ an % 14 But as daunting as the recovery effort is, I think it is matched by the spirit of those who live on the islands. And we saw that; we felt that. I don’t know whether I am doing some promoting here or not, but while we were over there in Puerto Rico, we were reminded that there is a resiliency in the people. Members have been given a can of soda this morning that was manufactured and bottled in Puerto Rico with the hashtag that says, Fuerza Puerto Rico, which is ‘‘Puerto Rico Strong’’. I thought that was pretty cool, that even in the midst of all this they were coming together. They were working to remind each of us of the resiliency of the people of Puerto Rico, the people of the U.S. Virgin Islands, that this is their home and to reinforce our commitment to our fellow Americans that we need to do what we can to help rebuild these islands. Today’s hearing will also look at ways to make the electric grids on the islands more resilient to future storms. I think we all agree that it makes no sense to spend hundreds of millions of dollars in Stafford Act funding to rebuild these grids to pre-storm conditions, as the Stafford Act currently requires. Puerto Rico’s electric grid was already antiquated before the storms hit. So you really have to ask the question, why? Why would we rebuild it to that stand- ard? I think that there is broad agreement. I have talked with col- leagues in the other body and the other side of the aisle here. Con- gress needs to provide greater flexibility in how Stafford Act funds can be used. I am certainly going to work with my colleagues and the Administration to help implement that change. We also know that more hurricanes will impact the islands in the years to come. We are going to see poles that will break, lines that will come down and roads and bridges that will wash out. Residents will face flooding and mudslides. Communities will be disconnected from each other and from a central grid. And, you know, some of that is the reality of living on an island in a tropical location. But, again, the question that we need to be probing is, what can we do about it now? Right now. Right now. Restoring electricity is the immediate priority. It has been out for far too long, and it is harming the health of both local residents and their economy. When I say health, I think about things like mental health. Think about being without power for 60 days plus. Think about what that means. We see pictures of kids who are trying to do their home- work using the little flashlight on their cell phones. But in Puerto Rico where we were, their schools were not open. Schools were not open and have not been open for two months now. Think about what happens just from an educational perspective. So when we talk about health, I think we need to be more expan- sive in our understanding of what the impact to these islands has been. These conditions are awful. They are tragic, but they are also an opportunity for us to be working together to rebuild the grids in a smarter manner, whether through microgrids, distributed gen- eration, burying the lines where possible, direct current versus al- ternative or some other manner. 15 I think we need to be looking at this going forward with a few things in mind: making the grid more resilient to future weather events; and in case of damage from future storms, bringing that timeframe for repair on the grid on par to what we see here in the United States. I think we recognize that any one of the fifty states here, whether you are on the mainland or, like Hawaii or Alaska, apart from the continental United States, nowhere would we accept the fact that the people, the residents, have been without power for two months, particularly the numbers of people that we are talking about. But we also need to be working to bring down the overall cost of electricity, certainly compared to the pre-storm prices. We are fortunate to be joined by a very distinguished panel this morning, and we will have an equally distinguished panel as this one concludes. These folks are here today to help us better under- stand the conditions on the ground, what more needs to be done at the federal level and what a future electric grid could look like. All of our witnesses can be part of the solution, and I am hopeful that this hearing will be a step in that direction. I will turn to Senator Cantwell for her opening remarks, and I look forward to a very informative discussion this morning. Senator Cantwell. STATEMENT OF HON. MARIA CANTWELL, U.S. SENATOR FROM WASHINGTON Senator CANTWELL. Thank you, Madam Chair, and thank you for scheduling this important hearing to examine the hurricane recov- ery efforts in both Puerto Rico and the U.S Virgin Islands. I would like to thank all our distinguished witnesses for sharing their thoughts today. It has been 69 days since Irma struck and 56 days since Maria struck, and both the U.S. Virgin Islands and Puerto Rico continue to operate in emergency mode. They are struggling with even the most basic needs—providing drinking water, turning on the lights and delivering adequate healthcare. This is unacceptable. The United States is a strong nation and it needs to take care of its citizens. Approximately 3.4 million United States citizens in Puerto Rico and over 100,000 United States citizens in the U.S. Virgin Islands face challenges as we speak. The Federal Govern- ment needs to do more, and it needs to plan in advance. Inequitable treatment under Medicaid and Congress’ unpredict- able and haphazard treatment of territories under the tax code have dramatically harmed these economies. As a result, Puerto Rico and the U.S. Virgin Islands have suffered from economic con- tractions in recent years. In response to Puerto Rico’s debt crisis, Congress passed the PROMESA legislation of 2016. To be clear, I did not support that legislation. One of the reasons was because it favored more of the interests of the hedge fund shareholders than it did the U.S. tax- payers. But by far the most far-reaching, debilitating impact of the hurri- cane damage is to our electricity grid. And this Administration, which has been responsible for restoring the electricity grid, along with local partners, needs to do more for the people of Puerto Rico. 16 I welcome Mr. Walker today here. I supported your nomination and I am sure you are the right man to help, but you should hear, loud and clear, that we need to do more. The Whitefish contract in Puerto Rico raised particular concerns. In addition to the GAO reviewing the matter, the Inspector Gen- eral and the Department of Homeland Security are reviewing the matter and, according to a Wall Street Journal report, the FBI is also investigating. According to a New York Times report, the Flor- ida electrical workers subcontracted by Whitefish were paid $42 an hour, linemen, $63, and yet Whitefish billed the government and utility $319 an hour. Even if that figure is abnormally high because it included exorbitant charges for room and board, why would a contract specify a separate charge for room and board? The welfare of the Puerto Rico people, to rebuild the island, is my number one concern, but I will not stop making sure that the U.S. taxpayer is not gouged in this process. Let’s be very clear about this. My state has many storms and many natural disasters. The reason why you have mutual aid con- tracts is to rebuild at cost. That is what a mutual aid contract is, rebuilding at cost. So the notion that someone comes in there to gouge the Puerto Rican government and the U.S. taxpayer, charg- ing them an exorbitant rate and then writing a contract so that it cannot be reviewed properly was a great injustice to the U.S. tax- payer. When you look at how the situation occurred, we must under- stand that the Federal Government here also needs to change its process. I have seen this time and time again in my state, whether it is fire or a mudslide, where failed communication systems can’t even be restored to communicate to the public because someone is saying, who will pay for this? So, in the gap, Puerto Rico made a decision to go with an entity that gouged the U.S. taxpayers. It should have been clear from the very beginning that FEMA and the U.S. Government would pay on those contracts and it should have been done with mutual aid at cost. We are going to get to the bottom of this, if it takes a long time. Why? Because we never want to see this happen again. We do not want to be a country where interests of the private sector are pa- trolling the U.S. economy looking for a disaster and then saying, I’m going to go in there and capitalize on it. People should read and understand case law. Case law on price gouging has this very instance. In a blizzard in the Northeast, someone came in and tried to charge more for snow blowers. Why? Because they knew people had to buy them. So we are not going to put up with this kind of behavior in the United States of America. When people are in a crisis, in a dis- aster, the U.S. Government should have responded and should have said they would be there to restore the utility grid and do it at cost. We will have lots of time for questions. There is a fundamental problem with removing the authority of the grid from the people and handing it over to an unelected over- sight board. This is what was brought up in a court case yesterday. The mission of the board is to achieve fiscal responsibility and ac- cess capital markets which means playing nice with bondholders. 17 This is not what our priority is which is getting the lights back on and preventing a continuing humanitarian crisis. Those are the things that we must understand as this debate continues. Only a strong, independent regulator can assure that the grid operates efficiently, consumers pay low prices, utilities move toward a sustainable business model and that will be a very long process. I know our colleagues here want to talk about how we modernize this for the future. I do, too; but in the meantime, I am going to make sure that the U.S. taxpayer is well-protected and that we do everything we can to flatten any kind of process that exists be- tween bureaucracies and the government of Puerto Rico to make sure that they are not having to play 20 questions about financial assistance and aid. The answer from the U.S. Government should be yes, and we should be doing it at cost. Thank you, Madam Chair, and I look forward to hearing from our witnesses. The CHAIRMAN. Thank you, Senator Cantwell. Our first panel this morning will be led off by the Governor of Puerto Rico, the Honorable Ricardo Rossello´ Nevares. He will be followed by the Governor from the U.S. Virgin Islands, the Honor- able Kenneth Mapp. We welcome you. Mr. Bruce Walker is the As- sistant Secretary for the Office of Electricity Delivery and Energy Reliability at the U.S. Department of Energy (DOE). I will note that he has been on the job here for about a month, I believe, and as soon as he was sworn in he was sent to Puerto Rico, or he volun- teered to go to Puerto Rico, and has been there on the ground for much of the time. I think he will have a great deal to share with us this morning. We are also joined by Major General Donald E. Jackson, Jr., the Deputy Commanding General for the Civil and Emergency Operations for the U.S. Army Corps of Engineers that has been tasked to address the grid system there in Puerto Rico. Gentlemen, we welcome you to the Committee. Governors, we certainly appreciate that you have traveled to be with us this morning and appreciate your time. Governor Rossello´. STATEMENT OF HON. RICARDO ROSSELLO´ NEVARES, GOVERNOR, COMMONWEALTH OF PUERTO RICO Mr. ROSSELLO´ NEVARES. Thank you, Chairwoman Murkowski and Ranking Member Cantwell and all of the members of the Com- mittee for inviting me to testify today before you. I would also like to give special thanks to Senator Murkowski and all of the members from both the House and Senate who have taken the time to come to Puerto Rico to bear witness to the hor- rific conditions on the island as well as the unbreakable spirit of the people of Puerto Rico. It is impossible to describe the fury and violence of the storm to the people who did not experience it. Irma impacted the island and Maria left no corner of Puerto Rico untouched causing the full fail- ure of the power grid, major damage to our water systems, ports and airports were rendered unusable, roads and bridges were washed away and virtually all communication systems were shut down. 18 I was there when we had to rescue 2,000 people from rooftops in Toa Baja after flooding reached massive proportions several hours after the hurricane hit. I saw mothers holding their infant babies on rooftops praying that somebody would pick them up. A few days later I had to drive several hours northwest to the part of the is- land and through the mountainous regions to personally warn folks that their dam could collapse because there was no other way to communicate. No phones. No radio. No water. No power. No busi- nesses open. Little access to roads and little access to fuel. I flew over parts of Puerto Rico that looked like a Category 5 hurricane went through it. Others looked like a bomb was dropped. I person- ally took food, water and medicine to the people of Puerto Rico, in all corners of the island, that had lost their homes. Notwithstanding these challenges and the widespread devasta- tion, we are resilient and we’re making progress. We’re moving from life sustainment phase to the recovery. Water restoration is now at 90 percent. Telecommunications is at 75 percent. Almost all supermarkets and gas stations are open. I called for aggressive milestones for energy generation and called out everyone involved to make sure that we could do every- thing humanly possible to power Puerto Rico as quickly as possible. And tomorrow, we will have met our second milestone of restoring 50 percent of the energy grid by November 15th. Fifty-nine of the sixty—58 of the 68 hospitals are connected to the grid and we have started to steadily open schools—now we have 839 schools that are open. It is important to note that this event has no parallel in Amer- ican modern history with risk models categorizing this a 200- to a 1,000-year storm that caused between $90 and $120 billion in dam- ages. This was not a partial disaster; this was a total catastrophe. Had these twin storms blasted through another state, a catas- trophe would have ensued as well. I became Governor earlier this year with the challenging task of correcting decades of misplaced priorities and insufficient leader- ship. As you are aware, long before this hurricane season had started, Puerto Rico and its people had been battered by long storms of economic, fiscal and demographic challenges. I’ve worked tirelessly since taking office just ten months ago em- barking on an aggressive agenda of fiscal, economic and govern- ment reforms. Within six months of taking office my administra- tion has obtained the approval of Puerto Rico’s PROMESA—a re- quired ten-year fiscal plan—and enacted the first budget compliant with that plan. Although we’ve had our differences with the board, we have worked together. In addition, we also implemented an aggressive array of policies for economic and social growth, including a gold standard P3 law, labor reform, permits reform, government as a single employer, pensions reform and are currently working on a new government downsizing model, procurement reform and the transformation of the electric utility. Even during the recovery and restoration process we are focused on developing a plan for future electric energy in Puerto Rico. We are working with members of PREPA, our governing board, to 19 bring together top minds in the industry and provide best-in-class thinking on the future of our electric utility. Our team is evaluating all options including public and private ownership, or a combination, in order to achieve grid reliability and resilience for the long-term. We aim to revamp completely the de- livery of electric energy in Puerto Rico. This includes aggressively incorporating technological advancements and alternative energy sources, creating frameworks for distributed energy resources, vir- tual power plants, achieving customer engagement and developing a robust regulatory framework that creates the right market and competitive signals to assure electric power is delivered reliably and efficiently and at a sustainable cost structure. Therefore, I call upon Congress to approve by December an emer- gency supplemental legislation that provides equal treatment for the people of Puerto Rico compared to what any state in the coun- try would have expected had they experienced similar devastation. Attached to my written testimony I have provided an extensive analysis and documentation of the devastation of the hurricanes and the federal resources necessary to build a more resilient Puerto Rico, worked along with third party groups of reputable institu- tions and organizations. In doing this I am committed, I commit to you today, that I will lead the most transparent disaster recon- struction in American history. Toward that end I have issued an Executive Order creating the Central Office of Recovery and Reconstruction of Puerto Rico which has been tasked with ensuring full accountability and transparency for all state and federal funds directed toward the island recon- struction. To foster a culture of accountability we will create a re- covery transparency portal that will not only track the status of re- covery but will also provide information to the public about how and where the funds have been used. This great country of ours has always prided itself on leadership, moral values and principles. It has also responded to extraordinary times in extraordinary ways. Madam Chairwoman, the whole world is watching. It is time to show that we mean what we say when American citizenship is one and only one. It is time for our homeland to show that we can walk the talk. As Governor of Puerto Rico, but more so, as a proud U.S. citizen of this great country, I ask you to once again rise to the call as you have done so many times before. Thank you. God bless you, God bless Puerto Rico and God bless America. [The prepared statement of Mr. Rossello´ Nevares follows:] 20 Written Statement Hon. Ricardo Rossellé Governor of Puerto Rico U.S. Senate - Committee on Energy & Natural Resources Hearing, "Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands" November 14, 2017 Introduction of Hurricanes Irma and Maria Hurricane Irma struck Puerto Rico on September 6, 2017 leaving over 70% of the people of Puerto Rico without power for a substantial time. Two weeks later on the morning of September 20, 2017 Hurricane Maria, the strongest hurricane to hit Puerto Rico in close to 100 years, made landfall south of Yabucoa. The storm moved west-northwest across Puerto Rico pounding us with torrential rain and sustained winds of roughly 150 mph for the next 30 hours. It is impossible to describe the fury and violence of the storm to people who did not experience it, but the aftermath told the devastating story. The storm left no comer of Puerto Rico untouched. The electric grid experienced a complete failure with damage to every major transmission line, thousands of towers and poles were down, and generation facilities were damaged. For a significant period of time, 100% of the electric grid was down throughout the island. The communications networks were almost all destroyed, meaning 100% of the island had no traditional cellphone service for a period of time. All of the island’s ports and airports were unable to operate. Nearly 100 % of fields and crops were wiped out-—-a devastating blow for a society that already imported much of its food. Small and large businesses were forced to close, wiping out any source of economic activity and revenue for the Government of Puerto Rico. Roads and bridges were swept away. Supplies were limited and the ability to get critical items to the Island was challenged by the lack of access caused by the damage to the infrastructure. AIR a worldwide, a global leader in catastrophic risk modeling, estimates that the damages caused by Maria correspond to a storm that happens once in 250 to 1,000 years, while Moody’s has estimated the damages to be up to $95 billion. This is an event that has no parallel in modern American history. During Hurricane Andrew, Tallahassee was up and running, Katrina left Baton Rouge functioning, and Harvey left Austin unscathed. Unfortunately, Maria left all of Puerto Rico completely devastated. For the people of Puerto Rico Maria was not a disaster, it was a catastrophe. A catastrophe whose origins can be traced not only to the storm’s horrible winds, waves and rains, but to the societal conditions that Puerto Rico has been subjected to for over a century. 21 Puerto Rico’s Economic Situation Pre-Hurricane I became Governor earlier this year with the unenviable task of correcting years of misplaced priorities and insufficient leadership, because as you know long before this hurricane season had started Puerto Rico and its people had been battered by a decades long storm of economic, fiscal, and demographic challenges. A decade-long recession resulted in a loss of over half of the manufacturing jobs. More than half of the population was living below the federal poverty line. Puerto Rico lacked sufficient capital to repair and modernize its energy transmission infrastructure, which was vulnerable to outages, even under normal conditions. On the eve of Hurricane Maria, Puerto Rico was literally bankrupt—having sought Title III protection for the Commonwealth and certain of its instrumentalities, including the Puerto Rico Electric Power Authority (PREPA), due to a mountain of over $80 billion of debt that it could no longer service with available revenues. The dire financial condition of the island created an outmigration movement to the United States that has been underway for a decade now. During the last ten years, roughly 500,000 people have left Puerto Rico for the mainland. In the last year alone, that number has jumped to over 70,000 people leaving Puerto Rico. As you know, outmigration and the loss of human capital only makes rejuvenating the economy of Puerto Rico that much more difficult. That said, my administration entered office leaning on the strength of the people of Puerto Rico and determined to address the myriad of issues ailing the island. Although local mismanagement was certainly a significant factor in those crises, their root causes can ultimately be traced to the unequal treatment of the U.S. citizens of Puerto Rico by the federal government. It is an undeniable fact that under Puerto Rico’s current territorial status Congress can and does treat the island unequally under multiple federal laws, programs, and other policies. Laws that we are subject to, even though we have no voting representation in the U.S. Congress that makes them, and cannot vote to elect the President that is responsible for executing them. As the recent passage of Veterans Day reminds us, for over a century in times of war when America has needed us the most, the brave U.S. citizens of Puerto Rico have served, bled, and died for this country. Yet somehow, the people of Puerto Rico cannot count on an equal amount of federal support to what citizens stateside receive, but we are still expected to perform economically at the same level while being subjected to an uneven playing field. It is evident that the cumulative impact of this unequal treatment and incoherent federal territorial policies were fundamental factors that limited investment in Puerto Rico’s critical infrastructure, debilitated our response capacity, and rendered the territory more vulnerable than necessary in the face of this massive hurricane. Governor Rossello’s Reforms Following PROMESA Recognizing the importance of addressing Puerto Rico’s pre-hurricane challenges, I’ve worked tirelessly to bring forth strong local leadership and a clear vision for our island. Upon taking 22 office just ten months ago I embarked on an aggressive agenda of fiscal, economic, and government reforms. Within three months of being in office my administration obtained the approval of Puerto Rico’s 10-year Fiscal Plan by the Financial Oversight and Management Board as required by PROMESA, and three months later we enacted the first PROMESA- compliant state budget. All of this with the goals of putting Puerto Rico on a path to fiscal sustainability, responsibly restructuring our debts, rightsizing and modernizing our local government, and restoring the island to economic growth by unleashing the full potential of our talented and passionate people through the private sector. However, even with all this progress the extraordinary destruction and devastation that Hurricane Maria created in Puerto Rico has created a situation where without a massive federal investment there is no way Puerto Rico will ever fully recover. Request To Congress & Commitment to Transparency Therefore, I call on Congress to approve by December an emergency supplemental legislation that provides equal treatment for Puerto Rico compared to what any state in the country should expect if they experienced a similar level of devastation. Attached to my written testimony I have provided an extensive analysis and documentation of the devastation caused by the hurricanes and the federal resources necessary to build a more resilient Puerto Rico. In doing this I commit to you today that I will lead the most transparent disaster reconstruction in American history. Toward that end I have issued an executive order creating the Central Office of Recovery and Reconstruction of Puerto Rico, which has been tasked with ensuring full accountability and transparency for all state and federal funds directed toward the island’s reconstruction. To foster a culture of accountability we will create a Recovery Transparency Portal that will not only track the status of recovery, but will also provide information to the public about how and where funds are being used. Puerto Rico needs swift and robust action from Congress to show the 3.4 million American citizens still in Puerto Rico that there is hope for a better future. FEMA and the Stafford Act Moving Forward I would also like to speak to the immediate disaster response by this administration and specifically Administrator Brock Long and FEMA. Administrator Long with other top officials have been in close contact with me and my government throughout this recovery process. Thousands of relief workers have been working hard to save lives and alleviate human suffering long into the night for seven days a week for well over a month now. These efforts must not go unnoticed, the people of Puerto Rico are truly grateful for the work and sacrifices made by these heroic first responders. That said, the initial response from the federal government was far too slow. This delay has nothing to do with the efforts of the first responders, but rather the spirit of the Stafford Act and Congressional failure to envision a storm the magnitude of Maria hitting Puerto Rico. Unlike normal disasters facing the United States, such as Katrina in Louisiana, which left Baton Rouge fully functioning, or Harvey in Texas which left Austin firing on all cylinders, Maria wiped out San Juan, leaving our state government unable to communicate and effectively in the dark. we 23 Specifically, the Stafford Act authorizes FEMA to work in conjunction with the state and local governments to respond to a disaster. Therefore, much of the bureaucratic red tape and arcane agency approval process of FEMA is driven by the assumption that the state level government dealing with a disaster will have functioning computers, telephones, and workforce that can navigate these obstacles. Furthermore, FEMA is set up to purely assist the state level government, therefore when the state level employees become first responders themselves, it leaves FEMA paralyzed to jump into action. One example is the backlog we experienced at our ports due to a lack of available truck drivers in Puerto Rico. Under a more robust Stafford Act, FEMA and the federal government would have been able to better help deal with this situation, whether it be in pre-disaster funding and planning or with providing more help to resolve the situation on the ground. Simply put, a more robust Stafford Act that helps state and local governments work with FEMA more closely pre-disaster, while also expanding FEMA’s authorities in the most severe disasters is something that is necessary. I would like to work with Congress and Administrator Long to help improve the Stafford Act so that the federal government can learn from the difficulties that first responders faced in the immediate aftermath of Hurricane Maria. The Task of Rebuilding Puerto Rico The reality of the conditions on the ground highlights the fact that the job of rebuilding Puerto Rico is the responsibility of its people and elected leaders, including myself. Outside support from the federal government, this Committee, volunteers, relief agencies, and the Oversight Board are critical and of tremendous benefit. They are, however, temporary. Puerto Rico’s people and government are enduring. Outside assistance, while welcomed, cannot substitute or displace the self-determination and self-governance necessary to truly create a sustainable recovery and future for Puerto Rico that will benefit all its stakeholders. I know that the government has the will, vision and commitment to achieve this. We are prepared to chart the course for our future, in collaboration with the Oversight Board, and the support of this Committee, Congress, FEMA, the Army Corps of Engineers, and other federal relief agencies that are hard at work to assist us. In this time of humanitarian crisis, it is important that we work together and with respect—not seek to replace or diminish the government elected by the people of Puerto Rico—to achieve those goals. The Government of Puerto Rico Is Leading the Recovery Effort Despite the difficult and challenging circumstances, the Government of Puerto Rico has led the Island’s recovery efforts in close collaboration with the federal government, relief organizations, and other states to procure emergency funding necessary for the immediate implementation of emergency projects. We have a long road ahead but much has been accomplished, in extremely difficult and challenging circumstances, In the less than two months since Hurricane Maria, [am proud of the fact that the airports and ports are working, that the reconstruction of the water supply is over 85% complete, that over 70% of the communications and cell towers are back in operation, and almost 90% of the 24 supermarkets and 85% of the gas stations are open. Over 42% of the power grid has been restored and, despite substantial disruption to the process, the restoration efforts met the initial targets that I established. Some approximate numbers follow: ¢ Approximately 15,000 federal civilian personnel and military service members, including approximately 2,000 FEMA personnel, are on the ground in Puerto Rico engaged in response and recovery operations from hurricanes Irma and Maria. « 35 states are supporting 143 requests for mutual aid in Puerto Rico. e Aid relief and personnel have been put to good, constructive use. e Approximately 85% of wastewater treatment plants are working on generator power. Improvement will come as the electrical grid is restored. e Approximately 80% of banks are open. e The San Juan financial district is fully connected to the electrical grid. e Approximately 400 generators have been installed in Puerto Rico by the U.S. Army Corps of Engineers for critical infrastructure. e Approximately 1,507 miles of Puerto Rico’s 5,073 miles of roads are open, allowing for passage through the outer ring of the Island. © Over 95% of hospitals are open in Puerto Rico. The work continues every day and progress is being made. We are working tirelessly and will not stop until the job is done. Puerto Rico Has Implemented Compliance Measures In order to ensure that aid and financial resources are property utilized, [ have appointed an independent compliance officer with a background in procurement for the Government. In addition, the Government is developing a Contracting and Procurement Protocol consistent with the Oversight Board’s contract approval rights as adopted at its last meeting on October 31, 2017. Pursuant to this Protocol, all contracts with a value in excess of $10 million will be submitted to the Oversight Board for approval, and the Oversight Board has committed to responding to such approval requests within 7 days, so as to avoid delay in the recovery process. Financial Restructuring and the Role of the Oversight Board As we rebuild our infrastructure, the work of financial restructuring continues. The new facts and circumstances make emergence from Title IIf even more important for Puerto Rico. Without near-term certainty about the economic future of Puerto Rico, the inherent economic problems that existed prior to the hurricanes will continue and become increasingly more difficult to solve. There is no doubt that the March Fiscal Plan will require significant revisions, including new assumptions and revisions to Puerto Rico’s future growth trajectory. These will likely be negative. The Government is working to gather information and make revised projections so that we can revise the fiscal plans and resubmit to the Oversight Board. The Government is also committed to providing transparent information to creditors regarding the assumptions used in revised projections. Although most creditors will not like the outputs, we will ensure that they know and understand the inputs. 25 The Oversight Board can help Puerto Rico through revising the Fiscal Plan, lobbying, moving the Title ILI case forward, and offering helpful recommendations, as it is permitted to do under Section ILof PROMESA. The Oversight Board can also expedite the permitting process as it relates to PREPA and other critical infrastructure projects as provided for under Title V of PROMESA. But disaster recovery remains within the sole purview of the Government, which comprises elected officials responsible for coordination across the multiple entities and agencies that are rebuilding Puerto Rico. The Government should continue to have the responsibility to set and execute its policies within the confines of the certified Fiscal Plan and subject to Board review and approval rights. The Oversight Board would be an inefficient and ineffective mechanism for driving the policy choices underlying the reconstruction of Puerto Rico. Although PROMESA provides a mechanism for the Oversight Board to be involved in emergency response, the Government is supposed to and must lead recovery efforts with the Oversight Board, reviewing and assessing Government actions to ensure compliance with the certified fiscal plans and budgets. The Oversight Board is entitled to review Government actions and to be informed of all recovery efforts in real time. However, even the Oversight Board, in an October 19 letter to me, stated that it “does not intend to impede the Government’s implementation of any federal programs, particularly those related to disaster response and recovery.” Accordingly, instead of expanding the Oversight Board’s powers to take over Government functions, this Committee should in the first instance focus on what the Government has been doing to lead the recovery efforts (as previously discussed) and how the Oversight Board can be utilized to assist and enhance those efforts. Collaboration, not control, is the key to a successful future for Puerto Rico. Despite these challenges, at the moment Hurricane Maria hit Puerto Rico, the Government was making good progress with the Financial Oversight and Management Board on the road to achieve fiscal responsibility and access to the capital markets within the context of the statutorily mandated requirements of PROMESA, which became effective June 30 of last year. Over the last ten months we have worked collaboratively with the Oversight Board. For example: * On February 28, 2017 (only 58 days after taking office), my administration submitted a proposed fiscal plan to the Oversight Board. On March 13, 2017, after extensive collaboration and negotiation, the Oversight Board certified the fiscal plan submitted by the Government. Thereafter, the Government proposed and the Oversight Board certified fiscal plans for PREPA and the Puerto Rico Highways Transportation Authority (HTA”), among other entities. In that regard, we have succeeded where my predecessor failed. e Then in July 2017, the Government and Oversight Board again worked together to develop and approve the Commonwealth’s budget for fiscal year 2018. e This past Summer, Title III cases were commenced by the Oversight Board for the Commonwealth, HTA, PREPA, the Puerto Rico Sales Tax Financing Authority, and Employees Retirement System of the Government of Puerto Rico at the request of 26 those entities. Our professional advisors worked closely with the Oversight Board’s advisors to prepare those entities for Title TIL Almost from the start of those Title Il cases, the bondholders unleashed, unrelenting litigation against both the Oversight Board and Government disputing nearly every issue in the case. The Oversight Board and Government worked closely together in responding to litigation fending off attacks by a multitude of law firms and professionals representing various bondholder constituencies. The Government and the Oversight Board are completely aligned in defending against fundamental legal challenges raised by the bondholders concerning the legality of the fiscal plans certified by the Oversight Board and the constitutionality of PROMESA under the Appointments Clause of the Constitution. The Oversight Board and the Government have worked collaboratively with the mediation panel of five federal judges appointed in the Title Il cases to work with the bondholders to reach a consensual resolution of disputed issues. Clearly, the storms have altered the dynamics of the restructuring process, given the uncertainty of the impact of economic growth over the life of the Government’s fiscal plans. While both the Government and Board are still assessing the impact of the storms’ damage and the impact of that damage on the Island’s future economic health, we have agreed that the Title II proceedings should not be delayed. Moreover, the Government has been completely transparent with the Oversight Board from the beginning of my administration. We have endeavored to respond promptly to all requests for information from the Oversight Board and have never withheld information from the Board that it requested. The Government has and continues to submit periodic status reports to the Oversight Board. In addition to requests for documents and other information, the Government and its advisors have engaged in near constant dialogue with the Oversight Board and its advisors. The Government and its advisors have joined the Executive Director in weekly meetings where tasks and assignments are given for the Government officials to produce information to the Oversight Board or to undertake necessary financial analysis. Working groups have also been formed with Government representatives and Board representatives meeting to develop long-term plans with points of agreement for PREPA and HTA. The Government has agreed to comply with the Oversight Board’s contract compliance policy as recently announced at its tenth public meeting and is willing to give the Oversight Board transparency into Government requests for federal funds. All contracts with a value in excess of $10 million will be submitted to the Oversight 27 Board for approval, and the Oversight Board has committed to responding to such approval requests within 7 days, so as to avoid delay in the recovery process. « Moreover, I recently issued an executive order directing the appointment of an independent compliance officer at PREPA with a background in procurement. e The Government has also worked closely with the Oversight Board to advance transparency and provide information to the creditors. To that end, thousands of documents have been made available to creditors in a data room. Yet I must express disappointment that in the face of the great lengths the Government has gone to cooperate with the Board, my ex officio designee to the board has been routinely excluded from executive sessions and not given the benefit of gaining insight into the Board’s deliberative thinking as well as the Board hearing my positions and views on issues vital to Puerto Rico. The fact is that the Oversight Board is not on the ground dealing with everyday issues and problems in the recovery effort. In order for the Oversight Board to be fully engaged with the Government, it is essential that my designee be given better access to information so as to avoid confusion and misperceptions. In other words, transparency works best when it goes both ways. [realize that there continue to be disagreements with the Oversight Board with respect to certain narrow issues under PROMESA, but the fact is that the Oversight Board and Government have been united on a vast majority of issues. I respectfully disagree with the Executive Director’s statement that these “disagreements between the Oversight Board and Government have resulted in costly delay and litigation.” PROMESA intended that the Oversight Board and the Government work together in the spirit of collaboration to return Puerto Rico to fiscal responsibility and not as “petty rivals for power.” Our current point of disagreement with the Oversight Board relates to the appointment of a Chief Transformation Officer for PREPA. There is no other litigation in which the Oversight Board and the Government are adversaries in any of the other Title III cases, including that of the Commonwealth. The real source of litigation delay and cost has been the widespread bondholder litigation that both the Oversight Board and the Government have jointly defended and countered. We believe that the Oversight Board’s request that Congress intervene by mandating the appointment of a CTO for PREPA and other proposed changes because its mission has organically changed from fiscal recovery to disaster recovery is seriously misplaced. In particular, Ms. Jaresko requested that Congress take four actions to expand the Oversight Board’s powers under PROMESA: 1. Require that the Oversight Board “certify all requests for liquidity advances” from federal loans or relief funds; 2. Provide additional tools to monitor the expenditure of federal funds as part of a plan that makes sense for Puerto Rico’s future; Grant the Oversight Board the authority to control the Government and its instrumentalities through the appointment of chief executive officers that are accountable only to the Board; and we 28 4. Grant the Oversight Board authority to veto legislation enacted by the Puerto Rico legislature to the extent the Board determines, in its sole discretion, that such legislation is inconsistent with the fiscal plan. If the Oversight Board’s proposals to this Committee are adopted or somehow acknowledged or linked as a condition to future critical funding for Puerto Rico, they would effectively undermine the Government’s disaster recovery efforts and create unnecessary confusion. In effect, the Oversight Board as an unelected body with no connection to the people of Puerto Rico would displace a government of elected leaders at a time it was addressing an unprecedented humanitarian crisis. For these reasons, I would urge that no such actions be taken by Congress. Instead, the Government and the Oversight Board should be left to resolve any differences themselves without resort to litigation given that there is much more that unites than divides us in delivering for the people of Puerto Rico at this most critical hour. Conclusion This is a transformative moment in the history of Puerto Rico, We recognize that your leadership, along with that of leaders from both parties, will be essential to our recovery, and the future economic and fiscal health of the island. To that end, we are committed to fully engaging leaders from the private sector and Non-Governmental Organizations in the design and implementation of this rebuilding program. We will Build Back Better, not just in terms of the physical and economic reconstruction of the island, but through a true public-private partnership with a process that is open, transparent and accountable to our community, to the Federal government and the American people, who are showing such tremendous and heartfelt support for our efforts. Puerto Rico has been treated equally in times of war, sacrificing like any other state, now in our time of greatest need we call on Congress to treat us equally as we work to recover, and ultimately rebuild a new and stronger Puerto Rico. We have the will and the spirit needed to continue contributing as part of the great American family. Help us help ourselves, and in doing so you can live up to America’s greatest ideals. Our future is in your hands. With sustained federal assistance and your leadership and support, I am confident that in time the people of Puerto Rico will recover and grow stronger than ever. 29 sae . . — = - na SN S oy x SES as su ay a ae See ne = = = Soe a a ae as a — ae a - = i a - oe — — — - < - — — - - . : oe — — - a . an 7 . ~ . = . - co - o oS : = ‘ - . a es - = 2 Yo < - S — S _ _ . ce o _ - ce e : a ce _. - = . " ‘ a os ie e . a . Ms * ao : . = e . a . eh . . 2 _ x. is ‘ a : — _ a _ s S = 7 Re ° oo a < a a > q & c ae a a oo = ‘ - = ek x sons be > Ne a o . \ - : . . ee = = ae a ae : ~ i “ . on co Ave - — a i" oS = . ne _ a oe oe a é a 2 “ ei ce ae o a cK for Di . a a : . us e a cf v o a & S & : 3 an ‘ “i ‘ a t “ He " ‘ y " . _ a at . = “ < . ie a wk a a a : ge i . iG . “ y : : a . | . ae S i ie = ie s \ ne . x . < a 4 = ‘ . . NI < nN . : ‘ = . i) y 4 : \ a a ‘ : x x & < - ‘ a a a ie . me = i | y & ie vt i t e ‘ . ‘ < . 