REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com DRAFT 11/17/2025 5:47:59 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT COVER SHEET FCD G0.00 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION PROJECT RENDERING SCOPE OF WORK THE INTENT OF THIS PLANNING EFFORT IS TO DEVELOP A PATH FOR REDEVELOPING AN EXISTING NON-OPERATIONAL SCHOOL SITE TO ACCOMMODATE A NEW PK-8 EDUCATIONAL PROGRAM MODEL AND ALLOW THE DISPLACED STUDENTS COLLOCATED WITH THE BOWSKY PK-8 AND GOMEZ ELEMENTARY SCHOOLS TO RETURN TO THEIR “HOME SCHOOL”. CURRENTLY THE EXPANDED ENROLLMENT HAS BEEN ACCOMMODATED THROUGH THE TEMPORARY PORTABLE FACILITIES ON THE NOTED ALTERNATE SITES. WHILE AN ALL-NEW FACILITY, THE CAMPUS DEVELOPMENT IS TO BE PLANNED IN A WAY THAT AVOIDS INTERFERING WITH POTENTIAL FUTURE PHASES OF EXPANSION. TO THE BEST OF MY KNOWLEDGE, THESE DRAWINGS ARE COMPLETE AND COMPLY WITH THE "INTERNATIONAL BUILDING CODE", AND THE "INTERNATIONAL FIRE CODE". CIVIL ENGINEERS ARCHITECT 100 N. Biscayne Blvd, 27th Floor Miami, Florida 33132 (305) 372-5222 Tel (305) 577-4521 Fax LOCATION MAP STATEMENT DATE STRUCTURAL ENGINEERS M/E/P ENGINEERS ZYSCOVICH, LLC. FOOD SERVICES COPYRIGHT C 2025 ZYSCOVICH, LLC. ALL RIGHTS RESERVED. THESE DRAWINGS AND SPECIFICATIONS ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE PROPERTY OF ZYSCOVICH, LLC. WHETHER THE PROJECT FOR WHICH THEY WERE PREPARED IS EXECUTED OR NOT. THEY ARE NOT TO BE USED IN ANY MANNER ON OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT EXCEPT BY AGREEMENT IN WRITING AND WITH THE APPROPRIATE COMPENSATION TO ZYSCOVICH, LLC. REPRODUCTIONS OF SPECIFICATIONS WITHOUT THE WRITTEN CONSENT OF ZYSCOVICH, LLC. IS PROHIBITED. 1221 Brickell Avenue, Suite 1800 Miami, Florida 33131 (786)-264-7200 Tel Fax # 80 SW 8th Street, Suite 2160 Miami, Florida 33130 (786) 491-7660 Tel Fax # Thornton Thomasetti 5757 Waterford District Drive Suite 400 Miami, Florida 33126 (305) 366-6553 Tel TLC Engineering 63 Chapel Street Newton, MA 02458 (617)-876-2100 Tel (305) 577-4521 Fax RealFood Hospitality, Strategy & Design LANGAN ISSUE DATE: ZYSCOVICH PROJECT # IN REVIEW OF THE EXISTING CONDITIONS AND PRELIMINARY MASTER PLANNING BY VIDE, THE TEAM HAS CONFIRMED THE AMENDED PROGRAM AND PLANNING FOR THE SCHOOL CAMPUS. THE BASE PROGRAM WILL PROVIDE A COMPLETELY NEW SCHOOL FACILITY INCLUDING A GYMNASIUM (FEMA SAFE ROOM) FACILITY. THE PROTO-PART ASSEMBLY OF THE ADMINISTRATION / PK SUITE BUILDING, A 2-STORY SLC (K-5 + 6-8) BUILDING, ELECTIVES AND MEDIA CENTER BUILDING AND GYMNASIUM + DINING BUILDING WILL BE PLACED ON THE SITE UTILIZING THE MOST LEVEL AREAS THE NATURAL FORM OF THE SITE TO CREATE AN ACCESSIBLE “PLINTH”. A NEW DROP-OFF/PICK-UP AREA AND PARKING LOT WILL BE LOCATED AT THE NORTH SIDE OF THE SITE AND WILL BE CONFIGURED TO REINFORCE THE CLEAR SENSE OF ENTRY. A NEW SERVICE DRIVE AT THE WEST SIDE OF THE SITE WILL ALLOW FOR AN ACCESS ROAD TO BE CREATED TO ENHANCE SECURITY, MAINTENANCE, AND EMERGENCY VEHICLE ACCESS TO THE REAR OF THE SITE. RFQ 001-2024-STX/STT/STJ I St. Thomas Schools Bundle 2 Rebuilt USVI Construction Services FIRE PROTECTION ENGINNERING LOCAL ARCHITECT DESIGN AND CONSULTING 5143 Palm Passage (Dronningens Gade) Second Floor, Suite B24-25. St. Thomas, U.S. Virgin Islands 00802. (340) 340-777-1600 Tel FURNITURE SELECTION AND SPECIFICATION POOL CONSULTANT JAREDIAN DESIGN GROUP TURF CONSULTANT 260 Palermo Ave, Coral Gables, Florida 33134 (786)-264-7200 Tel Fax # 232 North Main Street Bushnell, Florida 33513 (800) 457.2745 Tel (800) 457.2778 Fax ERNIE MORRIS ENTERPRISES, INC. 5000 SW 75th Ave # 103, Miami, Florida 33155 (305) 667-8975 Tel Fax # AQUADYNAMICS DESIGN GROUP Turf Dr. Phil LLC 912 West Dug Gap Mountain Road Dalton, Georgia 30720 (706) 331-5407 Tel Fax # TURF DR.PHIL SLS CONSULTING BUILDING ENVELOPE 126 S Park Ave Suite A, Winter Park, Florida 32789 (407) 333-1977 Tel JAY AMMON ARCHITECTS Jose L. Murguido REG. NO.AR0010670 DECEMBER 15TH, 2025 DESIGN DEVELOPMENT 2025-0289.05 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION PROJECT LOCATION Rev Date Note INDEX OF DRAWINGS - FCD PACKAGE VV CURRENT REVISION REVISION DATE SHEET NUMBER SHEET NAME REVISION 1 GENERAL 11/17/2025 FCD G0.00 COVER SHEET SURVEY 11/17/2025 FCD V1.01 SURVEY (FOR REFERENCE) DEMOLITION 11/17/2025 FCD AD1.01 DEMOLITION SITE PLAN 11/17/2025 FCD AD1.10 EXISTING SITE PHOTOS 1 11/17/2025 FCD AD1.11 EXISTING SITE PHOTOS 2 11/17/2025 FCD AD1.12 EXISTING SITE PHOTOS 3 SITE PLAN 11/17/2025 FCD A1.01 OVERALL ARCHITECTURAL SITE PLAN FLOOR PLANS 11/17/2025 FCD A2.01 FLOOR PLAN LEVEL 01 - OVERALL 11/17/2025 FCD A2.02 FLOOR PLAN LEVEL 02 - OVERALL ROOF PLANS 11/17/2025 FCD A4.01 OVERALL ROOF PLAN ELEVATIONS 11/17/2025 FCD A5.01 EXTERIOR ELEVATIONS - AREA A - 1 11/17/2025 FCD A5.02 EXTERIOR ELEVATIONS - AREA A - 2 11/17/2025 FCD A5.03 EXTERIOR ELEVATIONS - AREA B - 1 11/17/2025 FCD A5.04 EXTERIOR ELEVATIONS - AREA B - 2 11/17/2025 FCD A5.05 EXTERIOR ELEVATIONS - AREA C - 1 11/17/2025 FCD A5.06 EXTERIOR ELEVATIONS - AREA C - 2 11/17/2025 FCD A5.07 EXTERIOR ELEVATIONS - AREA D - 1 11/17/2025 FCD A5.08 EXTERIOR ELEVATIONS - AREA D - 2 11/17/2025 FCD A5.21 BUILDING AXONOMETRICS 11/17/2025 FCD A5.22 BUILDING AXONOMETRICS 11/17/2025 FCD A5.23 BUILDING AXONOMETRICS 11/17/2025 FCD A5.24 BUILDING AXONOMETRICS FCD DRAWINGS ISSUE DATE: NOVEMBER 17th, 2025 FCD DRAWINGS NOVEMBER 17th 2025 REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com DRAFT 11/17/2025 5:48:02 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT SURVEY (FOR REFERENCE) FCD V1.01 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 18 3 1 12 19 3 12 3 3 5 5 5 5 12 20 1 PARCEL 385 APROXIMATE LOCATION NO MONUMENTATION FOUND REMAINDER PARCEL 148-325 UNMAPED ACREAGE UNKNOWN ASPHALT PAVEMENT 22 19 19 19 19 13 3 1 1 1 ASPHALT ROAD ASPHALT ROAD ASPHALT ROAD 12 12 21 18 18 18 18 18 18 18 18 18 18 18 18 18 18 13 13 13 13 13 13 13 13 13 13 13 13 13 13 19 19 19 19 2 2 2 2 2 2 2 2 2 2 2 20 22 DEMOLITION SITE PLAN LEGEND 1. THIS DRAWING IS ONLY TO ASSIST IN SHOWING THE SCOPE OF DEMOLITION WORK AND IT IS NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL REMOVE ALL EXISTING ITEMS AS REQUIRED TO COMPLETE THE WORK. 2. NOT ALL ITEMS TO BE DEMOLISHED ARE SHOWN ON THE PLAN. CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING A WALK THROUGH OF THE PROJECT TO IDENTIFY POSSIBLE CRITICAL ITEMS NOT OR INCORRECTLY ADDRESSED, WHICH REQUIRE REMOVAL/RELOCATION PRIOR TO SUBMITTING A BID TO THE OWNER. 3. CUT, REMOVE, PATCH, AND REFINISH EXISTING CONSTRUCTION AS REQUIRED TO LEAVE WORK COMPLETE AND IN SATISFACTORY CONDITION. 4. CONTRACTOR IS TO PROTECT ALL CONCEALED UTILITIES, ASSURE PROPER IDENTIFICATION OF ALL UTILITIES AND CAP AS REQUIRED. 5. DEMOLITION & REPAIR WORK MAY ENTAIL INTERVENTIONS IN AREAS OUTSIDE OF THE IMMEDIATE SCOPE OF WORK IN VARIOUS AREAS WITHIN THE SCOPE. IT MAY REQUIRE WORK INVOLVING REMOTE UTILITY LINES (ELECTRICAL, COMMUNICATIONS, DATA, ETC...). ANY WORK IN AREAS OUTSIDE OF THE IMMEDIATE SCOPE OF WORK SHALL BE ALL-INCLUSIVE, PROVIDING ALL UTILITIES, FINISHES AND EQUIPMENT REQUIRED TO RESTORE THE AREA TO FULLY OPERATIONAL CONDITIONS. 6. PATCH AND REPAIR ALL EXISTING SURFACES DAMAGED BY DEMOLITION AS REQUIRED, TO MATCH ADJACENT SURFACES. 7. FOR REMOVAL OF FIXTURES AND EQUIPMENT, REFER TO ARCHITECTURAL, CIVIL, ELECTRICAL, AND LANDSCAPE DRAWINGS AND SPECIFICATIONS. 8. COORDINATE WITH OWNER PRIOR TO DEMOLITION FOR ALL ITEMS WHICH WILL REQUIRE RELOCATION, STORAGE OR TURN OVER TO THE OWNER FOR ALL MATERIAL REMOVED FROM EXISTING CONSTRUCTION. 