FIELD VERIFY O EXISTING HOT WATER SOLAR . PANEL TO BE RAISED 6” TRACTOR SHALL ELEVATE EXISTING SOLAR HOT WATER PANEL, PIPING AND OTHER RELATED DEVICE APPROXIMATELY SIX INCHES (6”) ABOVE FINISH ROOF UNTO APPROPRIATE CADDY PYRAMID SYSTEM OR APPROVED EQUAL SECURED TO EXISTING ROOF SUBSTRATE AS PER MANUFACTURER’S SPECIFICATION. Existing Exhaust A) fan to remain S NOT IN CONTRACT ~ removed and replace with THE DEPARTMENT OF EDU QUAN TITI REPLACE DENOTES GENERAL AREAS WHERE A VAST AMOUNT FLUID APPLIED MEMBRANE (approximately 833 sq. ft.) WAS APPLIED ONTO THE EXISTING SINGLE PLY MEMBRANE. CONTRACTOR SHALL FIELD VERIFY ALL Existing A/C Condenser to Remain. Existing Exhaust System to be new BY CATION My Win AC UNIT ES. CUT OFF SECTIONS OF AFFECTED SINGLE PLY MEMBRANE THAT CANNOT BE CLEANED AND IN KIND OR BETTER AS PER MANUFARIURER'S SPECIFICATIONS. existing opening to below ROOF AREA= APPROX, 21,115.34 SQ. FT. existing opening to below (roof access ladder) existing opening to below r Existing A/C Condenser to TT \ DENOTES AREA OR SECTION OF EXISTING ROOF WITH ROLLED ON FLUID APPLIED MEMBRANE, CONTRACTOR SHALL REMOVE FLUID APPLIED MEMBRANE FROM ENTIRE PERIMETER OF EXISTING ROOF. AND REPAIR AS PER RECOMMENDATIONS OF SINGLE PLY MEMBRANE MANUFACTURES SPECIFICATION. CONTRACTOR SHALL INSPECT ALL ROOF DRAIN CONNECTIONS BOTH ABOVE AND BELOW EXISTING ROOFING ASSEMBLY, ASSURING THAT ALL EXISTING CONNECTIONS ARE SECURE AND FREE FROM DEFECTS. UPON DISCOVERY OF ANY DEFECTS CONTRACTOR SHALL REPAIR SAID CONNECTIONS, PIPING, ROOF DRAIN ETC. AS NECESSARY TO PREVENT ANY LEAKS. CONTRACTOR SHALL REPLACE ALL DAMAGED ROOF DRAIN SCREENS, STRAINERS OR DOME TO MATCH EXISTING OR BETTER. EXISTING 20 TON AIR CONDITION ROOF TOP UNIT TO BE REMOVED AND REPLACE WITH NEW A/C ROOF TOP UNIT WITH CORROSION PROTECTIVE COATING. A/C UNIT SHALL BE OF THE SAME TONNAGE, VOLTAGE, AMPERAGE, WEIGHT, COMPATIBLE TO BE INSTALLED ON EXISTING A/C ROOF CURB OPENING AND LISTED MANUFACTURER OR APPROVED EQUAL. NOTE CORROSION PROTECTING COATING SHALL BE APPLIED BY MANUFACTURER. existing openingto below Existing A/C Condenser to Remain. LL) {/ fly . /), 7] I FIELD VERIFY NOTES: 1. CONTRACTOR SHALL REMOVE ALL ROCK, LOOSE METAL, DEBRIS, FASTENERS, DERELICT PARTS, PLANTS OR TREES ETC. FROM EXISTING ROOF AND VACUUM SMALL METAL FRAGMENTS ETC. PRIOR TO POWER WASHING. 2. CONTRACTOR SHALL NOT ALLOW ANY CLEANING AGENT OR CONTAMINATED WATER TO ENTER ANY CISTERNS OR WATER STORAGE TANKS DURING THE POWER WASHING PROCESS. MEANING ALL RAIN LEADERS CONNECTED TO ANY CISTERNS OR WATER STORAGE TANKS SHALL BE DISCONNECTED PRIOR TO CLEANING THE ROOF. 3. CONTRACTOR SHALL REMOVE ALL FLUID MEMBRANE THAT WAS APPLIED ON TOP OF EXISTING SINGLE PLY MEMBRANE. AND REPAIR IDENTIFIED SECTIONS AS PER ROOFING MANUFACTURER’S SPECIFICATIONS. 4. CONTRACTOR WILL BE HELD RESPONSIBLE FOR DRAINING AND CLEANING ANY CISTERN AFFECTED BECAUSE OF NEGLIGENCE AND REFILL SAID CISTERN WITH CLEAN DRINKING WATER AFTER ALL ROOF REPAIR HAS BEEN COMPLETED. S. CONTRACTOR SHALL REPAIR ALL VISIBLE DAMAGED AREAS OF THE SINGLE PLY MEMBRANE ROOFING AS PER MANUFACTURER’S SPECIFICATIONS PRIOR TO POWER WASH APPROXIMATELY 3,941 SQUARE FEET OF EXISTING ROOF & PARAPET SURFACE AREA, THEN INSPECT EVERY SQUARE INCH OF THE ROOF & PARAPET FOR ANY DEFECTS IN THE SINGLE PLY MEMBRANE, TO INCLUDE PUNCTURES, CUTS, DELAMINATED SECTIONS, ETC. 6. CONTRACTOR SHALL MARK OR IDENTIFY ALL DAMAGED, PUNCTURED OR DELAMINATED AREAS UPON DISCOVERY OF SAID AREAS. 7’ CONTRACTOR SHALL HIRE QUALIFIED AND CERTIFIED ROOFING CONTRACTORS TO UNDERGO ALL NECESSARY REPAIRS AS PER ROOFING MEMBRANE MANUFACTURE’S SPECIFICATIONS. E. BENJAMIN OLIVER ELEMENTARY SCHOOL 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. CONTRACTOR SHALL INSPECT ALL EXISTING PATCHES AND SEAMS FOR ANY DEFECTS OR SEPARATIONS AND REPAIR AS PER ROOFING MANUFACTURER’S SPECIFICATIONS. CONTRACTOR SHALL INSPECT ALL ROOF DRAIN CONNECTIONS BOTH ABOVE AND BELOW EXISTING ROOFING ASSEMBLY, ASSURING THAT ALL EXISTING CONNECTIONS ARE SECURE AND FREE FROM DEFECTS. UPON DISCOVERY OF ANY DEFECTS CONTRACTOR SHALL REPAIR SAID CONNECTIONS, PIPING, ROOF DRAIN ETC. AS NECESSARY TO PREVENT ANY LEAKS. CONTRACTOR SHALL REPLACE ALL DAMAGED ROOF DRAIN SCREENS, STRAINERS OR DOME TO MATCH EXISTING OR APPROVED EQUAL. CONTRACTOR SHALL INSPECT AROUND ALL ROOF PENETRATIONS SUCH AS AIR CONDITION PIPING, PVC ROOF VENTS, EXHAUST VENTS ETC. FOR ANY DEFECTS IN EXISTING THE SINGLE PLY MEMBRANE OR SEALANT AND REPAIR ANY SUCH DEFECTS AS PER ROOFING MANUFACTURER’S SPECIFICATIONS. CONTRACTOR SHALL INSPECT EXISTING SINGLE PLY MEMBRANE ON ALL RAISED SURFACES AND AROUND ANY ROOF OPENING FOR ANY DEFECTS IN THE EXISTING SINGLE PLY MEMBRANE. UPON DISCOVERY OF ANY DEFECTS, SUCH AS CUTS, PUNCTURES, DELAMINATION, ETC. THE CONTRACTOR SHALL REPAIR AS PER ROOFING MANUFACTURER’S SPECIFICATIONS. CONTRACTOR SHALL REPAIR ANY SECTION OR PART OF ANY ROOFING MEMBRANE DAMAGED OR DELAMINATE CAUSED BY POWER WASHING. CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE DAMAGED OR STAINED ACOUSTIC CEILING TILES IN THE CAFETERIA, LIBRARY AND TEACHER’S LOUNGE, AND REPLACE IN KIND; COLOR, SIZE, TEXTURE & PATTERN. THE CONTRACTOR SHALL FIELD VERIFY QUANTITY OF TILES TO BE REPLACED. CONTRACTOR SHALL REMOVE ALL TREES,PALMS ETC. TOUCHING THE ROOF LINE AIR CONDITIONING CONTRACTOR SHALL CHECK ALL REFRIGERANT LINES FOR LEAKS AND PROPER INSULATION. A/C CONTRACTOR SHALL DISPOSE OF ALL UNITS IDENTIFIED FOR REMOVAL AS PER VIRGIN ISLANDS LOCAL CODES. A/C CONTRACTOR SHALL BALANCE ALL NEWLY INSTALLED AIR CONDITIONING UNITS AS REQUIRED ALL REFRIGERANT LINES SHALL BE ELEVATED OFF SINGLE PLY MEMBRANE ROOFING USING THE APPROPRIATE CADDY PYRAMID SYSTEM OR EQUAL. PROJECT |.D VIO101001 OIA Building Number O1 SOW Building 196504, 196584 & 196534 Identification No. PHYSICAL DESCRIP TION ADMINISTRATION, CAFETERIA AND LIBRARY BUILDING