4 ‘ \ U r 6 ‘ il x I i m i ue me x . : \ J mber 201 Nove a a = \ aN . i » \ i ' sh ti ‘I a _ ‘ re an i si ~ ; Sh i ee me iN ‘ ‘ a “ S S ‘ nai an ay = « i . ut n 4 Ne al . q ie 1 a es a ve aN ‘ ye e KS » .) ay x oy ws 8 : * sh * < os . < ~ Ay ‘ . . a x x y ‘ Ss 2 ~ a = < s ae _ a oS ve o a ue » Rica rdo A Ro a - aN i < . ae . me x Governoro e °O is S a ‘ m < = 30 ACKNOWLEDGEMENT In preparing our document the Government of Puerto Rico is greatly appreciative of the support of the New York Governor's Office of Storm Recovery (GOSR) and other agency experts who provided technical capabilities for our analysis of the sectors and estimation of damages, along with advising on the preparation of the report. In the interest of supporting the recovery strategy and its impact on PR, the Rockefeller Foundation, The Ford Foundation, Open Society Foundations and Rockefeller 100 Resilient Cities provided funding for Deloitte to aid in this project. Deloitte, in addition to providing their technical assistance and expertise, provided consultation on the information gathered in preparation of the report. This document represents an aggregation of the best available disaster damages and is an initial assessment of the cost to rebuild a stronger, more resilient Puerto Rico. Over the next few months as more data becomes available from our efforts and those of our federal partners, we will refine and rework our estimates of the impact of this disaster. Za) ensocey 2 Romo Deloitte. 32 ‘LETTER FROM THE GOVERNOR 33 November 13, 2017 The Honorable Donald J. Trump The President of the United States The White House 1600 Pennsylvania Avenue, NW Washington, DC 20500 Dear Mr. President: | thank you again for your leadership and action on the emergency supplemental package that you signed into law on October 26th, 2017. That package represented a critical first step by your Administration and Congress to address the most immediate emergency needs in Puerto Rico. As you are aware, much more remains to be done in order to stabilize Puerto Rico and set the island on a path to full recovery and reconstruction. The scale and scope of the catastrophe in Puerto Rico in the aftermath of Hurricane Maria knows no historic precedent. The island-wide devastation presents an extraordinary challenge to the American citizens of Puerto Rico, our local government and to the Federal government. A challenge that | am certain we can overcome together, as the United States is the undeniable world leader in disaster response and the resolve of the people of Puerto Rico is strong. As you know, the devastation in Puerto Rico has strained resources beyond FEMA's Disaster Relief Fund (DRF) and associated programs. To support the resiliency and mitigation efforts necessary for the reconstruction phase of Puerto Rico, we are calling upon your administration to request an emergency supplemental appropriation bill that addresses our unique unmet needs with strength and expediency. Specifically, the people of Puerto Rico respectfully request that Congress provide $30 billion within the FEMA DRF to recover critical infrastructure; $46 billion to restore housing and economic viability through the Community Development Block Grant - Disaster Recovery (CDBG-DR) program; and $17.9 billion in other Federal grant programs for long term recovery with the intent to reconstruct a stronger, more resilient Puerto Rico. 34 In addition, based on the per capita financial impacts of our recovery efforts across the island, consistent with the historical precedents of Hurricanes Andrew and Katrina, Puerto Rico requests Congressional authorization of 100% funding for Stafford Act Programs. With the required use of the Section 428 of the Stafford Act for Permanent Work under FEMA, the overall Public Assistance funding will be capped to the mutually agreed upon estimates. Furthermore, additional funding will be needed through the Community Disaster Loan Program (CDL)} to overcome the liquidity needs of the Government of Puerto Rico and our local municipalities. Data on the amounts needed from this funding source will be provided to your Administration and to Congress as soon as it becomes available. This is a transformative moment in the history of Puerto Rico. We recognize that your leadership, along with that of leaders from both parties, will be essential to our recovery, and the future economic and fiscal health of the island. To that end, we are committed to fully engaging leaders from the private sector and Non- Governmental Organizations in the design and implementation of this rebuilding program. We will Build Back Better, not just in terms of the physical and economic reconstruction of the island, but through a true public-private partnership with a process that is open, transparent and accountable to our community, to the Federal government and the American people, who are showing such tremendous and heartfelt support for our efforts. With sustained federal assistance and your leadership and support, | am confident that in time the people of Puerto Rico will recover and grow stronger than ever. Sincerely, Ricardo Rossellé Governor of Puerto Rico 35 TABLE OF CONTENTS 1. Executive Summary 1 2. Ensuring Transparency and Strong Financial Controls 4 3. Disaster Summary 5 4, Overview of Puerto Rico and Reconstruction Approach 7 5. Sectoral impacts and projects 10 Housing Power Grid and Resiliency Health and Healthcare Agriculture Social Services Economic Development Communications Infrastructure Roads & Bridges Ports and Airports Public Building Revitalization Water and Water Control Facilities Sanitary Sewer and Storm Drainage . Education and Schools Environment and Natural Resources Public Safety and First Response Coordination SB Rr RET Tr yA P AO TD 6. Additional Needs 94 a. Long-Term Recovery Management and Coordination b. Cost-Share 7. Appendix 97 a. Project Evaluation Criteria b. Damage Assessment Data and Methodologies 36 EXECUTIVE SUMMARY Hurricanes Irma and Maria devastated Puerto Rico, bringing sustained winds well in excess of 150 miles per hour, heavy rains, and catastrophic flooding the likes of which the island had never seen before. The storms caused nearly complete devastation, including the catastrophic failure of the island’s power grid, water and wastewater infrastructure, and communications networks. The economy of the island ground to a halt in the face of physical damages, loss of supporting infrastructure, and the absence of power and water. Roads and bridges faited or were blocked by debris across the island, leaving communities stranded and unable to obtain life-saving aid, food, water and medicine for a period of weeks. More than 472,000 housing units were destroyed or experienced major damages, forcing hundreds of thousands of Puerto Ricans to seek refuge in shelters and the homes of family and friends. The agricultural sector was devastated, with near total destruction of the sector’s infrastructure and loss of almost 80% of planted crops. Even today, approximately 60% of the island is still without power, and until recently 70% of the potabie water is either unavailable or has yet to be certified as safe to drink, hundreds of schools have yet to reopen, and thousands of businesses are closed or have limited operations including the pharma manufacturing industry, which may cause serious shortages of drugs supplies in the US inasmuch as pharmaceutical products made in Puerto Rico account for nearly 10 percent of all drugs consumed by Americans. Needless to say, these numbers do not capture the depth and breadth of the Puerto Ricans’ suffering. Power outages and the decimation of cell tower capability prevent regular communication or access to wireless internet services. Damage to roads and bridges and blockages caused by debris continue to render the hardest-hit areas of the island virtually inaccessible. Hospitals operate at a reduced capacity at a time when health services are most needed. Hundreds of thousands of Puerto Ricans are displaced and most children have not yet returned to school. All levels of government, as well as the police and fire departments, are hampered by the destruction of their buildings and infrastructure. The hurricanes also robbed thousands of Puerto Ricans of their livelihoods. Manufacturing, agriculture and tourism, pillars of the Puerto Rican economy, will be devastated for years. And the fabric of Puerto Rico’s communities has been torn, as tens of thousands of Puerto Ricans left the island to escape their post- hurricane hardships. The task ahead is as daunting as it is urgent, and recovery cannot be accomplished unless Puerto Rico receives substantial federal! assistance. In this Request for Supplemental Appropriations, Puerto Rico is requesting a total of $94.4 billion, targeted in the areas where assistance is most needed. 37 EXECUTIVE SUMMARY Requested Amount by Category Rousing PowerGrdand Resiliency Health and Healthcare Agriculture : Sovial Services Economic Devel lopment Communications Infrastructure Roads & Bridges : Ports and Airports Public | Building Revitalization Soe Water and Water Control Faclities , Sanitary Sewer and Storm Drainage Education and Schools Environment and Natural Resources : Publie Safety & First Response Coordination Long-Term Recovery Management and Sooreiination Cost Share __ $1,581,050,000 $31,068,532,671 = ~ _ $17,789,375,000 SAAR, 507,962 : $2,076,500,000 $288,262,193 $3,194,677,600 oe $1,500,000}000 ee $8,413,208,822 $486,990,571 $9,000,000 $4,358,445,905. Grand Total: $94,399,614,140. 38 EXECUTIVE SUMMARY Requested Amount by Funding Source CDBG-DR 052,313,558 DOL $55,000,000 EDA 228,750,000 PA FAA $54,000,009 : a $11,364,23 3 : HM §2,150,000,000 i | wh PA $28,237,727,357 USACE 519300020 wt SD $2,080,500,000 USFWS Gran $94,3 39 ENSURING TRANSPARENCY AND STRONG FINANCIAL CONTROLS In the aftermath of Hurricanes Irma and Maria, Puerto Rico recognizes that the commitment of funding from Congress necessitates an equal commitment from Puerto Rico to manage those funds with great efficiency, transparency, and accountability. The Governor and his entire Administration are dedicated to delivering on this promise, and the appropriate organizational structures, controls and processes are being put in place to protect the federal investment in the recovery. An extraordinary demonstration of this commitment is found in the recent creation of the Central Recovery and Reconstruction Office of Puerto Rico. The need to coordinate across the traditional agencies of government and the commitment to strengthen financial controls and the oversight of the recovery process led the Governor to issue an Executive Order establishing the Office that has been established with all necessary authority, powers and capability to: (a) identify, procure and administer all state, federal and/or private resources for recovery; (b) direct and coordinate efforts and activities of the Government of Puerto Rico related to the recovery; (c) fund and execute recovery and related infrastructure projects; and (d) advise the Governor and provide technical assistance to other entities across the Government related to recovery efforts, as required. This new office will provide the centralized oversight and financial controls that the Government of Puerto Rico and the U.S. taxpayer expect for the recovery effort. It will also ensure the Government can implement reconstruction efforts with efficiency and transparency, and capitalize on opportunities to build back in a manner that makes Puerto Rico better, smarter, stronger, and more resilient. The operation of this Office will also centralize the recovery procurement activities of the Government so that additional controls can be implemented to ensure those actions will be in full compliance with Federal and state requirements, approached with consistency, occur under the watchful eye of procurement experts, and are consistent with purchasing process best practices. It will ensure that all procurements are performed in a manner that achieve full and open competition and will make public information about procurement decisions available to the public. Puerto Rico is committed to implementing specialized tools, expanding the use of expert consultants and accounting support, utilizing proven grants management systems to support the program and financial management funding requirements that provide accountability to the island's recovery investment. A program that provides technical assistance to state agencies, municipalities, and other recipients of recovery funds is being implemented to increase awareness of financial and programmatic requirements and to assist with documentation management. Puerto Rico has engaged and is leveraging best practices from states such as Louisiana, New Jersey, New York, and Florida from past disasters. The Government will continue engaging with FEMA and other federal agencies, including with their respective Offices of Inspectors General, as it designs and implements programs and spends resources. Puerto Rico will also be developing and implementing processes, procedures, and protocols designed to manage the significant funding that is expected to be made available in the aftermath of the hurricanes to permit the Government to monitor those implementation efforts, ensure legal, regulatory, and policy compliance and ensure the appropriate use of funds. Finally, Puerto Rico is planning to create a Recovery Transparency Portal that will track the status of recovery and provide information to the public about how and where funds are being used. This will provide transparency related to the recovery effort, and will support a regimen and culture of accountability. 40 DISASTER SUMMARY Hurricanes Irma and Maria dealt a devastating blow to Puerto Rico, resulting in the largest and most complex disaster response and recovery effort in U.S. history. Hurricane Irma skirted the northern coast of the Island from September 6-7, 2017 as a Category 5 storm, causing significant flooding, regional power and water outages, and other significant impacts. Before response operations had even concluded however, an even more devastating Hurricane Maria slammed into Puerto Rico on September 20, making a direct strike as a strong Category 4 storm and causing widespread devastation and destruction the likes of which the island has never seen. Maria represented a “worst case scenario” for Puerto Rico, tracking east-to-west across the island and leaving no one and no thing untouched. Within a matter of hours, 100% of Puerto Rico’s population, economy, critical infrastructure, social service network, healthcare system, and even the government became casualties of the storm. All power was lost across the Island as a direct result of the catastrophic failure of the Puerto Rico Electric Power Authority's (PREPA’s) transmission and distribution infrastructure to the point that experts estimate it could take as long as a year to bring even temporary power back to all island households and businesses. This produced a cascading effect that impacted critical infrastructure and services that relied on power to operate (such as airports, seaports, hospitals, water systems, communications networks, hotels, traffic and street lights, etc.), plunged homes and businesses across the Island into darkness, and caused a devastating blow to Puerto Rico's fragile economy - an impact that continues to be felt throughout the island even today and that is expected to last for many years. The powerful winds, storm surge and localized flooding from Hurricane Maria caused significant damage or even complete destruction of over 472,000 housing units across Puerto Rico. This has forced hundreds of thousands of island residents to seek shelter in hotels, with friends and family or in congregate shelters. The magnitude of housing losses produced a housing emergency throughout the island due to the insufficient remaining housing stock to shelter all of those who have lost or have been forced out of their homes. This reality, added to the power and water outages, forced tens of thousands of Puerto Rico residents to flee to the continental United States, further impacting the island's ability to recovery and rebuild its communities and economy. In addition, both storms also created a severe threat to public health and safety - a condition that continues to this day. Hurricane Maria produced more than 6.2 million cubic yards of both vegetative and construction and demolition debris across Puerto Rico, impacting transportation, restricting access to hard-hit areas, and creating an environment that is ideal for rodent infestation and the spread of disease. Nearly all of the water and wastewater treatment plants in Puerto Rico were rendered inoperable, resulting in the release of millions of gallons of untreated waste into the environment. Furthermore, many hospitals and primary care facilities were forced to close, nursing homes were left without power or resources, the social service “safety net” fell apart, and basic resources such as clean and potable water, food and medicine became scarce and turned the emergency on the island into a humanitarian crisis. 41 DISASTER SUMMARY More than six weeks after Hurricane Maria struck the island, both Puerto Rico and its federal counterparts remain heavily focused on response activities to protect public health and safety and meet basic needs. [n fact, the Irma and Maria disasters represent the longest period of joint federal and state life saving and sustaining response operations to a natural disaster in U.S. history. But there is light at the end of the tunnel. Emergency assistance is having an impact, and the provision of generators and temporary work is beginning to stabilize conditions on the island. As the focus turns from response to recovery, the scale of the devastation also provides Puerto Rico and the United States Government with an unprecedented opportunity to rebuild portions of the island's infrastructure, housing, and economy in a way that makes Puerto Rico stronger, smarter, safer, better, and more resilient than before. Due to the unparalleled and widespread devastation, the disaster recovery period in Puerto Rico represents a chance to “begin again” and rethink the design of major components of the Island's critical infrastructure, invest in the quality and survivability of its housing stock and public buildings, and restructure, modernize and reform how it delivers basic services to its residents. Puerto Rico can also improve its resiliency and sustainability to protect the federal and state investment in the recovery and produce benefits for the island's residents for generations to come. To achieve these goals, however, the people of Puerto Rico will need assistance above and beyond that available from FEMA. This is the basis for this Request for Supplemental Appropriations. 42 OVERVIEW OF PUERTO RICO AND RECONSTRUCTION APPROACH Puerto Rico is a territory of the United States located in the Caribbean approximately 1,030 miles southeast of Miami, FL. Puerto Rico has an area of approximately 3,500 square miles and a population estimated at 3.44 million by the United States Census Bureau as of July 1, 2016. Puerto Rico, one of the largest economies in the Caribbean, offers a stable legal and regulatory framework where major U.S. and foreign multi-national corporations have historically operated, benefiting from its favorable investment environment. The economy includes a sophisticated financial system, has a high concentration of pharmaceutical and life sciences manufacturing, biotechnology, medical devices, agriculture, rum, aerospace, and electronics and contains strong consumer, retail and service sectors. ‘opulation = 3.42 million Cand Area 8,959: sq-kmoo Currency. : : 2 YS Dollar (USD) Language’? oso i eS Spanish, English: GDP Per Capita (USD, Current terms) $30,516 However, the Government of Puerto Rico, its agencies, public corporations and instrumentalities (the “Government”) are currently facing the unprecedented devastation caused by Hurricanes Irma and Maria. In addition, the Government had embarked on profound fiscal adjustments that limits the amount of reconstruction funds from its own government sources. 43 OVERVIEW OF PUERTO RICO AND RECONSTRUCTION APPROACH HRRRUR RBG ie odie — ERR Be FEN a Biss ite ARE: Racatages R TSHR BAS. Foot AUB Baersriea Rael, q Aap iiarciet ed Caen ed F The Government of Puerto Rico has a strong foundation to effectively receive and deploy infrastructure funds and capital. The devastation of Hurricanes Irma and Maria places the highest level of urgency on the need to effectively fund and invest in critical infrastructure. For this, the Government's aligned policies to encourage infrastructure investment together with coordinated Federal efforts conform a solid foundation for infrastructure reconstruction. Puerto Rico's strong Private Public Partnership (“P3”) framework, one of the most comprehensive in the U.S., together with close inter-agency coordination, and effective and transparent funds monitoring promises to be a powerful combination to accelerate and deliver transformative reconstruction in Puerto Rico's infrastructure. In fact, no other state has offered innovative infrastructure delivery tools such as P3s to be part of the entire ‘tool box’ to fund, invest, deliver and monitor infrastructure reconstruction like Puerto Rico is proposing. Although the recent natural disasters represent a devastating blow to Puerto Rico, the Government is committed to maximize funding opportunities with a comprehensive framework which will effectively deploy, fund, invest in and execute much needed infrastructure projects. 44 \ SECTORAL IMPACTS AND PROJECTS \ 45 IMPACT TO HOUSING a — \\ i % eu q BY a ie “S iy . bee ‘ i ~ a a a min “ os hee Hwee {8 < tet i Vi] 2 Me a ou ‘ere ae he | o a fs a e ye iN ne re & Ase ae ro ae ES < 46 HOUSING Hurricane Irma and Maria took a huge and unprecedented toll on the island's home and housing stock. it is estimated that over 472,000 housing units have received major damage or been destroyed by the hurricanes. This forced tens of thousands into congregate shelters and hundreds of thousands more into hotels or into the homes of family and friends. As of early November, more than 1 million Puerto Rican households have applied for FEMA individual assistance, with many more expected to apply in the coming months. While damage was widespread and impacted people of all economic and social strata, many of the most severely damaged or destroyed housing units sheltered lower-income populations, were of poor quality and/or were not constructed to modern building code requirements and resiliency standards. The loss of power, water, and access challenges across the island have further complicated matters, making housing that otherwise could be occupied uninhabitable. One of the major challenges in Puerto Rico is that a substantial portion of housing stock was made uninhabitable or taken off-line, reducing supply at the same time that demand for safe and decent housing increased due to the storm effects. This has created a situation in which there are insufficient housing resources to support the needs of displaced populations. This problem is particularly acute for individuals and families of low-income or who have special needs. Because Puerto Rico is an island, this situation has left tens of thousands of Puerto Ricans with no other option but to leave for the mainland United States to secure safe and habitable housing. Given the extent of housing losses, Puerto Rico is looking to build back a more resilient housing stock that can correct some of the deficiencies and problems that contributed to the massive damages. Substantially-damaged structures located in the 100-year floodplain will need to be reconstructed, elevated, or bought out (of the total occupied housing units, approximately 58% are situated in mapped floodplains). Puerto Rico will be adopting an updated hazard resistant building code that will ensure that housing repairs and reconstruction will result in safer and more secure housing across the island. As required by FEMA, the Government of Puerto Rico will use the recovery period to address the problem of “informal housing” ~ a term used to describe homes built by people on government land without permission and without following building code requirements - by supporting the development of safe and decent replacement housing away from government land where these individuals and families can be relocated. Puerto Rico will also implement programs for single-family, multi-family, and public housing repair, restoration, and reconstruction to facilitate replacement of the housing stock. The Puerto Rico Department of Housing manages existing public housing projects and offers housing assistance to more than 40,000 low-income housing units housing over 100,000 households. The Department of Housing is currently assessing the damage to the affordable housing stock. Low-income households have fewer options in securing safe and decent housing especially in times after a major disaster given their limited resources. Considering the magnitude of damage caused by the hurricanes, it is anticipated that temporary housing solutions for those affected by the hurricanes will be needed for months or, in some cases, years. This produces a temporary recovery need for residents that includes rental assistance as well as repair and mitigation. 47 It is critical for the island’s recovery that there be adequate funding for housing resources that can meet the needs of all its residents and permit those who have been displaced and who were forced to leave Puerto Rico to return to their communities. Currently, the FEMA Individual Assistance program inspections are not rep: ive of the di ges as the total inspections are predominately in the metropolitan area and only include 7% of the overall housing inspections required. At this time, it is estimated that Puerto Rico suffered almost $37.41 billion worth of damage to its owner-occupied and rental housing stock. After taking insurance into account, the estimated unmet need based on damage estimates and the need for mitigation is approximately $311 billion. 131,139 $4,589,861,178, 105,757 §1,586,357,550. 105,757 $528, 785,850 This estimate was based on information regarding the housing stock prior to the hurricanes, open source housing data, FEMA Individual Assistance data, US census data, insurance info, and assumptions based on local knowledge. Below are the assumptions made in developing the housing estimate: + The percentage of damage level (Destroyed, Major, Minor, Affected) were based on Hurricane Hugo and Georges * Cost for repair/rehabilitation by category (i.e. 120,500; 35,000; 15,000; 5,000) based on median home prices and input from PR housing agency. * Puerto Rico insurance industry provided insurance rate of 31% + The mitigation factor of 30% is based on the HUD standard of 30% of Major and Destroyed properties For additional information on the methodology, please see the appendix. $31,068,532,671 48 REPAIR AND RECONSTRUCTION OF PUERTO RICAN HOMES Estimated Cost $31,068,532,671 Proposed Funding Source CDBG-DR or Other Possible Funding Sources FEMA,SBA,SSBG EVALUATION CRITERIA DESCRIPTION Repair and rebuild a more r nt house stock for 80666 single-family, multi-family, and pub © RESILIENCY residents. Develop programs mp! as. jms ECONOMIC 9 ©0000 ofthe larger community su youts an lnbie Meng a hazard resistant bull Sho TECHNICAL 8 OO06 (IMPACT sla Ve! 2 socut © 006 6 Damage was widespread across 472,000 homes received Or ag been destroyed by the Laat es. AS rt w@ ENVIRONMENTAL @ @ @ @ O ion to. Rica ‘November, more than 1 households. have A individ WES aeeletatice: LOCATION NITIE LONG-TERM BENEFIT AND OP of Ri ns have Hundreds of thousan been. displ by e hurrican ma more | ing in damaged ho very get ho hold: ack into safe nd decen housing quickly as well as 16e) in itigati futu ptions that can. reduce pact St housing stock and ma communities stronge 49 cee s - & - < — oS _ < . aS ~ _ “ o . a . ‘ 4 4 - _ . / . - . x . . ~ a & = . . _ . a a Oo) s a ae - ae S = — ac = — = = - c | a oe af < = : = a a a - . - - = x x . . SS oS “ . a aS . o So - a = : ~ ae a : . ~ a - = ~ - a So | . . oo = = Se . . . 4 = — - < . - = a ‘ . i = . Se = = - = < a Y x = < — at ™ . ~ oc Ss BS a = = ~ < = : . — xs x a = "i Ss . i si . oS a 2 x ee hee — otk ae " in a Ne x i mT i ane BN ie soot OER. ‘ AY Y Se Shire aN sss ay eS me v " a at au . x Y wy ae — A a “i ane ae ye a ae Ni Ss + ea ise a i sa ec s << x . i _ _ AR = < _ So SS x << Sx . >) @ oe) a e S ae S me LGR . oe a - S ~ . a ~ . . - - ~ eS < ‘ ~ x a . i s - ale a a 0 a ne 50 POWER GRID AND RESILIENCY Hurricanes Irma and Maria caused the complete failure of Puerto Rico’s power grid. Generating facilities include 6 fossil and 21 hydroelectric power plants, owned and operated by the Puerto Rico Electric Power Authority (PREPA), as well as privately owned facilities including 2 cogeneration plants, 2 windfarms and 5 solar farms. The transmission and distribution system consists of 2,478 miles of transmission lines, 31,485 miles of distribution tines, and 344 sub- stations. The storms decimated both transmission and distribution lines across the island, with 847 poles and transmission towers destroyed, and nearly 900 conductor and insulator failures system-wide. 74% of substations, both primary and secondary control centers and all power generation plants incurred moderate to severe flooding and varying levels of wind damage. These systemic failures caused the longest sustained power outage in U.S. history that continues to this day on approximately 60% of the island. According to the PREPA and the U.S. Army Corps of Engineers (USACE), it may take considerable time to provide temporary power to all points on the island and several years to rebuild the entire grid. This cataclysmic failure of the power grid has produced some of the most costly and impactful consequences of the hurricane disasters, creating ripple effects throughout the housing sector, communications, critical infrastructure, health care and economy. The failure of the grid provides both Puerto Rico and the United States the unique opportunity to rebuild the power infrastructure and rethink how power is generated and distributed across the island to make the systern more efficient, resilient, and sustainable. The system can be modernized to include state-of-the-art technologies while incorporating renewable energy sources such as wind and solar along with energy storage to reduce system costs, improve resiliency and decrease “last mile” costs of the distribution system. The grid can be built with smaller generation units that are distributed so as to provide redundancy and a series of micro- grids that are multi-directional (vs. one-way). The system can also be sized to meet the forecasted decreases in load over the next decade, which will allow PREPA to modernize the system in order to provide stable energy at a low cost. This model could also serve as a laboratory for the future development of power production, transmission and distribution systems and the incorporation of renewable resources. The rethinking of the power grid has broad implications for Puerto Rico’s citizens, businesses and government. Our summary for estimating the need was as follows: See S = Lid = aw Lat ce a z = = ee oS ac la = S a 51 POWER GRID AND RESILIENCY 34 $45, lasement control ult floodi rotection “few. su tation ‘elacati nS 3} ipgrade structur sand to. T58m) Substati Rebuild replace end of ti cil break and Hardenin: arden. grade. rel : protection systems, T/D SCADA, and ecurity TRANSMISSION LINE RECONSTRUCTION AND HARDENING KV & 23BOkKV. $400,000. 00: Includes Ware: ral on: oles, ‘eplacemen eee 0,000 001 rd € upg! 10 100 000, 1200. 100) reconstruction a mH / fe $2.48 ardening: Including = ERS REBUILD AND HARDENING acento — CONTROL CENT! Pri ry Control $10,000,000 build and ardenit adihveiiuns Sian Sani Backup Cor $24,000,000 Center relocation, rebuild and hard E... sgn ronnie on “Spare ntory: inane 0 $800,000 $8,000,000 Transformers: ms $50,000,000 /OT syste EMS, ADMS/DERMS, GIS, AM. Cybersecurity ims/Fiber/Wir $400,000,000. esi Ni eae GENERATION 500, © arde peath Rebuilds, Spares replacement eis Bienes Cay Fuel infra $1,001 Peon ‘ested DE a Assuming. microgri westment to-get 10%. ee : peak load (comes to 260 MW} on mic $4/W. ie $4/W. breakdow! gen tor, $1/W for lorage. ~$1.5/W for: dw ate control CESS ESS SSS Rea as fe ERacton AD $17,78' 000 Power Grid and Resilie cy. 52 POWER GRID AND RESILIENCY INVESTMENTS — 8 Estimated Cost $15,639,375,000 a Proposed Funding Source PA/HM Other Possible Funding Sources CDBG-DR & EVALUATION CRITERIA DESCRIPTION Modernize and har n the clad lectric: system substations reconstructi Ss and. floor S RESILIENCY 8 OO 6 @ transmission and distributio nes hard Q center rebuilding, with upgr es th quis ECONOMIC 08060 IT; power generation, and fuel su ng, distributed energy resources build out ers. ‘Bo TECHNICAL @00066 IMPACT J soci. @ 6 @ @ © Hurricane Maria hit Puerto. directly Category 4 hurricane witl sustaine ~@ ENvRONMENTAL @ @ @ @ © 155 mph (250 km/h) that knocked out the and secondary ele transmissions _ lines co er essential infrastructure This resulted on the generation stations and U.S histor rgest blackol LOCATION ee samonns LONG-TERM BENEFIT AND OP! TUNITIES the th, With this nd will be ‘pro MOre Fe ent lectrical em that ecurrence of catastro| situation caused by the fter th 00% Maria e popul 100% of iNESS.an ommunicati sland wide benefit from the projec ech’ ide the have transmission losses and ill wer MM tenan costs. 53 OFF GRID ENERGY PROJECTS Estimated Cost $150,000,000 Proposed Funding Source HM Other Possible Funding Sources CDBG-DR, EDA EVALUATION CRITERIA DESCRIPTION SEN ENS ee one Development: and. installation of renewable (GS) RESILIENCY 8®@e@o0o 6 energy sources that will ensure that water and o energy can continue to be provided during — sie ECONOMIC © 6 6 6 6 emergency stations. a “hy teconical «= @ OOO @ ® soci ®@e@ee IMPACT Approximately 90% of th of ENVIRONMENTAL @ @ @ @ @ collapsed due to damages of the electrical grid LOCATION LONG-TERM BENEFIT AND OPPORTUNITIES Critical water facilities. silient: to blackout. allowing the distribution and sewer services to function properly even in future hurricane scenarios 54 _— ERE B & at < Ne aN = < x te S a . . co rh ‘ << nS a < =< . ‘ “A . a ~ ~~ ie 3 wy 4 - . . ~ ce aS 2 a a . s : on oS es . x s os - S a o A Me ey “ . x ‘ be ~ y . a o . ‘ we : 4 a “ . . ‘ . ae a a : nee . at . . . . oF ‘ co q “ : ‘ . « oo : o \ ‘ ue if ae ane a oe _ < \ . “i : a ae hg Ne \ cue C ‘ . i a ie = o . : i, on . i. cs “ : ah “ : ‘i . ‘ : ae iN . ~ » \ . ‘ . _ . : ‘ . nN a x a so ‘ . be a \ 4 ‘ . a ne uO oe 2 a ‘ nt e * i a _ - . oe c . . x N \ a ‘ ‘ Ne tt iN | it ay - ES « - a ii oe . a oo . a . : Aa : x i s us a - A . o : i He 7 ; ~ iM th a Q oo : . i RY y aN se eS oS oF / S “ ti a as \ : f oo iy ‘ * : S i ‘ ey ‘ aS eae ” : aS aa : ae aM Ne : . ‘ ah oF co AM “i eh ate wi . ue ae au x As a AEC Nt Ss . i S AES BEaNS ae i a ais A ¥ , =8 ‘ ae AM a ae i a Ni ih i mt iS “ Ni a < < i a a at e el o x Se e ‘ . a \ \ “ i LS ENS = " x ae . i‘ . 4 ‘ . . aN = . ‘i ' . | ‘i ES S x i oe aN aS ‘ ‘ x ‘ : ra i ot a - me oe a sy we aS o a . i x am ne nt u ~ ‘ . o . < Se & ag vy AN au ~ ~ cr x a ie a“ Se a ~ a ‘ = og ce oS oe . . 2 - Se or oS ro YC hs As o . ‘ ~ = : . . = we 2 55 HEALTH AND HEALTHCARE The damage to Puerto Rico’s existing healthcare system was significant. Each of the 68 hospitals and 107 health clinics across the island experienced significant structural damages and power loss, and in many cases pre-existing generator back-up systems were either damaged or destroyed due to the storms or the duration of the power outages. One hospital in Vieques was completely destroyed. The island's network of primary and critical care centers ail but closed down due to power and damage issues, requiring the expenditure to date of over a hundred million dollars by the Federal Government to activate the National Disaster Medical System, a Combat Army Surgical Hospital and other temporary medical facilities, provide air-lift support for critical patients, and even mobilize the U.S. Navy Hospital Ship Comfort to fill the gaps. Nearly six weeks after the storms, twelve (12) hospitals remain on back-up generator power, and many are operating at reduced capacities due to power and water limitations and damage. Only 72 of the original 107 health clinics are known to be operating: 33 of which are on generator power. Puerto Rico is now facing a public health crisis. Vector control remains a significant concern, as does the potential for disease outbreak due to contaminated or compromised water supplies, and the presence of nearly 6.2 million cubic yards of debris that can serve as an ideal breeding ground for rodents and other disease-carrying vermin. There is an unknown number of people potentially affected by ingestion of contaminated water and the secondary effects of infection and long-term toxicity from ingesting dissolved or suspended toxins. Puerto Rico should also expect increased morbidity and mortality of those suffering from chronic diseases such as asthma, hyperglycemia/diabetes, kidney failure requiring dialysis, hypertension, chronic depression, and those who have more limited access to healthcare providers and medications. The chronic impacts of the disaster on the population's health may take years to manifest. One of the most significant and immediate challenges faced by the Government of Puerto Rico is the impact that the storms has had upon its already fragile Medicaid program. After many years of structural underfunding, the Medicaid program has been further hobbled due to the hurricanes causing widespread public health impacts that are expected to generate significant increases in usage of Medicaid by program participants. These impacts include health problems associated with hazardous conditions, insect-borne disease, health and safety issues associated with debris and damaged facilities, and increased risk of infections. The increase in unemployment and other social factors is expected to increase the population eligible to participate in the program. This situation is further complicated by the exodus of tens of thousands of Puerto Ricans to the mainland because of the lack of safe and decent housing on the island; these individuals will be seeking medical services in their adopted homes at costs that run 4-5 times higher than that of similar care in Puerto Rico. The Government must either expand coverage under Medicaid to assume these unanticipated costs, or strand its residents away from home without access to necessary health care services. 56 HEALTH AND HEALTHCARE In the aftermath of these events, the Government of Puerto Rico needs sufficient funding resources to implement its Medicaid program to address the immediate and longer-term healthcare needs of the island's population. The Government of Puerto Rico is planning to restructure its health care delivery system to permit a more rapid assessment and response to health crises and disease outbreaks, and build a modern and resilient healthcare system that can sustain the load from crises. The goai is to regionalize response to health issues in the future by establishing regional healthcare “hubs” to provide high levels of care and to serve as a regional resource centers for other health facilities to ensure they always have access to critical supplies, medicines, equipment, and surge capacity support. Puerto Rico seeks to “harden” hospitals and other critical healthcare facilities to make them more resilient, ensuring their availability immediately before, during and after a disaster occurs. The government has identified specific restoration projects that total the amount specified below. The following projects illustrate a few of the ways in which Puerto Rico is planning to implement measures designed to achieve these objectives. _ Health and Healthcare $14,946,507,962, 57 MEDICAID ASSISTANCE Estimated Cost $11,350,000,000 Proposed Funding Source HHS EVALUATION CRITERIA DESCRIPTION Obtain necessary. fu ugment. th ress’ 98°00 Medicaid program in Puerto © RESILIENCY related costs and reduce the CO! 2 ECONOMIC ©0060 Noahclal es that impe ter IMPACT ‘ho TECHNICAL @@ 6 @ 6 The hurricanes produced signi cant u for medical care for pa ipan ©6806 JM soca. Medicaid program du expected program usage as w sed sys 2@ Envronmenta, @ © © displaced Puerto Rican: acce much more exp care on the mainia JM st -O! derfunding of Puerto Git island). Also, the structural Rico's Medicaid program MODINE ve LOCATION disruptions to economic activity and Liat fee collectio make. alleviating the structural burden’ of. Medicaid in Puerto Rico = ta LONG-TERM BEN AND OPPORTUNITIE Providing at itiol g for Medic > the healt! man coming five yea © SUTVIVO! Uh ed ‘eased ica th nancla lief from Viding thi wad fance: ‘ill ee OUICe! the La yf Puert purs! VEN in ab: hi ous and effective manne: 58 HOSPITALS IMPROVEMENTS Estimated Cost $141,906,000 Proposed Funding Source ‘. CDBG-DR Other Possible Funding Sources EVALUATION CRITERIA DESCRIPTION Puerto Rico is planning to mode and resilient healthcare system that can sus nthe load d Key RESILIENCY © 06 0 6 after crises. Hardening. of hospitals and oth itical SJ healthcare facilities will be undert: nas well othe yu» ECONOMIC 8 OO O60 mitigation efforts. This project will maximize é able to bette! renewable power generation which wil ‘ky TECHNICAL © © @ 6 @ withstand — storms . and flooding nd oderniz equipment and services. @ 6 6 6 6 IMPACT J socia One hundred percent: of 68 ‘hosp and yl! ENVIRONMENTAL @ @ @ ¢ health clinics experienced significant structural damage and fost power. In: any instances, pr ISting: generator systems were either damaged, destroy OF Wai failed. The National Di ter Medical. Syster LOCATION activated and utilized a Combat A\ sur Ho: ital and other temporary. medical faci 1€: rovided. air: nd even: mobil d the support for criti | patients, Navy Hospital Ship Comfort ta the ga LONG-TERM BENEFIT AND OPPORTUNITI Making t isla ith re facilities and te e more resilient will permit for m« tapid response health issues nd moro continuity. f services especially in time: saster and reduce the need for extra: nary. measures: to re the sidents. of 0 Ri have access to heal ca 59 STATE EMERGENCY STOCKPILE Estimated Cost $5,000,000 Proposed Funding Source CDBG-DR Other Possible Funding Sources EVALUATION CRITERIA DESCRIPTION Funding to ensure. time 68660 immediate local acce: cr © RESILIENCY supplies even if the islani anspo ite ECONOMIC y @ 6696 network is disrupted in an emerge Shev TECHNICAL 00006 IMPACT 2% soca. 860686 In the immediate aftermath of Mari Ss to hospitals did not hav efficie me nes due wf ENVIRONMENTAL @ © @ @ medical supplies an disruption of the ply ch Thes eatment to \jured al disruptions: del yet sick citizens, xacerba the already ficul LOCATION conditions. SSS LONG-TERM BENEFIT AND OPPORTUNITIE -— Well st i alt supply Kpiles of essent lie: | medical ‘Sul =< and | -ensur rompt medical treatment in thi if fut disaster 60 HOSPITAL REPAIR & REFURBISHMENT Estimated Cost $3,445,735,962 — Proposed Funding Source CDBG-DR Other Possible Funding Sources EDA EVALUATION CRITERIA DESCRIPTION Funding to rebuild, re mize: stor we ef RESILIENCY © 0 6 6 6 impacted or destroyed hospitals and medical cl linics across Puerto Rico. . gi ECONOMIC ©0606 ho TECHNICAL 686066 IMPACT Each of the 68: hospitals: 10 ealth cl 3 socut ©0066 across the island experienced. ign damage, including destruction o existing back-up »@ ENVIRONMENTAL @ @ @ @ © power supply systems. TI ges sign degraded or fully obstruct th bility. these critical facilities rovide basic medical are to Ae Puerto. Rico's. citizens. including. the erly an LOCATION children. LONG- TERM BENE IT AND OPPORTUNITIES | A. fully oper alth ca syste dS: cornerst ni n any. mo societ When significan capital investments are ade. t pa health care facilities, these facili hould ith curren al are upgraded ‘in accor ractices od up date meaica technologies. 61 . = = i cee — — = = = =< = “ : a < = oo = — ~ : SS ~ < = - = - = o . < ~ o Q = = = = - . a . os AS & < . . a eo . _ SS = ——— oo - - ~ . - - = —— ms a S - . s. x q x . : > = = . S a < < S = « & . og < x ES . . — he < < = = ~ < . = < ae — x 2 ~ ~ x = oS - - < < = = — = = ~ oS . . . a . . . = > eC =< = = - = - =< - os . A : . / / - a . a < —S . = = . " - ~ a . = . os - = . & 2" a a A oi tah a - _ ae . : a = ~ me & = a se = So : a oe = eS 2 ae = as . * ees : . “ . = = ~ ot ‘Se = Ss = = = ae a a nee Se = = og Se 3 oe S = . s a ~ Soe ca oot ? e oa X ‘ Xe = = ave = ie Me ae . Ne <= ue - — a = ene ‘ a > ine “s ¢ = 4 Use n eee en “S = = oe we ae . ey an ‘I - a “ a ae me sy = ae eo an a o nt ee \ ae 4 o i 4 . ae % e a © = = “ ot ace Si a sont ; a We mt a < ake ‘ bial ae Ss a inhi a a y See eS Ai Re =¥ ip’ * $276,600,000 Proposed Funding Source CDBG-DR Other Possible Funding Sources HM, USDA EVALUATION CRITERIA DESCRIPTION Relocation of existing Wastewater Treatment @eeee@ Plant located on a flood zone into a new rey RESILIENCY location that is not flood prone. gm ECONOMIC 8®eee0 Bo TECHNICAL @9e0ee@ IMPACT B® socu @eee0 As a result of the floods generated by Hurricane Maria the Dorado WWTP was affected putting at ~@ ENviRONMENTAL @ @ @ @ © risk the health and. safety of the persons residing near the facility. LOCATION LONG-TERM BENEFIT AND OPPORTUNITIES The new project will provide Increased Py reliability of wastewater treatment and will not expose citizens to contaminated water. ~~ oe 78 101 LEVEES DESIGN COMPLIANCE AND REPAIRS — Estimated Cost $100,000,000 Proposed Funding Source USACE ae Other Possible Funding Sources CDBG-DR, HM . EVALUATION CRITERIA DESCRIPTION le Assessment and reconstruction. ©9006 infrastructure to comply with en code: ey RESILIENCY current regulations. © ©6606 puke ECONOMIC ho TECHNICAL ©6060 IMPACT. Levees were damaged by &@006 exacerbating riverine. looding J soci Por eunites: : vi environmental @ @ @ @ @ sReerenertin LOCATION LONG-TERM BENEFIT AND OPPORTUNITIE Levees. contr ooding long rivers providin life, infra fea operty rotection SUF This project will protection and. pportunities to area economic developmen’ benefiting from this rk 102 ees eS a < - ae a ae a < eS . Ss = o = = % e . = “e = oo - nS g a = * ‘ . a = _ eI ‘) 4 <) \\ a e = e & ms ee - " S ot ‘ it a re a) \ SS aS ‘Ray i ee i, A _ , = Si \ 4, i a iS ft cs 4 ny Sy e \ He i] us ee “ “ es — a 3 = one i i “5 ah * “ . ‘ uN i ae " osteo BH se is A yf a M We 3 a me oun asa nC ch fi ete a AN one - om sno — — « _— ‘3 wan eer ae % cama " ee fs he ie, “ x “s s an we ay ‘a & A ne io a A i . Soy Sex EDU ION A D oe a ae %, i ae = JG 103 EDUCATION AND SCHOOLS At the time of the Hurricanes the Puerto Rican educational system consisted of approximately 1,113 public primary; secondary schoo! campuses (5,000 buildings - 400,000 students); 750 private primary and secondary school campuses (2,000 buildings - 150,000 students); community colleges/technical schools serving approximately 65,000 students; and 24 Universities that serve over 250,000 students. During the hurricane, several thousand of these island's educational facilities were damaged, with the worst impacts at the primary and secondary school levels. As of November 6, more than six weeks after the storm, 598 public schools had yet to reopen, 200 still do not have water service restored, and at least 70 school campuses may never reopen due to the severity of damage. in addition, thousands of students and teachers left the island for the mainiand after the storm hit, potentially impacting the demographics of the educational system once the education sector is restored. In light of the disasters, Puerto Rico now has the opportunity to consolidate campuses, modernize facilities, and improve and expand the use of technology so as to adapt the educational system to the unique needs of Puerto Rico and its economy. The Government will consider the size and number of schools needed at the primary, secondary, and post-secondary levels when making decisions on reconstruction, with an eye toward achieving efficiencies, consolidating facilities based on current and projected demographic trends, and improving education delivery. As it rebuilds and repairs, Puerto Rico now has the opportunity to consolidate campuses, modernize facilities, and improve and expand the use of technology so as to adapt the educational system to the unique needs of Puerto Rico and its economy. Achieving this vision will be complex and challenging, but it is clear that substantial funding above and beyond available FEMA resources will be necessary to accornplish this vision. The projects listed here provide insight into the types of initiatives that will be implemented in Puerto Rico to restore the island’s educational system and capitalize on the opportunity to enhance and improve it as part of reconstruction efforts: - $8,413,208,822 ce ol o = = o ” 2 = 2 2 = aa S a & a 104 OPTIMIZATION AND REINVESMENT IN SCHOOL SYSTEM INFRASTRUCTURE Estimated Cost $300,000,000 Proposed Funding Source CDBG-DR Other Possible Funding Sources &» ED EVALUATION CRITERIA DESCRIPTION . Renovate one public sc er unicipali G RESILIENCY © 66 6 @ Right-sizing the school syst togetl o simultaneous re-investment. | ve. iy ECONOMIC ©0606 of school infrastructure for hous students by aligning. educatio © O@ 66 Bo TECHNICAL eonditions of the 2st century. JD sociat 9OOO6 wf? ENVRONMENTAL @ @ @ @ © IMPACT : Severe impact and_ mages iCLOSS ho infrastructure. Prese numero! Lic Shoo remain LOCATION LONG-TERM BENEFIT AND OPPORT! TE Significantl ove th Hien school infrastructure an nhan th academi perform 105 Se Se] =, . Ss 2 BMS = * . es Sh a Ss = uy ae ey coh Ne & we x r x SS = e 4 oS 3 s iS % 7 ra ee ‘ : o s we 2 = a x = ae oe a ‘ = ne a we Te " < Se i. y a ee “i “ < s i a ee ei * i at « ae a = a0 * 58 ts = “y Ri he = sad oe mi i & < eS e VEN o no =s on f? u My a a a oa EE: me an, | s pe : e a el * wo Ni z A a < et on 3 e “ ‘ x Wate ) By = a “ “ 4 wn ca Oe an Xs Oe ys ahs " 4 Eayan we if ay soy ‘ Se ant es < x # . « of et ke xe geo ES Ae EY My aA x saith i NY uy) ae eR aA rene eal Si ce . at ce ‘ Af ah «| 4 < me, eh a a yy BN § ‘ That ii y ‘ay y * xe y th is ‘i ¥ K. & was I i SG ye a bY ‘ ys Aa ut es ‘ ue ne ty ce ae 2 A a a Oy =e ak a \o : ag SS A a ey » - ‘i im ‘i x IMP. ‘i NT a e4 i A AND N 3 a < R CES 7 Sri . . ay me — 106 ENVIRONMENT AND NATURAL RESOURCES Hurricanes Irma and Maria caused widespread impacts on the natural resources of Puerto Rico, ranging from the devastation of the rainforest canopy, to massive production of debris, the release of chemicals and untreated sewage into the environment, the devastation of coral reefs and sea grasses, and the severe erosion and destruction of the coastline and associated biomes. In forty-two of the island's coastal municipalities, damage to beaches, dunes and bluffs that normally provide a natural barrier to coastal flooding has been severe, significantly increasing the risk of future damages in those areas. Landscape and biological corridors conservation and connectivity, as well as habitat for endangered species has been impacted by the devastation of the rainforest and the existence of storm debris. These and other impacts are what is known, but the long-term impacts on Puerto Rico's environment and natural resources will take months or even years to fully evaluate, mitigate and repair. As an urgent matter, Puerto Rico must address the challenges related to storm-generated debris, which threatens public health and safety and overwhelms the available infrastructure of the island for its disposal. It is estimated that the hurricanes created debris is equivalent to 4-5 years of landfill capacity at the island’s 27 existing landfills, which is an amount that would significantly deplete available space for waste disposal on the island. To tackle these problems, Puerto Rico will pursue a comprehensive strategy to evaluate and assess the short, mid- and long-term impacts of the storm, plus monitor impacts over time and track progress related to restoration efforts. Special focus will be placed on the restoration of habitat in the rainforest as well as the creation of coral farms to restore damaged reefs. Puerto Rico will also need to pursue a program involving replanting and reforestation, the removal of invasive species, and restoration of fisheries to both enhance the environment and strengthen the economy. The government has identified specific restoration projects that total the amount specified below. To implement this strategy, Puerto Rico is hoping to execute initiatives like those shown below to help assess environmental impacts of the hurricanes and begin the process of restoring the island's natural habitat: © $1,581,050,000 107 CANO MARTIN PENA RESTORATION AND RESILIENCY PROJECT x Estimated Cost ek = $1,000,000,000 ~= ) 131 for reimbursing our publicly-owned hospitals under Medicare, as well as unrealistic benchmarks under Medicaid. These shortfalls in federal healthcare funding have adversely affected the quality of healthcare in the Islands and have required our Government to borrow money to cover a significant portion of the gaps. Rebuilding a future for our children ... Hurricanes Irma and Maria impacted the most vulnerable in the Territory: our children. Nine (9) public schools were destroyed and condemned: seven (7) schools in the St. Croix District: (1) Lew Muckel Elementary School, (2) Pearl B. Larsen Elementary School, (3) Eulalie Rivera Elementary School, (4) Arthur A. Richards Elementary School, (5) Elena Christian Elementary School, (6) John Woodson Jr. High School, and (7) Alexander Henderson Elementary School; and two (2) schools in the St. Thomas/St. John District: (1) Addelita Cancryn Junior High School and (2) E. Benjamin Oliver Elementary School. The only public school on St. John was severely damaged as well. Additionally, school gymnasiums and the Curriculum Center in St. Thomas were also destroyed. All aspects of our public school system have been impacted to include the loss of school buses, total decimation of the agriculture program, aquaponics labs, the poultry farm, and all school gardens. In addition, our children are without musical instruments, athletic equipment, and home libraries that we were actively promoting through our literacy initiatives. The schools have lost literally hundreds of computers, smart boards, and other technology-centered materials that requires rebuilding of the infrastructure of the IT system to facilitate connectivity and reliability. We’ve managed to open enough schools to continue teaching our children, but most are learning in difficult conditions or have to endure long commutes. Given our smaller school population, we plan to consolidate and build six new resilient schools to include one in St. John, two in St. Thomas, and three in St. Croix. This will allow us an opportunity to include pre-school centers in our schools and an opportunity to expand our vocational training programs to drive workforce development to diversify our economy. Our founding fathers insured that all U.S. citizens must receive a free and appropriate public education, and the Virgin Islands Department of Education will be a major contributor to the restoration and rebirth of the Territory. 132 Regarding public safety—we lost two fire stations, a police station, and our Emergency Operation Center for disasters on St. Croix. The campuses of the University of the Virgin Islands were heavily damaged on both islands, and they require extensive repairs. So many of our critical facilities must be built back stronger and more resilient than before, and I have convened an advisory board with representatives across multiple disciplines to drive our re-building efforts. Rebuilding stronger and smarter will also ensure the most cost-effective use of precious federal recovery funds because it will prepare us to better withstand the hurricanes that are certain to come in the future. But first, shelter ... While we are appreciative of the FEMA Blue Roof Program, this mainly protects homes from further damage. However, this program does not create a suitable housing situation in the midterm, particularly during the heavy rains we have continued to experience. While FEMA traditionally relies upon the Rental Assistance Program to displace persons, there are very few homes and apartments available to rent in the U.S. Virgin Islands. Even though FEMA has authorized the Transitional Shelter Assistance Program for the Virgin Islands to allow people to stay in hotels, there are too few participating hotels because so many were damaged or are housing recovery and response workers. Ihave asked FEMA to immediately authorize the Sheltering and Temporary Essential Power (STEP)/Rapid Repairs Program at an average cost of $50,000 across all homes Territory-wide, instead of the $20,000 cap for each home in the current FEMA-approved STEP policy for the Virgin Islands. While $20,000 may be adequate on the mainland, in the Virgin Islands this amount is not sufficient. In the Blue Roof Program, FEMA provides an average of $25,000 just to put a tarp on a breached home. So how could it be conceivable that an entire home can be repaired and a habitable shelter created for $5,000 less? We are ready to implement the program as soon as FEMA removes this cap and completes a few other simple program modifications that we have requested. For longer term and permanent housing solutions, we will need nearly $2 billion under FEMA’s Permanent Housing Construction Authority, from HUD’s Community Development Block Grant Disaster Recovery Program and from FEMA’s Public Assistance Program for public housing, to enable all Virgin Islands families to return to safe, sanitary, and resilient permanent homes as soon as possible. 133 Our citizens—-American citizens—have suffered terrible losses, dislocation, and distress in the wake of these storms. Our recovery will be long and difficuit. Virgin Islanders understand and accept our responsibility for being in front of rebuilding our communities, but we cannot do it alone. We cannot squander this opportunity to rebuild a better, stronger, and more resilient Virgin Islands simply to rebuild quickly. If we do, we will only compound the suffering that so many of our citizens have endured. With your support, that won’t happen. Thank you for listening and for supporting your fellow Americans in the U.S. Virgin Islands. Legislative recommendations: (1) We must build our energy transmission and distribution systems to be stronger and more resilient than what existed before the hurricanes. To eliminate any doubt that federal Stafford Act funds can be used to not only restore these systems, but also to make them stronger and more resilient, we urge your support for amendments to the Stafford Act that will specifically authorize federal funding for such purposes. (2) Because of the extreme and extensive damage to the Territory’s infrastructure caused by the hurricanes, and the resulting stress to the Territory’s finances, the Government of the Virgin Islands cannot continue to shoulder the current burden of the local matching requirement for Medicaid funding, which we estimate to be $64 million in FY 2018 and an additional $50 million in FY 2019. The Virgin Islands Government respectfully requests that the Medicaid provisions of the Social Security Act be amended to provide for a temporary disaster-relief increase in the Territory’s FMAP to 100% (from 55%) through September 30, 2020. There is ample precedent for an increase in a jurisdiction’s FMAP in response to disasters or for other reasons. The funds to cover this cost can be drawn directly from the sums which were set aside for the Virgin Islands under the ACA that remain unspent. For the period after September 30, 2020, the Government respectfully requests that our FMAP be calculated like that of every other State (consistent with the recommendations of the bipartisan Congressional Task Force on Puerto Rico) or, at least, a 70% FMAP (the same as for the District of Columbia). (3) We are experiencing — as a result of the hurricanes—a significant increase in demand for Medicaid services, an increase in our Medicaid-eligible 134 population, as well as increased demands for reimbursement from states providing services to displaced Virgin Islands residents. All of these factors will substantially increase our Medicaid costs, which will accelerate the rate at which federal Medicaid funds are accessed. Consequently, as a result of the hurricanes, there may be little or no ACA Medicaid allotment remaining as of September 30, 2019 unless Congress acts. I therefore respectfully request that Congress address the “fiscal cliff’ by eliminating the cap on Territorial Medicaid reimbursements, or at least providing annual allotments of at least $80 million beyond September 30, 2019. Ifthe “fiscal cliff’ is not addressed by September 30, 2019, the Virgin Islands’ Medicaid program will be at risk. The Virgin Islands’ annual base Medicaid allotment is only $17.9 million, which is only 19% of the annual Federal funding needed by the Territory to support our current Medicaid program. Unless the “fiscal cliff’ is addressed, up to 30,000 U.S. citizens (30% of our population) could lose access to healthcare coverage under Medicaid. (4) We are also asking that Congress eliminate the “cap” on the rate of federal rum excise taxes returned to the Virgin Islands (the “Cover-Over Rate’’), as recommended in the December 20, 2016 Final Report of the bipartisan Congressional Task Force on Puerto Rico, and/or at least extend the temporary rum tax cover-over rate enacted by Congress in 1999 (the “Temporary Cover-Over Rate”) and regularly extended by Congress thereafter. Extension of the Temporary Cover-Over Rate, which expired on December 31, 2016, is a major source of funding for the Government of the Virgin Islands. It is critical that Congress act quickly to eliminate the cap, or extend the Temporary Cover-Over Rate, on a retroactive basis to ensure that the Territory has the resources necessary to help fund its recovery from the destruction of Hurricane Irma and Hurricane Maria. Delay in Congressional action would risk reduction or loss of these urgently needed funds. (5) Any long-term recovery plan also requires as its core the need to spur and sustain economic growth. Federal tax policy plays a critical role in creating the investment climate to generate sustainable economic growth in the Virgin Islands and help the Territory create jobs and improve its long-term fiscal health. It is my fervent hope that in its tax reform proposals Congress will consider the unique status and circumstances of U.S. Territories. The Virgin Islands is considered a foreign jurisdiction and not part of the United States under the Internal Revenue Code, even though Virgin Islanders are U.S. citizens, and Virgin Islands businesses are U.S. businesses. Further, the Virgin Islands’ (and Guam’s) income tax system is based on a “mirror system” of taxation, in which the Internal Revenue Code is used as the Territory’s Internal Revenue Code (commonly known 135 as the “Mirror Code”). As a result, any change to the U.S. Internal Revenue Code would automatically impact the Mirror Code Territories, which raises both technical and revenue issues. Fundamentally, the Territories, as part of the United States, should always be treated more favorably than foreign jurisdictions under federal tax law. Unfortunately, that is not always the case. Indeed, as a result of unduly harsh provisions in the JOBS Act of 2004, the Territories are in many ways treated worse than foreign jurisdictions. In particular, the (effectively connected) income sourcing rules imposed by the JOBS Act have unfairly restricted our Economic Development Commission (“EDC”) program and inhibited our ability to grow our economy, particularly in the increasingly important knowledge-based and financial services sectors. We have been working with the U.S. Treasury to “re-balance” the overly restrictive JOBS Act rules by making modest corrective changes to the JOBS Act. I urge your support for inclusion of these changes in legislation this year. In addition, I urge that Congress consider the unique circumstances and economic development needs of the Territories in other elements of tax reform, including taxation of possessions earnings repatriated to the United States from the Territories. 136 The CHAIRMAN. Thank you, Governor, and know that your full statement, along with everyone on the panel, will be included as part of the record. Let’s go to Bruce Walker, welcome. STATEMENT OF HON. BRUCE J. WALKER, ASSISTANT SEC- RETARY, OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY, U.S. DEPARTMENT OF ENERGY Mr. WALKER. Good morning. I’d like to thank Chairman Murkowski, Ranking Member Cant- well and the members of this Committee for moving me favorably from this Committee during the confirmation process and expe- diting the confirmation so that I may go to Puerto Rico and the Vir- gin Islands to get a firsthand account of the damage and devasta- tion that was done. With the permission of the Committee I would like to enter my written testimony into the record so that I can convey my thoughts regarding the time spent on the island. The CHAIRMAN. Your full written testimony will be included as part of the record. Mr. WALKER. Thank you. I’d like to discuss three topics: number one, the successes that I realized in my attending the Virgin Islands, as well as Puerto Rico; the challenges that were faced; and the opportunities we have going forward. And speaking to, specifically, a number of the things that both Governors mentioned, there are opportunities and we have an opportunity to take advantage of those. Successes. The leadership provided by the two Governors sitting next to me was fantastic and the resilience and the heartfelt strength of the citizens of both Virgin Islands and Puerto Rico was amazing. The calm on the island was outstanding. The key human- itarian challenges are continuing to be met with the leadership pro- vided by the Governors. I’d like to point out there were two critical components with the restoration that, I think, are worth noting. Number one, PREPA, with the limited crews that I had—I will point to this map over here—made an early decision to tie the southern portion where the generation is to the northern portion where the load is. And in doing so they made a key decision to construct the 230 kV line from the south bringing it up to the San Juan area, the Bayamo´n Substation. On the map you can see here, from down here wrapping up through where that dotted line is, from up here, all the way over to here. [The information referred to follows:] 137 ose eS ay . ss = ~ = = 4 < > < i < te x - 4 . . a 4 a 4 = > — aS S : ce — SS x ~ . ~~ = eo < = : - a . = s i . = ss ee : . ee . co a . ue - = ce 2 . c . a a ny < ee Ny Ss eo aS ‘ . A 8 a . se a . e at a “i A i AS x Ng . o os %, sor Ss - Sh SA . < - a os S No ao pc “ Re oe ae 3 “ Sn = KS VS :. RS os SS a " —S Sf i 8 ay 7 u = a Se a ‘ ‘ x 4 at Ne is Sc S i i “ ~ L rt y “ 4 a = ot At “ a : ae a x Sf | i Se 3 : vi hat vA me a eS leas mt in a Bs nee cc @ ‘ A 2) ~ Ss 0 Se ‘one e of > ‘ ‘ \ ee is : oY a ‘ x _ 5 : : a i > Msc An 3 oy SS RS a a “i o ( < oi x eS A 4 4 © a WE ~ “ Sal . é ic ‘ oe 8 uN a 5 SS EN A a wy : NN | aoa we S i BR ‘ . Re NS Y * : \ x 8) Y = o i S A SK < a ~ ay oi we ea me ay : ‘ a “ a e i sy . ( o ~~ S \ : 2 il ‘ a ‘ i : i: q - 4 ‘s => SS aK aa . ae \ e . ~ ane ‘ ‘ : a ‘ “ t G NGA fe < a a q i; : ‘ ' : x ‘ he el ae “ % \ mn ys OF se an Pi ie a \ . Hy = ~~ "a a my a ‘ ° ‘ a NE > ‘ . i Ie a hos ° : ‘ Ff ‘ x s o & Wiss aus . 4 . ‘ . . a ee » : \ . r x \ . . au 2G ae : ‘ i ‘ 2 : : Van au . “ ‘ f x i x \ 2 a oe a G5 3. : B5= ae ESh o ol ‘S a al é of ae K q = ~ ts . a . ae is NS s ae a A 4 b _ Oe. AS . = o os oe m5 = <— = ee ce he _ SN of Ss a a oes i 138 What was important about that was that one decision and the efforts made by PREPA, with limited staffing, enabled the power to be distributed to where the load was and in conjunction with the other big decision, which is the next slide. Jennifer? [The information referred to follows:] worsn}au65 daig oS ¥ UONEZHIGON ~ OS SE SF PSE ayajdwioy yoenuog aseg ajajduio: Buruorsstunu05 payeny Buiuoissimw0 ! ajajdwio5 aZHIGOW vA daig ays feausy 1ay podsueiy fessan 43P10 aueydaty aug uS ysey paemy dinb3 mma asey B68s0N9] 01 Vdaud MONTE LO! BtUOo19AO 0} PeY Ort JeUy SBBUBHIEYS fe BIE” Wave 40 YUH OF SoNSOUBE!D Ud eu any e 6 ‘yuey jany eBesojs ying as-JO-yNo ayy Guueday ‘oe seek yb jung sem 7ey) Ue|d Jamod e ou! yUawWdinds yWe-ay;-Jo-a}B}s paljeisul any :emnjon.aseyUl Bu . “a[UNY S14; Buywoosero ur sn Bugsisse ul eUaWNSUYI Ye B1aA dA ‘Aon *SOUOSSIIN Od Ud ‘SoNSIBO? Yad UeuUEW AJowly e UI ays Gof aut 0} (a\doad g yusuIdinba) saoinose! BuNjeD -JeoNsI6O7 OM BU} aja|dusoo Of paysiiqe}se sem aujewy eaissasbbe AYyByy y :euyjouy, ‘o]@ ‘SuOHEZLOYINE syByse year ‘spaau jeAoidde pue Buode ‘sjaguag Aresodwie} oy) pue pub 1194) yosjord 0} sAeja ‘syusWayNbs: yuuad UOIssIUA Ae Yq INe YYM BOUe!JWOS YsIqeIse 0} WAIN Ula uoHeUIpsoeS asuszUl paiINba: ph Buysixa ue ojuo Jemod Aesodway BuiBuag ‘spIePURIS YAY, UWA souRdu0g “aunyny ey) ul peysidiucoge aq you Aj Yonul sy “aoueldwod Ul attuM Yog Yen URS oy} YBNolUy salpowW0CE BAOU! 0} BIDE SEM Hd 'SNUL “L}0Z 190 EL Peale ‘spuejs] AseUeD ayy WOY SJBGUED Yay SuPodsueN jesser uBjai9j ‘| pueysuaBbsoyy SUL “21.07 190 BL IHUN SHOg SN Ul e100W [I] PjNod aynoy UI saBiEq PU 210z 190 g YBNoINY PaAIRM SEM YOg SP ao UL) BIOW UI BIO 0} sjassan UBJaJ0y 10} JUaWa!INb|s ay, YOY SEUOP ayy UNM aQUedWOD, SBHUGT aS “BOonqeA Je UOTINSXs pue GuruUeld 34} Ul pessesppe AjaAnoeoud Bujeq ee OOS OfeY WO PeLee; SUOSsE] + “ainpayos pue ‘Anoes ‘Ajejes | JO} h jo aut ul paynsas yolym ‘uognosxe pue Buiuueld ay} oyu! syas IS id Aivep 4yauy Idd YM dp puepueys Aysnpul Aq aoed piove) puoM - pieme Jaye step Jepuajes 17 UF Pauoss}UOS pUe ‘paljEysuI ‘ays ely 0} peziiqow ‘pabieg e1em Ajoedeo MW 9S YIM SJaguEed OM, + juawuBlsse uoissius jo Jdjaoe Jaye SABP G PapPlEMe JEPIO ASEL + “patoid 394i j0 uoynsexe pure ‘uoReziiqou ‘pseme pides & Jof pemoi|e [oOo} Bugoejuos jqy 1OuUIsIP BYBWIO * id Bur pur joo) Bur > (ae) | PuBsaysesiqg pidey + "SSa00nS ‘aguuadxa JO YSLN39 ASNOdS3d Aidva NOILVYOLSaY HAMOd ad0u0d MSWL 140 The Army Corps, working with PREPA, installed two 25-mega- watt generators at the Palo Seco Generation Plant. And that, in conjunction with the rebuild of the 230 line, enabled power to be distributed to the northern portion to start picking up commercial and residential customers. Those two efforts were monumental, given the facts and cir- cumstances. The installation of this generator was with the letting of the contract and the install and I was at Palo Seco when this was being put in, and the work that had to be done was really in- credible. We had fantastic support from PREPA in coordinating it, particularly with the relaying and the coordination with the Army Corps. Lastly, the work of the Federal Coordinating Officers, both in the Virgin Islands, and the Governor mentioned, Bill Vogel and his Deputy, David Haas, and then in Puerto Rico with Mike Byrne and his Deputy, Ahsha Tribble. The coordination that was set forth by FEMA was outstanding in an effort to drive and work with the leadership provided by the two Governors to my right. On the challenges—I think you can see through a number of these pictures, the mountainous terrain was a key component where there was stress in trying to rebuild the transmission sys- tem. Lack of generation in the north necessitated the work to be done on the transmission system. [The information referred to follows:] 141 * x — =e = i < a a : S - . * . a ~ Se . : = o a Re Ae = 5 ~ ~ cs £ ge a “= = AK < To aD cau ‘ e i My a 2 a a . ps Me = \ és oe i ie # iy iat ti ao « a 0 st _ o a . 2 wt we a x ne st aM : 4 K ac © St % . - i a ae t Seal i Res a . an \ a eS sy “ . NS 3 ie . 4 i * a a a “ ae K . \ e SS x i : A ut S < 7 a ‘ \ ue Ro : ‘ EN Me P ‘oD ‘ a : cn x : . “i ‘ a x * ct ‘ NK ‘i ‘ ae he a aes < Ny Soe. oe a oe \ Th as a a ge att at a eee _ oh “ =~ ‘ ~ < s : < s aS = << . Se . a i 142 aS - = x _ s oc ay S > . oo . oS . x a . . o — . x ie ne _ 2 a oI . = o _ He . < . x . a ae 3 oe a - . oe < < Se Y ce — a . < . x y SS . . ‘ oo . 2 of . . . _ x “ . “1 - a vf ‘f « ie r hos i es ee . ce a as Eas RY oe a ‘ uh a ss i TE Re * ui a A Hs a ‘ a a : : i : ‘ & A . a ‘ ae i . fet c \ : : \s x wh \ ae ( me ile ee : a x a a : aN a ‘yh iF ue ah ve one a ot ree rah * ‘ au ae ma es . ~ S . AS ‘ vi i . m ‘ 143 The logistics, as were mentioned, were highly successful in trying to mobilize all the things necessary—equipment, people and mate- rial—to get down there, and it’s still a challenge just to be working through. The amount of fiber optics on the island were a challenge, particularly as they increased their wind shear and, therefore, the damage to the poles. And the water infiltration to 18 substations, three of which were inundated to the point where they were not able to be energized. That leads me to my last component which is the opportunities. At a very high level we’ve already mobilized the Grid Moderniza- tion Lab Consortium to look at work that has been previously done by labs like PNNL and Oak Ridge. And we’re looking, specifically, at things like modern relay protection at key substations, pre- dictive modeling with improved sensing capabilities, hardening con- trol devices. Secondly, microgrid opportunities. We’ve already looked at and started the process to install 200 locations representing 11 megawatts of power on Puerto Rico. Those are key locations where we have provided generation for hospitals’ water supplies, and we have 400 other locations behind that we’re doing the investigation on right now to add additional microgrid opportunities. And then we’ll also begin looking at them in the Virgin Islands as well. Use of the American Society of Civil Engineering Standards for the 18 substations that were inundated, there’s a flood mitigation program, it’s called 24-14. We’re looking at that for the reconstruc- tion of those 18 substations. In conjunction with that, we’re utilizing NOAA to do a wind study to identify where we can put solar and utilize, take the mountains, and utilize them as shieldings for the design. Also, we’re looking at the SLOSH modeling done by NOAA for the Virgin Islands as well as Puerto Rico, in order that when we have to re- place substations we don’t put them in an area that could ever or that would be inundated going forward. Also, we have the opportunity with the high penetration of the fiber optics to develop the BlackNet and utilize it. And there was a discussion here with this Committee on the cybersecurity, a real opportunity because of the density. Integration of distributed generation and/or other generation re- newables, particularly in the northern area where the load is, that’s a key component and would add a level of resiliency into the network because the transmission system wouldn’t need to be built from the south to the north in the event that we have to raise this up and then inevitably we’ll see more hurricanes. And lastly, there are some basic structural components that we have the opportunity to do. I have some of our folks at the Bonne- ville Power and WAPA doing investigation on the tower construc- tions because the dead-end towers that are used on the trans- mission system which you see pictures of there, fundamentally, most of those were standing through the island. The other style towers, actually, were more damaged, and it’s mainly because these towers are guyed or anchored differently than the other towers. [The information referred to follows:] 144 ey . <- _& fi ‘ ue \ * a * x Ae Mos a = 2 g a : &y k we ae se “e ayer a ef we ee =) be x Wi am ‘a ‘Ss we, £ ¢ < * ak is && % ee * § nr ae aR ' re ‘SOF eee =e < te am akR By . is a i ey ats. we \ a ae ae a ees € © att ate we a ae iy RS ik aos Treen a Fas fal we We ee — Rate decision: In January 2017, the Commission issued the first-ever order in which PREPA's $3.5 billion in annual costs were reviewed, and rates established, by an independent body of experts.6 While granting PREPA nearly all the dollars it requested (for both capital and operating expenditures), the order detailed the extent of system deterioration; the history of counterproductive political involvement in financial, operational, and rate deficiencies; and the absence of discipline in PREPA’s budgeting and spending. In the rate order's crucial Part Four, the Commission addressed the problem of PREPA's imprudent costs. The Commission explained that because PREPA is a non-profit, government-owned entity, conventional disincentives used to prevent utilities from taking on imprudent costs—namely, requiring their absorption by shareholders rather than imposing them on ratepayers—are unavailable because a non-profit company has no private shareholders. In the non-profit context, the utility will have insufficient revenues to operate unless all costs are recovered from ratepayers. Given this constraint, the only way to protect ratepayers from imprudent costs is to prevent PREPA from incurring them to begin with. The Commission therefore required PREPA to submit an annual budget before spending its money. That way, the Commission could prevent imprudent expenditures before they are incurred. (PREPA had proposed an annual “true-up" process that amounted to "We spend it, we tell you about it, you make ratepayers pay for it"—the very absence of accountability that Act 57 was enacted to fix.) Other orders: The Commission has approved the format for a simplified customer bill so that customers better understand the bases for their charges.’ These efforts and others are summarized in the Appendix to this testimony. 5 Notice of Investigation to Identify Opportunities to Improve Performance of the Puerto Rico Electric Power Authority, Case No. CEPR-IN-2016-0002, November 16, 2016. Available at; http://energia.pr.gov/wp- content/uploads/2016/11/15-nov-2016-Notice-of-Investigation-AEE-CEPR-IN-2016-0002.pdf 6 Final Resolution and Order, Case No. CEPR-AP-2015-0001, January 10, 2017. Available at: http://energia.pr.gov/wp-content/uploads/2017/01/Final-Resolution-and-Order.pdf. 7 Final Resolution and Order, Case No. CEPR-AP-2016-0002. Available at: http://energia.pr.gov/wp- content/uploads/2017/11/Final-Resolution-and-Order-CEPR-AP-2016-0002.pdf 206 All these activities—conducting integrated resource planning, establishing special charges to satisfy bondholder concerns, setting rates, auditing performance—are the central purposes of independent oversight of utilities, as carried out by commissions throughout the Mainland and, in fact, the world. The Puerto Rico Energy Commission is the institution authorized to carry out, and expertly capable of carrying out, these activities in Puerto Rico. lil. The Commission’s current emphasis: Restore and transform, cost- effectively In the last three weeks, the Commission has issued three orders that address restoration and transformation. Investigation of collapse and solutions: Three weeks ago, the Commission opened a proceeding to assess the physical state of PREPA's system after Hurricane Maria. The proceeding will (a) identify the system's vulnerabilities that contributed to its collapse; and (b) identify short-, medium- and long-term actions, by PREPA and the Commission, that will produce an electric system that is modern, flexible, resilient, and capable of supplying electric service reliably and at just and reasonable prices. Analysis of options for microgrids and distributed generation: PREPA's difficulties restoring service show the need to adopt and implement alternatives that allow greater resilience and faster restoration. Distributed generation technologies, such as microgrids, have the potential for restoring power to unserved areas and providing stability to recently reconnected areas. In this proceeding, the Commission will assess alternative ways to promote these technologies, increase private participation in restoration efforts, and reduce dependence on centralized generation—all with the goal of enabling us to respond to future emergencies more quickly and cost-effectively.? Disciplining the PREPA's contracting process: Prior Commission inquiries have produced unambiguous, concrete examples of defective contracting policies and poor project management. Correcting these defects is crucial to PREPA's ability to attract future financing, while lowering its rates so that the Commonwealth's economic development efforts can succeed. But the Commission's corrective measures have been resisted by PREPA, and challenged in court by PREPA and the Financial Oversight and Management Board (FOMB). In this new order, the Commission has established rigorous oversight measures, which include detailed expense and labor reports for each contractor, so that the Commission can prevent waste before the fact.1° In these and other proceedings Commission will be focusing on the following areas: 8 Resolution, Case No. CEPR-IN-2017-0002, October 27, 2017. Available at: http://energia.pr.gov/wp- content/uploads/2017/11/Investigacién-Post-Maria-CEPR-eng-.pdf. ® See Case No, CEPR-IN-2017-0002. Available at: http://energia.pr.gov/expedientes/?docket=cepr-in-2017- 0002, 40 fd, Available at: http://energia.pr.gov/expedientes/?docket=cepr-in-2017-0002. 207 PREPA's spending, cost recovery and rate-setting: Budgets, revenue requirement, rate design, and procedures for updating and reconciling those items. PREPA's internal operations: Performance metrics, reporting procedures and enforcement methods; independent monitors to oversee restoration contracting and work; standards for restoration plans and maintenance plans; power plant efficiency standards; criteria for hiring of contractors; disaster preparation and restoration plan (for future events); and plans for workforce recruitment, development, and compensation. PREPA's finances: Financing plans, debt restructuring, debt issuances, and approvals of Transition Charge mechanisms. PREPA’s customer relations: Bill format, customer complaint procedures, and customer education programs to produce efficient consumption under both monopoly and competitive market structures. The Island's supply and demand resources: Reliability parameters, integrated resource plans (including the mix of renewable and non-renewable sources and “ancillary services"); near-term action plans; specifications for requests for proposals and competitive bidding procedures for power supply, energy efficiency, and demand resources; designating appropriate types of customer meters; approval of contracts for supply and demand resources and infrastructure modernization; and siting approvals. The Island's market structure transformation: Identify strengths and weaknesses of alternative market structures (monopoly vs. competition) for various products and services; implement competition for competitive services; consider any transfer of PREPA assets or business functions to other entities; and determine the appropriate roles for distributed generation, net-metered resources, community solar, microgrids, and other venues for sale of energy by third-parties to end-use customers; along with interconnection terms, compensation, payments for transportation, locational choices, and other parameters. IV. The Commission's needs: Jurisdictional certainty and sufficient resources Act 57, passed in 2014, makes the Commission the Commonwealth's policy leader on our electricity future. I have explained how we intend to lead: our legal duties, our principles, our past actions, our current actions, our plans. To continue this progress, to succeed, the Commission needs two things: jurisdictional certainty and sufficient resources. A. Jurisdictional certainty The Puerto Rico Oversight, Management, and Economic Stability Act (PROMESA) has several provisions recognizing the Commission's centrality to Puerto Rico's electricity future. Most importantly, section 503(b}(1)(D) provides that if the Commission determines, per a PROMESA-established deadline, that an “Energy Project will adversely affect an approved Integrated Resource Plan, then the Energy Commission shall provide the reasons 208 for such determination and the Energy Project shall be ineligible for Critical Project designation|...]." Ensuring such projects pass through a Commission screen is essential to establishing and maintaining competitive accountability and cost-effectiveness. At the same time, a problem has arisen. PROMESA section 4 says: "The provisions of this Act shall prevail over any general or specific provisions of territory law, State law, or regulation that is inconsistent with this Act." We appreciate the purpose underlying this sentence: The FOMB, charged with "provid[ing] a method for a covered territory to achieve fiscal responsibility and access to the capital markets” (Section 101(a)), must be able to achieve its purpose without obstacles. The problem is in the practical application of this principle. The Commission is the Commonwealth's electricity expert. Its powers and obligations are expansive. It was here before the FOMB arrived and will be here after the FOMB departs. In addressing PREPA's performance and in transforming Puerto Rico's electricity markets, both entities have essential roles to play. We must find a way for each entity to use its powers and skills in a way that supports and reinforces the other. Unnecessary conflict, turf-protection and failure to coordinate will lead only to expensive litigation, policy delays and loss of public trust. Earlier in this testimony, I described how the Commission will discipline PREPA's expenditures (so as to prevent careless service engagements, as recently experienced) by reviewing its budgets in advance of spending. PREPA has opposed this requirement. Surprisingly, its opposition was supported by the FOMB in a submission made to the federal court with jurisdiction over the Commonwealth's debt situation. You may also be aware that FOMB has asked the federal court to approve its appointment of a Chief Transformation Officer to run PREPA. We have asked the federal court to avoid inadvertently finding that such an appointment preempts the Commission's authority. We also asked the court to direct the lawyers for FOMB and the Commission to create protocols that preserve each entity's strengths, so that conflict and litigation can be avoided. While the FOMB’s legal staff has expressed willingness to communicate with the Commission, little effort has been made on their part to achieve meaningful coordination which leads to productive results. We remain hopeful that future actions will yield concrete results. The Commission recognizes the overlap between its budget review requirements— necessitated by the Commission's statutory obligation to protect ratepayers from imprudent costs and make rates that are just and reasonable—and the FOMB's need to review and approve budgets. There are ready ways to coordinate these two entities’ efforts so that each strengthens the other while avoiding duplication of effort. The Commission's and FOMB's purposes aim for the same results: financial solvency, attraction of capital, operational discipline, prudent expenditures, and responsive customer service. The Commission therefore has notified FOMB's representatives of this need, prepared a detailed work plan for producing coordination solutions, and assumes that FOMB will reciprocate productively. | also assume that such coordination is the wish of this Committee. 209 B. Sufficient resources The Commission's annual resources are currently limited to the statutory level of $5.8 million, supplemented by approximately $1.25 million that we collect through fees. This amount was never well-aligned with the Commission's responsibilities since its inception; it is now unrealistically small given the complex questions we now need to address, as my testimony has explained. Should Congress be willing to supplement the Commission's budget, the needs fall into four main areas: (a) establishment of regulatory procedures for the immediate recovery period; (b) monitoring (in part via independent auditors) of PREPA's restoration process; (c) audits of PREPA’s existing system, resources, and assets; and (d) proceedings to transform Puerto Rico's electric sector. Conclusion In this testimony, I have sought to explain the Commission's obligations and plans for restoring our electric service and transforming our electric industry. The need for an independent entity, free of politics and focused on merits, with the single-minded goal of bringing cost-effectiveness and competitive rigor to the Commonwealth's most important infrastructural industry, could never be greater. Chairman Murkowski, Ranking Member Cantwell and Members of the Committee, thank you for this opportunity to testify. | look forward to your questions. SUBJECT DOCKET NUMBER 210 Appendix DESCRIPTION Rates CEPR-AP- 2015-0001 The rate case is an examination and subsequent ruling on PREPA's first petition for permanent rates before an independent regulatory body. In its review, the Commission sought to obtain the most thorough picture of PREPA's finances and costs, so as to establish a rate structure consistent with both PREPA's current financial and operational situation, and to carry out the Commission's and PREPA’s duties to further Puerto Rico’s energy public policy. Provisional Rate Order CEPR-AP- 2015-0001 As part of its rate review petition, PREPA included a petition for provisional or temporary rates to be applied to its customers for the duration of the rate case before the Commission and until the application of the final set of rates approved by the Commission. Revenue Allocation & Rate Design CEPR-IN- 2017-0001 The rate case established PREPA’s total revenue need but, because of the tight statutory deadline, did not address major questions about how to allocate PREPA’s revenue needs among customer groups (revenue allocation); and for each customer, between the fixed charge and the variable charge (rate design). This separate investigation is intended to complete that work. It includes dealing with the adequacy and completeness of the information and data used by PREPA to determine revenue allocation and rate design. In this investigation, the Commission seeks to determine and gather the information necessary to determine the revenue allocations and rate designs that are consistent with economic efficiency, and just and reasonable rates. New Transparent Bill CEPR-AP- 2016-0002 Paralle] to the rate proceeding, the Commission carried out a proceeding to establish the content and format of PREPA’s "New Transparent Bill” pursuant to §6B(C) of Act No. 83. PREPA's new transparent bill, which will enter into force along with PREPA‘s new rates, will itemize specific cost categories, such as “subsidies,” contribution in lieu of taxes, the Transition Charge, and fuel costs; so that customers will have clearer picture of the key components of their monthly electric service bill. Transition Charge CEPR-AP- 2016-0001 Through this proceeding, the Commission enabled the PREPA Revitalization Corporation ("PREPARC") to set in motion a series of financial transactions with participating PREPA bondholders by which PREPA's overall “legacy" debt is reduced, in exchange for the establishment of a “Transition Charge", which will be billed to customers along with their monthly electricity bills in order to cover the repayment of PREPA's legacy debt. Under Act 4-2016, the amount will be determined by a Commission-approved “Adjustment Mechanism". The Commission's final decision modified PREPARC's proposed charge by making it a 211 volume-based charge rather than a fixed charge, as well as establishing key exceptions for certain net metering and fixed block customers, upholding the provisions of Act 114-2007 and Act 22-2016. Integrated Resource Plan {IRP) CEPR-AP- 2015-0002 In an Integrated Resource Plan {IRP) proceeding, required periodically by Act 57, PREPA submits -for the Commission's evaluation and approval-a comprehensive, long-term plan for the use of all existing and future resources PREPA intends to deploy in order to meet the demand fer electric service, over a 20-year planning period. The IRP includes an rent of the planning environment, a detailed study of a range of future load forecasts, existing generation and demand resources, current investments in conservation technology, existing transmission and distribution facilities, and the relevant forecasts and scenario analyses in support of the selected plan. PREPA's Performance CEPR-IN- 2016-0002 This proceeding is a far-reaching inquiry into PREPA's overall performance as an electric utility. Informed by its IRP and rate rulings, its overall regulatory body of work, as well as ample stakeholder input, the Commission is in the process of gathering the necessary information with regard to PREPA's current performance, in order to regulate a set of performance metrics for PREPA across several key indicators. Aguirre Site Economic Analysis CEPR-AP- 2017-0001 Stemming from key questions raised by the Commission and stakeholders during the [RP proceeding, the Commission seeks to ascertain whether PREPA’s reliance on the Aguirre Offshore Gas Port (AOGP) project as part of its proposed IRP is economically beneficial to PREPA's ratepayers. Sunnova Investigation CEPR-IN- 2016-0001 This investigation responds to a petition by the Independent Consumer Protection Office, which brought to the Commission's attention several concerns raised by a number of customers of Sunnova Energy Corporation, regarding their dissatisfaction with Sunnova’s services pursuant to its long-term power purchase contracts for rooftop solar. Within this investigation, the Commission has issued a series of information requirements to Sunnova in order to better understand its business model and determine its place within the broader regulatory framework for electric service providers other than PREPA. PV Properties v. PREPA CEPR-QR- 2017-0001 In this proceeding, the Commission addresses a complaint by PV Properties, Inc., who alleges that PREPA is in violation of the provisions of Act 82-2010 with regard to the latter's refusal to purchase the Renewable Energy Certificates (RECs) that the former has offered for sale. This complaint raises, among others, questions concerning the nature and scope of Act 82-2010 in shaping and creating a market for RECs in Puerto Rico, the role of the Commission in enforcing said Act's provisions on this matter, and the interaction between the RECs market and PREPA’s Renewable Portfolio Standard (RPS) obligations. 