9. PLANS SHALL BE SUBMITTED BY THE CONTRACTOR PRIOR TO COMMENCING WORK FOR ALL PHASING, STAGING, CONSTRUCTION AREAS AND MAINTENANCE OF REQUIRED CLEARANCES FOR OPERATIONS, EXITING AND ACCESS AT THE EXISTING SITE IN ACCORDANCE WITH ALL APPLICABLE CODES. 10. PRIOR TO START OF WORK, CONTRACTOR SHALL CONFIRM ALL EXISTING CONDITIONS. CONFIRM ALL UTILITIES. SHOULD ANY PROBLEMS BE EVIDENT, NOTIFY THE OWNER AND ARCHITECT FOR DIRECTION. THE FIRE ALARM AND COVERAGE FOR THE SURROUNDING AREAS SHALL REMAIN IN OPERATION AT ALL TIMES. 11. DO NOT SCALE DRAWINGS. 12. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO FIELD CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AND NOTIFY THE OWNER AND ARCHITECT IF ANY DISCREPANCIES ARE FOUND. 13. ALL AREAS OF DEMOLITION OPERATIONS SHALL BE PROPERLY POSTED WITH SIGNS WARNING OF DANGER. SUFFICIENT WATCH PERSONS SHALL BE PROVIDED TO WARN WORKERS OF IMPENDING DANGERS, AND ALL UNAUTHORIZED PERSONS SHALL BE EXCLUDED FROM PLACES WHERE DEMOLITION IS IN PROGRESS. ALL TREES & STUMPS DESIGNATED FOR RELOCATION OR REMOVAL TO REMOVE ENTIRE ROOT STRUCTURE AND SHALL BE EXCAVATED AS REQUIRED. SEE LANDSCAPE DRAWINGS. 14. TREE STUMPS SHALL BE REMOVED TO THEIR FULL DEPTH. ROOTS 3 INCH AND LARGER SHALL BE REMOVED TO A DEPTH OF 2 FEET BELOW FINISHED GRADE. STUMPS SHALL BE LEGALLY DISPOSED OF OFF-SITE. 15. CONTRACTOR TO MAINTAIN SAFE INGRESS AND EGRESS TO THE SITE AT ALL TIMES. COORDINATE WITH OWNER FOR PHASING. 16. CONTRACTOR SHALL COORDINATE WITH OWNER FOR RELOCATION OF ANY EXISTING UTILITIES. REMOVE ALL FOUNDATIONS AND UNDERGROUND UTILITIES. CAP AND TERMINATE AS REQUIRED. 17. CONTRACTOR TO COORDINATE SURVEY, CIVIL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION DRAWINGS FOR UTILITY CONNECTIONS, TRENCHING, AND REQUIRED DEMOLITION. COORDINATE WITH OWNER FOR ALL TIE-INS AND SYSTEMS CONNECTIONS. 18. CONTRACTOR TO COORDINATE AND PROVIDE MAINTENANCE OF TRAFFIC OPERATIONS PLAN (WITH ALL APPLICABLE MUNICIPAL APPROVALS) FOR ALL TEMPORARY SIDEWALK/ROADWAY/UTILITIES WORK TO MAINTAIN EGRESS AND ACCESS FOR THE SITE DURING CONSTRUCTION & COORDINATE REPLACEMENT OF TEMPORARY SIDEWALK PRIOR TO COMPLETION OF CONSTRUCTION. SEE CIVIL DRAWINGS. 19. PROPER SAFETY BARRICADES AND PROTECTION SHALL BE IN PLACE BEFORE DEMOLITION AND DURING CONSTRUCTION IN COMPLIANCE WITH LOCAL CODES AND 1926 OSHA CONSTRUCTION INDUSTRY REGULATIONS. TYPICAL ALL DEMO. 20. NEW WORK AND DEMOLITION OPERATIONS SHALL BE IN COMPLIANCE SHOWING COMPLIANCE WITH APPLICABLE SECTIONS OF THE NFPA 1 CHAPTER 16, FBC CHAPTER 33, NFPA 241, AND OSHA REGULATIONS FOR PROPER; WASTE DISPOSAL OF CONSTRUCTION MATERIALS, HAZARDOUS MATERIAL HANDLING, MAINTENANCE OF MEANS OF EGRESS, PRESERVATION OF EXISTING FIRE PROTECTION SYSTEMS, ACCESS FOR EMERGENCY SERVICE VEHICLES AT ALL TIMES, UTILITY DISCONNECTIONS, FIRE PROTECTION AND DETECTION SYSTEM TEST AND RE- CERTIFICATION REQUIREMENTS WITH THE DEMOLITION OF THE PORTABLE BUILDINGS. 