Department of Property&Procurement Goverment of the United States Virgin Islands 3274 ESTATE RICHMOND, CHRISTIANSTED, U.S. VIRGIN ISLANDS 00820 8201 Sus BASE, 3RD FLOOR, ST. THOMAS, U. S. VIRGIN ISLANDS 00802 ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.777.9587 HTTP://DPP.VI.GOV AMENDMENT TWO (2) August 9, 2016 TO: SUBJECT: RFP-017-2016 (P) To Provide a Pool of Qualified Architectural/Engineering (A/E) Firms to Perform Design Services for the Island of St. Croix INSERT: Questions & Answers 1. Question: Please confirm if the Department of Property and Procurement will award the contract to non-residents / foreign firms. If so, please confirm if such firms also be required to obtain a Business License. Answer: These services require you to be on island and therefore a U.S. Virgin Islands business license is required. Question: The Instruction to Proposers (Item E) states that “seven (7) sets of proposals” are required. However, the Scope of Services indicates that five (5) copies are to be submitted. Please confirm the number of copies which must be submitted. Answer: One (1) original and six (6) copies. Question: Please confirm if the services required are Architecture Design Services or Engineering (Civil, Structural, Mechanical, Electrical or Plumbing) Design Services, or both? Answer: Yes, the services solicited are both Architecture and Engineering Design Services. RFP-017-2016 (P) Amendment Two (2) Page 2 4. Question: The scope of Services requires that “an anticipated project schedule” be included in the submission. However, it is difficult to develop one at this stage without knowing the full scope of the project. Please confirm if this is required? Answer: Acknowledged. A project schedule is not required at this time based on the fact that no specific project is identified under this RFP. 5. Question: Please confirm the duration of the consultancy period? Answer: The duration of consultancy period is two (2) years. 6. Question: Please confirm that a Cost Proposal is not required at this stage. Answer: Cost is not required at this stage. All other terms and conditions remain the same. A copy of this amendment must be returned with your bid.