Department of Property & Procurement TMEA 3 as / Government of the United States Virgin Islands 3274 ESTATE RICHMOND, CHRISTIANSTED, U. S. VIRGIN ISLANDS 00820 ms = A = 8201 SUB BASE, SUITE 4, ST. THOMAS, U. S. VIRGIN ISLANDS 00802 O} Pl a _ => ..\ PUBLIC WORKS DEPARTMENT 6002 Estate Annas Hope Christiansted St Crom VI 00820-4428 >. “fart, Tel (340) 773-1290 OWISION OF ENGINE L RING Fax (340)773.6865 {PROJECT : Scope of Work for Repairs of Roads at Tipperary PAGE 10F1 |DATE: Friday, July 27, 2018 |PREPARED BY: Eran Flemming Revised Repairs to Tipperary Residential Roads ROAD LENGTH = 3,000 L.F ROAD WIDTH = 20L.F ITEM DESCRIPTION OF WORK QTY. UNITS UNIT COST PRICE OAD NO. 1 LENGTH = 3,000 L.F ROAD WIDTH =20L.F 15101 Mobilization 1.00 L.S 30301 Road Reconditioning (Grading) 30.00 Stations 2" Asphalt Concrete Pavement, CL-"A" aesOa i) GR-"D" Type 1V - Smoothness ny Tons GR,-"D" Type 1 - Smoothness 41202 Tack Coat 800 Gallons JROAD NO. 2 LENGTH = 1,398 L.F ROAD WIDTH = 20.L.F SECTION NO.1 = =LENGTH =1,258 L.F ROAD WIDTH =20 L.F 30301 Road Reconditioning (Grading) 12.58 Stations 2" Asphalt Concrete Pavement, CL-"A" 402014) GR-"D" Type 1V - Smoothness 313 Tons 41202 Tack Coat 335 Gallons ECTIONNO.2) LENGTH=140 L.F ROAD WIDTH =20 L.F 30301 Road Reconditioning (Grading) 1.4 Stations Untreated Aggregate (1/4°-3/4" 30101 compacted crushed stone base 6" 70 CY depth) Structural concrete in place for roadway 40101(A) (140'x20'x8" thick). 3/8" rebars shall be 70 cy utilized @10" O.C for slob TOTAL =====s======== > PROJECT DURATION - 60 CALENDAR DAYS > 4g Ema Fh A: Fae i. a /. '3 Total Cost of Project is Licensed Contractor Note: The undersigned Contractor acknowledges that the quantities included on the Bid Sheet are estimated values. It is the Contractor's responsibility to ascertain that the required material and quanties are included in the Bid Sheet in the event that there is a descrepency between what the Contractor estimates is required to complete said project. Any descrepancies in values or material required must be identified at the time of the Pre-Bid meeting. Once the contract is executed, the Contractor will be required to complete the project based on selected bidder's contractual agreement cost.