10 Hurricane Maria Investigation CEPR-IN- 2017-0002 212 The Commission initiated this investigation in order to assess the overall state of Puerto Rico's electric system after Hurricane Maria's strike on September 20, 2017. With the information gathered in this proceeding, the Commission will determine the appropriate short-term regulatory actions necessary to facilitate the restoration of Puerto Rico's electric power system and, more importantly, the longer-term actions that will enable its reconstruction into a more robust, efficient, and resilient system. Net Metering Regulation Standards CEPR-MI- 2014-0001 Pursuant to its mandate under Act 114-2007, the Commission established the standards by which PREPA must abide in regulating the interconnection of net metered customers into its grid. In the face of questions concerning PREPA's compliance with its statutory obligations, the Commission's orders in this docket have enforced and ensured PREPA’s compliance with Puerto Rico’s public policy promoting net metering and distributed generation. Customer Bill Disputes Multiple The Commission presides over disputes that customers have with charges on electric service bills, as well as the consumer protections the law affords consumers. The Commission's process includes an initial informal procedure before the electric service company (pursuant to the Commission's regulations), and a latter formal review procedure before the Commission. 11 213 The CHAIRMAN. Thank you, Mr. Morales. Ms. Jaresko, welcome. STATEMENT OF NATALIE JARESKO, EXECUTIVE DIRECTOR, FINANCIAL OVERSIGHT AND MANAGEMENT BOARD FOR PUERTO RICO Ms. JARESKO. Thank you, Chair Murkowski, Ranking Member Cantwell and members of the Committee. I am Natalie Jaresko, the Executive Director of the Financial Oversight and Management Board for Puerto Rico. It is an honor to appear before the Com- mittee. Unlike the other members of the panel, I am not an energy ex- pert, but I will try to frame for the Committee the Board’s ap- proach to the Island’s power system. Let me first, though, if I may, step back. The Oversight Board is a creature of Congress, created in last year’s PROMESA legisla- tion to deal with the fiscal and debt crises faced by the Common- wealth and many of its instrumentalities, including its power sys- tem, PREPA. The problems we were designed to address were dec- ades in the making. Under PROMESA, our primary tools to restore fiscal discipline and access to the private capital markets are Certified Fiscal Plans. And before the hurricanes, we had put in place fiscal plans and associated budgets for the Commonwealth and several of its in- strumentalities, including PREPA, that were balanced without ad- ditional federal aid. Because the Commonwealth and some instru- mentalities, including PREPA, had an enormous and unpayable debt burden, they entered the bankruptcy-like process established by Title III of PROMESA. That is more or less where matters stood before the hurricanes and in the Board’s view, after the hurricanes, the Board’s role of providing confidence, oversight and transparency is even more im- portant to the welfare of the people of Puerto Rico and the protec- tion of taxpayers. We are an oversight board. Our mission is to be able to assure all stakeholders—from residents of the Island to Congressional members, from creditors to American taxpayers—that the Com- monwealth and its instrumentalities are fiscally responsible and self-sufficient. To do so, we are utilizing all the tools Congress gave us to the fullest extent possible. We have the power to certify fiscal plans that meet PROMESA’s goals, and deny those that don’t, we have the power to require that spending be in accordance with the Certified Fiscal Plans and annual budgets, and we have the power to review contracts to require that they be consistent with Certified Fiscal Plans. But the truth is, the recovery of the island now depends not only on fiscal discipline but much more importantly on federal hurricane relief. We must revise our fiscal plans to reflect the new realities of de- clining revenues, postponed savings and the need for emergency- and recovery-related expenditures. There is no way around it—the immediate human needs and the longer-term success that the Board was established to facilitate depends on the continued gen- 214 erosity of American taxpayers in the form of emergency and sup- plemental appropriations. Similarly, the success of our mission depends on the people of Puerto Rico and its businesses, especially its manufacturing base, having the confidence that timely and sizable federal aid is coming and will be sufficient for the rebuilding and the recovery. In par- ticular, the number of people and businesses that leave the island over the coming months will be deeply affected by the perception of whether the necessary help is forthcoming. Hence, the Board joins with the Governor and the people of Puer- to Rico in requesting that the upcoming supplemental appropria- tions give the people and businesses of the Commonwealth con- fidence in the Federal Government’s commitment to the island’s re- covery. However, we know that it is not realistic to believe that Congress will appropriate the level of funds needed if it is not con- fident of adequate oversight of those funds, and we will do every- thing we can to provide that oversight. Turning back to the power sector—this is the single, most impor- tant block of recovery, short- and long-term. Electricity is the key. Without it, we will not have functioning classrooms or businesses. Without it, we will not have truly safe and livable neighborhoods and homes. Without it, we will not even have a working water sys- tem, because it too depends on the restoration of power. Similarly, we will not succeed in achieving a long-term, sustain- able economy, which is the mission of PROMESA, unless we can create a reliable, affordable, sustainable power system. PREPA’s history and the system’s decrepit condition, poor service and high rates before the hurricane evidenced that fundamental change is needed. The Board, working with the Governor and PREPA, intends to require transformation of PREPA in its revised fiscal plan. That plan is scheduled for certification by the Board in the final days— first days, excuse me—of February, and that revised fiscal plan needs to chart a path to provide stable, reliable and cost-effective power via a grid that incorporates best practices, private capital and acts as a catalyst for sustainable economic growth. And then all of this must be reflected and confirmed in a plan of adjustment proposed by the Board that also brings an end to the debt restruc- turing and ensures the future path for PREPA and that it serves Puerto Rico well. I commit that the process of revising the fiscal plan will be open and transparent, and it will welcome the insight from a broad array of experts. We have already scheduled several stakeholder listening sessions and we, of course, welcome input from the mem- bers of the Committee, those testifying here today, and all others with good ideas. Again Madam Chairman, Ranking Member and members of the Committee, thank you for the opportunity to testify today and I look forward to the Committee’s questions. [The prepared statement of Ms. Jaresko follows:] 215 Testimony of Natalie Jaresko Executive Director Financial Oversight and Management Board for Puerto Rico before the Senate Committee on Energy and Natural Resources November 14, 2017 Chair Murkowski, Ranking Member Cantwell and members of the Committee, I am Natalie Jaresko, Executive Director of the Financial Oversight and Management Board for Puerto Rico. It is an honor to appear before the Committee. Unlike the other members of the panel, I am not an energy expert, but I will try to frame for the Committee the Board’s approach to the Island’s power system. Let me first, though, if I may, step back. The Oversight Board is a creature of Congress, created in last year’s PROMESA legislation to deal with the fiscal and debt crises faced by the Commonwealth and many of its instrumentalities, including its power system, PREPA. The problems we were designed to address were decades in the making. Under PROMESA, our primary tools to restore fiscal discipline and access to the private capital markets are certified Fiscal Plans. Before the hurricanes, we 216 had put in place fiscal plans and associated budgets for the Commonwealth and several of its instrumentalities, including PREPA, that were balanced without federal aid. Because the Commonwealth and some instrumentalities, including PREPA, had an enormous and unpayable debt burden, they entered the bankruptcy-like process established by Title II of PROMESA. That is more or less where matters stood before the hurricanes. In the Board’s view, after the hurricanes, the Board’s role of providing confidence, oversight, and transparency is even more important to the welfare of the people of Puerto Rico and the protection of taxpayers. We are an oversight board. Our mission is to be able to tell all stakeholders — from residents of the Island to Congressional representatives, from creditors to American taxpayers — that the Commonwealth and its instrumentalities are fiscally responsible and self-sufficient. To do so, we are utilizing all the tools Congress gave us to the fullest extent possible. We have the power to certify fiscal plans that meet PROMESA’s goals, and deny those that don’t. We have the power to require that spending be in accordance with the certified Fiscal Plans and annual budgets. We have the power to review contracts to require that they be consistent with certified Fiscal Plans. But the truth is, the recovery of the island now depends not only on fiscal discipline but more importantly on federal hurricane relief. We must revise our 2 217 fiscal plans to reflect the new realities of declining revenues, postponed savings and the need for emergency- and recovery-related expenditures. There is no way around it—the immediate human needs and the longer-term success that the Board was established to facilitate depends on the continued generosity of American taxpayers in the form of emergency and supplemental appropriations. Similarly, the success of our mission depends on the people of Puerto Rico and its businesses, especially its manufacturing base, having the confidence that timely and sizeable federal aid is coming and will be sufficient for the rebuilding and recovery. In particular, the number of people and businesses that leave the island over the coming months will be deeply affected by the perception of whether the necessary help is forthcoming. Hence, the Board joins with the Governor and the people of Puerto Rico in requesting that the upcoming supplemental appropriations give the people and businesses of the Commonwealth confidence in the federal government’s commitment to the island’s recovery. However, we know that it is not realistic to believe that Congress will appropriate the level of funds needed if it is not confident of adequate oversight of those funds, and we will do everything we can to provide that oversight. Turning back to the power sector—this is the single most important building block of recovery, long and short term. Electricity is the key. Without it, we will 3 218 not have functioning classrooms or businesses. Without it, we will not have truly safe and livable neighborhoods and homes. Without it, we will not even have a working water system——because it too depends on the restoration of power. Similarly, we will not succeed in achieving a long-term, sustainable economy for the island unless we create a reliable, affordable, sustainable power system. PREPA’s history and the system’s decrepit condition, poor service and high rates before the hurricane evidence that fundamental change is needed. The Board, working with the Governor and PREPA, intends to require transformation of PREPA in its revised Fiscal Plan. That plan is scheduled for certification by the Board in the first days of February. That revised Fiscal Plan needs to chart a path to provide stable, reliable and cost-effective power via a grid that incorporates best practices, private capital, and acts as a catalyst for sustainable economic growth. And all of this must then be reflected and confirmed in a plan of adjustment proposed by the Board that also brings to an end the debt restructuring and ensures the future path of PREPA serves Puerto Rico well. I commit that the process of revising the PREPA Fiscal Plan will be open and transparent and that it welcomes the insight from a broad array of experts. We have already scheduled several stakeholder listening sessions, and we of course welcome input from the Committee, those testifying here today, and all others with good ideas. 219 Again, Madame Chairman, Ranking Member, and members of the Committee, thank-you for the opportunity to testify today, and I look forward to the Committee’s questions. 220 The CHAIRMAN. Thank you, Ms. Jaresko. Thank you all for your testimony here this morning. Mr. Ramos, let me begin with you. I think you have heard, as you have listened to the questions directed to Governor Rossello´, some frustration, maybe a fair bit of frustration, questions about why mutual aid was not triggered earlier. Obviously, questions about the Whitefish contract and what has happened with that, clearly an issue of concern for all of us, as Senator Cantwell mentioned. It is one thing to be responsive in the immediate aftermath of a hurricane, it is another thing to be en- gaged in something that we would all call gouging of the taxpayer when you look at the terms that were agreed to. You have indicated, and the Governor said this as well, that right now it is about 49 percent power throughout Puerto Rico. We recognize that, particularly in the more interior parts of the island, it is going to be a long time before we see power to the island. There was an article just a couple days ago that on Thursday there was a major outage in the area apparently that Whitefish had been working on and that you literally went from, and this is quoting this article, ‘‘went from 40 percent of power down to 18 percent.’’ My question to you is, have we gone backward in certain areas? Have we seen parts of the efforts that were rebuilt failing? The 49 percent that you are saying today is something that, I un- derstand, is fluid. The Governor has said that he wants to be 95 percent by the end of the year. Is that realistic and, really, what does that mean? Because what I was told was that that may be 95 percent to certain areas but long-term for the island of Puerto Rico. When do you realistically envision power to the full island? So sev- eral questions there for you. Mr. RAMOS. Yes. So let’s go to the first one. We suffered an outage last week not related to anything failing on any already repaired infrastructure. After the failure, we flew over in helicopters to find out the reason. We believe, because they denied it, there was an overhead crane working, not for PREPA, something else and it touched one of the conductors. Certainly, the system auto-protects, but that line is the only line that is tying the south where most of the generation re- sides to the north. Therefore—and most of the load is in the north. So therefore, we went down to about 18 percent. To give you an example, about 65 percent of the load is in the metropolitan area which is about five to six towns joined together. The CHAIRMAN. So is this back online now? Mr. RAMOS. It is, oh, it was back online, the line was reenergized within one hour because it didn’t have any failures, nothing to fix. And then the system restoration takes time—the restarting the already repaired circuits—because we still don’t have all of the communication with our substations. Therefore, every time the power goes out men have to go to each substation and open each circuit. When the power and the transmission system is restored, men have to go, physically, to each substation and throw the switches to return power back to the people. But right now, we’re at 49 percent. The CHAIRMAN. How about meeting the deadlines? Mr. RAMOS. I’m sorry? 221 The CHAIRMAN. How about meeting the end-of-year deadline that the Governor has set for 95 percent? Mr. RAMOS. The deadline is for tomorrow, 50 percent—— The CHAIRMAN. Right. Mr. RAMOS. ——and we are at 49 percent today so we feel very confident that we’ll be meeting that deadline. The CHAIRMAN. And then for the year-end at 95 percent? Mr. RAMOS. Year-end is 95 percent. It is a hard deadline to meet. We’re working, very conscious about it. We are focused on our work. We believe we can reach it. The CHAIRMAN. Is it fair though to acknowledge that there will be parts of the island that will be without power for a significant period of time? Mr. RAMOS. Certainly. And let me put this in context. Hurricane Hugo in 1989, when PREPA had 4,000 additional em- ployees than it does today and where the system was certainly in better condition than previous to Maria, took six months, six months. The CHAIRMAN. We do not want that to be a standard. Mr. RAMOS. We don’t want that to be a standard. The CHAIRMAN. I think we all agree—— Mr. RAMOS. I agree, but every time an expert from the U.S. has come to Puerto Rico to help us, and we’re very grateful, we take him in our helicopter trip and their jaw drops because of the rug- ged terrain, the amount of damage. So we need to keep that in per- spective. We are bringing in now, through APPA and the EEI, a lot more resources. We’ve been in discussions since basically last week, try- ing to get hold of rooms which are not available. I think we’ve reached an agreement where people that are al- ready there will, of course, they already have hotels. We provide them to them. And the rest may be in camps, like military-type camps. So—— The CHAIRMAN. I think, though, Mr. Ramos—— Mr. RAMOS. Yup. The CHAIRMAN. ——that some of the frustration was, as I men- tioned with the previous panel, that there truly was a full month of recovery effort that was lost. When you have individuals within DOE and the Army Corps suggesting that really the recovery began when that mutual aid, when APPA was brought in, when EEI was brought in, you can certainly understand the frustration, not only of the people of Puer- to Rico, but those of us that, well, all Americans who want to be there to be helpful and supportive. Let me go to Senator Cantwell. Senator CANTWELL. Thank you, Madam Chair. So, Mr. Ramos, you were in charge of the contract with White- fish? Mr. RAMOS. I certainly authorized its signature. The in charge was the procurement people of PREPA with our legal advisors, many of them, of course—you have to remember the dire conditions that Puerto Rico was in and some of the people arrived to the office weeks after. So we need to do a head count. But certainly, our 222 emergency procurement personnel assigned to the Emergency Man- agement Office were in charge of that contract. Senator CANTWELL. Okay, so emergency procurement people. Mr. RAMOS. Yeah. Senator CANTWELL. So on September 26th the President author- ized 100 percent federal cost-sharing for emergency work in Puerto Rico. PREPA had been granted $200 million for expedited funding to cover purchase of fuel. It was covered 100 percent by the Federal Government. So when we hear about these huge markups and these huge prices, you know, juxtaposed to mutual aid, mutual aid is about re- covery at cost. It is about people coming in to help you. That is why it is called mutual aid. They come in to help you at cost. That is why you sign an agreement. I am sure there are places all over my state, probably in Alaska as well, where people have already signed them because we have storms all the time. So mutual aid is, ‘‘Hey, neighbor, neighboring county, neigh- boring state, if we have a disaster will you come in and help us at cost? Oh, I’ll come in and help you at cost.’’ Okay? Mutual aid is not, ‘‘I’m going to come in and charge you exorbitant rates and gouge.’’ Okay? Just to be clear. So once the Federal Government committed to 100 percent of the cost up front, why did you double down on the Whitefish contract instead of activating mutual aid instead? Why did you just keep going with Whitefish? Mr. RAMOS. Well, Madam, the mutual aid agreement—first of all, PREPA is a proud member for many, many years of the APPA. I think, certainly, we need to revise mutual aid agreements in terms of PREPA. PREPA doesn’t have a neighbor, as you just explained. The only neighbor is St. Thomas, which we have worked together in the past under certain storms, and they were devastated as well. The mutual aid agreement requires that the utility, the host util- ity, takes care of all of the logistics. There were no logistics in Puerto Rico. There were, at the first couple of weeks, no fuel, no phone, no internet, no nothing. The people that actually got there from Whitefish, they brought all their satellite and equipment, et cetera. We had a process. I mean, we had six offers from six compa- nies. So I realize—and one other thing, you need to recognize and this is hard to change—hurricanes pass first through the Caribbean and then come here. And that situation, of course, creates some im- mobilization of the mutual aid resources. Right? If they’re available, they probably are from the West Coast be- cause as you correctly said, they’re expecting to find out where the landfall is, what the damage is, in order to help their neighbors, physical neighbors, not virtual neighbors like we are. So we needed first responders. We did a process with six dif- ferent companies. Six companies provided us with rates. The rates were extremely similar, very similar. Senator CANTWELL. Okay, so are you saying that Puerto Rico, as an island, didn’t understand mutual aid or are you saying that the concept of mutual aid as doing work at cost because it is an emer- gency, didn’t exist? Is that what you are saying? Mr. RAMOS. No, I’m not saying none of the above. 223 What I’m saying is that Puerto Rico is not part of the continental USA so that the concept of neighbor, you know, companies coming to the aid gets changed, you know? The market basically sets the rates. PREPA is under bankruptcy. There’s logistics for mobilization, costs of mobilizations. And when we saw that six companies, some of them very reputable, actually some of them now under contract with the Corps of Engineers, had similar rates for PREPA, we decided to move with the first re- sponder effect. Eventually, after that first responder, we specifi- cally required experience on transmission lines crossing moun- tainous regions. Eventually we were going to call everyone to help. As a first responder—— Senator CANTWELL. Well, I guarantee—— Mr. RAMOS. ——we needed to have somebody—— Senator CANTWELL. ——everybody was calling you, I guarantee you. You may not have been able to receive them, but I guarantee you everybody was offering to send people. Practically every mem- ber of Congress I talked to said, ‘‘my utility wants to go.’’ Mr. RAMOS. Yeah. Senator CANTWELL. And I guarantee you they were not charging Whitefish rates to go. So somewhere, when the Administration said they would pay 100 percent of the cost, that is when we should have stepped in and said, why are we paying exorbitant rates? And just because you are an island—I guarantee you we have disasters in Alaska. I doubt that people just gouge the heck out of people just because it is hard to get to Alaska. It is very hard to get there, all the resources, to every part of Alaska. Right? Mr. RAMOS. So—— Senator CANTWELL. So I doubt that my utilities sit around and go, ‘‘Ugh, it’s Alaska, let’s gouge.’’ Just because it’s Puerto Rico— so my point is, the reason why we are going through this painful exercise today is we don’t want this to happen again. I personally, looking at these reports, think we are going to have a lot more dis- astrous storms. So we don’t want to see price gouging just because somebody had the really unfortunate experience of being in a path of this kind of devastation. I just want to ask you, do you know of anything, of any informa- tion, any individuals that might have received a kickback from Whitefish, as part of this contract? Mr. RAMOS. I don’t know of any individuals that may have re- ceived a kickback from Whitefish. The price gouging issue will then be, we’ll be talking about six different companies in both, in that sort of a situation. You know, our focus, again was restoring power, having first re- sponders. We have six proposals, very similar pricing. So if there was price gouging, it involves six companies and I believe that’s an- other legal term for that situation. No, we don’t know of anybody having been offered a kickback—— Senator CANTWELL. Whitefish. Mr. RAMOS. In PREPA, we, the negotiations and the contracts were direct from PREPA, from the evidence I’ve gathered from the Procurement Office. 224 We have no—there’s a legal figure in Puerto Rico which a rep- resentative, actually protected by law, that can represent a com- pany. That was non-existent for none of those six companies. So, no, it was a direct contract with our procurement people—— Senator CANTWELL. Okay. Mr. RAMOS. ——contact with the procurement people and White- fish. Senator CANTWELL. I want to ask you—Whitefish Energy said they had contacted Interior Secretary Zinke after signing the con- tract with you. Do you know of any contact there? Mr. RAMOS. With PREPA, none. Senator CANTWELL. Okay. Ms. Jaresko, do you know anything about this? Do you have any emails or communications or anything related to this? Ms. JARESKO. None. We learned about the contract in the press, as you did. Senator CANTWELL. Okay, alright. Well, we may have some more questions for you, Mr. Ramos. But, I think, it isn’t a question of whether other people wanted to charge exorbitant rates. It is that we want to set a principle here that is, I think this is how this all came about, is a bunch of utili- ties who know that this is the standard way we respond to disas- ters, is not to go in and charge exorbitant, gouging rates, but to have mutual aid agreements. Mutual aid is akin to the following: if you have a disaster, I will come there to help and do it at cost. And cost, sometimes, can be a little more than it would be if it was just in Oregon versus all the way to Puerto Rico but it doesn’t mean that it is going to be these rates. And I am going to come back to you with questions about why, because previously what Puerto Rico has told us is, ‘‘Well, we weren’t clear. We weren’t clear. So we had to get somebody on the job and we didn’t know who was going to pay so we were forced into this.’’ But you are telling me it wasn’t that you were forced into it, that you thought this was a standard way of doing business. Mr. RAMOS. Senator, the standard way of doing business in an emergency, right, may get somewhat really—I’m very familiar with mutual aid. As I said, when I was young and worked in PREPA, we went to the Virgin Islands to provide help. What I’m saying is that on the conversations with the different CEOs of mutual aid that we had prior to Irma, it became evident that I would not get a fix date for resources arriving to Puerto Rico. That was evident. Therefore, after we saw that the hurricane was imminently hitting Puerto Rico and crossing it from one side to the other, I needed first responders. Senator CANTWELL. Yes, well, I—— Mr. RAMOS. I requested six companies. Senator CANTWELL. Yes. Mr. RAMOS. The prices were very similar. We engaged one of them knowing that we will need more resources. I got calls from other utilities. They were not bringing diesel. They were not bring- ing lodging. You can ask the FEMA people. There are no hotel rooms in Puerto Rico. You have to come military style, you know, with a tent, with your diesel, with your generator—— 225 Senator CANTWELL. Yes. Mr. RAMOS. ——if you want to have all of those. Senator CANTWELL. Yes, well, I guarantee you, I am sure if you raised that flag up the—my time is expired. If you would raise that up the flagpole and said to the U.S. Federal Government, should we be paying these rates, I doubt you are going to find somebody that says, yes, let’s pay those rates. Thank you. Mr. RAMOS. Thank you. The CHAIRMAN. Let’s go to Senator Franken. Senator FRANKEN. Maybe this is a misunderstanding, and I think surrounding all of this there sometimes are misunder- standings. But I learned from someone at DOE that the reason that mutual aid or mutual assistance did not kick in right away or that there were not offers right away, and now I am hearing there were six that were just high-priced, but that mutual aid is usually based on the state being able to repay, to pay you, and that since Puerto Rico was in bankruptcy that there were not offers to do this. Is that just wrong? Mr. RAMOS. Senator, the six offers were from private companies. They were proposals. None of them are related to APPA or mutual aid. Senator FRANKEN. Yes. Mr. RAMOS. They’re private companies. Senator FRANKEN. Okay. So I think that’s, that might be part of this, that it wasn’t the normal, you know—if Minnesota gets hit, Wisconsin and Iowa and South Dakota, North Dakota are ready to go in there under normal mutual aid and to do it under the normal circumstance. But that the fact that you are in bankruptcy made these other, all the nor- mal utilities that come in, worry that they were not going to get paid. And so, that’s perhaps why the offers you got were not the normal ones coming in. This past weekend I met with Minnesotans from Puerto Rico. One issue they raised was ensuring that stakeholders across the spectrum in Puerto Rico are engaged in the rebuilding planning process. So I just want to make that heard. Another major concern they raised is about what critical infra- structure is being prioritized to receive power, especially when it comes to medical treatment. And I know when we say load restored to 49 percent that doesn’t mean 49 percent of the population. That means 49 percent of the 100 percent of the grid power is being gen- erated and it goes to strategic places. So citizens need medical help right now, the hospitals, most of the hospitals are up, but what I was hearing from my folks in Min- nesota was that in some cases community clinics or a doctor’s office might make more sense since the hospitals are so stressed. And if you could get a generator to a doctor’s office, he could see people in his area and the same with community health centers or clinics. Mr. Ramos, are these smaller facilities being prioritized for emer- gency power now or during the rebuilding, grid rebuilding process? Mr. RAMOS. Certainly, the U.S. Corps of Engineers, part of their mission has been to put emergency power generations on those fa- cilities, critical facilities, that PREPA cannot reach on an expedited 226 basis. So we’ve been collaborating with the U.S. Corps of Engineers on that strategy, and we believe it’s worked fine. PREPA has 85 percent of all of the hospitals in Puerto Rico, hospitals, energized under its grid at this moment. There are smaller, as you said, med- ical facilities that are still running on generators. We have another, I don’t have the percentage here, but we have also energized some of those medical, smaller medical facilities. The priorities were set from the beginning to get hospitals first because of the extreme forces that this hurricane impacted Puerto Rico with. So it was medical facilities and, of course, first the large, then the medium, then the small in each region. We have accom- plished that with the exception of the southeastern region which we, I mean, we accomplished that fairly quick, but the southeast region took us longer. Last week we were able to energize the Gua- yama Hospital in the southeast. Senator FRANKEN. Okay. Mr. RAMOS. But it’s more south than east. And we have a strat- egy in which, of course, again, the Corps of Engineers is helping. Senator FRANKEN. I’m sorry, but I only have so much time. Mr. RAMOS. Yup. Senator FRANKEN. I just want you to hear from my—— Mr. RAMOS. Constituents. Senator FRANKEN. ——Puerto Rican constituents in Minnesota that doctors, private doctor’s offices, might be a good way to deliver healthcare to people so they don’t all, they don’t have to go to hos- pitals. That is all I was saying. And I am out of time. I just wanted to ask you about—I can ask these questions for the record, of course, but about how you see PREPA going forward in the rebuilding of the infrastructure, and Ms. Jaresko, what you see as your oversight responsibility regarding PREPA so that we can make sure that this is all done as efficiently as possible. That is what we all want. So—— The CHAIRMAN. That is such an easy question, yes. Senator FRANKEN. Huh? The CHAIRMAN. That is an easy question there for all of them. Senator FRANKEN. Yes, it is very simple. The CHAIRMAN. Yes, yes. Senator FRANKEN. It is like that. Boom. [Laughter.] It is up and done beautifully. Thank you, Madam Chair. The CHAIRMAN. Thank you, Senator Franken. I think those, and so many others that people will have, we will submit for the record, but it is important that we try to discern what these appropriate roles are going forward. Senator Cortez Masto. Senator CORTEZ MASTO. Thank you. Ms. Jaresko, previously, and by the way, thank you all. Thank you all for being and sitting this morning and testifying. In the previous panel there was a question that was asked, I think it was of Mr. Walker, and the question was whether or not the disaster relief money could go to bondholders to satisfy that lien and he responded, he was confident through, I think, some of the attorneys in FEMA, that the disaster relief money coming from 227 the United States could not be utilized by the bondholders to sat- isfy the lien. Do you feel the same way? Are you confident in that statement as well? Ms. JARESKO. Yes, I am, ma’am, as well. We acted on behalf of the debtor and on behalf of the Common- wealth and filed and achieved a comfort order in the court, in the Title III Court, to assure everyone, in particular the Federal Gov- ernment agencies, that their grant funding could not be used in that way. Senator CORTEZ MASTO. Thank you. And then to respond to Senator Franken’s last question, because I noticed you were ready to respond. I am curious as well what your answer is. Ms. JARESKO. Well, the tools that we’ve been given by PROMESA, in particular, have to do with fiscal plans and budg- eting. So we are in the process of asking for a revised fiscal plan from PREPA which will be due December 22nd. We will then re- view and discuss with a goal to certify that by February 2nd. That fiscal plan is basically a five-year business plan and then it will be followed by a single, annual operating budget to ensure that we actually are fulfilling that business plan. Beyond the fiscal plans, beyond the budgeting, we also have a contract policy where we have now begun to review all contracts over $10 million, as well as using that contract review policy to look back at other contracts, on an ad hoc basis, under $10 million. And then, finally, we have an authority through Title III as the representative of the debtor to bring all of this together. Many of you have asked questions about how the creditors work, how maybe being in bankruptcy affected the decisions that were made. All of this needs to come together in a plan of adjustment to take us out of bankruptcy in the end, and the plan of adjustment has to be filed in the court. It’s a business plan, even beyond what- ever business plan, fiscal plan or annual operating budget we have that gives everyone confidence that the situation is stabilized, the debt has been restructured, PREPA is no longer in bankruptcy and that we have achieved those goals that we talked about which is cost-efficient, reliable energy for the island, for the residents and the businesses. Senator CORTEZ MASTO. Thank you. Thank you, all. We appre- ciate you being here. No further questions, Madam Chair. The CHAIRMAN. Thank you, Senator. I think it is important to note that you have a head of PREPA, Mr. Ramos, who has been on the job since March of this year, you indicated. I understand that there has been a significant turnover with the PREPA Board. The most tenured member has been in place now for just 11 months. We have the Energy Commission as a new regulatory body that has been stood up. You have the Over- sight Board that just came on with PROMESA. And oh, by the way, let’s just throw two hurricanes into the mix as they are trying to deal with all of this, making a very hard situation, I think, even much more complicated and just really hard. Mr. Rhymer, I want to ask just one question of you, sir. We do not want to leave the Virgin Islands out of these discussions. I will 228 tell you, and I know that Senator Franken saw the same thing when we were there on our trip, there has been so much attention focused on Puerto Rico that I kind of assumed that the Virgin Is- lands were doing just fine and perhaps the damage had not been as substantial. Then we get there and see the facts on the ground and it was just a true reminder that just because we have moved to another disaster on another island does not mean that the Vir- gin Islands are all well. The Governor has indicated that during his tenure, five hurri- canes have gone through, an opportunity, if you will, to have to deal with a rebuild of the grid five different times. Surely you learn from each successive disaster and that effort to ‘‘harden the grid’’ is there with each rebuild. To what extent has the U.S. Virgin Is- lands been able to harden the grid from successive disasters to allow for greater resilience? Mr. RHYMER. Over several years we’ve been able to basically tap hazard mitigation funds and that’s why we have underground sys- tems that actually generate, basically, power to about 75 to 80 per- cent of our businesses with our commercial districts on St. Thomas and St. Croix. And that’s what we’ve been doing since each storm that we try to learn from each lesson learned how do we go underground, how to become more resilient. And that’s what we’re doing now in terms of microgrids, going toward, basically, composite poles, et cetera, to make sure that in the next storm there’s less damage, not as much damage or little to no damage such as we have enclosed all of our, basically, our substations in concrete buildings. So there was no damage on our, basically, substations, territory- wide. So that made it where there’s no damage. In the past, we would have had damage on the, actually, substations. Now we have zero percent damage on those. So with each storm and each succes- sive storm, we learn and we get more resilient. The CHAIRMAN. I am told that Senator Lee is on his way back, so I am going to ask another question until he arrives. Secretary Walker mentioned and we saw a picture of some of the transmission lines that were just loaded with, almost a jungle, of fiber optics. He and I had an opportunity for conversation as we were coming back from our visit to both Puerto Rico and USVI. He indicated that this was something that Department of Energy was going to be looking at in terms of, does that increase vulnerability to additional damage? Mr. Ramos, have you looked at this aspect, those lines that were carrying, kind of a jumble, if you will, of fiber optics? Are you see- ing some evidence that, perhaps, this may be something that we need to address and change going forward? Mr. RAMOS. Certainly. Many of the fallen poles fell because of the additional weight of infrastructure that really was not sup- posed to be there. So the grid itself is old. Our new design stand- ards account for an amount of additional infrastructure for commu- nications and other, but many of the poles were, you know, they had communications because some local law of Puerto Rico per- mitted the common right-of-way usage. So we had to allow, you know, telecom companies to put the telecommunications cables up, but the pole itself was not necessarily designed to those standards. 229 The new standards in PREPA, prior to Maria or the hearing, they’ve been in place for some years now, do include so that people can put, companies can put, additional infrastructure. Puerto Rico, as you know, even though we’ve lost so many peo- ple, you know, going out of the island, it’s still, the metro areas are highly populated, you know. It’s very difficult, and I understand the situation, for other infrastructure to get a space other than the PREPA pole. But you know, it’s something that needs to be revis- ited. Everything relies on PREPA. All of the other infrastructure relies on PREPA, but you know, they need also to invest in their systems. Let’s say telecommunications, for example, in order to pro- vide excellent service. The CHAIRMAN. Yes, well, it was a new issue that had been raised with me and one that, I think, is important to look at and one that I understand was not at issue in the U.S. Virgin Islands which makes it, again, an interesting comparison there. Mr. Morales, a question to you about the Energy Commission. I noted that it is a relatively new regulatory body. In terms of your ability to gain operational capacity, what is it that is needed within the Energy Commission to support what it is that you need to do? Mr. ROMA´ N MORALES. Thank you, Madam Chair. Definitely the Commission operates with a statutory budget that is very limited to what the requirements are that they mandate, the local law mandates the Commission to do, especially now with the restoration that is required. It’s not only—one thing that we need to keep in mind is that PREPA is a government-owned, non-profit utility. So typical—tools that regulators have to stop imprudent costs to be borne by the ratepayers are not present in the situation that PREPA has be- cause PREPA has no shareholders. So any costs in being prudent or imprudent are borne by the ratepayers. So the Energy Commission is very—we have to be involved in what’s in all the restoration, not only if the federal forms are used correctly, but any recovery that is not covered by the federal forms will be covered by the people of Puerto Rico, by their ratepayers. So our role is to make sure that all actions are prudent. With that situation is why the Energy Commission ruled on the rate case order that, since we could not disallow costs after the fact, we needed to stop them from being incurred at all. And that’s the reason why we requested PREPA to submit the budget so that we could approve the budgets before they actually started spending the money. There is a challenge of coordinating with the PREPA Board. So we ask PREPA, this is something that can be coordinating between one of the PREPA’s board’s requirement of approving budget as well as the fiscal oversight board requirement of approving the budget. But we are responsible that the costs are prudent and that the rates are just and reasonable for the people of Puerto Rico. So it’s a matter of now working all together, being able to put a plan in place. The Commission has been the regulatory expert in the performance—we’ll take a first look at it, PREPA will approve it and then the fiscal oversight can approve it and then we can move forward. 230 The CHAIRMAN. Let me ask you, Ms. Jaresko, and I mentioned this just a few minutes ago, about the fact that you have a lot of new folks, a new regulatory body. From the oversight board per- spective have you seen enough to determine that an emergency manager is necessary now or should the new leadership be given a chance to implement whatever reforms you feel are appropriate? Ms. JARESKO. So as you know, Madam Chairman, the Board took an action and filed in Title III Court to name a Chief Trans- formation Officer. The court ruled yesterday against us in that ac- tion, although we have not yet seen the written judgment so I can’t comment on it in detail. The reason we thought that was necessary, the reason we think that is necessary to deal with PREPA is to bring together these various components, not in any way to interfere with the emer- gency work that’s being done, the recovery work that is absolutely primary, number one and most important today, but to bring to- gether the medium- and long-term aspects of federal funding, fed- eral funding that has to be brought together with, potentially, pri- vate sector funding to ensure that the sector is finally competitive and providing the kind of low-cost, reliable electricity we all want to see and bring it together with, as I said earlier, the end of a debt restructuring and the end of the Title III process. Bringing all of those short-, medium- and long-term perspectives together was what we thought and we believe that the Chief Transformation Officer could do. However, the judge’s decision is a setback for us but we are not throwing up our hands. We still, as I said earlier, have the author- ity to deal with the fiscal plans and we are in that process and we will continue to work toward providing the oversight necessary to assure everyone and give everyone confidence that all the funds that are being used will assist us in achieving the goals that we all share. The CHAIRMAN. You describe this as a setback. Do you think that this will limit the ability to attract that private investment that you believe is necessary? Ms. JARESKO. I think it is a setback from the perspective of pro- viding the oversight that the Congress has been asking of us and for meeting the lofty expectations of the members. I believe that we will still work with the tools that we have. We will see what happens when we see that written judgment, as to what is in the written judgment from the court yesterday, but we will continue to work toward, together with PREPA, the govern- ment and the regulator, who I think is really quite critical. And I can’t underline enough, in my previous experience in the energy sector in Ukraine, having an independent regulator that provides private sector with confidence about rate policy and con- sistency of rate policy, I think, is even—is an extremely critical part of attracting private sector capital. The CHAIRMAN. Thank you. Senator Lee. Senator LEE. Thank you very much, Madam Chair. I would like to start with you, Mr. Ramos. Do you think politics have played a part in PREPA’s failures? Mr. RAMOS. Historically? 