ITEM NO. DESCRIPTION EST. QUANITY UNIT UNIT PRICE TOTAL 1 ALTERNATIVE ENERGY PROPOSAL 1 LS 2 REPALCE ALL SUPPLY LINES COPPER PIPING AT ALL BATHROOM AND KITCHEN LOCATIONS WITH CPVC - 3/4" , 1/2" AND INSTALL TO FIXTURES COMPLETE 1 LS REPALCE ALL LIGHT FIXTURES TO LED FIXTURES TO MATCH EXISTING LOCATIONS 1 LS REPLACE ALL BATHRROM COUNTERTOPS AND INSTALL LAMINATE COUNTERTOPS 1 LS 3 BULK STORAGE l LS 4 PATIENT MONITORING SYTEM 1 LS 5 SECURITY UPGRADE FOR ACCESS CONTROL 1 LS 6 REPAIR PROPERTY BOUNDARY FENCING 1 LS DEMO REAR STEPS AND REPLACE WITH CONCRETE STEPS TO MATCH EXISTING 1 LS 7 SITE STAIRS CONNNECTING WALKWAYS l LS $ $ The total amount of this BID ALTERNATE proposal is based on the Contractor's Estimate of quantities and is as follows: $ Bidder's Signature Date 6A ANNA'S RETREAT ST.THOMAS SECTION 2: BID ALTERNATES SCHEDULE FOR CONSTRUCTION TELEPHONE: ALL BIDDERS ARE REQUIRE TO A MANDATORY PRE BID MEETING AND INSPECTION OF PROPERTY PRIOR TO SUBMITTING BIDS. FIELD VERIFY ALL QUANTITIES AND MEASUREMENTS. ALTERNATE BID CONSTRUCTION TOTAL DEPARTMENT OF HEALTH: ELDRA SHULTERBRANDT LONG TERM CARE FACILITY CONTRACTOR'SNAME: Grant No . D12AP00349 (Vl-CIP-2012-3) GOVERNMENT OF THE UNITED STATES VIRGIN ISLANDS September 9 , 2016 ADDRESS: