INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PROO13.028 TABLE OF CONTENTS Summary of Work Excavation . . . . Backfilling . . . . . . . Dewatering . . . . . . . Concrete Reinforcement Cast-In Place Concrete . Piping and Accessories . Well Casing Installation 01010-1 02222-1 02223-1 02224-1 03200-1 03300-1 15410-1 16100-1 PROOl 3. •••WP-4/ConlcnU.Tbl DRAFT GERAGHTY & MILLER. INC. TUT 006 1O9O *64715* 64715 DRAFT INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 PART 1 - GENERAL 1.01 WORK INCLUDED A. Work by CONTRACTOR B. CONTRACTOR use of site and premises 1.02 WORK BY CONTRACTOR A. This section is intended to provide a general description of the work to be performed, and is not to be taken as complete in all respects. The CONTRACTOR shall provide all necessary labor, materials, equipment, tools, utilities, and protective equipment as required to effect a complete and finished project, acceptable to the Tutu Environmental Investigation Committee, herein referred to as The COMMITTEE, Fourwinds Plaza representatives, herein referred to as OWNER, Geraghty & Miller, Inc., herein referred to as the ENGINEER, and in compliance with the latest edition of applicable Local, State, and Federal Codes. Work to be performed by the CONTRACTOR includes but is not limited to the following items: 1. Excavate asphalt covered area underlain by clay and wet gravel. This excavation will require shoring, sump pump, piping^ materials and equipment. The excavation will be completed in two stages, including one 4 foot by 4 foot section to a depth of 7 feet related to the repair of a polyvinyl chloride (PVC) non pressurized line and second 4 foot by 4 foot section to a depth of 7 feet related to locating obstruction and to set a permanent well casing. Dimensions are approximate. 2. Repair 4 inch schedule 40 PVC non-pressurized pipe at approximately 5 feet below land surface. 3. Install 8 feet of 24-inch nominal diameter PVC casing, vertically from bottom of excavation to 1' above land surface. 01010-1 SUMMARY OF WORK GERAGHTY & MILLER. INC. TUT O06 iov.1 INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 DRAFT 4. Backfill and compact. 5. Install coarse stone and replace concrete paving with 8 feet long by 4 feet wide by 6 inches thick concrete slab. 6. Dispose of soil, debris, and other waste generated during excavation and construction activities. Vehicles and containers for off-site disposal shall be provided by the CONTRACTOR. 7. Restoration of the site to "original conditions" after performing the required Work. This includes removing trash, debris, and construction waste generated by the CONTRACTOR. An inspection by the ENGINEER shall determine completion of Work. 8. Work shall be conducted at night after business hours or between the hours of 6:30 p.m. and 6:30 a.m. 1.03 CONTRACTOR USE OF SITE AND PREMISES A. The CONTRACTOR shall not interrupt the normal activities of the plaza, and shall keep the access road clear at all times. B. The CONTRACTOR shall exercise extreme care to avoid any spillage, leakage or dripping of gasoline, solvent or any other hazardous material. The work will be performed in a critical environmentally protected area, and the CONTRACTOR will be held responsible for any adverse environmental impact resulting from willful actions or negligence. Particular care must be exercised to avoid bringing hazardous materials onto the site, and refueling of vehicles and construction equipment, cleaning of tools with solvents, etc. should be performed offsite to the extent possible. C. Site access is limited to the hours between 6:30 p.m. and 6:30 a.m. 1.04 SCOPE A. These specifications shall constitute the design and construction requirements for 01010-2 SUMMARY OF WORK GERAGHTY & MILLER. INC. T(|T r,O6 1O92 INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 this project. The CONTRACTOR shall provide necessary labor, materials, equipment, tools, and appurtenances as required to effect a complete and finished work, acceptable to the OWNER, and the ENGINEER, and in compliance with the respective codes. 1.05 MATERIAL AND EQUIPMENT 1. Equipment, piping and backfill material shall be stored in an area designated by the OWNER and ENGINEER. 2. Store and protect products in accordance with manufacturer's instructions, with seals and labels intact and legible. Store sensitive products in weather-tight, climate controlled enclosures. 3. The CONTRACTOR will be responsible for providing heating, cooling, and weather protection for equipment and materials that requires that level of care. A. SUBSTITUTIONS 1. Substitutions after project initiation may be considered only when a product becomes unavailable through no fault of the CONTRACTOR. 2. Substitution of components is allowed as follows: A. "No substitution" or unspecified means substitutions will be allowed unless compelling reasons exist to require the substitution and the ENGINEER concurs with the CONTRACTOR and approves the substitution. 1.06 REFERENCES Specific codes and standards are cited in each section. END OF SECTION PR0013.*«*WP-4/01010SUM.SPE 01010-3 SUMMARY OF WORK GERAGHTY & MILLER. INC TUT OO6 109: INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 PART 1 - GENERAL 1.01 WORK INCLUDED The CONTRACTOR shall: Excavate the required areas for repair of 4-inch diameter PVC pipe and installation of 8 feet of 24-inch PVC casing. 1.02 RELATED WORK A. Section 02222- Backfilling. 1.03 PROTECTION The CONTRACTOR shall: A. Comply with all federal, state and local codes, ordinances and laws governing excavation. B. Protect existing buildings, structures, sidewalks, paving, and curbs from damage caused by execution of the work and equipment. C. Protect above and below grade utilities that are to remain in use. D. Protect excavation by the use of sheeting, bracing and/or shoring where required to prevent sidewall caving or excessive groundwater in-flow. E. Protect adjacent structures, including foundations, service utilities and pipe chases, which might be damaged by excavation work. F. Notify the ENGINEER of unexpected subsurface conditions interfering with normal construction methods and discontinue Work in the area until given written notice of how to proceed. G. Repair any areas or property damaged as a result of the operations of the CONTRACTOR. 02222-1 EXCAVATION GERAGHTYc'MILLER. INC JUT (-)06 1094 INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 H. Provide safety barricades around open excavations as needed. PART 2 - PRODUCTS Not used. PART 3 - EXECUTION 3.01 PREPARATION A. Identify required lines, levels, contours, and datum. B. Identify all underground utilities. Identify and mark the location and depth of existing underground pipelines and other identified utilities. C. Identify and mark the location of surface and overhead utilities. D. Identify and mark the areas which will be excavated. E. Maintain and protect the utilities which pass through the Work area and are to remain in use. F. Notify utility company to remove or relocate utilities, if required. G. Disconnect and cap utilities which are to be abandoned. H. Notify the ENGINEER PRIOR TO COMMENCEMENT OF EXCAVATION. 3.02 EXCAVATION A. Shore adjacent structures which may be damaged by excavation work, including utilities and pipe chases, as directed by the ENGINEER. B. Excavate subsoil required to accommodate piping, and construction operations as directed by the ENGINEER. 02222-2 EXCAVATION GERAGHTY6> MILLER. INC. W INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 C. Do not excavate in excess of that required by these Specifications unless authorized to do so in writing by the ENGINEER. Unnecessary and excessive excavation work shall be rectified at no extra expense to the COMMITTEE. D. Excavated materials if appropriate may be used for backfill on approval of the ENGINEER. Fill materials will contain no organic material. E. Excavated material, not reused, will be stockpiled as directed by the ENGINEER and as specified, examined materials shall be disposed of off site in accordance with federal and state regulations. 3.03 FIELD QUALITY CONTROL A. The CONTRACTOR and ENGINEER shall conduct routine visual inspections of the excavation activities for compliance with these Specifications. END OF SECTION PROOl 3. —WP-4/02222EXC.SPE 02222-3 EXCAVATION GERAGHTY & MILLER. INC. . „. TUT 006 1096 INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 r~ ^ r ' • .-'• .""'V PART 1 - GENERAL 1.01 WORK INCLUDED A. The CONTRACTOR shall furnish all fill for the backfill from an on-site or off-site borrow area, and provide the equipment necessary for spreading, placement, and compaction to densities specified and/or as called for in these Specifications. B. The CONTRACTOR shall furnish clean fill material certification from a certified laboratory for all off-site borrow material, including chemical analysis of the borrow material. 1.02 RELATED WORK A. Section 02222- Backfilling. 1.03 REFERENCES A. ANSI/ASTM C136 - Particle size analysis of soils. B. ANSI/ASTM D698 - Moisture-Density Relations of Soils and Soil-Aggregate Mixture Using 5.5 Ib (2.49 kg) Rammer and 12 inch (305 mm) Drop (Standard Proctor Test). C. ANSI/ASTM D1556 - Density of Soil in Place by the Sand-Cone Method (or ASTM D2922 - Density of Soil in Place by Nuclear Methods). 