GOVERNMENT OF THE VIRGIN ISLANDS of the UNITED STATES Public Services Commission MEMORANDUM From the Desk of: S. L. Setorie Executive Director Dear PSC Customer, As you requested, attached is a copy of the procedures outlining the requirements for application for small power production and co-generation certification in the Virgin Islands. Please feel free to contact us if you have any additional questions or concerns at 778- 6010 and 776-1291. For additional information and to review the V. I. Rules & Regulations governing the procedures please go to www.psc.gov.vi. Thank you for your inquiry. cc: Sandra L. Setorie Executive Director Attachment: 12. Applicant should describe the following: a. Anticipated siting and pennitting, construction start-up and commercial operations dates b. Nature of siting activities to be undertaken and status c. Nature of baseline environmental and engineering studies to be undertaken and status d. Identification of permitting activities and status e. Status of design engineering activities and status f. Status of equipment procurement activities and status g. Proposed construction contracting activities h. Description of the interconnection to WAPA's delivery system 13. Provide the estimated electricity production from the proposed project. a. Describe the methodology used by the Applicant to detennine production levels b. State all assumptions concerning project efficiency and station service and any power losses. c. Provide the expected monthly and annual energy production output that would be available to WAPA. 14. Identify any delivery system requirements and interconnection with W AP A. a. Describe the proposed delivery system and interconnection facilities proposed. b. Include an electrical on-line diagram of the proposed interconnection. 15. Indicate those products and services Applicant contemplate that W AP A will provide the proposed project, for instance: a. Supplementary or backup power b. Maintenance power c. Interruptible power 16. Describe the permitting process including: a. Identification of each pe1mit required b. Milestones associated with each pennit c. Parties responsible for each permit d. Current status of each permitting activity e. Identify Applicant's proposed environmental, aesthetic, and noise mitigation strategies 17. Describe the status of project commitments by the Applicant. For instance: a. Have legal, financial and engineering counsel been retained and given notices to proceed by the Applicant? b. Has the Applicant ordered any equipment? c. Has the Applicant initiated discussions on the purchase of a proposed project site? 18. Description of Applicant's proposed capital financing structure for the project including: a. Proposed financing sources and capital to be raised from each source b. Proposed credit enhancements expected to be provided by W AP A or the VI government, if any. c. Table summarizing the sources of capital funds and uses of those funds