231 Senator LEE. Yes, historically or currently? Mr. RAMOS. I can attest that historically, certainly, there’s been—it’s very hard to manage PREPA being a big corporation which is part of government. It gets—it is, even in its current bankruptcy, PREPA is like the jewel of the crown of Puerto Rico regardless of the bad service and the, you know, bad condition which it is in. And certainly there’s, you know, too much intervention, you know, by government officials in the sense of—may I be—don’t, please, don’t feel bad, but it gets a lot of attention if you do bills for PREPA, if you do, you know, the people get attention so, you know, politicians, in order to get attention, they, you know, do sub- sidy, subsidies for and actually, subsidies have killed PREPA in its finances as well. Too many subsidies in order to get, I guess, you know, votes, et cetera. So certainly there’s been—— Senator LEE. The thinking is, ‘‘I’ll look good if I do that,’’ and it encourages people to do that. What about in employment? How many political appointees are currently employed by PREPA? Mr. RAMOS. PREPA, traditionally, has been a company where politicians or, you know, parts of government can get their family members to get work—— Senator LEE. Do you ever think—— Mr. RAMOS. ——percentage wise, certainly over 50 percent, but—— Senator LEE. Okay. Many hundreds. Many hundreds. Mr. RAMOS. Sorry? Senator LEE. Many hundreds of political appointees currently work there. Mr. RAMOS. They’re not political appointees by the Governor. What I’m saying is that historically the PREPA, that PREPA has served as the place for employment of families of, you know, polit- ical figures since the ’70s, or early ’70s. Senator LEE. Okay, so this is separate and apart from any polit- ical appointees—— Mr. RAMOS. Exactly. Currently the political appointees are my- self in the sense that the Governor recommends me and, but the Board of Directors confirms my assignment and then in turn, I choose, you know, qualified individuals, which many years ago used to be also a political issue, this time with the independent members of the Board that we have. We, you know, I choose the people according to their capacities and then the Board ratifies them. Senator LEE. Okay. My understanding is that, historically, currently there might be around 200 political appointees there. Historically, that number has been much larger at about 650. That is a lot of people. There are a lot of ways we could turn that. But I want to move on. I would like to speak to Mr. Rhymer for a moment. In our first panel this morning, Mr. Rhymer, Governor Mapp stated that WAPA has gone to great lengths to ferret out cor- ruption. We are happy to hear that and look forward to hearing what changes have been made, and we will certainly follow up with Governor Mapp to learn more about them. 232 But for now, I would like to focus on power theft and on some of WAPA’s accounting practices. Back in May of last year, May 2016, if I am not mistaken you blamed some emergency rate in- creases on the territory’s hospitals saying that they ‘‘just don’t pay.’’ At that time, the estimate was that the government of the U.S. Virgin Islands owed WAPA nearly $32 million. Can you tell me, sir, how much money WAPA is currently owed by U.S. Virgin Islands’ government agencies, independent authori- ties and non-profits? Mr. RHYMER. Currently about $36 million. Senator LEE. Thirty-six million. And what are you doing to col- lect that money? Mr. RHYMER. We work with the Governor of the Virgin Islands to actually try to collect those funds. The difficulties that you have is the two hospitals that, as you quoted earlier, simply just can’t afford to pay because of the Medicare/Medicaid structure that here it is, they don’t—you’re going to have a lot of uncompensated care that forbids them to be able to have the cash flow to be able to pay the utility. So what happens is they know that I’m not going to turn them off because it’s a critical function of the actual Virgin Islands. So they just do not pay the utility. Senator LEE. Okay. So this is something that they are doing in order to deal with the funding shortfall that they have. They just don’t pay and then they continue to have power. Have you changed your auditing and your billing procedures? Mr. RHYMER. Yes. Senator LEE. What can you tell me about changes you have made to your billing procedures and speak to what issues of fraud or cor- ruption you have uncovered like, you know, duplicate billing or de- faulted accounts? Mr. RHYMER. Well, we’ve never had duplicate billing. What nor- mally happens in the Virgin Islands before we used to bill cus- tomers in terms of estimates. We now have an AMI structure in place where it’s automated so we actually get more accurate billing. I’ve never encountered any fraud in terms of billing as a whole. We’ve had theft on the customer side, but not from the utility side. Senator LEE. Okay. I have other questions that I will submit in writing. Thank you very much, Madam Chair, and thanks for letting me come back to do this. The CHAIRMAN. Absolutely. Thank you, Senator Lee. Thank you for your testimony here this morning. Obviously, we have much to do working with you and the leadership and the peo- ple in Puerto Rico and the U.S. Virgin Islands. Well, this is the Energy Committee and we have focused a great deal of today’s hearing on the energy piece and how we can build out a more resilient, efficient and better grid. We are also the Committee that has the oversight of our terri- tories and our insular properties, so we heard discussion about Medicare, Medicaid, healthcare. I raised the issue of schools. And while it might not be specific jurisdiction for this Committee to 233 take up, for instance, those issues relating to reimbursement for Medicaid or Medicare, I think it is important to recognize that we do have that oversight role within this Committee. And when you recognize the impact, the economic impact, the personal impact that these two significant territories, common- wealths, have sustained with these recent disasters, it makes the role of this Committee just that much more heightened. I think you have seen from the interest and the participation from Committee members, not only in today’s hearing, but the many of us that have made the trip down to take a look for our- selves. I might note that Senator Carper, while not on this Com- mittee, had joined us and had hoped that he would be able to par- ticipate or at least listen to some parts of today’s hearing as well. So there is a great deal of interest. We need to be working with the Administration. We need to be working with so many of you that have given insight here today and know that as we move forward with proposals, we will be look- ing to you for your input and guidance on these specific areas. With that, I thank you all and this Committee stands adjourned. [Whereupon, at 12:49 p.m. the hearing was adjourned.] APPENDIX MATERIAL SUBMITTED (234) 235 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Ricardo Rossellé Nevares [The referenced information was not received at time of print.] Question from Chairman Lisa Murkowski Question: Alaska has quite a bit of experience working with microgrids due to the isolated nature of most of our communities. What role do you see microgrids having in the islands post- hurricane and how can Alaska’s experience be best put to use? Questions from Ranking Member Maria Cantwell Question 1: How would you characterize the Federal Government’s overall response to Hurricane Maria in Puerto Rico? What areas do you feel are most lacking? Question 2: What would be the consequences be if Puerto Rico is not given the proper resources and support from the Federal Government? Question 3: How has the Whitefish controversy impacted the honest efforts of your government to work with the federal government on recovery efforts? Question 4: Senator King asked a question about how wind farms in Puerto Rico fared. You cited the case of some wind turbines and towers that were severely damaged. a) Was all wind generation similarly affected on the island, or did some wind farms fare better than others? b) Ifthe latter is the case, do you know yet if differences in siting or technology played a role in the resilience of existing wind farms to the hurricanes? c) Could you provide any statistics, to the extent they are available, about how resilient wind and solar generation resources (both utility-scale and distributed) on the island were? Questions from Senator Ron Wyden Question 1; Governor Rossell6, we heard that most of the hospitals on Puerto Rico now have power, but that many smaller community clinics and doctors’ offices do not. I am concerned about health care access, and about a potential crisis with regard to mental health amid reports of increasing anxiety, depression, and suicidal thoughts among the population. 236 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Ricardo Rossellé Nevares What steps are you taking to speed power restoration to community clinics and doctors’ offices? In your opinion, what steps should the Federal government take in the short- and long- term to ensure that Puerto Ricans have sufficient access to effective health care, including mental health? Question 2: Safety net programs like Medicaid and the Children’s Health Insurance Program (CHIP) have been shown to be vital following natural disasters. Indeed, following disasters like Hurricane Katrina, previous Administrations have proactively reached out to states to ensure access to needed care for vulnerable individuals. Because Congress has allowed CHIP funding to lapse for the first time in the program’s history, many states, even those not impacted by significant disaster, are struggling to fund their programs, which may compromise access to needed health services for millions of children. ¢ Given the extra strain that this disaster has placed on Puerto Rico, when do you anticipate that Puerto Rico will run out of federal funding for CHIP, if it has not already? e Has the Department of Health and Human Services reached out to you to offer assistance or redistribution funding in case funding does run out? e If Puerto Rico were to run out of CHIP funding, what would be the impact for children covered by CHIP and the territory’s ability to successfully recover from this disaster? Question 3: Safety net health care programs play a critical role in helping states and territories address the impact of natural disasters, including devastating hurricanes like Hurricanes Irma and Maria. However, Puerto Rico’s Medicaid program has faced significant challenges due to the capped financing structure of the program. Unlike the fifty states and the District of Columbia, which receive open-ended federal funds according to their need, Puerto Rico and the other U.S. territories operate capped Medicaid programs with lower, fixed federal match rates for Medicaid expenditures. These limitations have strained Puerto Rico’s Medicaid program, which provides coverage to approximately 1.3 million enrollees, nearly half of Puerto Rico’s population. The Affordable Care Act attempted to ease these strains by providing an additional $7.3 billion in federal Medicaid funding to the territories, and by raising the fixed federal match rate to 55 percent. After Puerto Rico exhausted a significant portion of their ACA funding, Congress provided an additional $295.9 million in Medicaid funding through the Consolidated Appropriations Act of 2017. Despite these steps, estimates before Hurricane Maria projected that Puerto Rico would exhaust its remaining federal Medicaid funding in the spring of 2018. These estimates also suggested that up to 900,000 people could lose access to health care as a result. 237 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Ricardo Rossellé Nevares e As people seek care after natural disasters, states and territories are often forced to rely heavily on their Medicaid programs to address the health care needs of affected individuals. How has Puerto Rico’s Medicaid program been impacted by the territory’s response to Hurricanes Irma and Maria? To what extent, if any, have the hurricanes changed the projection of when Puerto Rico’s federal Medicaid funding will be exhausted? e Please describe how CMS has worked with Puerto Rico to ensure that impacted individuals and evacuees have access to needed health care coverage and services under Medicaid. e Please describe how CMS has worked with Puerto Rico to ensure impacted individuals who have evacuated from the island after the disaster continue to maintain access to their Medicaid coverage and essential services and providers, regardless of where they seek care? ¢ Do you think Congress should provide additional Medicaid funding to areas affected by disasters like Hurricane Maria, as it did after Hurricane Katrina in 2005? ¢ In 2005, Congress allowed additional federal Medicaid funding to be used for the non-federal share of Medicaid expenditures for individuals impacted by Hurricane Katrina. In your view, should areas affected by Hurricane Maria like Puerto Rico also receive additional support for their non-federal share of Medicaid expenditures in light of the disaster? e If Congress does not act to provide additional Medicaid funding to Puerto Rico, how will this impact access to benefits and services under the program for beneficiaries? Question 4: Safety net health care programs are critical during disaster relief efforts to help affected individuals access the medical care and services they need. With approximately 750,000 beneficiaries in Puerto Rico, Medicare has and will continue to play a key role for older and disabled individuals dealing with the aftermath of Hurricanes Irma and Maria. The majority of these beneficiaries, roughly 567,000, are enrolled in Medicare Advantage, nearly half of whom are in Medicare Advantage Dual-Eligible Special Needs Plans. e Please describe how the Centers for Medicare and Medicaid Services (CMS) and other federal agencies have worked with Puerto Rico to ensure that impacted individuals and evacuees have access to needed health care coverage and services under Medicare. ¢ The Department of Health and Human Services has announced special enrollment periods for affected individuals seeking to enroll in Medicare Advantage or 238 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Ricardo Rossellé Nevares Medicare Part D. Has Puerto Rico requested a special enrollment period for those unable to enroll in Medicare Part B due to Hurricanes Irma and Maria? If so, has Puerto Rico received a response from CMS? Questions from Senator Steve Daines Question 1: Did you encourage the PREPA board to approve the Whitefish contract? Question 2: Have you coordinated with the Federal Oversight Board before enacting various executive orders or decisions like agreeing to the Whitefish contract, taking action to suspend the sales tax collections, or establishing the Central Recovery and Reconstruction Office, and if not, why not? 239 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Kenneth Mapp Responses of the Honorable Kenneth Mapp, Governor of the U.S. Virgin Islands Question from Chairman Lisa Murkowski Question: Alaska has quite a bit of experience working with microgrids due to the isolated nature of most of our communities. What role do you see microgrids having in the islands post- hurricane and how can Alaska’s experience be best put to use? Response: The microgrids, once added to the electric grid, have the potential to allow the Authority to maintain service in the areas serviced by the micro grids during times when other areas experience a power disruption. The length of time that the microgrids remain on line is contingent on the amount of storage capacity. The microgrids as envisioned have the ability to function in conjunction with the generation produced by the power plants. Alaska can be used as a resource for information on the best practices for implementation for the microgrids. Questions from Ranking Member Maria Cantwell Question 1: Though much attention has focused on Puerto Rico’s grid, when hurricanes Irma and Maria swept through the U.S. Virgin Islands virtually all power infrastructure was wiped out. Itis estimated that power will be fully restored by Christmas, but, as you mentioned in your testimony, this will be the fifth time that the federal government has had to pay to rebuild the power distribution systems in the USVL How can the federal government work better with your government to construct a grid that is more resilient to future natural disasters? Response: The Virgin Islands and its Water and Power Authority (“WAPA”) can be best assisted through federal funding for the purchase of smaller sized generators and storage components. When service interruptions occur as a result of the failure of smaller units, smaller numbers of customers are affected when compared to larger generators which affect a significant number of customers. In addition, more resilience can be built into the transmission and distribution system through the undergrounding of feeders coming out of the power plants. Our focus continues to be the undergrounding of feeders to critical facilities such as schools, the container ports, marinas, and the business districts. For above-ground systems, WAPA has already begun to install composite poles, which can sustain higher wind speeds, in remote areas such as Coral Bay on St. John and on many of the main transmission feeders. We must build our energy transmission and distribution systems to be stronger and more resilient than what existed before the hurricanes. To eliminate any doubt that federal Stafford Act funds can be used to not only restore these systems, but also to make them stronger and more resilient, we urge your support for amendments to the Stafford Act that will specifically authorize federal funding for such purposes. Question 2: What innovations do you suggest we embrace when rebuilding a grid to be more resilient to natural disasters in the USVI? 240 Response: We suggest innovations such as the use of composite poles and the undergrounding of as many feeders as possible in large areas. The composite poles have been proven to withstand higher sustained winds, and the undergrounding can significantly reduce the large portion of the current system that consists of vulnerable aerial cable runs. Question 3: How would you characterize the Federal Government’s overall response to Hurricanes Irma and Maria in the U.S. Virgin Islands? What areas do you feel are most lacking? Response: Overall, the response of the Federal Government has been outstanding and is much appreciated. We have had differences of opinion on a few issues, but those differences so far have been resolved in a cooperative and constructive manner. Ultimately, sufficient federal funding will be needed in order for the Territory to recover fully from these natural disasters and better withstand future hurricanes. Question 4: What would be the consequences be if the U.S. Virgin Islands are not given the proper resources and support from the Federal Government? Response: The potential negative consequences of such a scenario would be too severe and too numerous to adequately describe here. As an example, if Community Disaster Loans (“CDLs”) are not timely provided in sufficient amounts and on reasonable terms, the Virgin Islands Government would not have sufficient funds to provide basic and necessary government services, many of the more than 100,000 of your fellow American citizens in the Territory will be without adequate permanent shelter, the fragile economic situation would further worsen, and the Territory will be even more vulnerable to future natural disasters and economic downturns. Question 5: How are the National Park sites on the Virgin Islands recovering, especially Virgin Islands National Park? What resources are still needed to get these parks, and the communities they support, back up and running? Response: The Virgin Islands National Park, Coral Reef National Monument, and the Salt River Bay National Historic Park and Ecological Preserve sustained significant damage and in some areas, total loss. Many beaches, trails, and other areas have been cleared and are now open to visitors to enjoy. The National Park Service, along with other federal agencies and Territorial resources, are working hard to reopen additional areas. The hurricanes destroyed Caneel Bay Resort, located within the Virgin Islands National Park, which has provided world-class accommodations for visitors to the Park and to St. John. The resort has been a mainstay of the local job market and economy for many years. The operator of the resort is committed to rebuild, at its own considerable expense, if the federal lease is extended by [60] years, which would make the investment financially viable. We request that Congress authorize the Department of the Interior [and National Park Service] to enter into a lease of at least that duration to allow this important project to move forward as quickly as possible. 241 Question 6: In your testimony, and in the hearing, you discussed the educational challenges facing students in the USVI. What resources do you need on the federal level to ensure that students in the USVI does not fall behind due to these natural disasters? Response: Hurricanes Irma and Maria destroyed nine of our public schools, and other public schools were severely damaged. Additionally, school gymnasiums and the Curriculum Center in St. Thomas were destroyed, and school buses, hundreds of computers, smart boards, and other technology-centered materials, books, school supplies, musical instruments, and many other school resources have been lost. We’ve managed to open enough schools to continue teaching our children, but most are learning in difficult conditions and on shortened schedules or have to endure long commutes. Federal funding is needed to build schools. Given our smaller school population, we plan to consolidate and build six new resilient schools (one in St. John, two in St. Thomas, and three in St. Croix) in place of the nine schools that were destroyed. We also respectfully request federal funding to replace textbooks, supplemental instructional and assessment materials, equipment/furnishings, libraries, school buses, as well as software (including Management Information Systems), servers, computers, laptops, tablets, and other components of an IT infrastructure damaged or destroyed as a result of the hurricanes. Further, federal technical and financial assistance is needed to provide for remote learning, a necessity given our geographic isolation and shortage of teachers. A more stable and equitable level of federal educational funding is also needed to allow us to improve our educational system and provide our students a fair shot at competing with their peers on the U.S. mainland and elsewhere in the Caribbean. Question from Senator Ron Wyden Question: Governor Mapp, in your written testimony, you highlighted that Virgin Islanders do not have access to critical health care. You also described difficulties arising from the Federal matching rate for Medicaid in the Virgin Islands. I am concerned about health care access, and about a potential crisis with regard to mental health amid reports of increasing anxiety, depression, and suicidal thoughts among the population. In your opinion, what steps should the Federal government take in the short- and Jong-term to ensure that Virgin Islanders have better access to effective health care, including mental health? Response: Because of the extreme and extensive damage to the Territory’s infrastructure caused by the hurricanes, and the resulting stress to the Territory’s finances, the Government of the Virgin Islands cannot continue to shoulder the current burden of the local matching requirement for Medicaid funding, which we estimate to be $64 million in FY 2018 and an additional $50 million in FY 2019. We respectfully request that the Medicaid provisions of the Social Security Act be amended to provide for a temporary disaster-relief increase in the Territory’s federal matching rate CFMAP”) to 100% for all Medicaid expenditures through September 30, 2020. There is ample precedent for an increase in a jurisdiction’s FMAP in response to disasters or for other reasons. If that is not possible, we respectfully request that the Social Security Act be amended to provide the Territory an FMAP calculated beginning in FY 2018 like that of every other State (consistent with the December 2015 recommendations of the bipartisan 242 Congressional Task Force on Puerto Rico) or, at least, a 70% FMAP (the same as for the District of Columbia). Further, we expect to experience, as a result of the hurricanes, a significant increase in demand for Medicaid services, an increase in our Medicaid-eligible population, as well as increased demands for reimbursement from states providing services to displaced Virgin Islands residents. All of these factors will substantially increase our Medicaid costs, which will accelerate the rate at which federal Medicaid funds are accessed. Consequently, as a result of the hurricanes, there may be little or no ACA Medicaid allotment remaining as of September 30, 2019 unless Congress acts. We therefore request that Congress address the “fiscal cliff’ by eliminating the cap on Territorial Medicaid reimbursements, or at least providing annual allotments of at least $80 million (with the applicable growth factor) beyond September 30, 2019. The Virgin Islands is also fiscally disadvantaged because the Centers for Medicare and Medicaid Services uses decades-old benchmarks and methodologies for reimbursing our publicly-owned hospitals under Medicare, as well as unrealistic benchmarks under Medicaid. These shortfalls in federal healthcare funding have adversely affected the quality of healthcare in the Islands and have required our Government to borrow money to cover a significant portion of the gaps. We ask for Congress’ help in directing CMS to provide fair and equitable reimbursements to our hospitals. In addition, we respectfully request the continuation—at least for the short term (six months)—of certain critically-needed services to deal with the effects of the hurricanes, including the air ambulance contract for medical evacuees, the National Disaster Medical System and Federal Patient Movement Operation, assistance in obtaining functional dialysis services so that we can bring the evacuees back to the USVI, and access to the Emergency Management Assistance Compact (“EMAC”) and other deployment methods to supplement staffing for health department services, including mental health (psychiatry and counselors) and other specialty care (for example, dental, pediatrics, and nurse practitioners). Further, we request federal technical assistance (for example, the expertise of a health economist) to help the USVI evaluate public health, behavioral health, and health care policies, evaluate our healthcare market, public health, and healthcare programs, and assess the economic benefit of our current and proposed public health and healthcare interventions, so we can make informed and strategic decisions as we rebuild our public health, behavioral health, and healthcare systems. Longer term, federal funding is needed to replace our healthcare facilities that were destroyed— including our two hospitals, and the Myra Keating clinic on St. John—and to repair and rebuild our other clinic on St. John (Morris DeCastro). Assistance is also required in order to grow our own public health and healthcare professionals, through apprentice and certificate programs, and recruiting and retaining clinical specialists to come to work in the USVI. Ql. Al. Q2. A2. 243 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Bruce Walker QUESTIONS FROM CHAIRMAN MURKOWSKI Can you discuss the efforts underway with the national labs to look at a more resilient grid for Puerto Rico? Have they had any contact with PREPA in developing their plans? The U.S. Department of Energy (DOE) is leveraging the knowledge, capabilities, and expertise available at the national laboratories to identify various options to assist in the restoration of Puerto Rico’s electric grid with added resilience. At this time, DOE has not received a Federal Emergency Management Agency (FEMA) mission assignment to undertake this work. The intended impact of this effort is to ultimately improve power availability during and after disruptive events. Some of the options can be implemented easily and with little cost, but many of the options are more complex and would take more time and resources to implement. DOE, through the Emergency Support Function #12 — Energy (ESF-12), has been the primary contact with Puerto Rico with respect to restoration. At this time, national laboratories have not had direct contact with PREPA or the Puerto Rican government in long-term planning. The national laboratories have worked with DOE to consider longer- term restoration actions. However, DOE has contacted Puerto Rico representatives for participation in ongoing DOE research and development activities, which can spur direct exchanges between Puerto Rico and the national laboratories. Please outline the current arrangement with PREPA and the Virgin Islands Water and Power Authority to restore power to territories. What is the role of the Department of Energy and the Army Corps in each location? DOE is the coordinating agency for ESF-12 under the National Response Framework and a primary agency for the Infrastructure Systems Recovery Support Function (RSF) under the National Disaster Recovery Framework. As the coordinating agency for ESF-12, DOE works to facilitate the reestablishment of damaged energy systems and components, in coordination with the state, local, territorial, and tribal governments, FEMA, other Federal agencies, and industry. At the peak of the response efforts, DOE had 29 personnel deployed to the U.S. Virgin Islands: three ESF-12 responders who are supporting FEMA at the Joint Field Office on 244 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Bruce Walker St. Crotx and the Area Field Office on St. Thomas, and 25 personnel, as well as 10 line- trucks, from the Western Area Power Administration to provide mutual assistance through multiple mission assignments from FEMA. As of December 11, three ESF-12 responders remain deployed to the U.S. Virgin Islands along with three subject matter experts, while the personnel from the Western Area Power Administration have completed their restoration work on the electrical transmission system on St. Thomas and finished their demobilization of equipment and personnel on November 29. The deployed ESF-12 responders work to coordinate efforts between FEMA and the U.S. VirginIslands Water and Power Authority and to collect and evaluate information on damage to the energy system and the status of restoration efforts across the Territory. In the U.S. Virgin Islands, the U.S. Army Corps of Engineers (USACE) has been providing temporary emergency power for critical facilities, infrastructure assessments, and debris management; however, USACE does not have a direct role in the power restoration mission. At the peak of response efforts, DOE had 14 personnel deployed to Puerto Rico: three ESF-12 responders, seven subject matter experts, and four personnel supporting FEMA ESF-15—-External Affairs efforts. As of December 11, two ESF-12 responders remain deployed to Puerto Rico, along with four subject matter experts and one person supporting ESF-15. Deployed ESF-12 responders in Puerto Rico have supported a wide variety of efforts, including damage assessments of energy infrastructure, collection and evaluation of information on the status of various components of the energy systems, including progress on electric system restorations and the availability of fuel, validation of materials requests from Puerto Rico for restoration efforts, and coordination among the Puerto Rico Electric Power Authority (PREPA), FEMA, USACE, and industry partners. Deployed DOE subject matter experts are providing technical assistance to USACE with planning, estimates, validation, and quality assurance/quality control. In Puerto Rico, USACE received a mission assignment from FEMA under the Stafford Act and National Response Framework to lead the Federal role in repairing the hurricane-damaged electrical power grid in support of the government of Puerto Rico. USACE has partnered with PREPA, DOE, and FEMA, to restore safe and reliable power to the people of Puerto Q3. A3. 245 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Bruce Walker Rico. USACE has awarded several major contracts to assist with the restoration efforts covering the crews and equipment needed to work on the approximately 33,000 miles of transmission and distribution lines that need repairs, and for generators to stabilize the power grid, such as those installed in Palo Seco and scheduled for Yabucoa. USACE has also worked with PREPA to identify the materials and equipment needed for this effort, which have been procured through the Defense Logistics Agency. USACE is relying on the U.S. Navy’s USNS Brittin Roll-On-Roll-Off Cargo Ship to transport these materials and equipment between Charleston, South Carolina and the Puerto Rico. In addition to DOE’s deployments of personnel, there are also DOE personnel who have volunteered for the FEMA Surge Capacity Force. As of November 30, the Department of Homeland Security (DHS) has deployed five DOE personnel, through the Surge Capacity Force, to the U.S. Virgin Islands and 22 to Puerto Rico. Alaska has quite a bit of experience working with microgrids due to the isolated nature of most of our communities. What role do you see microgrids having in the islands post- hurricane and how can Alaska’s experience be best put to use? A variety of advanced electric system designs that involve distributed energy resources (DER), storage technologies, and microgrids show potential to increase future system resilience. Assessing ongoing activities, such as the system of microgrids project in Alaska by the Grid Modernization Laboratory Consortium, is critical to assuring that future investments are technically informed and successfully benefit from these broader experiences. Several of the Alaska microgrid and networked DER models (storage, wind, solar, and diesel) can inform island-based grids. Ql. Al, Q2. A2. 246 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Bruce Walker QUESTIONS FROM SENATOR CANTWELL You mentioned in your opening testimony that Hurricane Maria broke the limits of what PREPA’s infrastructure was designed to withstand. Given its geography and climate- driven trends in extreme weather, it is reasonable to assume that Puerto Rico will be hit by another, potentially more catastrophic hurricane in the future. How would you characterize the assistance that is needed to restore PREPA’s grid so that it is not only repaired, but is more resilient for the future? The U.S, Department of Energy (DOE), leveraging the assistance of subject matter experts deployed from the Power Marketing Administrations, is working with the Federal Emergency Management Agency (FEMA), the U.S. Army Corps of Engineers (USACE), and Puerto Rico Electric Power Authority (PREPA) to facilitate safe and reliable power restoration of Puerto Rico’s electric grid in compliance with the Stafford Act. DOE isalso leveraging the expertise of the national laboratories to identify various options to assist in the restoration and development of potential long-term solutions to improve the resiliency of Puerto Rican energy infrastructure for the future. We understand the largest residential solar company in Puerto Rico has reported that they have assessed the damages of nearly all of their systems on the island and found that over 75% of the residential systems made it through the storms with little or no damage. Solar providers are now in the process of providing battery storage to these systems. Given the resiliency demonstrated by these systems, and the relatively quick install time, what efforts are already underway, either by FEMA, the Corps, or PREPA to incorporate deployment of residential solar as part of a more robust and resilient energy system in the territories? As the coordinating agency for Emergency Support Function #12 — Energy (ESF-12), under the National Response Framework, DOE works to facilitate the reestablishment of damaged energy systems and components, in coordination with the state, local, territorial, and tribal governments, FEMA, other Federal agencies, and industry. Following Hurricanes Irma and Maria, initial efforts on the electricity system in Puerto Rico have focused on the safe and reliable restoration of electricity service. USACE received a mission assignment from FEMA under the Stafford Act to lead the Federal role in repairing the hurricane-damaged electrical power grid in support of the government of Puerto Rico and USACE has outlined four main lines of effort in the road to repairing the electrical grid: Q3. Q3a. Q3b. A3b. 247 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rice and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Bruce Walker e Provide temporary emergency power and spot generation for critical facilities like hospitals and shelters; « Ensure adequate generation at the power plants; e Reinstall and repair transmission lines, and; e Restore and repair distribution lines, ultimately providing power to local residences. At this time, DOE, USACE, and FEMA do not have any efforts underway to deploy residential solar systems in Puerto Rico, and such efforts could not be undertaken under Stafford Act authority. Several private companies are working with entities in Puerto Rico to install solar and energy storage systems to provide temporary power until grid restorations are complete. Beyond the immediate restoration efforts, DOE is leveraging the expertise of the national laboratories to develop potential long-term solutions to improve the resiliency of Puerto Rican energy infrastructure for the future. These efforts include exploring a variety of options and recommendations, including the use of solar and micro-grids. Part of the hearing focused on damage to generating resources, including utility-scale wind farms. Was all wind generation similarly affected on the island, or did some wind farms fare better than others? Deployed ESF-12 responders have reported that wind farms on the southeast side of the island experienced significant damage and additional reports have noted that significant damage was also experienced by wind farms along the northeast coast. ESF-12 responders also report that the wind farm on the south central coast sustained no significant damage; however, a detailed damage assessment of all wind farms is not available as of November 20. If the latter is the case, do you know yet if differences in siting or technology playeda role in the resilience of existing wind farms to the hurricanes? Hurricane Maria made landfall along the southeast coast of Puerto Rico and the eastern portions of the Territory, which is where several of the significantly damaged wind farms Q3c. A3c. 248 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Bruce Walker were located, experienced the strongest winds. The wind farm along the south central coast that experienced no significant damage was located in an area that experienced less significant winds during Hurricane Maria. At this time, it is unknown if specific technology played a role in which wind turbines experienced damage and which remained intact through Hurricane Maria. Could you provide any statistics, to the extent they are available, about how resilient wind and solar generation resources (both utility-scale and distributed) on the island were? At this time, a formal assessment of how resilient wind and solar generation resources were on Puerto Rico is not available. Per ESF-12 responders on Puerto Rico, the utility scale solar and wind farms on the southeast side of Puerto Rico, near Humacao, suffered significant damage. The utility scale solar farm on the south central coast sustained some damage and a solar farm on the northwest side of the island sustained approximately 3 percent damage to the panels. A wind farm on the south central coast sustained no significant damage. At this time, we do not have independent data on roof-top (distributed) solar generations beyond aerial observations that show that most roof-top installations visually appear to be intact. QL. Al. Q2. A2., 249 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Bruce Walker QUESTIONS FROM SENATOR WYDEN Mr. Walker, Governor Mapp testified that Congress should either amend the Stafford Act or have a separate authorization and appropriation for longer-term grid upgrades. In your opinion, would it be more effective and efficient to build more resilient grids by amending the Stafford Act, or by creating separate authorization and appropriation bills? The Stafford Act provides the principal Federal mechanism to reimburse state and local governments for the actual cost to repair or rebuild damaged public infrastructure. The Stafford Act also authorizes the Federal Emergency Management Agency (FEMA) to provide funds for hazard mitigation projects that can lower projected rebuilding costs or reduce the rebuilt infrastructure’s risk of future damage, as authorized by a Federal Disaster declaration. However, there are some restrictions on how these funds can be utilized. In some instances, more resilient technologies could provide long-term savings by mitigating against future disasters. My colleague, Senator Heinrich, alluded to a power purchase agreement made by Tucson Electric Power for solar plus storage costing 4.5 cents per kilowatt-hour. As we heard, Puerto Rican electricity costs are 5 times higher than that. What levelized cost of electricity do you believe would be possible for Puerto Ricans for a similar installation of solar plus storage? The Department does not have access to competitive market costs of developers, nor various costs specific to Puerto Rico, and thus cannot speculate on the price autility-scale solar plus storage project might be offered for in Puerto Rico. QL. Al. Q2. A2. 250 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Bruce Walker QUESTIONS FROM SENATOR FRANKEN Weneed to rebuild a more resilient grid that is better able to withstand the effects of extreme weather without sacrificing the pace of power restoration. Given your experience on the ground, are there ways to provide power quickly in the short-term without investing heavily in rebuilding an antiquated electric grid? The U.S. Department of Energy (DOE), leveraging the assistance of subject matter experts deployed from the DOE Power Marketing Administrations, is working with the Federal Emergency Management Agency (FEMA), the U.S. Army Corps of Engineers (USACE), the Puerto Rico Electric Power Authority (PREPA), and industry partners, to facilitate the safe, reliable, and timely restoration of power to Puerto Rico, in compliance with the Stafford Act. The restoration efforts on the portions of the system that need to be repaired or rebuilt adhere to code and current industry standards, to ensure safety and to maintain functionality. Restoration efforts are focused on segments of the electrical system that were damaged and are needed for power restoration. DOE is also leveraging the expertise of the national laboratories to develop potential long-term solutions to improve the resiliency of Puerto Rican energy infrastructure for the future. There may also be opportunities to explore ways to cost-effectively reengineer segments of the electrical system to improve efficiency and resiliency. What is your long-term vision of the electric grid for Puerto Rico? And what do you see as the role of national labs within that? DOE is helping PREPA and the government of Puerto Rico with their long-term vision of the electric grid. Through our national laboratory system, DOE has the technical capabilities to assist Puerto Rico in designing a grid that is better prepared for and adaptive to changing conditions, and able to withstand and recover rapidly from disruptions. Ql. Al. 251 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to the Honorable Bruce Walker QUESTION FROM SENATOR DAINES Can you expand on suggested ways that Puerto Rico and U.S. Virgin Islands can make their grids more resilient for future events? There are number of technologies that can be utilized to enhance the resilience of the electric grid. Significant advances have been made with the development of smart grid technologies that improve preparation and hardening before an event, enhance awareness and response during an event, and reduce recovery and reconstruction time after an event such as that experienced in Puerto Rico. Greater deployment of distributed energy resources with storage and intelligent controls; more robust poles and, where appropriate, stronger guying (anchoring), optimizing the siting of generation assets; and even robust modeling and system-integration analysis could build greater resiliency. 252 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to Major General Donald E. Jackson, Jr. Questions from Chairman Lisa Murkowski Question 1: Please outline the current arrangement with PREPA and the Virgin Islands Water and Power Authority to restore power to territories. What is the role of the Department of Energy and the Army Corps in each location? Answer: Under the leadership of the Federal Emergency Management Agency (FEMA), the Corps is working with other Federal agencies as part of the overall effort to restore power, and stabilize critical infrastructure in Puerto Rico and the U.S. Virgin Islands. On September, 30 2017, the U.S. Army Corps of Engineers (Corps) was given a FEMA Mission Assignment, within the authority of the Stafford Act, to assist the Puerto Rico Electric Power Authority (PREPA) in further repairing the power system to its pre-storm condition. This Mission Assignment from FEMA states that the Corps will “...lead planning, coordination and integration efforts in preparation to execute electrical power grid restoration in Puerto Rico due to impacts caused by Hurricane Maria. Develop and execute applicable temporary repairs to the segments electrical grid to allow interim restoration of system segments as directed by FEMA until the full electrical grid restoration can be implemented.” As part of this mission, the Corps is tasked with leveraging its contracting authorities for repair work, including ordering and providing electrical repair materials to its contractors, PREPA and its contractors, and other entities conducting grid repairs under FEMA. PREPA directs prioritization to the Corps for the grid repairs and assigns transmission and distribution lines from its electrical grid to the Corps for repair and restoration. PREPA conducts repairs to its grids with its own crews and contractors. PREPA coordinates with the Corps on the use of their available material, warehouses, and other properties. The Corps and PREPA also coordinate on access to easements, rights-of-way, and safety protocols for all personnel working on the grid. The Government of Puerto Rico provides guidance to PREPA and has assisted the Corps and other responders with access to property and related authorities. In the U.S. Virgin Islands, the Corps Mission Assignments from FEMA include: Temporary Power, Temporary Roofing, Debris Removal/Technical Assistance, and Infrastructure Assessment. Temporary Emergency Power assessments are underway in USVI at critical facilities (hospitals, water treatment facilities, airports, a shelter, etc.). Of the 179 temporary emergency generators installed by Corps personnel, 136 have already served their purpose. They are no longer needed in those locations and, therefore, have been uninstalled. 253 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to Major General Donald E. Jackson, Jr. Question 2: Alaska has quite a bit of experience working with microgrids due to the isolated nature of most of our communities. What role do you see microgrids having in the islands post- hurricane and how can Alaska’s experience be best put to use? Answer: The Corps, in coordination with PREPA, activated microgrid systems for the towns of Patillas, Maunabo, Yabucoa, Culebra Lares, and Naguabo to provide immediate power until full repairs could be made. The first microgrid activated in Puerto Rico was on the island of Culebra. The decision to install a microgrid at a given location is a combined effort that includes input from the Corps PREPA, FEMA, and the local government. Not every site assessed qualifies for a microgrid. Many factors determine what makes a suitable location, such as the estimated time until main grid restoration, the number of critical facilities at the location, the state of the distribution network and the ability of the system to accept generator power, and the number of federally supported generators that can be uninstalled and used in other locations, due to the implementation of a microgrid system. First, the decision to install a microgrid must be at the request of the local government. Additionally, PREPA must determine that grid power will not be restored to the area in the near future, that the distribution network can accept power, and then finally designate the location. The Corps and FEMA then conduct meetings and assessments to determine the suitability of the site and the best power generation options for a given community. Questions from Ranking Member Maria Cantwell Question 1: Based on your experience working on the current recovery effort in the USVI and Puerto Rico what are the most pressing reconstruction efforts the islands are facing? What challenges have you encountered when working on these reconstruction efforts? Answer: In any disaster, the three top priorities are to support immediate life-saving and life- safety emergency response priorities; to sustain lives with critical temporary emergency power and other needs; and to initiate recovery efforts by assessing and restoring critical infrastructure. In the USVI, the debris mission is probably the most challenging, due to the scarcity of disposal sites for the amount of debris. The Corps is coordinating with the USVI Department of Planning and Natural Resources for approval of temporary debris disposal sites. The pre-storm infrastructure, particularly in Puerto Rico, was an aged system with production deficiencies. The Puerto Rican power infrastructure is unique to Puerto Rico with special components only used there. That has caused one of the challenges in restoring the system as those parts are no longer produced and have to be manufactured. Another challenge in Puerto Rico compared to the mainland is the geography and difficult terrain. The biggest challenge in restoring the system is getting the amount of materials and supplies to the island. Hurricane Maria’s damage to Puerto Rico’s ports, airfields, roads, bridges, electric grid and 254 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to Major General Donald E. Jackson, Jr. communications has slowed initial assistance efforts but conditions and the pace of recovery continues improving. Question 2: To compare your experience working with other disasters in the U.S., such as recovery efforts for Hurricane Harvey in Texas or Hurricane Irma in Florida: Is Congress supplying Puerto Rico and the USVI with the resources they need to adequately rebuild? Answer: The Corps is working with other Federal agencies as part of the overall effort to assist the people of Puerto Rico and the U.S. Virgin Islands. As in any disaster, the three top priorities are to support immediate life-saving and life-safety emergency response priorities; to sustain lives with critical temporary emergency power and other needs; and to initiate recovery efforts by assessing and restoring critical infrastructure. The Corps has sufficient resources at this time. Question 3: Why has restoring power in Puerto Rico and the USVI taken so long relative to Texas and Florida? Answer: The damage to the power infrastructure in Puerto Rico and USVI was much more extensive due to Hurricanes Irma and Maria compared with the damages in Texas and Florida from other storms this season. It is estimated that 80 percent of the electrical grid was affected in Puerto Rico. Recently, there has been an increase in the number of private line workers arriving on the island. The Corps is also increasing its material production and delivery to support those line workers. Questions from Senator Al Franken Question 1: A concern raised by my constituents is regarding how power to critical infrastructure is prioritized, especially when it comes to medical treatment. If citizens need medical help right now, their option is to visit the hospitals, which are already stressed. But in many cases, a community clinic or a doctor’s office might make more sense. However, I’ve heard that many smaller treatment facilities do not have power or generators available to them. Are these smaller facilities being prioritized for emergency power during the grid rebuilding process? Answer: The Corps is partnering with the Puerto Rico Electric Power Authority, the Department of Energy, and FEMA to restore safe and reliable power as quickly as possible. The Corps is assisting with assessments and with generator installations at critical facilities such as hospitals, and water and wastewater treatment facilities in Puerto Rico. Task Force Temporary Emergency Power, in coordination with PREPA, activated microgrid systems for the towns of Patillas, Maunabo, Yabucoa, Culebra Lares, and Naguabo to provide immediate power until full repairs could be made. The first microgrid activated in Puerto Rico was on the island of Culebra. 255 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to Major General Donald E. Jackson, Jr. Question 2: Does resilience factor into the Army Corp’s decision making in the rebuilding process? Answer. FEMA, per the Stafford Act, has mission assigned the Corps to perform emergency work which does not permit consideration of resilience or mitigation measures. PREPA may incorporate resilience and mitigation measures with funding, provided to it by FEMA for permanent repair and reconstruction. The Corps is required to replace, in kind, the system that was in place before the hurricanes. For the most part, this means line-for-line, pole-for-pole, and wire-for-wire. As we restore the system, we do upgrade to current PREPA standards and to U.S. electric codes for those lines, poles and wires; however, exceptions to this are in cases where the cost of a different solution is less than restoring the current system. An example of this might be when the poles run up an undeveloped stretch of mountainous terrain or through wetlands. Ifa better solution exists, such as running along a road near that mountain or wetland, then the Corps has the flexibility of changing the installation after it has been reviewed for cost, schedule and any right-of-way issues. Question 3: From what I understand, many rural areas are still struggling to gain access to power. Can you speak to the specific challenges facing rural communities? Answer: It will take significant time to restore power to the majority of people due to the challenges of terrain, the state of the grid system before the storms and the extensive damage caused by the hurricanes. Many of these rural communities are located within difficult terrain and challenging geography. In both urban and rural areas, we are working to provide temporary emergency power and spot generation for critical facilities like hospitals and shelters; ensure adequate generation at the power plants; reinstall and repair transmission lines, and; restore and repair distribution lines, ultimately providing power to local residences. Question 4: You stated last month at a hearing in the Senate Committee on Homeland Security that many municipalities in Puerto Rico are not accepting help from FEMA. Is this still the case, and if so why? And how is this interfering with restoring power across the island? Answer: In some municipalities, there have been neighborhoods that have decided to not use federal assistance to dispose of their debris. In the case of power restoration, we are not aware of any communities that have declined federal assistance. 256 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to Major General Donald E. Jackson, Jr. Questions from Senator Steve Daines Question 1: The Corps of Engineers was issued a mission agreement from FEMA to help restore power. When do you predict full power to be restored? Answer: Restoring power to the people of Puerto Rico involves a joint effort by many agencies. The Puerto Rico Electric Power Authority continues to refine its master restoration plan, which affects the amount of remaining work and the schedule for when customers will have their electricity restored. For example, as part of the ongoing restoration effort, workers continue to identify additional damage to the island’s electric infrastructure. The Corps is working as quickly as possible, as are all of the other agencies. The current estimate is by late February/early March 2018 power will be restored to 95% of the pre-storm average load. Question 2: Did the Corps have any involvement in procuring the Whitefish Energy Contract? Answer: No. Question 3: What is the Corps’ involvement in contracting the power restoration with PREPA now? Answer: As part of this mission to restore power to Puerto Rico, the Corps is tasked with ordering and providing electrical repair materials to its contractors, PREPA and its contractors, and other entities conducting grid repairs under FEMA. PREPA directs prioritization to the Corps for the grid repairs, and assigns transmission and distribution lines from its electrical grid to the Corps for repair and restoration. PREPA also repairs its grids with its own crews and contractors. PREPA coordinates with the Corps on the use of their available material, warehouses, and other properties. The Corps and PREPA also coordinate on access to easements, rights-of-way, and safety protocols for all personnel working on the grid. The Government of Puerto Rico provides guidance to PREPA and has assisted the Corps and other responders with access to property and related authorities. 257 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to Mr. Ricardo Ramos [The referenced information was not received at time of print.] Question from Chairman Lisa Murkowski Question: Please outline your vision for what the electric grids on your islands could and should look like moving forward. What assistance will you be seeking from the federal government to achieve this vision? Questions from Ranking Member Maria Cantwell Question 1: Several members raised questions at the hearing about the level of disaster planning PREPA had conducted prior to Hurricanes Irma and Maria. a. What requirements does PREPA have to submit up-to-date disaster plans to the Governor and Legislative Assembly? b. When was the last time PREPA submitted a disaster plan? c. Could you submit a copy of the most recent plan to the committee? Question 2: Did potential responding utilities under mutual aid cite PREPA’s fiscal situation as a deterrent to providing assistance in the wake of Hurricane Maria? Question 3: Is it your contention that the need for responding utilities to provide their own logistical support for mutual aid crews (e.g., room and board) was the primary deterrent to activating mutual aid in the wake of Hurricane Maria? Question 4: On September 26, the President authorized a 100 percent federal cost-share for emergency work in Puerto Rico. The same day, you signed an initial agreement with Whitefish Energy. On September 29, FEMA assigned to the Corps of Engineers the mission to ensure emergency power restoration. Almost three weeks later, on October 17, you signed a revised contract with Whitefish Energy that established a $300 million ceiling. Once the federal government committed to pay 100% of the cost, in many cases extend “expedited funding” before any expenses had been incurred, and assigned the Corps of Engineers a power restoration mission, why at that point did you not immediately activate mutual aid? Question 5: Is the public contention of the owner of Whitefish Energy accurate that he made initial contact with PREPA through a message on LinkedIn? Question 6: How many customers does PREPA have? 258 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to Mr. Ricardo Ramos Question 7: How many customers have power? Question 8: Which regulations, standards, or codes govern construction of the grid and grid components in Puerto Rico, including but not limited to towers, poles, wires, substations, and generation facilities? Please send any and all regulations, standards, and codes that apply. Question 9: Has PREPA completed a comprehensive damage assessment? If so, when was it completed? Questions from Senator Ron Wyden Question 1: Mr. Ramos, in response to questions about why it is taking so long to restore power to Puerto Ricans, you noted that it took 6 months to restore power after Hurricane Hugo in 1989, at a time when PREPA had more employees and the grid was in better shape. It is striking to me that it took so long when times were more favorable, and I am concerned about what will happen after the next storm. The hearing explored how technologies such as solar installations can boost resiliency, assuming they are built by experienced vendors. What percentage of power needs to come from distributed resources so that future recovery efforts take only days, rather than months? What does PREPA need to ensure that amount of distributed generation gets built? Question 2: Mr. Rhymer noted in his testimony that the U.S. Virgin Islands used FEMA hazard mitigation grant funding to move parts of their distribution network underground and install stronger utility poles made of composites. How is PREPA leveraging FEMA hazard mitigation funding to take similar steps to harden Puerto Rico’s distribution network? Question 3: My colleague, Senator Heinrich, alluded to a power purchase agreement made by Tucson Electric Power for solar plus storage costing 4.5 cents per kilowatt-hour. As we heard, Puerto Rican electricity costs are 5 times higher than that. What levelized cost of electricity do you believe would be possible for Puerto Ricans for a similar installation of solar plus storage? 259 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to Mr. Ricardo Ramos Questions from Senator Al Franken Question 1: Why did it take so long for PREPA to request mutual assistance from other utilities through the American Public Power Association and Edison Electric Institute after Hurricane Maria? Question 2: [am very concerned about how PREPA is entering into contracts with private companies. I specifically want to inquire about the PREPA contract with Cobra Acquisitions based in Oklahoma City. The company was just formed in January 2017 to work in electricity transmission and distribution, and they’ ve now won a $200 million contract with very little experience in the field. What was the process for selecting Cobra Acquisitions and the size of the contract they would be awarded? Question 3: Is PREPA pursuing additional private sector contracts? Question 4: In what ways is PREPA working towards a long term plan for building resilient grid infrastructure? Questions from Senator Steve Daines Question 1: Can you describe how Whitefish Energy, a company of two people with minimal track record of projects, made good financial sense to contract with to begin restoring the island’s power? Question 2: What progress has Whitefish Energy made since being awarded the contract? Question 3: Will PREPA negotiate advance contracts in a transparent and cost-effective manner before the next disaster, to ensure maximum accountability and effectiveness of taxpayer resources? Question 4: In your testimony you mention that there could be ways to improve the contracting process. What are some of those ways? Question 5: As the Whitefish Energy contract phases down, is there a plan in place to work with other partners to ensure the work gets done? Lv) 260 U.S. Senate Committee on Energy and Natural Resources November 14, 2017 Hearing Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands Questions for the Record Submitted to Mr. Julio Rhymer, Sr. Responses of Mr. Julio Rhymer, Executive Director, U.S. Virgin Islands Water & Power Authority Question from Chairman Lisa Murkowski Question: Please outline your vision for what the electric grids on your islands could and should look like moving forward. What assistance will you be seeking from the federal government to achieve this vision? Response: The Virgin Islands Water and Power Authority (“WAPA”) envisions the reconstruction of a generation system as well as a transmission and distribution system that are more reliable, efficient, and resilient. This goal can be achieved through the addition of smaller sized generating units, electric microgrids, and composite poles. Smaller-sized generating units will prevent large geographical areas from experiencing extended electrical outages due to the failure of larger units at the power plants. The benefits of adding microgrids to the distribution system is two-fold. The microgrids function in tandem with the power produced at the plants but have the flexibility to function on their own, in the event of a service interruption. In the event of an outage, the microgrids rely on the stored energy to maintain electricity to the area it serves. WAPA seeks a combination of hazard mitigation and federal government funding totaling $850 million to accomplish this goal. Question from Ranking Member Maria Cantwell Question: Mr. Rhymer, in your opening statement, you described efforts to move toward developing micro grids across the Territory to act as small generating facilities in the event of a major electrical service interruption, providing greater electrical reliability for the US Virgin Islands. WAPA is currently developing an initial micro grid that utilizes solar power and battery storage, which may assist the effort to reduce the reliance on fuels by 60% by the year 2025. Though investing in these micro grids could be costly up front, do you expect that they would provide a long-term solution to potential future power outages in the Territory? Response: While microgrid technology is a costly undertaking, its introduction to the Territory’s electric grid is a part of an overall long-term solution to future electrical service interruptions in the Territory. The mircogrids, in combination with smaller-sized generating units and renewables, will enable continued improvements in efficiency and reliability of the utility. 261 NL.t 4 | ‘COMISIGN DE ENERGIA DE PUERTO RICO December 12, 2017 Darla Ripchensky, PMP Chief Clerk U.S. Senate Committee on Energy and Natural Resources 304 Dirksen Senate Office Building Washington, DC 20510 Dear Chairman Murkowski and Ranking Member Cantwell, Attached please find my responses to questions submitted by members of the U.S. Senate Committee on Energy and Natural Resources following my testimony at the hearing of November 14, 2017. If you have any additional questions, I will be pleased to answer them. Sincerely, Sea Jose’ . Roman-Morales rman / Associate Commissioner www.lenergia.pr.gov EENFICTO WORLD PLAZA, 268 AVENIDA MUROZ RIVERA, SUITE 702. HATO REY PLR, DOeTS 262 Responses of Acting Chairman José Roman Morales, Puerto Rico Energy Commission Question from Chairman Lisa Murkowski Question: Do you believe that PREPA's transmission lines should be open-access and open-retail for any power generator and purchaser to sell and buy power through? Would that provide for greater private sector investment opportunities? Response: The Commission has not issued orders that address these questions explicitly. There are, however, three principles, each one central to effective utility regulation, that will guide the Commission when it is time to issue such orders. 1. For each major service required to bring electricity to our citizens, the provider should be the one most qualified to do so cost-effectively and reliably. Whether the selected entities come from the private sector or the public sector is less important than whether they have proven themselves the best at acting efficiently, responsively, cost- effectively, and in compliance with all appropriate utility standards. An objective understanding of the century of electric service on the mainland shows that customers are best served when there is a mix of private and public sector actors, all competing for the unique opportunity to provide electric service. 2. For electric services that are most cost-effectively provided through competition, there must be non-discriminatory access to all "bottleneck facilities"—facilities for which access is necessary to competition and which are not economically duplicable by new entrants. The classic examples are transmission and distribution facilities, but in the new world of decentralized electricity production, the category might include geographic sites, interoperability protocols and customer information. An appropriate policy ensures non- discriminatory access to such facilities on a basis that properly compensates their owners. Supporting this point are the nation's experience in telecommunications, gas and electricity, as seen in the 1996 Telecommunications Act; FERC's Order No. 636; and FERC's Order Nos. 888, 889, 890 and 1000 respectively. Commonwealth law empowers the Commission to create comparable regulatory requirements. The Commission is prepared to use that authority once the facts demonstrate that competition at wholesale and at retail will serve the long-term interests of Puerto Rico's citizens. As the Committee certainly knows from its own experience, such transitions— from monopoly markets long dominated by a vertically integrated company to competitive markets hosting numerous viable sellers—takes expertise, patience and time; and is best accomplished by an objective, well-resourced regulatory agency free of political pressure. 3. Introducing competition for wholesale generation is a very different task from introducing competition for retail service. In both efforts, one must be careful to align competitive opportunism with economic efficiency; otherwise there is risk of cherry- picking, uneconomic bypass and stranded investment, along with cost-shifting to the most vulnerable segments of the population. 263 To summarize, existing Commonwealth law provides for open-access and open- retail to power generators and directs the Commission to craft the framework necessary for its successful implementation.! In doing so, the Commission will use the three principles described above to guide Puerto Rico towards an orderly and articulate transition from a public, vertically integrated monopoly towards a competitive, competence-based market structure. Questions from Ranking Member Maria Cantwell Question 1: The Puerto Rico Energy Commission was established in 2014 to regulate, monitor and enforce energy policy, and protect ratepayers. Ensuring you have a strong independent utility commission is crucial for Puerto Rico's future. An independent utility commission or board is an almost universal feature of American electric utility governance. In your assessment what else is needed to ensure that PREPA is run in a transparent and effective way while delivering reliable electricity at reasonable rates to its customers? Response: To ensure that a utility is "run in a transparent and effective way while delivering reliable electricity at reasonable rates to its customers," an independent commission is necessary but not sufficient. Here are some additional necessary elements: 1. The independent commission must have sufficient resources to assess all areas of the utility's performance; and then, for areas where performance is subpar, identify, order and oversee solutions. The necessary commission resources include access to expertise comparable to the utility’s expertise, so that the Commission's judgments carry professional credibility. 2. There must be no political interference in the utility's decisions. The utility's board must be populated by responsible citizens who have the necessary expertise; citizens who are answerable only to their statutory and managerial duties. The utility's top management must be selected by that independent board after a thorough search conducted by an independent, qualified search firm. As well, the top management's hiring decisions, at all levels, must be based solely on merit, free of nepotism and political pressure. 3. The utility must build and maintain a culture that insists on making all problems transparent, and solving those problems when they arise rather than deferring them to some indefinite future—especially problems whose solutions become more expensive the longer they are delayed. 4. The utility must demonstrate a culture that accepts the presence and decisions of the independent regulator. That does not mean that the utility must agree with each of the regulator's many judgments, or must refrain from challenging unlawful regulatory decisions in court. But ignoring Commission rules and orders, and insisting that the Commission disregard its statutory duties—all of which PREPA has done—reflects a culture unprepared | See Article 4, Section 2 of Act 73-2008, 13 L.P.R.A §10672, and Article 6.30 of Act 57-2014, 13 L-P.R.A. $1054cc. 264 to accept the need for regulation. The Commonwealth had 70 years of an unregulated monopoly, literally. Act 57-2014 ended that era, emphatically. 5. Turning to policymaking: For each policy area requiring decisions, there must be a single ultimate decision-maker. That does not mean that the Commission must be the decision-maker on everything affecting electric service. Certainly, there is a need for separate decisions and decision-makers on subjects like zoning, environmental issues and labor relations, to name a few. But on the issue of economic performance for the electricity customers, the utility must be answerable to a single entity—the Commission. That is what Commonwealth law says, and that is how things work in the 50 mainland states. Otherwise the utility can avoid orders from one government agency by getting a different answer from another government agency. The current situation lacks this clarity. At least four governmental entities are claiming some legal authority to address PREPA's performance: the Commission, the Governor, AFFAF, and FOMB. The federal court overseeing the PROMESA litigation also has arole. The absence of clarity and coordination concerning each entity's role is a serious current problem. For more thoughts on this question, see our response to Senator Wyden's questions below. Question 2: What measures should Congress consider taking to ensure the commission remains in position as a strong independent regulator on behalf of ratepayers? Response: Under Act 57-2014, the Commission has the legal authority it needs to discipline PREPA's performance and to introduce and oversee market structures that create an appropriate mix of competitive service and regulated monopoly service. What is necessary, and what Congress could assist with, are the following: 1. Ensure that the Commission has sufficient resources. As explained in my previously submitted testimony, the Commission's annual resources are currently limited to the statutory level of $5.8 million, supplemented by approximately $1.25 million that we collect through fees. This amount was not well-aligned with the Commission's responsibilities from the outset; it is unrealistically small given the complex questions we now need to address. Should Congress be willing to supplement the Commission's budget, the needs fall into four main areas: (a) overseeing the immediate recovery period; (b) monitoring (in part via independent auditors) of PREPA's restoration process; (c) audits of PREPA's existing system, resources, and assets; and (d) proceedings to transform Puerto Rico's electric sector and identify and implement an appropriate market structure. The Commission is prepared to provide more details on its budgetary needs if requested. 2. Ensure the Commission’s ability to use those resources independently. Sufficient resources alone do not result in a strong, independent Commission. The Commission must also be able to use those resources effectively, efficiently and in furtherance of its statutory mandates, free from political or misguided intervention.? In recognizing the Commission’s ? For example, current, across-the-board cost control measures threaten the Commission’s operational and substantive independence, by limiting its ability to use its independently-sourced funds and placing the final saying on the use of such funds on entities with a direct interest on the result of Commission proceedings, 4 265 unique and central role in overseeing immediate restoration efforts and formulating mid- and long-term strategies for implementing a resilient, competitive and modern energy market structure, Congress should also recognize the Commission’s operational and substantive independence as a necessary condition for effectively addressing Puerto Rico’s chronic energy problems. 3. Direct FOMB to work out with the Commission a memorandum of understanding that systematically and clearly allocates to each entity regulatory responsibilities that are consistent with, and avoid conflict between, their existing statutory authorities. On that subject, see the response to the questions from Senator Wyden. 4. Define the FOMB's authority with more clarity so that it does not encompass areas traditionally and properly within the realm of an independent, expert utility regulator. Otherwise there is serious risk of a "multiple chefs in the kitchen” problem described in response to the questions from Senator Wyden below. 5. Condition the spending of federal funds for Puerto Rico's electric system on the Commission's approval of the projects and associated budgets to which those funds will be deployed. Doing so will ensure that the spending conforms to a unitary plan that, long after federal involvement ends, will be subject to the Commission's oversight. Questions from Senator Ron Wyden Mr. Morales, a longer-term rebuilding of Puerto Rico's electricity system to be more resilient, efficient, and clean will take years and coordination among many stakeholders. Question 1: Who do you believe should take the lead in such a long-term revisioning and rebuilding process? Response: This question is critical because there are, at present, multiple "chefs in the same kitchen"; specifically: I. Government entities with legal obligations: PREPA, FOMB, Governor and Legislature, Commission. 2. Government entities with legal discretion: FEMA, U.S. DOE (including National Labs), U.S. Army Corp of Engineers, Congress. 3. Federal court In addition, there are think tanks, businesses, and industry groups—all trying to influence the actions of the above-mentioned government entities. This diversity of actors, interests and passions could make for a vibrant, disciplined process of problem-solving. But that is not the current situation. Instead we have the following problems: 1. There is no single coordinating entity. thereby undermining the budgetary, operational and substantive independence necessary for the Commission to fulfill its role in achieving the reforms sought after by Congress and Act 57-2014. 266 2. There is no single set of policymaking principles. 3. There is no single decision-making procedure. 4. There is no single decision-maker. 5. There is no single body of law. 6. In many situations, one entity's decision or recommendation can be blocked by some other entity. 7. Each entity is acting in what it thinks is its organizational obligation or its self-interest, without necessarily accounting for the obligations of other entities. 8. In some situations, a decision that seems to be "right" for the short term could be "wrong" for the long-term. Prior to PROMESA and prior to federal involvement in the hurricane aftermath, the legal responsibility for the Puerto Rico's electric industry's performance rested with the Commission. Once federal involvement ends, that same legal responsibility will rest with the Commission. During this interim period of federal involvement, it is both logical and necessary for the Commission to continue playing a central role. The Commission does not expect, however, to be the final decision maker during this period on every single subject. It is willing and prepared to work with multiple agencies at the federal and Commonwealth level. But for the working relationships to work, the coordination and hand-offs must be clear, and the central principles must be widely accepted. It is less important to determine that one entity "takes the lead," than it is to determine the unique expertise and role that each entity must play. As indicated above, there is at present no coordination between any federal agency and the Commission, no single steering committee to achieve coordination among all the acting entities, and no effort to create that coordination through a steering committee or other means. We have some sympathy for PREPA, which has to answer to these multiple masters. Our sympathy diminishes, however, when PREPA's response is to disregard Commission orders, to enter into expensive contracts without Commission review, and especially to continue incurring costs that it will ultimately insist be included in rates by the same Commission it has ignored. The Commission is ready and willing to take on that coordinating role, assuming it has sufficient resources. The Commission also is ready and willing to share that role with others, and to accept that someone else plays that role—provided that such other entity acts objectively, preserving the Commission's authority while helping to avoid conflicts as the Commission carries out its authority. Question 2: What should that process look like to ensure it is timely and a sound expenditure of taxpayer dollars? Response: Our immediate recommendation is twofold: (a) As we already have explained, there must be a memorandum of understanding between FOMB and the 267 Commission that allocates roles and schedules clearly, to make appropriate use of each body's expertise while avoiding conflict. (b) There should be a steering committee of all the governmental entities, led by an objective person with no "agenda" other than the public interest, which uses a decision-making process that is respectful of the authority of each entity. Questions from Senator Al Franken Question 1: Mr. Morales, I noticed in your testimony that the Puerto Rico Energy Commission has issued recent orders to promote the resilient rebuilding of the grid. Before the hurricane, the Commission was charged with oversight of PREPA and pushing for increased use of renewable energy as mandated in the island's Renewable Portfolio Standard. I believe that the Commission should have a key role in the rebuilding process. What do you see the role of the Puerto Rico Energy Commission to be in the rebuilding process, both short and long term? Response: The Commission's role is defined by Act 57-2014. As my previously submitted testimony explained, the statute commands that the Commission— "shall be able to guarantee the orderly and integrated development of our electrical system, thus ensuring the reliability, efficiency, and transparency thereof, and the provision of electric power services at reasonable prices." "shall evaluate [PREPA's plans] regarding its obligation to efficiently generate electric power, various operational issues, and the integration of renewable energy, among other mandates." "shall oversee all types of operations, processes, and mandates pertaining to the efficiency of the energy sector of the Island." "shall oversee [that] PREPA's debt issues are in the public interest." "shall approve the electricity rates proposed by PREPA." "shall require that the prices included in any power purchase agreement, wheeling rate, and interconnection charge are fair and reasonable, consistent with the public interest, and compliant with the parameters established by this Commission..." "shall ... guarantee that PREPA meets its obligations to bondholders.” Under these general provisions and the many associated specific provisions in Act 57-2014, the Commission must shape the future electricity landscape so that it attracts those players best able to serve our citizens. The process of making those determinations must address the following points, in sequence: 1. Determine the desired mix of products and services, for the Commonwealth and for various geographic areas. 268 2. For that mix of products and services, determine the likely quantity required. 3. Determine which products and services are natural monopolies, and which ones can potentially be provided more cost effectively through competition. 4, For each category of product and service, determine the types of companies that are most likely to provide it cost-effectively. 5. Create criteria for competition to select the provider of monopoly services. 6. Create criteria for licensing companies seeking to provide competitive services. 7, For the competitive services, take all steps necessary to convert the market from a monopoly market to a competitive market. 8. Arrange for any necessary sale of PREPA assets to the providers of the new services. Of course, the Commission must address these issues in the open, transparently, inviting the best minds and best ideas, and subjecting those minds and ideas to vigorous questioning. Question 2: Has the Puerto Rico Energy Commission interacted with the Financial Oversight and Management Board to discuss the commission's authority and role in the rebuilding process? Response: On multiple occasions, since May 2017, the Commission has sought to engage the FOMB in a detailed discussion about our respective authorities. The Commission's efforts have not borne fruit. In May 2017, the Commission's outside counsel held a conference call with attorneys at the Proskauer firm (one of FOMB's outside firms), for purposes of initiating conversations about our respective authorities. The Commission's outside counsel urged the Proskauer attorneys to recommend to their client the formal commencement of such discussions. The Proskauer attorneys chose not to accept that recommendation, saying instead it was the Commission's task to contact the FOMB. The Commission has held several informal discussions with the FOMB Chairman and Executive Director, urging them to direct their attorneys to meet with the Commission's attorneys to develop protocols. On October 29, 2017, the Commission, on its own, prepared a two-page memorandum of understanding. This document, to be signed by the Chairmen of the Commission and of the FOMB, would simply direct each entity's lawyers to work on a master protocol and to complete it by a date certain. The intent was to commit both agencies to this essential dialogue. By email of November 2, 2017, the FOMB's executive director declined to adopt this MOU, stating that FOMB’s legal counsel would be in touch. Thus, as far we know, the FOMB has not directed its lawyers to work with us to produce a master MOU by any date certain. 269 Subsequently, the Commission's General Counsel, attempting again to get a dialogue in place, sent to FOMB's outside lawyers a master list of all actions the Commission has the duty to take under Act 57-2014. The Commission's General Counsel suggested that the two sets of lawyers use this list as an agenda, to determine how the commission’s duties should interact with the FOMB's duties. A telephone conference (November 9, 2017) held to address this list ended prematurely when the FOMB's lawyers said they needed more time to study it and would reschedule. That was four weeks ago. FOMB representatives have said on several occasions they intend to cooperate with the Commission, but no steps toward cooperation have occurred. In the absence of any substantive dialogue with the FOMB, the Commission's advisors have now completed a first draft of a detailed protocol for coordination that it will submit to FOMB shortly. Compounding the problem of FOMB unresponsiveness is its position before the federal court. Brief background: In its rate order issued in January 2017, at Part Four, the Commission required PREPA to submit its annual budgets for Commission approval, such submission to occur prior to PREPA incurring any costs under those budgets. The Commission explained that because PREPA was a non-profit entity, the conventional regulatory treatment of imprudent costs—requiring their absorption by shareholders rather than imposing them on ratepayers—is infeasible because a non-profit company has no private shareholders. In the non-profit context, unless all costs are recovered from ratepayers the utility will have insufficient revenues to operate; so disallowing costs from rates is cutting off one's nose to spite one's face. Given this constraint, the only way to protect ratepayers from imprudent costs is to prevent PREPA from incurring them to begin with. The Commission therefore required PREPA to submit an annual budget before spending its money. (PREPA had proposed an annual "true-up" process that amounted to "We spend it, we tell you about it, you make ratepayers pay it"—the very absence of accountability that Act 57-2014 was enacted to fix.) PREPA has challenged this feature of the Commission's rate order in the Commonwealth court system. The Puerto Rico Fiscal Agency and Financial Advisory Authority (AFFAF) then filed with the federal court in September a "Notice of Removal" removing that appeal to the federal court, arguing that the Commission's action was preempted by the FOMB's authority under PROMESA. AFFAF's removal action was joined by the FOMB. Thus, the irony: While arguing to the federal court that the Commission cannot act on PREPA's budgets because of conflict with FOMB, FOMB has cited no specific conflict and is failing to work with the Commission to develop protocols that will avoid conflict. PROMESA section 4 is clear that if a Commonwealth agency issues an order that is "inconsistent" with an FOMB action, the FOMB action prevails. The Commission of course accepts this legal reality, and has said as much to FOMB’s lawyers. But it appears that FOMB's lawyers have confused this "conflict preemption" provision with an “occupation of the field” provision—the latter being a situation in which the congressional intent is that the federal agency occupy an entire field of play (such as budget review) with no state agency allowed to act within that field. Section 4’s express language is the language only of conflict preemption. It is illogical to claim a conflict before a conflict has occurred, especially when the Commission is seeking to work out protocols to avoid conflict. 