21. CCS SHALL BE NOTIFIED PRIOR TO DISCONNECT ANY EXISTING FIRE SUPPRESSION OR DETECTION SYSTEM. 22. WHEN ANY EXISTING FIRE PROTECTION OR DETECTION SYSTEM IS OUT OF SERVICE FOR MORE THAN 4 HOURS IN A 24-HOUR PERIOD, THE AHJ SHALL BE NOTIFIED, AND THE BUILDING EVACUATED OR AN APPROVED FIRE WATCH SHALL BE PROVIDED FOR ALL PARTIES LEFT UNPROTECTED BY THE SHUTDOWN UNTIL THE SYSTEM HAS BEEN RETURNED TO SERVICE. 23. A SAFETY PLAN SHALL BE PROVIDED BY THE CONTRACTOR WHICH CLEARLY DELINEATES AREAS FOR CONSTRUCTION, SAFETY BARRIERS, EXITS, CONSTRUCTION TRAFFIC DURING THE VARIOUS PHASES OF THE PROJECT AND WHEN CONDITIONS CHANGE. PROVIDE A DEMOLITION PLAN SHOWING PROTECTION OF EXIT PATH, FIRE ALARM DEVICES, AND FIRE SPRINKLERS DURING CONSTRUCTION. SITE DEMOLITION GENERAL NOTES EXISTING TREE TO REMAIN (SEE LANDSCAPE DWGS.) PROJECT LIMIT PROPERTY LINE WORK TO BE DEMOLISHED (SEE NOTES) LANDSCAPE AREA NOT IN SCOPE OF WORK EXISTING TREE TO BE RELOCATED OR REMOVED (SEE LANDSCAPE DWGS.) 1 EXISTING GRADING TO BE MODIFIED; COORDINATE WITH CIVIL DRAWINGS EXISTING GRADING TO BE MODIFIED AND SOIL PREPARED/IMPROVED BASED ON GEO-TECHNICAL REPORT TO RECEIVE NEW BUILDING PAD AND HARDSCAPED AREAS; COORDINATE WITH CIVIL DRAWINGS EXISTING FENCING, CONTROL ACCESS SYSTEMS, & CONCRETE FOOTINGS/PIERS TO BE REMOVED REMOVE AND RELOCATED EXISTING FIRE HYDRANT; COORDINATE WITH CIVIL, ARCHITECTURAL, AND M/E/P/FP DRAWINGS REMOVE EXISTING ASPHALT PAVING, SUB-BASE, AND CURB, AS REQUIRED; COORDINATE WITH CIVIL DRAWINGS EXISTING GRADING TO BE MODIFIED AND PREPARED TO BE CONNECTED BACK TO EXISTING/PROPOSED GRADING AND SITE CONNECTIONS; COORDINATE WITH CIVIL DRAWINGS PROTECT EXISTING UTILITIES AS REQUIRES; COORD. WITH CIVIL AND M/E/P/FP DRAWINGS REMOVE DIRT/CONCRETE ROAD EXISTING MARQUEE AND ASSOCIATED UTILITIES TO BE REMOVED EXISTING M/E/P/FP EQUIPMENT TO BE REMOVED. COORDINATE WITH CIVIL AND M/E/P/FP DRAWINGS EXISTING COVERED WALKWAYS COLUMNS, & ASSOCIATED FOUNDATIONS TO BE REMOVED REMOVE ALL UTILITIES AND CAP WITHIN 5' OF THE MAIN CONNECTION AT THE EDGE OF THE PROPERTY, TYP. REMOVE EXISTING SIDEWALK/ASPHALT/WOOD OR CONCRETE SLAB; COORDINATE WITH CIVIL AND STRUCTURAL DRAWINGS EXISTING EXTERIOR CONCRETE PLAY AREA AND FOUNDATIONS TO BE REMOVED REMOVE/RELOCATE TREE