g es : ES ARIMENS OR ~ Department of Property&Procurement Govemment of the United Siates Virgin Islands ~~ : > ; ee 3274 ESTATE RICHMOND, CHRISTIANSTED, U.S. VIRGIN ISLANDS 00820 STares 8201 SuB BASE, 3RD FLOOR, ST. THomas, U.S. VIRGIN ISLANDS 00802 ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.777.9587 HTTP://DPP.VI.GOV March 3, 2017 AMENDMENT #3 — IFB016DPWT17 (C) Liliendahl Road Repairs in St. Thomas, Virgin Islands. INSERT: Questions and Answers ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS AMENDMENT WITH THEIR BID PROPOSAL. Amendment #3 IFB016DPWT17(C) Liliendah! Road Repairs in St. Thomas, Virgin Islands Page 2 1. On Item No. 9 of the bid schedule, does the Hazard mitigation stands for the Gabion baskets retaining wall, installation only and nothing else is involved? Please confirm this. Response: Hazard mitigation covers all cost associated with the installation of the Gabion baskets. 2. No road paint or stripping is mentioned on this scope, is this not necessary to include a cost for it on the road 2" overlay, on item no. 6 of bid schedule? Response: There will be no stripping. 3. On Item no.7, what does CEF Cost Estimate stands for? Is this the cost for preparing this proposal? Response: Cost Estimating Format (CEF) allows the estimator to take into account special factors, such as local prices, plan checks, building permits, and special reviews. All this is done so that the estimator can have a better reflection of the city cost index. 4. On Item no.8, is the direct Admin. Cost the cost for administrate this job? Is this the cost for us to have a Foreman, sup intendant, manager, etc? Or does this stands for some other costs or services we have to provide to the agency? Pease confirm. Response: Contractor cost for Labor, Equipment and Material Cost.