02223-1 BACKFILLING GERAGHTY & MILLER. INC. TUT 006 1097 INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 PART 2 - PRODUCTS 2.01 MATERIALS DRAFT A. Type A - Coarse Stone: Angular, washed natural stone; free of shale, clay, friable material, sand, debris; graded in accordance with ANSI/ASTM C136 within the following limits: Sieve Size Percent Passing 2 inches (50 mm) 100 1 inch (25 mm) 95-100 3/4 inch (19 mm) 75-90 5/8 inch (16 mm) 35-60 3/8 inch (9.5 mm) 15-35 No. 4 (4.75 mm) 0-5 This shall be used for sub base material for concrete slab. B. Type B - Sand: Natural river or bank sand; washed, free of silt, clay, loam, friable or soluble materials, or organic matter; graded in accordance with ANSI/ASTM C136, within the following limits: Sieve Size Percent Passing No. 4 (4.75 mm) 100 No. 16 (1.18 mm) 10-100 No. 50 (0.30 mm) 5-90 No. 100(0.15 mm) 4-30 No. 200 (0.075 mm) 0-1 This shall be used as structural fill where required by the ENGINEER. C. Type C - Subsoil: Reused, free of gravel larger than 3 inches (75 mm) in size and debris. This shall be used as the commonfill for non-structural fill, as directed by the ENGINEER. 02223-2 BACKFILLING GERAGHTY & MILLER. INC. TUT ! 3.05 FINISHING DRAT" A. Forms shall not be struck or removed until permitted by the ENGINEER. In general, forms shall not be removed until the concrete has attained sufficient strength to assure structural stability under all dead and construction loads, and until removal can be accomplished without marring concrete surfaces. B. All form ties shall be carefully snapped back, to a depth of at least one and one-half (1-1/2) inches below the concrete surface. C. All horizontal surfaces shall receive the following initial floating operation: 1. The concrete surface shall be accurately struck off and screened with a long straight edge to the required elevation; suitable guides shall be used, as necessary, to carry the proper grade, pitch or slope; and 2. The surface shall be bull-floated to an even surface, with no unevenness exceeding 1/8-inch in 10 feet in any direction. D. Float Finish: After screening, consolidating, and leveling concrete slabs, do not work surface until ready for floating. Begin floating when surface water has disappeared or when concrete has stiffened sufficiently to permit operation of power-driven floats, or both. Consolidate surface with power driven floats, or by hand floating if area is small or inaccessible to power units. Check and level surface plane so that depressions between high spots do not exceed 5/16 inch under a 10-foot straightedge. Cut down high spots and fill low spots. Immediately after leveling, refloat surface to a uniform, smooth, granular texture. E. Unless otherwise directed, all edges and corners which will be exposed in the finished Work shall be beveled or rounded by the use of appropriate forms or form inserts, and care shall be taken to prevent chipping or cracking of finished edges. 3.06 FIELD QUALITY CONTROL A. Maintain records of placed concrete items. Record date, location of pour, quantity, air temperature, and test samples taken. A copy or these records will be submitted to the ENGINEER as soon as they are available. 03300-7 CAST-IN-PLACE CONCRETE GERAGHTY STILLER. INC. ^ 1 ± ± 2 W INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 3.07 CONCRETE CURING AND PROTECTION A. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury. B. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete. C. Concrete temperature shall be maintained above fifty (50) degrees Fahrenheit and in a continuously moist condition for a least the first seven (7) days after placement. Curing compounds shall not be used. Concrete curing shall be in accordance with ACI 308, "Standard Practice for Curing Concrete." 3.08 WEATHER CONDITIONS A. When concrete is mixed during extremely warm weather, the ENGINEER may require the CONTRACTOR to pre-cool aggregates with water sprays and to schedule the placing of successive layers of concrete so as to cause maximum release and dissipation of the heat of setting. All concrete placed during hot weather shall conform to ACI 305R. END OF SECTION PROOI3. •"WP-4/03300CAS.SPE 03300-8 CAST-IN-PLACE CONCRETE GERAGHTYc" MILLER. INC. TUT 006 1113 INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 PART 1 - GENERAL 1.01 WORK INCLUDED A. The CONTRACTOR is responsible for the supply and installation of all piping and accessories including, but not limited to, the following items: 1. Pipe (PVC), pipe fittings, and couplings. 2. Temporary Supports. 1.02 RELATED WORK A. Section 02222 - Excavation. B. Section 02223 - Backfilling. 1.03 REFERENCES The following standards shall be adhered to as applicable: A. ASTM D1784 - Standard Specification for Ridged PVC and CPVC compounds. B. ASTM D1785 - PVC Plastic Pipe, Schedule 40 and 80. C. ASTM D2467 - Socket-Type PVC Plastic Pipe Fittings, Schedule 40 and 80. 1.04 TESTS A. Any damaged or defective materials or equipment, including, but not limited to pipe, and fittings that are discovered shall be repaired or replaced at no cost to the COMMITTEE or the OWNER. B. The ENGINEER shall inspect the piping installation for leaks prior to backfill. If the piping leaks, the piping shall be repaired or replaced at no additional cost to the OWNER or the COMMITTEE. 15101-1 PIPING AND ACCESSORIES GERAGHTYc? MILLER. INC. JUT OQfe ± 1 ± 4 INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 PART 2 - PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. Materials and Equipment supplied for this Work shall conform to the requirements of these Specifications. 2.02 PVC PIPE, FITTINGS, AND COUPLINGS A. Pipe and fittings shall be manufactured from PVC which meets the Type 1, Grade 1, cell clarification conforming to ASTM D1784. Schedule 40 PVC pipe and Schedule 40 PVC fittings shall be used in all instances unless otherwise indicated in these Specifications. B. Fittings shall be socket type outline in ASTM D2467, and the socket diameters shall be such that they are compatible with the Schedule 40 PVC pipe. Fittings shall have a minimum working pressure rating of 100 psi. PART 3 - EXECUTION 3.01 INSPECTION The CONTRACTOR shall: A. Visually verify that the fill to be used is clean and approved by the ENGINEER before placement. B. Visually verify that the excavation is free of miscellaneous debris and standing water. . 3.02 BACKFILL PREPARATION A. The CONTRACTOR shall compact the excavation subgrade bottom surface prior to placing backfill material. 15101-2 PIPING AND ACCESSORIES GERAGHTY & MILLER. INC. TUT OO6 1115 INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS _ PR0013.028 Op /- - W-fex^f* f 3.03 EXCAVATION A. Excavate the soil trench sufficiently wide to allow installation and inspection of the pipe. 3.04 PIPE PREPARATION The CONTRACTOR shall: A. Inspect for defective or damaged spool pieces prior to assembly. B. Remove scale and dirt, inside and outside, prior to assembly. 3.05 PIPE INSTALLATION A. All PVC pipe shall have solvent-welded joints and fittings unless otherwise specified in these Specifications. Follow manufacturers recommendations for preparation and joining. D. The CONTRACTOR shall: 1. Route piping in an orderly manner and maintain gradient. 2. Cut pipe to exact measurement and install without forcing or springing. 3. Install piping to conserve building space and not interfere with use of space. 3.06 SCHEDULE OF OPERATIONS The CONTRACTOR shall: A. Support the pipe to prevent movement during placement and compaction of the backfill. B. Backfill systematically and promptly to allow maximum time for natural settlement. Do not backfill on top of porous, wet, or spongy subgrade surfaces. Compact soil in 6-inch lifts to minimum of 95 percent of the maximum dry density as determined by a Standard Proctor Test (ASTM D698). 15101-3 PIPING AND ACCESSORIES GERAGHTY & MILLER, INC. _....... rtrt, .,,.,, tUi UU& .A. j..l. o INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 C. Employ a placement method that shall not disturb nor damage existing building foundations in close proximity. D. Maintain optimum moisture content of the backfill materials to attain the required compaction density. The ENGINEER may require the CONTRACTOR to verify the compacted density by field testing at locations specified by the ENGINEER. E. Remove from the site any excess fill materials. END OF SECTION PR0013.***WP-4/15101Pip.Spe 15101-4 PIPING AND ACCESSORIES GERAGHTY & MILLER. INC. J{ ,T or,6 ± .{ j 7 INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 PART 1 - GENERAL • f*W /__ p^- w fv /M-i*' ? : 1.01 WORK INCLUDED The CONTRACTOR shall: Install 24-inch nominal diameter PVC (ASTM DF679) permanent casing. 1.02 RELATED WORK A. Section 02222 - Excavation B. Section 02223 - Backfilling 1.03 REFERENCES The following standards shall be adhered to as applicable: ASTM DF679 PVC Gravity sewer pipe sizes 18"-24" PART 2 - PRODUCTS 2.01 MATERIALS A. The CONTRACTOR shall use 24-inch nominal diametrer (ASTM DF 679) PVC or approved equal for the permanent casing. PART 3 - EXECUTION 3.01 INSPECTION A. The CONTRACTOR shall inspect the excavation and verify the integrity. 16100-1 WELL CASING INSTALLATION GERAGHTY & MILLER. INC. TUT OO6 111S INSTALLATION OF PROPOSED MONITORING WELL MW-24 WESTERN AUTO UST AREA TUTU WELLS SITE, ST. THOMAS PR0013.028 p 3.02 REMOVAL OF EXISTING PAVEMENT The CONTRACTOR shall: A. Saw-cut the existing pavement and remove, with pneumatic chisels, backhoe or other suitable methods, all material for prompt disposal off-site. 3.03 WELL CASING INSTALLATION PROCEDURE 1. The permanent casing shall be placed in a vertical orientation and perpendicular to the excavated bottom. The top of the casing shall be l'-0" above the top of finished slab and capped. 3. The permanent casing shall be braced to avoid movement during backfilling. 4. The CONTRACTOR shall backfill around casing as specified. 7. The CONTRACTOR shall install concrete slab sub-grade and concrete slab as specified. 3.04 FIELD QUALITY CONTROL A. The ENGINEER shall perform a field inspection for conformance with these specifications. END OF SECTION PR0013. •••WP-4/16100CAS.SPE 16100-2 WELL CASING INSTALLATION GERAGHTY & MILLER. INC. TUT O06 1119