REFER TO LANDSCAPE TREE DISPOSITION PLAN LANDSCAPE/PLANTER TO BE REMOVED, REFER TO LANDSCAPE TREE DISPOSITION PLAN CONCRETE RETAINING WALL TO BE REMOVED, REFER TO CIVIL AND STRUCTURAL DRAWINGS EXISTING MASONRY BUILDING TO BE REMOVED, INCLUDING ALL RAMPS, STAIRS, AND UTILITIES. COORDINATE WITH CIVIL, STRUCTURAL, AND M/E/P/FP EXISTING RAMPS AND STAIRS, TO BE REMOVED. COORDINATE WITH CIVIL, STRUCTURAL, AND M/E/P/FP SIGN/FLAG POLE & ASSOCIATED FOUNDATIONS TO BE REMOVED SLAB TO BE REMOVED REMOVE DAMAGED BASKETBALL COURT DEMOLITION KEYNOTES 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com DRAFT 11/17/2025 5:47:50 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT DEMOLITION SITE PLAN FCD AD1.01 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: 1/32" = 1'-0" FCD AD1.01 1 DEMOLITION SITE PLAN Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com DRAFT 11/17/2025 5:47:52 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT EXISTING SITE PHOTOS 1 FCD AD1.10 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: 12" = 1'-0" FCD AD1.10 1 EXISTING SITE PHOTO FACING NORTH Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com DRAFT 11/17/2025 5:47:54 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT EXISTING SITE PHOTOS 2 FCD AD1.11 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: 12" = 1'-0" FCD AD1.11 1 EXISTING SITE PHOTO FACING SOUTH Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com DRAFT 11/17/2025 5:47:56 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT EXISTING SITE PHOTOS 3 FCD AD1.12 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: 12" = 1'-0" FCD AD1.12 1 EXISITING SITE PHOTO FACING NORTHWEST Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 1. ALL SITE ADAPTATION WORK REQUIRED TO CONSTRUCT BUILDINGS SHALL BE IN ACCORDANCE WITH THE FOLLOWING CODES OF RECORD: IBC LATEST EDITION. IFC LATEST EDITION. 2. CONTRACTOR SHALL CLEAR AND PREPARE THE SITE TO RECEIVE NEW BUILDING AND WALKWAY PAD. FILL SHALL BE COMPACTED TO PER PROVIDED GEO-TECHNICAL REPORT. GENERAL CONTRACTOR SHALL SUBMIT TO OWNER GEOTECHNICAL REPORTS CONFIRMING THE REQUIRED COMPACTION PRIOR TO CONSTRUCTION OF BUILDING. CONTRACTOR SHALL PREPARE THE SITE TO RECEIVE NEW FOUNDATIONS AS REQUIRED BY THE GEOTECHNICAL REPORT. 3. BUILDING SHALL BE ACCESSIBLE. ALL COVERED WALKWAYS, RAMPS, AND STAIRS LEADING TO THE BUILDINGS SHALL BE IN COMPLIANCE WITH INTERNATIONAL ACCESSIBILITY CODE. THERE SHALL BE NO CHANGES IN WALKWAY ELEVATION GREATER THAN 1/4". 