270 Question 3: I am very concerned about how PREPA is entering contracts with private companies. I understand that Puerto Rico Energy Commission is seeking more oversight authority for such contracts. What is your recommendation on how to conduct appropriate oversight? Response: The Commission is not "seeking more oversight authority"; the Commission already has sufficient authority under Act 57-2014—notwithstanding PREPA's lawyers' arguments to the contrary. Under that authority, the Commission on November 17, 2017 issued an order requiring PREPA to obtain Commission approval of major contracts. That Order is attached as an Appendix to this Response. PREPA must act lawfully by following Commission orders. The alternative—PREPA insisting that it can spend money without Commission approval, then expecting the Commission to raise electricity rates to reflects costs the Commission did not approve—is contrary to the statutory requirement that rates be "just and reasonable" and is a return to the 70 years of unregulated monopoly that Act 57-2014 reversed. Should PREPA continue to resist the Commission's authority under Commonwealth law, we recommend that the Congress use its territorial authority to compel PREPA's cooperation, including conditioning all federal funds allocated to PREPA on PREPA's complete adherence to Commission orders. Question from Senator Steve Daines Question: Do you have any suggestions for PREPA on how to improve contract policies and project management? Response: Yes. PREPA must improve its bid processes, its contract evaluations, its recordkeeping, and its knowledge management practices. With respect to contract bidding and evaluation, the Commission has found that PREPA has historically failed to execute competitive bid processes (January 2017 Rate Case Order paras. 249, 471); and accepted provisions with unacceptable allocation of risk (November 2017 Contracts Order, Appendix A, p.5). These omissions underscore the need for independent oversight of bid processes and review of proposed contracts. With respect to recordkeeping, the Commission has found that PREPA does not maintain electronic records of work orders, project plans, or project budgets (January 2017 Rate Case Order para. 175). Even major projects are often handled at the local district level and PREPA’s executive leadership has little to no visibility on project progress and budget status (Id.). This lack of visibility and appropriate recordkeeping has led to over-spending and redundancy in some cases and abandonment of needed projects due to minor budget overruns in others, as described by PREPA staff during our Rate Case hearings and technical conferences during our Performance Investigation. PREPA must modernize its recordkeeping and budgeting systems. With respect to project management, our Order on Contract Oversight Measures notes multiple occasions on which PREPA failed to appropriately manage its consultants, 10 271 leading to cost increases and procedural delays (November 2017 Contracts Order, pp.2-3). Our Performance Investigation revealed a near-complete lack of succession planning. Our January 2017 Rate Case order discusses the special complexity of PREPA’s contracts for the Aguirre Offshore Gas Port (January 2017 Rate Case Order, paras. 222-223), but during hearings in the pending AOGP Economic Analysis docket, PREPA noted that it had no staff responsible for management of several of those contracts. PREPA must establish appropriate expectations for performance on the part of its counterparties and maintain clear chains of responsibility and authority, as we ordered in Section I(b) (p7) of our November 2017 Contract Oversight Measures Order. 11 272 Appendix: Commission Order on PREPA Contracting (November 17, 2017) 12 273 COMMONWEALTH OF PUERTO RICO 2 0 ‘C Sh. Contin 93 evensia OE FuRinO HCO 4 4i 4 PUERTO RICO ENERGY COMMISSION IN RE: TEMPORARY OVERSIGHT MEASURES } CASE NO.: CEPR-MI-2017-0008 RELATED TO THE PROCUREMENT AND MANAGEMENT OF RESTORATION SERVICES || SUBJECT: Order identifying and BY PREPA implementing temporary oversight measures. ORDER Through this Order, the Puerto Rico Energy Commission (“Commission”) identifies and implements a set of measures, requirements and directives aimed at ensuring optimal accountability, prudency and reasonability in the procurement and _ prospective management of restoration support services by the Puerto Rico Electric Power Authority (“PREPA”) in the wake of Hurricane Maria. These measures are taken to ensure PREPA funds allocated towards the restoration and recovery of the Island’s electric grid—whether these funds come ultimately from PREPA customers, Commonwealth taxpayers or federal taxpayers—are spent effectively and efficiently, producing measurable and quantifiable results. Another objective is to avoid wasteful, fraudulent or abusive practices, by holding PREPA and its contractors and sub- contractors accountable for the quality and efficiency of their work. The measures taken herein are consistent with the Commission’s overall goal and statutory mandate of inducing administrative and financial discipline to PREPA’s operations and culture; they are not meant to duplicate any efforts by any other state or federal agency, but rather to support such efforts.! Finally, as detailed below, the measures and directives identified herein are necessary and essential, in light of both recent and historical examples of doubtful PREPA contracting determinations. They are especially necessary in light PREPA’s insistence, in testimony and briefs presented in the rate case petition proceeding and in arguments to state and federal courts, that the Commission has no power to review and prevent PREPA’s spending before it occurs; but rather, once that spending has occurred, must approve rates that reflect those costs, even if wasteful or imprudent.? 1 The Commission recognizes that the Fiscal Agency and Financial Advisory Authority (“AAFAF” for its Spanish acronym) and the Financial Oversight and Management Board for Puerto Rico (“FOMB”) also may conduct some type of contract review. Those reviews do not relieve the Commission of its duty under Act 57-2014 to ensure that rates are just and reasonable generally, and do not include imprudent costs specifically. The Commission is pleased to coordinate with both AFFAF and FOMB to avoid duplication of effort but it must and will carry out its independent legal obligation. To that end, the Commission contacted representatives of AFFAF and FOMB in May 2017, and FOMB again in November 2017, providing a systematic path to coordination. The Commission is awaiting their response but in the meantime must and will use its unique expertise and experience with PREPA, demonstrated in numerous prior orders—most importantly the Transition Charge, the Integrated Resource Plan and Rate Case—to protect Puerto Rico’s citizens. 2 See, in general, Part Four of the Commission’s Final Resolution and Order, In Re: Review of Rates of the Puerto Rico Electric Power Authority, CEPR-AP-2015-0001, January 10, 2017 at pp. 147-156 (“Resolution and Order 274 ‘ct we Le In ideal circumstances, the Commission would ask for comments on procedul ete 1 4i Comin ot mania DE TUERTO EO 4 ensure prudent, least-cost contracting, then craft requirements that align with PREPA’s practical abilities. The present emergency does not allow for taking extra time with such procedures. Accordingly, this Order goes into effect immediately. The Commission does, however, invite PREPA to suggest alternative means of accomplishing the same objectives as the ones furthered through this Order. I. BACKGROUND a. PREPA’s History of Imprudent Procurement and Contracting On October 17, 2017, PREPA signed a contract with Whitefish Energy Holdings, LLC (“Whitefish”) for the provision of certain services related to the restoration and recovery of PREPA’s electric grid. Less than two weeks later, amid a myriad of controversies, PREPA announced its intention to cancel the Whitefish contract on October 29, 2017.3 In the 12-day period in between, PREPA incurred at least $20.7 million of costs associated with this contract. PREPA entered into the Whitefish contract without notifying or seeking prior approval from the Commission. Whitefish is not the only instance in which PREPA’s actions with regards to the procurement, contracting and management of contracted services have shown to lack the level of discipline and scrutiny expected from a public utility and required by Act 57-2014.5 Throughout many of its proceedings, the Commission or its consultants have raised concerns regarding the terms and conditions agreed to by PREPA when entering into contracts (and whether such terms and conditions are in PREPA’s and ratepayer’s best interest), as well as the lack of performance metrics to ensure the quality of the work performed by the contractor. Examples include, but are not limited to, the quality of the products prepared by PREPA’s contractors Siements PTI and Navigant Consulting, Inc. (submitted as part of on PREPA’s Rates”) and Part Il of the Commission’s Final Resolution addressing PREPA’s Motion for Reconsideration, CEPR-AP-2015-0001, March 8, 2017 at pp. 14-34. See also, PREPA’s Verified Motion for Reconsideration of Provisions of the Final Resolution and Order, filed January 30, 2017, and PREPA’s Appeal to the Puerto Rico Court of Appeals challenging the legality of the Commission’s determinations, Case No. KLRA2017-0444, consolidated with Case No. KLRA2017-0446. Of special concern is that PREPA’s attempts at freeing itself from required oversight have been supported by both AAFAF and the FOMB. See Notice of Removal, Case No. 17-04780 (LTS), Adversary Case No. 17-00256 (Docket Entry No. 279). 3 While PREPA announced its intention to cancel the Whitefish contract on October 29, 2017, Whitefish would continue providing services until certain milestones were completed. As of the date of this Order, Whitefish continues to provide services to PREPA, + http://cb.pr/whitefish-no-se-va-hasta-que-entregue-la-linea-de-aguirre-y-aguas-buenas/. This amount is expected to increase, given, as noted before, that Whitefish would continue providing services to PREPA until the completion of certain milestones. 5 The Puerto Rico Energy Transformation and RELIEF Act, as amended. 275 fC Ne Le PREPA’s IRP and Petition for Rate Review)},6 PREPA’s maintenance contracts witlP 4 4i ‘Conse oe nenia GERUERTO MCD 4 Mitsubishi-Hitachi and Alstom Caribe,? PREPA’s multiple power purchase agreements with renewable energy providers,? and PREPA’s power purchase agreement with EcoEléctrica.? Appendix A to this Order provides detailed insight into these and other examples. As the aforementioned list shows, these concerns are not limited to contracts related to a specific area of PREPA’s operations, but rather span multiple areas of PREPA’s business. While the Commission has not made a finding regarding the prudency of these actions, they provide an insight into the type of decisions within PREPA that fuel the Commission’s concerns. Particularly, the Commission is concerned that PREPA’s management culture, a product of its 70-year long self-regulated monopoly status, is unwilling or unable to obtaining the type of concessions from its contractors generally sought after by investor-owned utilities worried about their bottom line. b. The case for Commission oversight In order to be financially and operationally sustainable, a utility’s rates must be sufficient to recover all of its costs, provided such costs are deemed by the regulator to be prudent, In the traditional setting of an investor-owned utility, a regulator is able to induce prudent spending and performance by preventing a utility from recovering through its rates costs which are deemed by the regulator to be the result of imprudent actions--those costs are thus paid for by the utility's shareholders, not ratepayers. This after-the-fact review is known as cost disallowance. The certainty that imprudent actions will result in lost revenues aligns the interests of shareholders and ratepayers, leading to better performance. PREPA’s case is different. PREPA is a government-owned, non-profit utility; it has no shareholders. Because it has no shareholders, all of its costs must be recovered through its rates, which means that ratepayers are entirely responsible for the costs incurred by PREPA. Once a cost is incurred, there is no practical choice but to reflect those costs in PREPA’s rates. If the Commission were to prevent PREPA from recovering a cost deemed as imprudent, PREPA would operate at a deficit, or would have to cut other necessary spending. Neither result is consistent with a financially healthy and sustainable utility providing reliable service. This certainty of recovery of costs reduces management’s incentives to seek during negotiations concessions from contractors that would reduce PREPA’s overall costs and exposure to risks and, ultimately, benefit PREPA’s ratepayers. Before-the-fact review by the 6 See, in general, the Part IV(A)(3) of the Final Resolution and Order, In Re: Integrated Resource Plan for the Puerto Rico Electric Power Authority, Case No. CEPR-AP-2015-0002, September 26, 2016 (“Resolution and Order on PREPA’s IRP”) and Parts Two, Three and Four of the Commission’s Resolution and Order on PREPA’s Rates, 7 Resolution and Order on PREPA’s Rates at $208 and J9211 - 218, respectively. # Resolution and Order on PREPA’s IRP, at [J 171-188. 9 Resolution and Order on PREPA’s Rates, at $152. 276 ‘C SL. Commission is therefore a necessary action to reduce customers’ exposure to imprbden? 1 41 Considn or eacin DeFUERTG FCO 4 costs. The Commission recognizes that PREPA’s key personnel are deeply involved in the restoration effort, as well as efforts to renegotiate debt and secure federal resources. But it is precisely at such times of crisis that discipline in spending can decrease—especially in a company whose pre-existing discipline is suboptimal. Lack of discipline and oversight can delay restoration services by reducing the effectiveness and efficiency with which emergency resources are allocated towards emergency response and restoration efforts. The temporary measures and directives identified in Part Il of this Order are specifically designed to ensure discipline during the current emergency and the period immediately after. While the Commission will subject PREPA to rigorous oversight, the measures adopted herein are also designed to avoid unnecessary burdens which may delay PREPA’s restoration efforts. Requiring PREPA and its contractors to account for their activities and costs is a small matter compared to the benefits in terms of certainty, transparency and accountability. However, the Commission invites PREPA to suggest alternative means of accomplishing the level of accountability that these requirements are designed to achieve. c. The Commission’s Authority to Require Review Act 57-2014 grants the Commission express and unambiguous authority to review PREPA’s operations and implement the regulatory actions necessary to “guarantee the capacity, reliability, safety, efficiency and reasonability of electricity rate [in] Puerto Rico.”!° Accordingly, the Commission is empowered to address "all types of operations, processes and mandates pertaining to the efficiency of the energy sector of the Island.”"! This broad authority is further strengthened by the closing sentence of Section 6.3 of Act 57-2014, which states that the Commission shall have all those “implicit and incidental powers that are pertinent and necessary” to comply with its mandates. Equally vital is the Commission unquestionable authority to “require and gather [from PREPA and certified energy companies] any pertinent or necessary information to properly carry out its powers and duties,”!2 IL REQUIREMENT FOR CONTRACT REVIEW The foregoing factors highlight the need to establish several requirements for PREPA’s contracting and spending under such contracts. These requirements will remain in effect for a period of six months, beginning on the date issuance of this Order, unless the Commission determines otherwise through resolution or order. 10 See sub-section {c) of Section 6.3 of Act 57-2014. 11 See Statement of Motives of Act 57-2014 at 920. 12 See sub-section (1) of Section 6.3 of Act 57-2014, 277 ‘Cc Nabe #1 CONSIGN OS ENERGIA WE POERIO ICO 201 4 a. Required Contract Provisions For any contract or amendment to an existing contract related to the procurement of energy, grid services, and fuel! for an aggregate value of at least $10 million; contracts for infrastructure work™ for an aggregate value of at least $1 million; and contracts for professional services!5 for an aggregate value of at least $250,000, executed by PREPA after the issuance of this Order, the Commission ORDERS PREPA to include the following provisions: (1) A clause stating that the contract will not enter into force unless PREPA has received written approval from the Commission or unless five business days have passed after PREPA’s submission of the contract to the Commission with no action from the Commission. The Commission, on notice to PREPA within the five-day period mentioned above, may extend such period for unusually complex contracts, provided such period shall never exceed 30 calendar days from the date of submission of the contract to the Commission. (2) A clause stating that, if the Commission finds, or has reasonable belief, that the work being performed is defective, inconsistent with the terms and conditions of the contract, with applicable legal and regulatory requirements or with any prior Commission order or directive, the Commission may order PREPA to direct a contractor to immediately cease the provision of services until the Commission states otherwise, or until 15 business days from the date the Commission’s stop-order was issued if the Commission fails to take any action within such timeframe. After the issuance of a stop-order, and after granting PREPA and the contractor reasonable opportunity to be heard, the Commission may determine to authorize continuation of services, require corrective measures to be taken, including contract amendments, or require the termination of the contract. 3 The Commission intends the term “energy, grid services, and fuel” to refer to provision of energy to be consumed by PREPA or sold by PREPA to customers; to the commitment to make generating capacity available when needed (commonly referred to as “capacity services”); to credits associated with production of “green” or renewable energy as defined by Act 83-2010; to administration of energy efficiency, demand response, and other demand-side management programs; to the services necessary to support the transmission of electric power to customers, including but not limited to frequency and voltage regulation, operating and spinning reserves, startup-related costs, black start capabilities, and flexible ramping capabilities; to purchases of combustible fuels; and to tolling, transportation, or other delivery payments associated with fuel purchases. 4 The Commission intends the term “infrastructure work” to refer to materials purchased for and labor applied to PREPA’s physical assets, These assets include, but are not limited to, generation, transmission, distribution, fuel delivery, information technology, warehousing, and transportation infrastructure and assets. 15 The Commission intends the term “professional services” to refer to work for hire that has no impact on PREPA’s physical assets, including but not limited to: legal services; advisory services; modeling, potential studies, and other analyses; engineering and design work, and others. 278 ‘C Nhat fF ‘Comisidn or eroia BETURREO AICO 20 1 4 (3) A clear, detailed scope of the work and activities included in the contract. (4) A total budget associated with the described scope, provided that PREPA may seek from the Commission a modification of this requirement in extraordinary circumstances. (5) An estimated spending schedule associated with the described scope and budget, with both monthly spending estimates and clear and objective milestones.'¢ Spending schedules must include spending estimates associated with those milestones. (6) A schedule of all labor, material, and/or service rates associated with the contract. (7)A scope and budget amendment process, which shall include a requirement to provide advanced notice, with no less than 30 calendar days in advance, to the Commission, of any proposed amendment to the contract scope, budget and amount, provided PREPA may seek an exception to the 30-day requirement (but not to the advance notice requirement) in extraordinary circumstances. (8) Require invoices to be submitted to PREPA on, at least, a monthly basis in electronic format. Invoices must contain the amount invoiced under the contract since the last invoice and the total amount invoiced since the contract’s execution, as well as a description of the work completed and being invoiced and the total amount of contract funds remaining after deducting the amount included in the most recent invoice. (9) Arequirement wherein PREPA’s contractor must submit, 10 calendar days in advance of a new month, monthly budget updates, with milestones accomplished and estimated spending and work to be completed in the upcoming month. (10} A clear description of performance guarantees in the contract, including a requirement that work performed under the contract will conform to all applicable legal and regulatory requirements. Contracts must include a certification from the contractor that they are aware of all legal and regulatory requirements and that, except for unforeseen or extraordinary circumstances, the contracted budget is sufficient to meet these requirements. (11) A clear description of risk-sharing provisions, including provisions describing the allocation of responsibility for costs between PREPA and PREPA’s contractor in the event of error on PREPA’s part, error on the part of PREPA’s counterparty, shared error, and the occasion of circumstances beyond the control of PREPA and PREPA’s counterparty. 16 In the case of contracts for energy, grid services, and fuel, “milestones” means delivery of such energy, grid services, or fuel. The requirement for spending estimates associated with delivery of milestones does not apply to such contracts. However, the schedule of labor, material, and/or service rates must include a rate for the delivery of energy {in MWh), capacity (in MW}, fuel (in MMBTU and physical units), or other services (in the appropriate units). 279 b. Contract and Invoice Oversight For any contracts contemplated in Part Il.a of this Order, the Commission ORDERS the following: (1) PREPA shall submit to the Commission contracts for review within one week of approval of contracting language by the contracting officer at PREPA. Contract submission must include at least: the contract itself; all appendices and attachments; a total budget estimate; a spending and milestone schedule; and a schedule of rates for labor, materials and services. The PREPA contracting officer who approved the contract shall certify to the Commission that the contract complies with the requirements established in Part Il.a of this Order. None of the materials submitted by PREPA may contain any redactions whatsoever; however, PREPA may request confidential treatment of those documents, or portions thereof, it deems confidential, pursuant to Commission Order CEPR-MI-2016-0009, as amended. (2) PREPA shall designate and identify the individual within PREPA responsible for reviewing invoices and contractor performance for each contract and whom shall act as liaison between PREPA and the Commission on matters related to the contracts under their supervision (“PREPA contract manager”). PREPA shall submit the name, title, e-mail address, and phone number of this individual to the Commission concurrently with each contract. (3) PREPA shall notify the Commission within 7 calendar days of any change to the identity or contact information of the PREPA contract manager. (4) PREPA shall keep and maintain all documents related to each contract, including all those documents identified in sub-section (1) above, in a secure Internet server, to which server the Commission shall have access immediately upon request. (5) Immediately upon receipt of an invoice or budget update, and of approval of such invoices, the PREPA contract manager shall upload all relevant documentation to the secure Internet server. (6) Upon request from the Commission, the PREPA contract manager shall schedule a briefing call or meeting, at a mutually convenient time, with PREPA officials and contractor representatives familiar with the contract under review. (7) Prior to the execution of any proposed amendment to the contract amount or scope of work of the services to be performed, the PREPA contract manager shall notify the Commission the intent, scope and nature of the proposed amendment no less than 30 calendar days prior to the intended date of execution of the proposed amendment. The proposed amendment shall be deemed to have been approved if the Commission fails to make a determination with regards to the proposed amendment within the 30-day period established before. PREPA may seek an exception to the 30-day 280 requirement (but not to the advance notice requirement) if extraordinary circumstances. Be it notified and published. Angel R. Rivera de la Cruz é H. Roman a Associate Commissioner e Commissioner CERTIFICATION Thereby certify that the majority of the members of the Puerto Rico Energy Commission has so. agreed on November .!"1_, 2017 and on this date a copy of this Order was notified by electronic mail to the following: j-morales@aeepr.com, n-vazquez@aeepr.com, c- aquino@aeepr.com and n-ayala@eepr.com. | also certify that today, November_\'7, 2017, I have proceeded with the filing of the Order issued by the Puerto Rico Energy Commission and I have sent a true and exact copy to the following: Autoridad de Energia Eléctrica de Puerto Rico Attne Ledo. Javier Morales Tafién Leda. Leda, Nitza D. Vazquez Rodriguez Ledo. Carlos M, Aquino Ramos P.O. Box 363928 Correo General San Juan, PR 00936-3928: For the record, I sign this in San Juan, Puerto Rico, today, November AZ, 2017. an Maria del Mar Cintrén Alvarado Clerk 281 ‘CT Xk ‘CONBION BE ENERGIA OF LENO MED 2 0 1 4i 4 Appendix I - Excerpts from Commission orders and supporting documentsS-in which the Commission or its consultants have expressed concerns regarding PREPA actions and contracting policies. (1) Renewables contracts "In [...] existing contracts, PREPA pays a price for energy, plus a per-megawatt- hour premium that PREPA refers to as "renewable energy credit” (REC). [...] The contractual energy price (ie, the price without the so-called REC) sufficiently covers the prudent costs of constructing and financing the projects plus a reasonable profit to their owners. The REC premium is therefore in excess of that reasonable profit. [..] [T]here is no evidentiary basis for assuming that a premium, such as that built into PREPA's existing contracts, will be required in future contracts, either by law or by competitive forces. Moreover, even if it were appropriate to assume that PREPA would pay for RECs, PREPA's REC price exceeds that of other United States jurisdictions, despite the absence of a REC market in Puerto Rico."? “PREPA has been signing contracts for utility-scale solar facilities at prices comparable to the full retail rates for some classes."? "The renewable contracts present uncertainty—not due to their prices (which are contractual) but due to their output, because their online dates are difficult to predict. Embodying this uncertainty is a 21% drop ($30 million), after less than six months, in PREPA's expectations regarding spending on renewable energy contracts." “Regarding the prices in existing renewable contracts, the Commission is not suggesting that high prices in existing renewable contracts reflect imprudent actions by PREPA or excess costs to consumers. Windmar argues that contracts signed in 2010-2012 preceded declines in renewable energy equipment, and occurred at a time when high oil prices made such contracts attractive to PREPA. Our point is not that PREPA necessarily should seek to terminate contracts, but to examine whether renegotiations can lower prices and also make operational dates more certain."* (2) Siemens PTI “PREPA's compliance with our IRP Rule was unsatisfactory. [...] Together with its chief consultant, Siemens Power Technologies International ("Siemens PTI" or 1 Resolution and Order on PREPA’s IRP at [']179-180. 2 Expert Report of Paul Chernick, Docket CEPR-AP-2015-0001, at p. 115, fn. 122. 3 Resolution and Order on PREPA’s Rates at 7161, 4 Id, at fn. 133. 282 “Siemens"), PREPA disregarded our rules, failed to use standard planning techniques, delayed the production of required information, and displayed insufficient appreciation of the potential for energy efficiency and demand response. These behaviors led PREPA and Siemens to reach conclusions that over-emphasized costly construction, while under-emphasizing the roles of renewable energy technologies and consumer behavior as ways to achieve the energy independence envisioned by Act 57. A related result of this behavior was a proceeding that took many more months, and cost the Commission and consumers many more dollars, than should have been necessary."> "The PREPA IRP was written and constructed almost entirely by Siemens PTL [...] We infer from these facts, as well as from explicit discussions in the IRP and discovery responses, that numerous decisions and assumptions in the IRP were informed by Siemens rather than PREPA.® "Siemens PTI was familiar with PREPA's system because it had provided transmission planning and renewable integration consulting to PREPA in the past. [...] Siemens PTI is owned by Siemens AG, which is also the parent company of a manufacturer of generating units. A key purpose of an IRP is to determine the need for and type of generating units. The purpose of a least-cost resource planning process is to minimize system costs over the long term. The process must be impartial, relative to the specific resources or manufacturers of generation or demand resources. The typical approach, therefore, describes resource options in generic terms only. While the characteristics of generic resources should be informed by real industry data, a choice of specific manufacturers or project specifications is typically considered only after generic resource choices have been selected; i.e., after the IRP process is concluded. Where the consultant conducting resource planning has a business interest in resource selection, there is risk of bias, intentional or unintentional. That risk rises when the modeling technique used by the consultant involves subjectivity. Given that risk, it is especially important for the utility that hires the consultant to oversee the consultant and inject its own independent judgments. Utility deference to a consultant with a potential for bias is not a prudent practice.” "In this IRP, Siemens was involved in the selection of both methodology and resources - a role especially influential given PREPA's lack of IRP experience. And its analysis did not speak solely in terms of generic units. Rather, it described specific units manufactured by Siemens, along with those of several other companies. PREPA conducted a screening study that included turbines from seven manufacturers, including Alstom, GE, Hitachi, MHI, Rolls-Royce, and Wartsila, in addition to Siemens. But the thermal resource selection process » Final Resolution and Order on PREPA’s IRP at { 13. 6 Id. at J 109. 7 Hd. at J 110. 283 ‘C NET /1 ‘CGRISION BE ENERGIA OE FLERTO RCO 201 4 conducted by Siemens PTI reviewed closely only three options: one from GE and two from Siemens technologies.® "We acknowledge that Siemens's witness asserted that the consulting arm of Siemens was “independent” of the manufacturing arm. However, both arms are commonly owned. At a time of deep citizen concern about PREPA's rates and performance, perceptions of bias or favoritism matter. If and when PREPA seeks to purchase new generation equipment, the Commission will require, and will ensure, that PREPA’s process for procurement is competitive and objective."? (3) Navigant Consulting "[M]uch of the crucial work that Navigant has done for PREPA in [the Rate Case] proceeding has been below industry standards. It has caused consultants to incur extra costs to identify errors, get clarification, seek documentary support, and sometimes even to understand the basic outlines of a proposal. Problems include the errors in the average-and-excess computations and the analysis of peak loads. Navigant witnesses have also made claims in testimony and discovery responses that they have been unable to support (such as the claimed benefits of the unbundled rates, or the response that billing determinants were decreased to reflect the residential fuel subsidy). The witnesses’ have frequently been unable to identify potential solutions, in such issues as whether coincident peak contributions could be computed in the same manner as non-coincident peaks, or whether multiple monthly peaks could be used for allocating generation costs for a utility in which every month contributes to capacity requirements. They took inconsistent positions between the cost-of-service study and rate design (on such issues as seasonality), and sometimes provided misleading information (such as the suggestion that PREPA had actual monthly NCP data by tariff code). !° “With regard to cost allocation and rate design, PREPA, the Commission and the public interest have been poorly served by PREPA’s consultants. PREPA should take steps to procure more competent assistance from Navigant or other firms, or bring more of this expertise in-house.”!! (4) EcoEléctrical? "The EcoEléctrica contract [...] requires an "excess energy payment” for energy required above a 76% capacity factor, EcoEléctrica sets the usage level associated with the 76% capacity factor monthly and sets the excess energy rate weekly. Sid at] iil. Id. at J 112. 10 Chernick Expert Report at § IX. “id 12 Resolution and Order on PREPA’s Rates at J] 150-153. 284 These factors make it difficult for PREPA to predict its payments EcoEléctrica."8 (5) Mistubishi-Hitachi™ and Alstom Caribe'S fC 2 1 4 TO "The San Juan [combined cycle] contract with [Mitsubishi-Hitachi] provides for Jayers of inspections at multi-year intervals, and can be expected to provide ongoing service for several years. While we do not have evidence that the maintenance contract at San Juan is not currently effective, the contract lacks any form of performance incentive or metrics. The contract appears to insulate the contractor from performance failures as well. While the terms of the contract are considered proprietary, the penalties imposed on the contractor for outage delays do not appear commensurate with the cost of those delays on PREPA."'6 "While the contract requires that Alstom provide a ‘permanent on-site operations and maintenance advisor,’ and provides a ‘technical field advisor’ for 'A’ and 'B' inspections, the contract does not actually specify the role of the technical field advisor, who leads the inspection and refurbishment process; and, most importantly, who bears responsibility for correctly executed inspections, maintenance, and replacement.!” "The contract limits Alstom's liability for PREPA staff negligence or deficiencies. Alstom included a contract provision ‘exclud[ing] any and all liquidated damages for outage schedule delays, unless such delay is 100% attributable to a negligent act or omission of ALSTOM (ie, ALSTOM fails to deliver a correct part or make available the required personnel and such late delivery/performance causes an outage delay).!® "Since PREPA did not provide a record of forced outages at Cambalache, including any reasons for outages or delays, the Commission’s consultants were unable to evaluate Alstom's performance. There was a two-year outage at Cambalache arising from a control system failure that caused an explosion in the turbine.!° 13 Id, at J152. 44 fd. at 9208. 15 Jd, at YY211-218. ‘6 Expert Report of Jeremy Fisher and Ariel Horowitz, Docket CEPR-AP-2015-0001 at § V(C)(6)(b){ii). 7 Resolution and Order on PREPA’s Rates at 9215. 18 Id, at J216. 19 Id. at F217. 285 ‘C NET 71 ‘COMIN BE ENERGIA OF PUENEE RIO 2 0 "[T]he Cambalache contract has no performance incentives or penalties to Keep the units in operation or in a state of good repair. Alstom’s liabilities are limited to a small fraction of the cost of the contract."° "The contract recognizes that Alstom relies on PREPA staff for much of the execution of maintenance, and specifically seeks to reduce Alstom’s liability for PREPA staff negligence or deficiencies.”2! (6) Excelerate and Aguirre Offshore Gasport, LLC?2 "The Time Charter agreement, a contract to hire Excelerate’s FRSU for fifteen years, requires a daily fixed payment of $111,500, or $40.7 million per year, and includes substantial liquidated damages to withdraw from the agreement once authorized. The contract contains a “hell or high water” provision, requiring that PREPA pay for the hire of the FRSU “without regard to (i) the amount of LNG delivered to EE for Regasification, (ii) whether or not LNG deliveries are actually made by PREPA or (iii) whether or not PREPA is able to receive or requires the use of Natural Gas from or beyond the Shore-side Natural Gas Delivery Point.” This contract represents a substantial—and nearly irrevocable—investment that is otherwise not disclosed by PREPA in filing this rate case."24 The Commission's Final Resolution and Order on PREPA’s IRP and Final Resolution and Order on PREPA’s Rates, as well as the expert reports filed by the Commission’s consultants, are available in full at the Commission website, energia.pr.gov or upon request to the Commission Clerk's Office at 787-523-6262. 20 fd at F218. 21 Fisher and Horowitz Expert Report at § V(C}(7)(a} (i). 22 Id, at § V(D)(3). 23 Id, at § V(D)(3)(b) (ii). 286 FINANCIAL OVERSIGHT AND MANAGEMENT BOARD FOR PUERTO RICO José B. Carvin Hi Chair BY ELECTRONIC MAIL December 12, 2017 Dear Chair Murkowski, Ranking Member Cantwell, and Members of the Committee: On behalf of Natalie Jaresko, the Financial Oversight and Management Board (the “FOMB”) is pleased to provide the following written responses to the written questions you sent on November 17, 2017 following the Hearing on “Hurricane Recovery Efforts in Puerto Rico and the U.S. Virgin Islands” on November 14, 2017. I understand that Judge Swain, of the U.S. District Court in New York, denied the Oversight Board's motion to install a Chief Transformation Officer within PREPA. The Oversight Board attempted to confirm an officer “with all the powers of a chief executive officer reporting to the Oversight Board” within PREPA, Does the Oversight Board plan to appeal the Judge's ruling? Tf you do not yet know, can you explain to us the process by which the Oversight Board would decide whether or not it will appeal? No we do not. The FOMB decided to focus our efforts to transform PREPA through a revised fiscal plan and other tools at our disposal rather than appeal the decision. The Puerto Rico Oversight, Management, and Economic Stability Act” er “PROMESA” established the Oversight Board with the express purpose of providing Puerto Rico with a method to “achieve fiscal responsibility and access to the capital markets.”” The Oversight Board is ina unique position of interacting with the Puerto Rican government on a regular and close basis, with visibility into the government’s finances and inner workings. Aside from appointing a Chief Transformation Officer, what do you think are necessary next steps that the Puerto Rican government must take to ensure effective recovery efforts to ultimately achieve fiscal responsibility and access to the capital markets? The most important goal is economic development, which is significantly dependent on the size and timing of federal aid, as well as the fiscal reforms required to balance the budget and the structural reforms necessary to spur the fundamental drivers of growth. That means liberalizing the labor, product, and service markets to encourage job creation and investment and improve productivity. The fiscal reforms laid out in the original fiscal plans remain just as important today, and in some cases, are even more so. Reforming the local tax code, reforming healthcare, right- PO Box 192018 San Juan, PR 00919-2018; www.oversightboard.pr.gov; comments @oversightboard.pr.gov 287 Page 2 sizing government, and implementing best practices for budget and cash management controls and protocols are all critical for Puerto Rico to achieve fiscal responsibility and regain access to the capital markets. However, more than ever, structural reforms are required to boost the economy’s competitiveness, growth potential, and adjustment capacity. What do you think are necessary next steps the federal government must take to ensure a smooth recovery? It is imperative that the federal government expeditiously complete its assessments of the impact of the hurricanes on Puerto Rico’s infrastructure and that Congress commit needed resources to support rebuilding a stronger, more resilient Puerto Rico. Puerto Rico’s infrastructure, particularly its energy sector, water and sewer systems, and roads need to be rebuilt and transformed in the aftermath of Hurricanes Irma and Maria. Schools, hospitals and housing have also suffered extensive damage and need substantial support for repairs and replacement. Extensive hurricane damage has substantially increased the Island’s infrastructure needs and accelerated the timeline under which reconstruction efforts must occur. Reconstruction funds must be subject to effective oversight, spent judiciously, and used to support transformation efforts reflected in revised and improved Fiscal Plans that the Oversight Board certifies under PROMESA. Without rebuilding and transforming its infrastructure effectively, efficiently, and prudently, Puerto Rico will not be able to address its dire fiscal and economic challenges, or restore growth and opportunity. Moreover, any tax reform legislation must not adversely impact businesses operating on the Island, Tax provisions should encourage, rather than discourage, business investment on the Island. You agreed with Assistant Secretary Walker that federal funds expended to restore the electric grid may not go to service debt bondholders. Do you believe the same is true of revenue generated by the rebuilt grid? PREPA’s existing creditors have a net lien on revenues generated by PREPA. To the extent that the rebuilt grid increases PREPA’s revenues because it is more cost-effective, then existing creditors of PREPA may indirectly benefit, to the extent any increase in revenues is available for debt service after payment of costs of operating the PREPA system and other priority obligations PREPA may incur during its Title HI case. Do you have any suggestions on how to improve the contracting process? The FOMB recently established a contract review policy and we are working with the Government of Puerto Rico on implementing it. Through the process of providing the FOMB the required documentation and ensuring the contracts are consistent with the relevant Fiscal Plans and with FEMA requirements for reimbursement, the FOMB can help the Government of Puerto Rico to become a more efficient and effective procurer of government contracts. Sincerely, Kyle A. Rifkind Deputy General Counsel CC: Natalie A. Jaresko 288 a CLEAN ENERGY (Naas BUSINESS NETWORK. Rebuilding the Electric Grid After Recent Hurricanes Compilation of CEBN Member Comments | Nov. 1, 2017 As federal agencies, local governments, and utilities work to help communities recover from recent hurricanes, there is an urgent need to restore power while also rebuilding the electric grid in a more reliable, efficient manner capable of withstanding future disasters. Expertise from the private sector can help inform these strategies to effectively meet the dual goals of rapid restoration of power and long- term viability of a more resilient grid. Below are a handful of ideas offered by members of the Clean Energy Business Network, which are particularly tailored to recovery efforts in the Caribbean. These suggestions are intended to begin a dialogue and are by no means comprehensive. As government leaders work to rebuild these areas, we encourage them to provide transparent channels for communication with affected stakeholders and the private sector to craft potential solutions. 1) First, there is a need to provide short-term solutions to restore power without locking in antiquated, inefficient energy systems. e Many Caribbean islands rely on diesel. If more diesel gensets are deployed, they could be coupled with organic rankine cycle (ORC) technology to save 5-10% on diesel costs and reduce vulnerability to running out of fuel. © Project example: ElectraTherm/Gulf Coast Green Energy developed an ORC genset solution for Guantanamo Bay. e Where internal combustion engines are used, these could be designed to be as fuel- agnostic as possible—i.e., they could run on either diesel or natural gas, so as islands gradually move away from diesel, the engines could be easily converted to LPG or LNG. e It may also be possible to deploy distributed generation—such as solar + storage, CHP internal combustion engines or microturbines, and other technologies at a wide variety of critical facilities in a relatively short timescale if there is a way to address interconnection issues. © Project example: Capstone microturbines kept facilities powered yp after Harvey, Irma, and Maria--now being deployed in FL. 2) Over the longer term, there is a need to make energy infrastructure more reliable and efficient as it is rebuilt. This ranges from building-level to community-level to grid-level solutions. e At the building level, rebuilding of structures must be done in compliance with new building codes to maximize weatherization/reduce demand. Care should be taken to avoid siting mechanical equipment in vulnerable locations. e Distributed generation can be part of the solution for critical facilities, community-scale projects, and businesses that value resiliency. Technologies that can provide clean, reliable distributed power include: CHP, solar + batteries, biomass, fuel cells, and geothermal. The U.S. Army Corps of Engineers, Department of Defense, and other federal agencies have previously been involved in building small-scale, localized power plants in combat locations and could utilize these strategies in hurricane recovery. e Community microgrids can keep hospitals, grocery stores, and areas of potential community shelter (e.g., schools) in operation after a storm. 