## Slide 1 Lindbergh Bay , St. Thomas Lime Out 2 LLC Floating Restaurant and Support Moorings Committee of the Whole September 17th, 2025 Permit Number: CZT –08-21(W)   Applicant: Lime Out 2 LLC ## Slide 2 Project Overview Goal of project: To install moorings to tie up floating restaurant (Taco Bar) and support mooring for vessels visiting the restaurant. Lime Out. Lime Out 1 operates in Coral Bay St John  Grey Water and Black Water Tanks- pumpout at 50%. Active service contract proof No Swim up , Kayak or Paddle board. Hurricane and Emergency Plan.  Decibel Level conditions Daytime operations Monitoring of benthos and marine life for 3 years after operations commence. ## Slide 3 Google Earth Image of Lindbergh Bay [notes] Left: Image of the overview of the entire proposed cable network from Trans America Fiber, U.S. Right: Zoom in to the proposed branches in Puerto Rico and St. Croix, image from Telegraphy Transport Networks Research Service and the online submarine cable map ## Slide 4 Approximate Location of Lime Out 2 ## Slide 5 Simplified Image of Helix Anchor with floating lines ## Slide 6 Lime Out Locations [notes] Top Left: Full view image of St. Croix showing northern location of the site in reference to the island (Google Maps Image using Map Geo) Bottom Left: North side of the island showing with the site highlighted (Google Maps image using MapGeo) Right: Static hi-res imagery of the site from MapGeo. Location is Parcel 4A, Butler Bay, STX. Building is currently owned by AT&T ## Slide 7 Image of Lime Out 1- photograph courtesy of Limeoutvi.com [notes] -Squiggly Lines: Existing submarine cables in the area -Solid red line perpendicular to St. Croix is the proposed cable installation. -Numbers are depths in Fathoms Image taken directly from the environmental assessment report (pg 12)