289 oe CLEAN ENERGY (lamas BUSINESS NETWORK. o Project example: Greener by Design is engineering community microgrids in Hoboken, NJ and elsewhere in the state post Hurricane Sandy. Solutions to make the grid more reliable include hardening distribution infrastructure and mandating maintenance. Techniques include installing telemetry to detect outages, using reclosers to expedite circuit restoration, and pruning trees to avoid line interference. 3) To move forward on resilient power rebuilding options in Puerto Rico specifically, businesses and the local government need greater certainty about the future structure of the power grid and its ownership. The U.S, government must work to provide a credible path forward to restore a functioning power grid operator. The Department of Energy’s Electricity Policy Technical Assistance Program can provide independent and unbiased technical support on electricity-related policies to Puerto Rico. Businesses and the local government in Puerto Rico are exploring distributed generation (DG) options as communities rebuild, but their decision-making is heavily impacted by the current bankruptcy proceedings involving the Puerto Rico Electric Power Authority (PREPA) and the lack of certainty around the future structure of Puerto Rico’s electric grid. The Army Corps has been providing rental diesel generators and has been able to get critical sites like hospitals and banks up and running--but these are not long-term solutions. The generators are not usually meant to run constantly and there are challenges with local access to and price of both propane and diesel fuel. Decisions to install more permanent distributed generation options are stalled. Existing regulations regarding on-site generation (e.g., interconnection and power purchase agreement policies) are confusing and subject to interpretation—these should be clarified as reforms are developed. Potential end users do not want to invest their time and money in a distributed generation system if the eventual grid will lock out such systems and be built around a more centralized power system approach. If a site installs a distributed generation system now, this would need to be done without permits because Clean Air Act/Title V and interconnection permitting are impossible without fully functioning governance mechanisms and certainty about PREPA’s future. Therefore, the site may eventually be forced to dismantle the system in the future. 4) Businesses have solutions to offer but need a point of entry for discussions with federal agencies, local governments, and utilities. These entities should utilize a transparent, open contracting process. As unique needs arise in the recovery effort, relevant agencies and communities may not even be aware of all the existing technology and financing solutions to address these challenges. [It would be helpful to have established points of contact and an open process for stakeholders to contribute solutions and see what works best for the affected communities. A competitive process will ensure communities receive the best solutions to fit their needs. 290 November 14, 2017 Senator Lisa Murkowski United States Senate Committee on Energy and Natural Resources 522 Hart Senate Office Building Washington, D.C. 20510 Honorable Senator Murkowski: The Institute for a Competitive and Sustainable Economy in Puerto Rico {ICSE-PR) is the only non-profit public interest organization approved by the Puerto Rico Energy Commission of Puerto Rico (PREC) in afl the regulatory proceedings to date and it is a participant in the Federal Court PROMESA Title lil proceedings for the Puerto Rico Electrical Power Company (PREPA) bankruptcy proceedings. We urge the Energy and Natural Resources Committee leadership to take note of Puerto Rico private sector capacity to contribute, to invest in the electrical grid re-design and in the distributed energy projects that can be executed now if the Fiscal and Oversight Management Board (FOMB) supports the PREC per PROMESA law. Stateside electrical system regulatory best practices can be executed now by the PREC with proper FOMB funding and federal government expert help that supplements current PREC statutory limitation of its $5.8mill yearly budget. Most of this private cleaner energy generation investment and local credit capacity is on hold waiting for clarity of interconnection processes and rules. if promptly provided under standard US regulatory protocols Puerto Rico businesses can help get the lights back sustainably and in support of a more resilient grid as well. Federal and Puerto Rico laws including PROMESA support prompt enactment of this rulemaking outside of PREPA bankruptcy court proceedings. Sadly, unnecessarily with dire consequences now to Puerto Ricans the bankruptcy proceedings have crowded out tax payer and ratepayer moneys and the FOMB’s attention to the fighting with Puerto Rico government for control of a reckless PREPA and an incomprehensible acceptance of the PREPA effort to sideline PREC supervision authority in bankruptcy court proceedings. if a fraction of these moneys and attention by FOMB and government of Puerto Rico went to legiti regul. y proceedings, confid to investors and credible hope to consumers can induce rapid private investments, commercial, industrial and residential scale energy security, low prices and power quality now. There is no need to wait for PREPA bankruptcy resolution, nor the grand utility scale public-partnership projects with no presently known financing capability. We can fix at a minimum 20% of our currently non-existent or unreliable electrical generation if PREC budget and collaboration with FOMB are fixed, as they urgently can and should. Modernizing our grid to U.S. standards must begin with U.S. of and independ supervision of public service utilities. When a utility fails to cooperate or to provide adequate budgeting, cost controls and reliable planning information — or all of the above as evidenced by PREPA, there must be consequences and controls only a robustly funded and empowered regulator can expertly execute until matters are corrected for the benefit of consumers. This has yet to happen in Puerto Rico and the FOMB is both empowered and tasked with supporting the PREC in carrying out its duties. PO Box 195477, San Juan, Puerto Rico, 00919-5477 291 The Federal Reserve Bank of New York 2012 Report on The Competitiveness of Puerto Rico’s Economy states that ‘tbjest practice suggests that a regulatory commission should be set up to oversee the Puerto Rico Electric Power Authority (PREPA) to protect consumers and improve the efficiency of the utility's operations”. In a similar manner, the 2011 Report on the President Task Force on Puerto Rico indicates that “[t]o achieve this goal (Developing Puerto Rico as a Model for Clean Energy), the Task Force recommends that the President and Congress support Puerto Rico in the specific ways set forth below... [w]ork with the government of Puerto Rico to develop improved regulatory and oversight conditions.” The modern legal regulatory framework enacted 2014 with Act 57 in Puerto Rico must and can promptly mature from federal government policy recommendations already put into law, into the required energy re-design and oversight that sufficiently expert and independent can strongly support PROMESA objectives and which FOMB can rely on and provide support to. There is no need to wait further given the proven inability of PREPA to work with the FOMB and the PREC. Title V of PROMESA specifically states that the Revitalization Coordinator must “support the Energy Commission of Puerto Rico in achievement of its goal of reducing energy costs and ensuring affordable energy rates for consumers and business”; and in terms of Energy and Critical Projects to be implemented by the Revitalization Coordinator “{i]f the Energy Commission determines the Energy Project will adversely affect an approved Integrated Resource Plan, then the Energy Commission shall provide the reasons for such determination and the Energy Project shail be ineligible for Critical Project designation...”. The events surrounding the Whitefish contract, the seemingly premeditated PREPA delay in getting further help which Puerto Ricans without power are receiving over a month too late, are the most recent example of the need for extraordinarily strong, independent and constant Commission supervision. Prior to hurricane Maria the C ission found and di ted sub ial mi: lack of controls and information. The documented failings included excessive and unnecessary cc iting fees, overly expensive r ble energy contracts and poor selection of energy and engineering consultants. After the denial of Judge Laura Tailor Swain of the FOMB motion to appoint a Chief Transformational Officer (CTO) for PREPA, more than ever, unequivocal actions should be taken by Congress to assure transparency processes, a very strong and constant oversight by the PREC over all costs that PREPA must be accountable for before passing them on as tariffs to ratepayers, negatively impacting the economic stabilization that must accompany a fiscal stabilization. The importance of a strong well-funded PREC is especially relevant in our post-Maria reality where new proceedings need to be developed in an expedited manner by the PREC to assure the modernization and transformation of the Puerto Rico electrical grid. Amendments to Title V will further ensure the powers and independence of the PREC and the prompt construction of new projects, all necessary to ensure the transformation and modernization of the Puerto Rico electrical system. In the meantime, the PREC can be strengthened by actual FOMB and federal government powers and capabilities. Your expedite consideration on this subject will be appreciated. Delays in addressing this important subject could hurt the health and opportunities for recuperation further than what the outdated PREPA monopoly and the lack of coordination between the FOMB and PREC already have. Executive Director XC: Files 292 d31SdNOIy ONY G4033N Sez $ spofoid VIN (WeSZZ$) Yd-948d9 GNH YSAIVM — GAAIVM SSTINNA — dOINH VIAIAd $0 %SZ PU Yq UO Y%OT sauinssy UO QueYs |Esapas-UON (a320 vd VIN34) SapuAnoy esuodsay (a O0€’TS) VINA saunseayy danoej}o1g Aouadiewy pue (vy 31€9 Wd VIN) feAoway sgeq sapnpou O0€'T $ Ajuagsawiy 8urosu9 (WOSTS) ¥d-Dgd0 GNH (IN OSTS) VINA saiioey pasewep puodag sjuawisaosd ui jana} LaysAS OoE S| saunseayy aouarisay IGN, (W 0S$) ¥d-9add GNH (WeSZS) VG Adualisas pue jeded uoljeys duind pue uejd quaujeas} sazemayseM, S?T S$ | $2092985 JUBWUIDANDH J9Y1O (W OOTS) ¥a-5aq9 aNH ‘292 ‘(NOTTS 4aqi} ]/W-1se] punossuapun (IW OSTS) VSS “‘W ZZ§ S48MO}) UOeSIpW/adualjisau ‘ (97S) 41edas sapnjou! ayewse NONIA 0Sz $ SUONeIUNWIWODaIa] dIUND YYeaH Buneaey YyesAy JOj sazewysa ysod yUaWAade|day (W S27) ud-98d9 GNH 49jUdD JedIpay] jLUOIZdY JAapPIaUYIS JO} SayeWNYSa JsOd JUaLUaTe;day (A OSES) VIA jeudsoy sinq uens Joy sazewunsa ysoo Juawadejday SLS $ BiedYYedSH B sperdsoy (A OOTS) YG-9dd5 GNH wess0ig jatjey Anuasiawy YH [enuue jo JaA1eM paan (IN OOTS) WMH AOMJou peo pue sioquey/syod “ode 10} ayeLUNsa Jara] YSIH (WW S2z$) VINA ayeuiyse asewep sx10M IGN Sty $ uoneyodsues) aunqonsysesjul 4ayem 104 Adual|isas/sieday Salypoel JUDLULIAAOS OO JO JUaUSsasse do}Ysap peolg (WW SZT$) ¥a-94d9 GNH youeug jeloipne wo ysanbas Sulpuny (A OSES) VA SBuIp|ing JUBWIUJAAOS g Jo JuaUIssassy SLb $ SONNE d JUBUILIBADH (W 00€S) ¥a-98dd GNH (IN0SZS) ssoyeseUlas Mau pue (AJ ODES) UYOF “35 UO yUe|d AoUasJaWa Mau (LOSS) VIN pue uonesiiw/aoualyisas ‘(A O0€-0S7$) sede 0} ys02 sapnjaul ayeuise VWdVM oss $ ABs9U3 (W STT$) YoReonp] jo ydaq s/n (WW 0098) WINGS azewiljsa GASN pue juawssasse pjalj UO paseg ajewjsa }so>D STL $ uonemnpy (VHIA) s}lun Buisnoy ayqnd jo jugwase;das/eday (a T$) ya-98d9 GNH weiSoud sedas Sursnoy yd-9g00 GNH (WW OSZS) VIN wes3oid Buisnoy Asesoduiay 31S OSL'T S BuisnopH Request for Disaster Recovery Support November 2017 The catastrophic destruction to the U.S. Virgin Islands by Category 5 Hurricanes Irma and Maria in September 2017 resulted in significant physical and economic damage that will take years to repair. The 185+ mph winds and 20 inches of rain devastated all aspects of life for 100,000 Americans living on the islands. The hurricane damage is estimated to be more than $1.7 billion over the next 3 years for the islands’ key industries. Damages to commercial facilities are estimated at $900 million. Uninsured hurricane-related damages are expected to exceed $7.5 billion. Over 15,000 homes were damaged or destroyed, over 400 boats were sunk, and damage to commercial buildings was extensive. Housing is critical, as there are very few available homes or apartments to rent, and hotels are struggling to repair damage or are housing response workers. The islands’ infrastructure and public institutions were also heavily damaged. Significant damage to numerous schools, the airports, government buildings, and other critical and essential buildings mean that many vital services have been disrupted. 293 The islands’ power transmission and distribution systems were 80% to 90% damaged. Our vision is to rebuild stronger than before, to make our buildings and infrastructure more resilient. To break the cycle of damage and repair, our recovery goal this time is to include resiliency measures such as burying utility lines and using micro-grid systems that can add renewable generation capacity to our power system. GOVERNMENT, PUBL HOUSING NEEDS Housing Education Energy Government Facilities Transportation Hospitals and Healthcare Telecommunications Other Government Sectors Public Resilience Measures Ongoing Emergency Response Activities Non-Federal Share on FEMA Projects 1,750M 715M 850M 475M 425M 575M 250M 125M 300M 1,300M 725M page 1 of 3 294 Damage by Sector* S i Sheltering and Temporary and Essential Power (STEP)/Rapid Repairs Program - 10,000+ homes Permanent housing repairs (6-8,000 homes) Public housing repair and replacement (330 destroyed units, 600+ damaged units) ENERGY | $850,000,000 , Replacement of nine destroyed and condemned schools with six more resilient schools to more effectively serve the reduced school population on the islands Replacement of wide range of equipment including school buses, aquapanics labs, poultry farm, computers, smart boards, musical equipment, ete. ~ $250-300 million system repair $300 million for resiliency/mitigation including, composite poles, some underground lines, new emergency plant on St.John $250 million for emergency back-up generators *Cost estimates include contingency and resiliency estimates $400+ million for repairs/replacement of government facilities including: Key government offices Judicial facilities Damaged/destroyed drinking water infrastructure Public safety facilities including two fire stations, one police station and Emergency Operations Center University of the Virgin Islands campus facilities page 2 of 3 295 = A 27 Bye ON O00 = $150+ million for road infrastructure repairs $250+ million for key transportation infrastructure including: * airport terminal, tower, and other assets x « Ports and harbors including cruise ship terminals i . oo = LOSS S75. ay 37 :000,000 Ls ANE -THOARE is Critical care currently unavailable in the Virgin Islands $250+ million for replacement of Juan Luis Hospital $250+ million for replacement of Schneider ac “ Regional Medical Center a Kos 2 & $25+ million for damages to Myrah Keating te Health Clinic = - nt ae 7 TELECOMMUNI W? ATIONS | § 250,000,000 . $25+ million repairs to existing network including towers $75+ million resilience/mitigation including, undergrounding of middle mile fiber aN $110+ million for undegrounding of last mile i fiber where feasi Ks SOT ia ik tnd ona ea D> a “se i i ad Cas ate) 7 ee 00 OTHER OOVERNMENT SECTORS | $1 5,00 0, $75+ million of wastewater treatment plant repair and resilience . co We $50+ million for pump station repair and resilience = | we : *Cost estimates include contingency and resiliency estimates page 3 of 3 296 Estimates ~ USVI -— Draft (11/07/2017) CDL - Disaster-Related Revenue Losses: Central Government: FY 2018 FY 2019 FY 2020 Autonomous and Semi-Autonomous Authorities: $495 million $440 million $410 million $250 million 297 LT0Z ‘ET JOquaAON vOO NUYI TOO SBPIO Sel JO4 sjuawussassy eseweg Aieulwijaid Jo Aewuwuns $1019D9S SUOIEI UNLUWODI]A,_ pue Agiauq apnpul jou sacp Juawnoop Siu} Ul papnpul UOIeWUOjU! JUBLUSSASse aseUeg 298 2 - ~ = x ue a oS < - — " — 2 — a . Ss — SS - = oe ce : Po S a < -— - eres ~~ - . . . . : _ . . a c “ AS ~~ Sa : Oe oS & . . a oo i ae _ x a x ae oS ay x \ « : x ‘ . x ‘ c oe e e < \ oe = oe ‘ . AY Pee: x ae in a S ° - a - wy ek : - ‘ A _ 4 V4 . - a Se an ie a x S e : ao “ve ay ue ae ANA a . ‘ . ne AS = : - . i ‘ 4 aN ae mo EA : oy Ae Ny . ‘ nS : ao eee a u _ a . ‘ . a a < S Se SS i x ‘ oe Ss a = ari co ok < af : oe ay & i s aa i a x x x i SAN : ‘ ee eS - AN ae x ae ‘ . ‘ ae se ets & Sa if oy et iN a ‘ . _ ae x By Bi - Sane aS ay s .\ au Ni ay hig St a e SS 5 Ns E au te 4 as a x ra a e A A 3 x e : sh : 7 a x . ny = & “ ne . 2 © = a 2 ae eee ae ee one te : 3 a ‘i st a ee it ie ay Si se LA ae ‘ Sues e us x \ % ‘ aN 2 © x“ 2 eee = ee i ae ae ne I “ RAS aay x be . \ uch ‘ vi nh A AY x a PETES a ae cote ie e an a iy ay i x . c ae 2a ea 5 Sue ERS: Gy o a & & ve Ni oe ts ae = Rt ‘s a i Po x ‘ a mS ai a a aan hah e ual SEG wy = & REE et ke wth : s x i s . % s S : = s As St Sus ° es m * SS = Be ee se ae x ans mt ui . . ‘ Re if : ae ioe a AS : ¢ ‘ a he Ge S eG aS ee i ue Se Bs i. = a a ae oe ES a oe as a au ‘ fo . a x co % x ne coy * . Be a e a i‘ x sy g 2 a : ciate See = 8 Ae ae - : ae e we ny at “ ‘ aS a i 6 . ‘i “ : ass a ee . S & x . Se Re s AY a ae a ® oA © < : 4 rs s . ‘ a oS : " bye a cit a a : > 2 a x Ms 2 aN x — oy = = o a ey ue S i‘ a . a a foe : to a if F a oe S & 2 Q ea e : wt & x & it faa we Oo & - ~ a a . x s Soe oS ~ a 7 * pas ce Ss S a - > oa e [o>)| — us o Ss - go ~ - Sk = ce oe se << a SES ~ iad & opn gr OF = = L org Oo &o 4 o oad Spee = SC = @ os 5 2 = = = co wie z SoG a = oo Wa ay O58: Ew - v 5 0 sv a oF > 299 — = - 23 — = - o — = < — - = <= = ce oe — ae = =e = << LD oS & . a o a . so cS 26 - SS oo a —< o < oe Ss mG a a S “ <& a . . = . - oc . <8 - Ss = . . Ss oe - ‘ . = . — Se . a a . . SS ae ~ oS \ e > = Bay x x : “ . a . ee . = & _ AY ae ‘ a ~ os in 4 A = amy . . = : 3 < S . . . . ce aS ioe ee ne & “ a : ie : ae ces oe = oe . TaN x a . e 3 & i “ Se a * a - ‘ ne ae i ic SS : x a : : . . x Se Sa aus : < . 2 c i. . . . \ . EOE ee 4 x + : Rs in . os 5 = : a ae : ‘ : ‘ ui : x 4 = Ss 4 S = Ne ak S Sh ee SS MME = ge ‘ i AY : ae a » ‘| ou < ne ~ : 5 = eS ee a ‘ ih aN ‘ : ‘ a ‘ : 5 SN as RAS EEG : Ha 4 aN \ He \ & t . ae oa i ‘i ue : i ‘ i : = Re 2 f | % ee A a A . : : : : . an cn a { ne NN ee es . a é a 4 Net ‘ ‘ ae AN SSS: cS ne ue Se eee a = x _ s ‘ ‘ a Salt Ae i iat aan : A a \ \ ‘ nee at ee ee a : . . Re A coe ce Ee eS a a a x = ‘ a A iN oh te a : 3 fn ies = u aR a aw a ae a a 6 2 0 fad oN te 2 yi ‘ . i NS a : . : ni ves & Ges at iS He ae! : a st me i a = ns i = se ye 2 : soe a ae oe S ‘i oF - 8 i @ ah = ae a Aeue Pape - SoS iat is i a oN “ Ba eS ee a 2 ‘es ‘! coos yi a ar i cat . ny ‘ ie of ‘ © sy : : & a : : a ue is eS se : i x s : WS SUNOS: S s % = Een 2 “ i i, x va iS * a . ie K Sue N ‘i . \ Ky ‘i ne ue eS ae Se el . aa as x ‘ * ‘S a & < a . fe aa ESS = es pa = ae s : ce 4 ‘ : He a ‘ a = o ) tS oe Sey aS a : x . . o a Ny a ‘ a G Ss 3 SS a Ro ae Ns he ‘ oe a a AS i = . we ee: = ne Wis a sue . AN aN ‘ & * e a a SE ae : x a vA P : = = ee a a ei Ae : i 8 a a : i ‘ . o Re ae ot at Se s ‘ se cae ea oS My * x . . ae : s ee es a3 a a s g = i et One ee ee Soa oe ‘ ‘ x nee oS au Ss ay et e ta A ‘i ‘ st ros 4 AS Ses : . : i AG ee \ : 2 : Oe — . ae AS m . “ : mo we se S i ue : a a ae sf a co ny a ae . ea ‘ & oo es e i \ 5 . = eo . i ne me a ne . _ 2 Me oa & < oe as a : ee a ‘ 4 - S a oe aN . me : ‘ “ S Ss S : ae See — ir) a B a a a ESE a oN a a ‘ ee “ i A ae y : < oF - = - : x w c es - : = oo x o “ = oy a — ec . = oa - - . : Gs oe oe ¢ ~ a - x ~ - S Re ~- = . e as AS > ag = = = - — ~ - a = a = SS - . — Su a cond 4 mn x Se i S eed ima abet — wv a Ge fas G rae] a a: Y Py & ww o com oO = — oh. t @& xo mx wa o ‘isdesensoe 300 = = —— — x cts = — & . Ae . — ~ x SoS —— n 8 ee = = ae a - . f a — . . See .: ce - . - - “ eS - a . . . . - ~ = a nu . ~ . x See . . o = . “ < - . - ~ x & . & S = we — ee = hy ue os = c a Qa o = ee 2s A ed e a s o a ‘ ue a x“ © A oy oS a aC : < aS a : ‘ Cay ‘ . \ " a o . < ey a 3 aS Mi = “i ‘ ‘ as a \ x ‘ x SS . . S a SES es a a o x S : < - “ . x = “ 4 Ae 4 : a . . . S oe ee ane : a at sf ea ik ce one Soe ae os ae aN Be . < ae a ce x ‘ ‘ ‘i < “ oe . a N “ ae . e oe - s . = a a a . aS a a oy ‘ mn \ x a ‘ x ‘i es Sh eS x eet me is “a : et ‘ “i ee Cae SER AY an e i . Me a st # Ge a i a ns i . a ae boat Sane 3S 8 & _ iN 0 a o . ass i = a oy. . iS i A a PN ‘ a ; \ Ge =n mS Sit eo a ay ~ - ae a as ‘ ae x ‘ ‘ re ac s a aa ae ca ne SEER i ii \ A = s ‘ < e RNS A MY A 4 a ‘ ts ‘ me a ine ae 8 av RN & aS = _ 4‘ c = A bi a ae By ie \ i aa i ae i Bag SS = Ss eae s us eeu eran Ae ot a i "E 4 ae 7 ee ey ‘i i is a Be an " se os iE > % : a Rs hs i a g FIN Ee os o = = Tee ‘ SSS CRS Roe e M \ Fd s ae a a ae Sa Nie i 8 uh \ ‘* ‘ i : = a a SS ie ae x Nl & . a & ee ne ae Soe ee = af me os uo ‘) " os « \ . oa a us . se o i i ¥ a Mi x " K x S ‘i = . ‘ ASS = ae x Se Sc 3 R ee x = a ee ee ui 8 aN \ ~ \ i “ ee a Hee gE Eee se ~ ae ae SEN s) a x Ny \ MI ue ee ef ex S e Se Sh Ss ects ASE ae - a : : ea : S Me os ae ce a ah e . ue ae hae os ©, = Be ee £ a ne ' Ny ae 2 ae a ee + 4 a of Pog 2 e ia a . a on ue ‘ ¢ ae ee 5. ae ue ‘ BS a e Su ee on SURES ES ene a wh NY a ‘ ies ars Ey tte ae Bo ‘ oN : cS . S ie sf & x Ny “ ‘ ~ . Ac x A . a : 2 < & ie hye Os ae sa a ge : “ x ay & _ BG Ge ae a i ue ae : . eS a - be _ S ae ae ss . is y o ca ee i. . . . cee : ve st rag v o a ‘i. — a x a a a . 4 “ = 4 < oo = a = Pe) > ee & . “S < a oD ae - Oe E ne & aS . & = 0 - us pans i . = ~ S << — a — oS vi ee a 4 @ sy w = w ay < Pal Re) re & Stee Rie Siow as a v ss aA a as? w ead cond _ ren = a o o = — ee @ 2 seessacomnenania 301 “8 = = = .< a = - cs — = i aN . — - . Sone . oe - . ON o o i a . . ~ — - . a Ae ~ ae ~ Ae . . a ‘ ‘ a ‘ . ne ‘ = — = ~ x [ os a aN “ . aS ~ a . a Mae re _ ~~ - = < oS a : % K << ca coe o i ee Ge a \ < A ~~ S . : . ae na <3 ae eS . x 3 E oS & RS ot NY ‘ = S “ ‘ . Se oe < . . . . . 4 ‘ x . : — oe oO ae ae & F < . . : ay 4 & fh : * xi 2 : : ‘ . ~ - Ss S t : . ‘ y \ ae aN “ “ . . = > oe cues : cS ~ \ . . . a ‘i e a ne Ris i Bon ‘ as co ~ ‘ ‘ A o y : : ‘ _ oe es : ‘s ae & oO i : “ : . eA = SEE : a a SRN a \ ~ en : s a co RANE nue is a a Sos a ; My At * . Oe ie UG SN cent ae a 4 iS ie o a & en a ie es ce ay aN - a ma i. ‘ a i a . eee ee q S Soe ee a ig oh ue " wh a a ae WN \ ‘ Tae e . & a BN < an oN a AN “i “ “ . x “ as ve AOE as . % si ‘ ‘ ean See a i x : i ah Ni : COs EN uN ~ See SESE OES e oa “ “Ee "i ° ue ‘ an & ae a s a UB. ‘, ee SE AN “ ‘ Ns x AA a ae ny is : < e s a ats SN x Me s as ‘i wee ay \ uN ny \ = ae : : Re Bis es sees a : ia : EA te ‘i ‘ mh a A +s uh a 3 se é o - ae a th o ul a . ‘ a ms : : e ae ot : F S we x Re < iG AES a mt ° Shad ASS es Br es a Sn - : i‘ SEN Bae Na A he i a SS te & Sh a = a - ce a Ed AB a < x“ Agee a se cM Q vn o e ‘ ‘ 2 s ae . eS a me : EN aie 0 uh cH F a v 3 =e = = ee eae “ SNe a : i . i \ x ‘ \ : Me 3 BY ee ae e . . te ‘ ‘ Se oS S 8 . ee A Ne a . “ : ° : \ ‘ : - Oe a aN 3 ae . ‘i ‘ “ oS A ox . a \ ae a aM ‘ ae a ~ a o : we aS . o : : : : : : a i . e aN < me “ a ‘ Me eae Se mn Ae Ee a oe S Te AN oS ‘ s a ce oS ‘ . a * . o : rd = aan : - i < o 5 : . . hes e a . S Wo . a = = . oT x & ASE - = a - oS x - a. a a - ee - a. ~ ‘ &. ae < = Se ae . ~ Os = - ne . - a B = = = = eS - = = . 4 ur — 4 & ced oh fad o wh wa ra Eee id ioe = a G — fad us insane 302 se = = . SS mo ~~ = ~ - - : S a n = oo a -— - = = — | SS S < = Ses ce = SS s i . - — - - oe 6 o . a x ee et < 2 - ce c a & a ie AS ~ . oo ha i . . a : ‘ no . a a a8 > A a : a = a ‘ a a ‘ \ e ao = “ ‘ S . oe = ~ a ee : . aS a - Ne Se nS es oe « ‘ : . x : - se CO ‘ ‘ . - x ‘ . . = . . * : < “ oe ‘i b - : 8 o a x Soh . S : ce ay Ea ‘i nS : : ‘ a a SS onan EGS 3 iS LN . i ‘ a ‘ : . e coe 2 ‘ a ‘ ‘ & ‘ x one ia as © {8 u ‘ Q & = a Ses ESS oi i: s ~ oe « a og . ue Te Y . ws . « ~ oS Ses oo s a a ee : “ a x as SS ve ue oF . BON Han * a Ny _ & we <5 He x oe : aN ae a) S . RS se ion es ee Se < : SE ve a “i x ‘ . e er a an : As ‘ ‘ eae Ra ne _ . Me x : ‘ a Ne x . See ey = x SE ee a Hs - a a ne a nh . es = es es aN tt is le a fe a = th o ae me " See Be & Sas ate a i ae My s a 7 a x an ee us ay : 4 A “ ‘ 4 ‘ < “ . . sae! ay : 3 st a a ae me AN ne y ue ‘ : iY Rees NaS coe = : y \ i Ha ae oe q iS « e REG ae ey ee e a a a ie se a ss Su My ‘ - Ss ss a Ne me sf ae aS : ce a wy a ae on i ane oe ae . . x a e > . x “ 2 ue ce Se : ay S ie os ae Ki i i a ¥ . } iS Ee: e pou ss ist & ‘ oy oe > mh a On i ‘ on a ss Se ae i SNe reat . a ih : “i A 3 at & s a a ce sat Cane % i i x me oe es SS Ne WIG fe SEEN ne Sent: - a < cS a es x a SS a = rae * et ne : a Hh a i ” a ‘ ‘ : ‘ aN x Sen * Be ee ay 3 : a ane ‘ ak : nae Tee u a R i te Bt ee Bae . s : <3 2 A & ny “ a : i ni ‘ ny ‘ 4 ay x Ne a * aa . st se > ‘ a ay % aN 8 eS “5 eS . J Si a : s ce igo : ne ay iN SN \ % . a aN . s a eee = ze ‘e 3 ‘vy wn seas on Se ee a 5 : ee a : a See = ee i" 2 ‘ a ) a 5 en te ss ne i ay nA in . ‘ e ‘ ‘ i Rox ee ae nan ny at nS A > eS eh ou ns . S ao we fe ane . se ne cen Ne ‘ ee a we ‘ Sa a Ve a 5 “ ay oy a ‘ : . es Sh = 2 a € \ Ae F at AS ae ‘ a es vk ss . o oe at ‘ in a sae sae a _ . o a : ss . ee ‘ a is s . a a Nt " . = me a gS : a ae fe pana My . “ oS . = S i 6 Sek cS at os : « a < . . aN ~ ee ee ee \ “ : ie os aS a - Se e ae . e ‘ “i xe & ‘ ao Or a . = aS eS os ake a Hone i: bay A 2 . ee Se ee a ae < aS : axe Ae ue x . ce eS : . o Ns x oe ee < “ . “ 2 . ‘ - Ss oe a ooh fa) . ce : Ms << 3 2 x aS & oS ae . — =o AS S ~ = = a8 . - . . a o aN eS _ — uw — 9 is - s. - < a ses G _ 24 See o ao & oo & By x @ Se aS Q = pane SB aS Se a wu a a Si is] o — wy Q. ia u wo ia Ww 303 = - . = < . = . So o ~ . ~ 5 c SS x SS LD = << Se a = ~ oS oe — 8 - s —— - > - —— = < 4 ~ . S 2 x - ~ = ‘ = oe . ce & a . . . cS a 4 . ae “ \ 4 . + ~ . = 3 a a ee os oe ‘ : . ‘ = . _ . S — oo 2, ie a“ i a . i < oe oh . : . a v ie < < Si Seat : “ . ‘ ae S ye . eS = we . “ . a i > a . ‘ oS . a Sc sce : : : oe i S 2 3 4 —s s ee a a tS ay ‘ con i ee : _ ane ce : “ ae .) ae ) es Q . = a ee es Sas = ce . a we aN co Se ee a MY Be ANN . “ mn ‘ = ee a a Akg = . SS a a a AS s fy A me a Ni NS Oy. ae * © ah a ae Wy at ‘ ae ‘ x = ae Se 8 ee eS s 2 SS ee cae es i . e a a o AGG a % ‘ i i “ og a Ue n « af s: a cS au NG AN Hi ‘ oN ‘ ae _ ie cise a x ae je Su cae See x oo " a “ oS En a 4 ae eS a cS 4 a x x ‘ ay i _ . . x a : es S “ Be : *: : : 3 ue ie \ i: Wt K \ ‘i ‘ i aS : iG x a st : aS ‘ aN a ae ‘ x NY AM Ses ‘ aioe 3 Re . ‘ NC aM : nN ~ aS . e at 4 _ a us coat Ny Ay a ital & i i MS x ne & sf _ s a So MF Mae ne CERES mY a “e ie . i Ea) = . ‘ “ : : ES ¥ a ae ‘ i Sait sass ao a mS x y o . ‘i a i at x rik a e 3 ie ‘ i a \ * x Huse a a x Bs ee ae Ss aN . E SURE eo ee ae a “ ‘ xt \ Y 3 oo: pa a Ee nn i ae : ‘SY o N : a ah sa ui < se sake ay i a . ‘| a . S < e A aS aa i o m & ss ee ‘ a ase es SS Ses se so Shiva _ o os a ee ay ue : mi AREY . = e ae Sy oe i i, 2 : nn yh nee a oe = as ey : . i; e e = iS 2 Ne fe es Au : : sed ‘ et ‘ @ “ . : a “ . : OS ae ne E ie & ss s ae : SS a \ rors Ae rae as a a i ae < y ee ae eee oe of ap Sh ‘ “ . ey = = me a ca ‘ a a . e cy i «tt a e one SS y mn x . ae SS . : : . . = - < - eu paneh ®§ x ke Se . ee a a SSN oe ee . “ “ : a in Sas : eS a a“ a i‘ a aN We : ac . o a Pay ave 1 a es ss y . “ : 4 7 : a . an eS es a : : “ AS eae : ai ae oes : . 5 ie} a ae : a ae oe ee : me a - 7 Be : i . a a : : ‘ aS wl x ; ee . ‘ ‘ad a ae oh = ac x ‘ x Ss. . : _ a So een c uo . x ~~ - < = - x = . — SS re = a ~ . = E - > = a - — . - a < - rea go 3 = — ~ _ = Soe SS ate ‘so = 24 ma og x re @ ~ © a a ee — aes raat a ~ f2 ws Ewa a. Lai cs a — fo i) wi a sesmeesnaniacs 304 = : . . - — = a aS — = ate = a . I Ss aes a ee aS Se - . ~ . ee ee — = ce a — oS = & we = - . . a ae PS a ~ 8 ~ . < oS ae < oS a SS - ue - ee oe . . < — = . oS . aA 4 . a ue . . ou ‘ . \ ‘ < - ae . - aS \ : < . _ . o SiaL x a x = “ _ “i - ‘ y . S S ~ ak . & \ a . ch . ‘ . “ . ou a es : ‘ * aoe ‘ S SS sO “ . . a Y ae = & . : . \ a a A = : a. a \ . % x ‘ oe \ A o x _ : a ae Ta a : : . < oo = ‘ He _ as Se . : 5 os as ue BEG ue _ ‘ a x . a ~ cS = se he : | es si 1 e : : : x ‘ a iL on x < a cee : - aS ae i‘ . F — \ " \ \ a = x < ee . - S a : ee x \ ue eo ‘ : 8 Se : ee a A ae . i a i = . . se s a SEA & Me . a & < a . ae < oe ao =f : th o ‘i iy a q a ‘ & < ue es sak Be Se 3 a Seat ae : ah : ‘3 & SS 2 ee . Be : ae ae ‘\ iP a Sy Sheet Ae x : . aN : . Qo ‘ RN a = e i “ A a ex Re = =< aE Ae _ ss aoe ay oN = NY iy * x SS . a ce a “a i & a ~ wes = ae ss a > Ro Bes a en ve - oS = ae : af x HARE sy i we oo RES aS e - eae an =n Ce ie ae a He a tt Ni 1 ay i ny ne he Rs . aS : oe = Pe = : 2 3 si po nt ras : a ee < ae x: oy SAE S iN MS \) ‘ i : w a Es iS = a s “ % eh ne xe SG ue i wa - Rh i ae ASE a a te SS x nN x uN a ‘ ‘ is - oe as & ee : ae e fs B : . o Be Ne us NY ‘ ‘ ‘ ea es Qe : my ay 4 ane “s i ‘ . et : 8 c iN ihe ye a es oe ue ee a ae e uf S Sve SERA = x * ie ad e : ied of ite i ue nt SEAR ie e eS se 4 a : a ee ~ aoe a aes ea ae ts oa Ki my v : x Y . we res ms Sti aS GES ee eS x ee x ee a3 i i im io ny nm ae a a sae is is i: ee i } i ‘ o * uN os es ant ise ae oe a : ie Ke HN & a me - 8 ae ie aN ss Sey s e e S e ae c aoe aS e a i ‘ i ‘i ce ‘ - e eee se a > as S Kt o ‘ oS : Ran an fees a ee aN S = : a se oe : a a > A x iO aS SF wom : - ee = ‘ . : Eta ¥ a ee ae Ne S Uae a & ee eo ‘ : \ \ . ‘ é : TA oS : 2 in SONS a oe He ue uv Be a s Ss es i So # a ts ie : we _ . AY \ = sk » x = = Se SESE 3 Sey si NE i. x x y < . & < S ee aes : ae a : : A ‘i a - if A wy : a Ae Hi : - ss oS un ss ss i : A ‘ Ag a o . ‘ s a ae oe ry on & o - i) SS . : He = ay © eM & ee a = - . a me ‘ ie yy . iS | > 6 ee - : * Aus oo : ak o a . a = ‘ ae 4 oy ea o = . * uy \ } oo uy . oS a . < > = ~ ae . ue SS g fea a oe — cy < . = oS SS ~ a . : ‘ oS - ce . Bae . ~ gy < a oe < a Fo} o + ss ~ 4 = 2 @ di _ ae] A 6g Ew ie eat a L ag S&S Feed & & oO — ae ra © x seonauenenereacisil 305 “ISAS YSIUI4 UOEINSU| JOUEIXy UUM BINPNAS |8a1S 4 uoIsnju Jelena ‘ebeweq joow ‘UIES USAC] PUIA\ :POO]4-UON 000°000"LZL$ 000'00L'08$ 000’00L'L$ 000'000'91$ | 000'000'9L$ 000'000’SL$ | 000'009’E9$ WHOIS JSYY WHOIS B1Oj9g 07800 XIOID 3g ‘paysuEHsHYyS Aqna puowelg aje1s3 200P jeyidsoy siny ‘4 uenr 306 iT ry eee: « say ae Se << ae J g . a ae ONS Ss < : me a . i iS * S An 4 ‘ i a A “ \ :§ ‘ x cee oe Ny —— x a 4 4 - NN Bae SN i £ ¥ & x a ‘ i‘ a ‘ ot a i \ § aN “ spt . & . a - a << . — 4 - aN ~ x Se ay A me At sd a ake < ‘ ae EN eo i = 2S a SN ye! = - ns i 4 +e = = a . - ie a oe — < - ~ - - = oS - o : = - y a — 4 ss G - S . < — - - - - — oO a a ‘ oS a - S . Se 307 aeua’y Jesipayy peuc Bay 40 < eSr v6e wayshs ysiuly UONE|NSU] JOLE}XS YIM BINNS aya10U0D pue jeais esi uolsnayuy Jayepy ‘ebewec Jooy ‘UIEYY UBALIC] PUIAA 7PoOo]4-LIORY 000'000'9.1$ bOr'’rse’ 00r'PSE'ZL$ S002 puke 7861 000‘000’9L$ . 000'000'9L$ 000’000'091$ , 000'000'82$ WHOIS JByy WHOIS a1Ojog “ SBWUOU] IS “SyEWIY ayOUeYO ‘py aqeisy wns gy06 Ja}Ua>D jedIpayy jeuolHay sapiauyrs 308 c ~ \ iT = = FS ae ce : x - a L = = * ~ x a ; < ue ee ‘3 “S c ~ i . o a a - ay . “ x . ? . Ss fe / aR s “ “ ie A x oO < oy a & SS x x AY if ‘ v ie ‘ ay es SS é ‘ nes i Wo iN i ae * oN . ~ S ee Y ate i ~ x St x iS aN < \ RE < 4 ae “ i a : . * a ui AN we uh _ aN co - . 4 x N — . ON - ~ we is - Be “ a a — A a x a - co “ x - x 7 ay x ‘ aS - iS x . . i “ : ~ . a . . x aS . . oy " AC . oe a A . . - o a & . aS A oy . _ ae — peel A x — < e ia s << . x ~ . SS << S = TS <= = = Se - o . . < a - = Oo - : c i aA oe aN 309 > O00'OLL‘Z$ cLc ‘Le 25 000'062$ 000’0ZE’9$ UNOS JOLY Sr5'6S2$ 000'06Z$ LeL ‘L6Z WUOIS B10jeg “-gonjsjjaysel|d YIM UONONysSUOS Aiuosew auo}s pue youg "uoIsnuyu JOVEN ‘USAUC PUI, :POO]-}-UON “SN "ZOBOO SewoYy 1S ‘oyeuly ayoueys ‘py Bieqeureujen NZ$ Hiaqauiayye> a}e}sy 310 — ~ = < = = a ie - - “he << : * se iT 4 e A i i . = 9 < Si mS . x = Se ie SiGe = Sou sane ¥ Y = a . < ei = < a . a eat an ie eh . ne . . = y : ~ , oa S eI aspen i \ se ‘i « zi 7 a \ ‘ ‘ Xe s a i a aN ay a uh ae i ~ nt . “Ay ‘ . ‘ Sats na RN A \ 4 1 iy ~ ‘i sy oS, » ay os 4 4 os % i Wy S ‘ . ON a o 3 i x ae nN re i ‘4 ae tN BROS , . “g e me ¥ — oN r. - = = = _ < = - x < = s “a ‘ ae 311 a f 000 6S$ 268'6 S2'8l$ 000°LL9'9$ 000'9¢6'zS$ Wuols Jayy zer'ore'l$ 000’ L9'9$ O1P'202'6$ ““-gonjspaiseid YIM UOHonNssUu0d Aiuoseu ouo}s pue youg ‘uoIsnayuy _, JO}EM ‘USALIG PUI :POO]4-LON oF cull | Buney sbeuleg ofey WUOIS aiojoq IASN 07800 XIO1D YS “paysueNsUYD “eons Oury GOLL NSLS Pa}SUeSY>D ‘XIOJD “IS ‘BSNOH JUDWIUIBAODH © 312 ice = . - ae a = ~ oo & n SS ~ at = oo < a SS ~ < ‘ o on os . . S a eS . & a — s oo . _ - ~ tes cS Fs on NG o ey p<. as oe oc i . < ay _ an . . a0 \ co a Se ee vee Son — SS AS BS AS cS . NK coe - a - Sa “ ae . . “ a aN in Seeeeen mar & a i te \ Ne & st 3 Q oF a ns \ a . ei é : s 7" ; LS e he ti ue . nee i : ne . ‘ . Se a a * i a A aa S ts canary a is i Ke ( . & LS so ‘ vs a ‘ ‘ f Ser is mf ie F ANS cue a < i : + iS nN A _ Bs aS . . = a te ° : a: " ~ a Ss Pe — ay aS 4 ‘ qq aS - | me ‘ < SS ‘ 3 a ¥ . sn a 2S . x C = = & c Se < yl ~ a =— . = = ~~ at ¥ . a = = . << a 313 cat . . < - 4 = ~ . SS. a . = . x q x —— . n - S : a - a — S oS x ce 4 < = = a x ae . . e 4 : : —— x — c. . x a “ . 4 nent ae : a Ae — r —— o < x“ We i xs i ay iSoenaicananes ae << ‘ a . oe . = > me x u a x ‘ a a i x Sen is ES a S ms AG su ane BRIER . a sau se “ we a Ne HY : . \ a ys i i AN ‘ ay i \ an : in \\ ‘ a ae cause AY : ‘ AN ‘ © a ae a Fi ae a ae ENS & a SO ue as y Ney Nf a + sme \ aN » a \ . ‘ at . aN — a ie — ne . . - ‘e x SAS y x at x ee . x ‘ - ro ~ Se at ee “ - is . . - o x rol an ae o . Me é a a . am os ~ . = = . a q “ | ee. eae i ue a = : & q . as 314 WEL Zes$ w2$ 000'LLS'€E$ 000°91L9'8z$ WHOIS JBYYy SLL'6ES$ 000'LLS'e$ y8'969'2$ auldiosiq Aq sjuawssassy Asura ““gonjs/ia}se|d UII UOHONASUOS Aiuosew auojs pue youg i ‘uoIsnsUy Jeyeaa ‘ebeweq JOOY ‘USAUG PUI :poojs-UON 66Z1L punky abeule - J0fe, W0IS alojaq 0800 ‘xI0ID ‘IS ‘paysyiiepel4 ‘een aout GLE NZ$ Ppa}sy2Upasg ‘XIOJD “3S ‘BSNOH JUBWIWIBAOH © 315 n Sh = < . — . i - oS = < \ a a A a - S + = a ne, bo < va = co xy : ee Ss Pd jee 4 fas ane aie he uy i a > i 2 uM an Seales ‘i i‘ a al un wt “fl Re Ba i e hs x x _ Arte: nee ~~ ~~ . mis a na a ‘ a — v wy MS \ M . ay i . ue . ee “ = . ms 7“ 2 e K su a SEU nl Ss = . a . . e aS ag i ae : as ae < ~ o . ES - _ e sl es x“ a . ae - s - Se a See co : eee = eS - o _ a - = e < i a s a o oe 7 ee . e . - eS - - se _ = = = SS = . - . 316 = £ x = © = ‘ = = = Se a = < =e ~ i 2 o iD a + a iS aa aw a . — o ey — < ~ a a - . ce : ~ v ? a > “ . AC - SN De, — S ue . . y KS i eS i 7 ~ A co x ~ ~ i A a \ ane : oy ‘ e , i‘ ‘ = ay BN. SENS n a : i, ‘ . E QUAN ®. wae ws ” x (sj oo & . y ¥ \ I \ ie ‘ . aN \ Sy Viva: *y n \ A — gO < x . Oe aK ‘ , Se iS = ae ‘S + TON as eT : i x ee = x = a x a a < 3 a . 2 - - = = = . i . - oe . a 317 eANOUIpIy AON Aue 4 Dovey one uUN EGO, if aul|diosiq Aq sjuauissassy AseUlLUasd 9LL'Y ““gonjsjjeyseld UM UoTOnssUu0o W Ajuosew suojs pue youd O0r'S67'r$ | 216'695'2$ ‘uoIsnju] JayeA, ‘abeweq JOOM ‘USAUC PUI {POO]-J-LON 6cL'Bre$ syieey AERA es SZ8l 009 LL r$ 009’LL7$ 00g'0z8'e$ | PrO'EDL'LS WIOTS siojeg Legog “UYor 1S ‘Keg ZNID ‘Jeogs jenwues Aue UYOL "JS ‘BSNOH JUSWUILIBAOD | WODEV 318 . = n : ae = < s ae i e = = . Re oe = = c <= = ss 8 = S - < a . 7 \ — = ~ 3 = “ on < a“ eS a - oS . x s Fe a \e e u AN soi RS x Ss nee aK \ < . “ & ~ ‘ ‘ nt an awe AN " ok ‘SN SS ke ce ae ~ t ae : a ue \ i = . - : « = x = os SS aN . ~ . s x 5 e ‘ . y ~~ < . we = ce ss . oe . . > - — . - ~ = - a - x — - + — J & - a= as . S = c . = x — . = = . = = - = . abn a ae a — . Be =e s = 319 WoIs Jeyy 169'6£9'r$ 056'6¢S$ 000'09%'L$ Brl'6r9'%$ “Tee payeBnuod ‘ysiuy oooNys ‘AUOSeW alqqns suojs pue yOUg ‘uOIshijul Jajeny ‘ebeweq JOO% ‘UGAUC PULA :POO|4-UON WHOIS B10Jeg vOROO Sewoy] 1g ‘eyeUy ayopeys ‘epes) susbuoy ¢z-1z SPWOU] 1S ‘OSNOH JUSLWUJIAOH 320 a nN oS EF : S a fe . . = 2 : o . = x . o = = . UES . ot . x ~ < < on a a x 4 =o shh & Ne a \ be s a), ne De . a Re N " a i i ‘i is puke i \ i . \ + ee neen i uy a a“ * . 1 v i SSSR ‘ a “ ns x Ns “ x ee — — acces SSA Su FS . = E = S < - sae s 2 ~ a . si a ® = . S o BS . S ~ Fe = = cS = a x ne = S o = = Ss . << cS - — - & aS aes = < a < = - <— = — - = — a — - ~ < = < o = a _ = 325 a x e et el = x q iT “Se . C i Se # = . : we Shi i q i if i. - — ‘ c Ig ava ie Bin = en a . oa . a afl aS an 4 heal occcol a A 4 q a ae i - v . : BS o as CARRE 3 Ra ote i Se. A Ny ore TNS Ld ose a) a = NG te i \ * \ . m A . ma ence # i SS Re = e a = . i a Se 13 a “ So \ aN a Bn aA \ “ ek x ay — AS a a a a oe a = io = — =; a fi = . = yg “ : oS EES oS [ 326 “=Thomas a==USAF Group November 14, 2017 Chairwoman Lisa Murkowski 304 Dirksen Senate Building Washington, DC 20510 Chairwoman Murkowski and Ranking Member Cantwell, Thank you very much for the opportunity to present for the record testimony for your hearing on the storm damage in Puerto Rico and the Virgin Islands. My name is Michael Thomas, CPA and I am the CEO and Founder of Thomas USAF, and a participant in the USDA Loan Program for 37 years. Our companies are major originators and underwriters in several federal guarantee lender programs and are the largest secondary market purchaser of USDA Rural Development guaranteed loans. I have had an opportunity to visit the Virgin Island since the double whammy of the two hurricanes. Our partner banks (Byline Bank and Touchmark National Bank) and Thomas USAF in the past year have had $32 million in loans approved for seven different borrowers working in the Virgin Islands and currently are working on $50MM - $150MM in new USDA Business & Industry, Community Facility and REAP loans in the islands. Our recent trip demonstrated the need for additional federal involvement through USDA guaranteed loan programs. Both hospitals in the Virgin Islands (Governor Juan F. Lewis Memorial Hospital in St Croix and the R. L. Schneider Hospital in St. Thomas) will need to be replaced. There are number of severely damaged schools and the St. Croix police station was without a roof. In addition, as 1 am sure you will hear today there is a severe lack of power on the islands and most power is coming from generators or solar power. USDA’s Rural Development has several loan programs that could be of great assistance to the Virgin Islands and Puerto Rico. We have been a lender to the United Corp. Shopping Center in St. Croix, which runs on solar and battery power supplemented by a propane gas generator. This solar power project was made possible USDA’s Business and Industry Loan Guarantee Program. As both the Virgin Islands and Puerto move forward Congress should consider both private and public sector opportunities to take advantage of solar and battery power to provide local electricity and not be dependent on a large grid. Interestingly the solar system at the United Shopping Center was not damaged by 3060 Peachtree Road, NW, Suite 1855, Atlanta, GA 30305. Tel. 404-365-2040 www.thomasusaf.com 327 either storm and is fully operational today. Solar power is attractive given the insolvent financial condition of the public utilities in both the Virgin Islands and Puerto Rico. USDA also operates its Community Facilities Program (CF) which can provide low cost guaranteed loans for any public or non-profit facilities. As the Islands rebuild, there will be the need for a lending facility that can help given the impossible financial problems centered in their public utilities. T have met with Anne Hazlett who is Secretary Perdue assistant to the Secretary for Rural Development recommended seeking Congressional approval for an increase in the available credit in these programs. Given the severity of the programs in both Puerto Rico and the Virgin Islands, I hope that Congress will consider in its next supplement for hurricane damage the following increases in authorizations: USDA Community Facilities Loan Program $1 Billion + (Note: Program has a 1% loss rate) USDA Business and Industry Loan Program $1 Billion + USDA REAP Solar Loan program $1 Billion + (Note: There are zero losses in solar loans dating back to 2011) Let me be clear these are guaranteed loan programs and require very little appropriated funds. For example, in FY17 USDA’S Business and Industry Loan Program authorized nearly $1 billion in loan activity requiring slightly more than $30 million in appropriated funds. Furthermore, the appropriated amount can be reduced or even eliminated if there is an effort 'to move over time to zero subsidy. These loan programs which obviously require the borrowers to repay the loan are a much miore effective way to begin the rebuilding process using fewer taxpayer resources and incentivizing economic development and job growth. Best Regards, MLO Mike Thomas Chairman, Thomas USAF Group ec: Senator John Isakson ce: Senator David Perdue cc: Congressman Robert Aderholt ec: Congressman Sanford Bishop 3060 Peachtree Road, NW, Suite 1855, Atlanta, GA 30305. Tel. 404-365-2040 www-thomasusaf.com 328 voc Leadership in Action VOCES: CONGRESS MUST ACT NOW TO RESPOND TO THE CRISIS IN PUERTO RICO AND THE USVI On September 20th, Hurricane Maria changed the lives of 3.5 million Americans in Puerto Rico and the US Virgin Islands stranding them without shelter, food, clean water, electricity, and services, disconnecting entire communities from the rest of the world. Almost two months later, the situation remains dire with millions still without power or access to clean drinking water. Government response has been slow and inefficient resulting in prolonged hardship and unnecessary risk to human health. Our fellow citizens should not be forced to wait any longer. The time for action is now. We at Voces call on congressional leaders to act swiftly to put Puerto Rico on the path to a just recovery that prioritizes the needs of the people, directed by the people. As in the case of Florida and Houston, we call on leadership to deliver a robust relief package that does not force Puerto Ricans to give up environmental or other safeguards and rights. In addition to resolutions presented by other organizations and the NHLA letter, Voces presents the following recommendations. (This list is intended to be an initial list that should be expanded upon in consultation with impacted communities beforehand): Mobilizing Federal Agencies to Meet Immediate Needs for Puerto Rico and the US Virgin Islands: Under the National Response Framework, responsible federal agencies must take immediate action to ensure that residents of Puerto Rico and the U.S. Virgin Islands have reliable access to critical services such as water, energy, and housing. Rebuilding the Electrical Grid Prioritizing Resilience and Clean Energy: Urgently addressing the need for access to electricity must not sacrifice health and wellbeing. Rebuilding the grid and electricity systems with an 329 emphasis on clean, renewable energy, stronger, more resilient to future storms, and more reliable. An Immediate Analysis of the Safety of Drinking Water Sources: EPA must immediately begin testing of drinking water systems and publicly release the results. EPA should also develop a system for information distribution that takes into account the widespread communications disruptions which has left many disconnected or with sporadic access to communications systems. Address Immediate Health Needs and Create Plans for the Future: The Environmental Protection Agency and Department of Health and Human Services must take urgent action to address the immediate health needs of hurricane-affected areas, including mold exposure, wound infections and illness from contaminated water, heat-related illnesses and deaths, PTSD and other mental health issues, injuries from debris removal, and more. Federal agencies should develop comprehensive health plans for future disasters. Incorporate Environmental Justice and Social Vulnerability into Recovery Planning: To ensure a just recovery, states, cities and communities receiving federal disaster aid and recovery funding must utilize an environmental justice (EJ) analysis, integrate considerations of Cumulative Environmental Exposures, Sensitive Populations, and Social Vulnerability, and working with communities—into recovery planning and policies crafted to support redevelopment and establishment of their recovery plans. Post-Disaster Workforce Redevelopment Plan: The Department of Labor and the Department of Housing and Urban Development, in collaboration with the Department of Energy should support a post-disaster redevelopment plan that ensures that displaced people can re-establish secure and sustainable livelihoods that enable their recovery, similar to what was done after Hurricane Katrina. Resilient Water Infrastructure Funding: Provide $2 billion to support reconstruction of more resilient water infrastructure and funding to correct 330 longstanding water infrastructure problems in Puerto Rico and the U.S. Virgin Islands. Provide Technical Assistance to Recovering Communities Responsible federal agencies have deep expertise and should be funded to provide technical assistance on multiple levels to support both immediate recovery from disasters and assessment of climate-related vulnerabilities for future planning purposes. Flood Protection Standards for Federally-Funded Infrastructure: Reinstate the Federal Flood Risk Management Standard, or create a flood protection standard that achieves the same outcome, to assist hurricane- impacted communities rebuild damaged infrastructure with a higher margin of safety against future flood events. Maximize Deployment of Clean Energy in Rebuilding: Through direct grants to impacted communities, responsible federal agencies should support clean energy, energy efficiency and renewable generation, for electricity, heating and transportation, while ensuring recovery resources for rehabilitation and residential upgrades reach and benefit low income residents. Leverage existing grants, low-cost financing, and incentive programs to invest in rebuilding more efficient and storm-resistant homes and ensure proper disposal of discarded/ruined equipment. Clean Energy for Low-Income Communities: Provide grants for communities to expand installation of energy efficiency upgrades and distributed renewables based on the Clean Energy for Low Income Communities Accelerator for communities affected by natural disasters to be funded through the Housing and Urban Development CDBG-Disaster Funds in close consultation with Department of Energy Weatherization and Intergovernmental Affairs Office.