4. CONTRACTOR SHALL REROUTE AND REPAIR ANY IRRIGATION IN CONFLICT WITH PROPOSED SCOPE OF WORK. CONTRACTOR SHALL REGRADE AND RESOD ALL AREAS AFFECTED BY NEW WORK. THIS ARCHITECTURAL SITE PLAN. 5. GENERAL CONTRACTOR SHALL PROVIDE 6 FT. CHAIN LINK CONSTRUCTION FENCE (WITH SCREEN) AS REQUIRED CONTROL AND SEPARATE PEDESTRIAN AND VEHICULAR TRAFFIC FROM CONSTRUCTION ACTIVITIES. EXACT LOCATION AND CONFIGURATION SHALL BE COORDINATED WITH OWNER'S REPRESENTATIVE AT PRECONSTRUCTION MEETINGS. 6. FOR EXISTING SITE CONDITIONS AND IMPROVEMENTS REFERENCE ATTACHED SITE SURVEY. 7. GENERAL CONTRACTOR SHALL COORDINATE AND SUBMIT SIGNED AND SEALED SHOP DRAWINGS AND CALCULATIONS FOR ALL SPECIALTY ITEMS TO BE APPROVED BY DESIGN ENGINEER/ARCHITECT OF RECORD FOR DESIGN INTENT AS PER CHIEF PLANS EXAMINER AND BUILDING OFFICIAL AND IBC 104.2.2.2. SPECIALTY ENGINEERING ITEMS INCLUDE BUT ARE NOT LIMITED TO: ALUMINUM CANOPIES, FENCING. 8. PRE-ENGINEERED ALUMINUM COVERED WALKWAY AND/OR TRELLIS (SYSTEM) SHALL BE INTERNAL DRAINING BEAM TYPE AND CONNECTED TO STORM DRAINAGE LINES BELOW GRADE, SEE CIVIL DRAWINGS. COLUMN SPACING & FOUNDATION REQUIREMENTS SHALL BE PROVIDED BY COVERED WALKWAY MANUFACTURER. 9. CONTRACTOR SHALL SUBMIT SPECIALTY ENGINEERED SHOP DRAWINGS AND CALCULATIONS SIGNED AND SEALED (WHICH USE ASCE CURRENT AS CRITERIUM FOR LOADS). 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL BE FAMILIAR WITH AND BE RESPONSIBLE FOR ADHERENCE TO ALL GOVERNING REGULATIONS. 11. DURING THE ENTIRE CONSTRUCTION PERIOD, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN CONDITIONS AT THE JOB SITE SO AS TO MEET IN ALL RESPECTS THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA). THIS PROVISION SHALL COVER THE CONTRACTOR'S EMPLOYEES AND ALL OTHER PERSONS WORKING UPON OR VISITING THE SITE. TO THIS END, THE CONTRACTOR SHALL INFORM HIMSELF AND HIS REPRESENTATIVES OF OSHA STANDARDS. 12. CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS FOR EXACT EXTENT OF DEMOLITION AND NOTIFY ARCHITECT OF ANY DISCREPANCIES BEFORE PROCEEDING W/ WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CONFLICTS THAT MAY HAVE BEEN AVOIDED THEREBY. 13. CONTRACTOR IS TO REFER TO CIVIL, LANDSCAPE, STRUCTURE, MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS FOR FULL EXTENT OF WORK. 14. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER SO THAT THE OWNER'S ACTIVITIES ARE NOT INTERRUPTED. IF ANY ACTIVITY IS TO BE INTERRUPTED, I.E. NORMAL WORKING CONDITIONS, TELEPHONE, ELECTRICITY,WATER OR ANY OTHER UTILITY NOT MENTIONED, CONTRACTOR IS TO OBTAIN WRITTEN PERMISSION FROM THE OWNER AUTHORIZING SUCH INTERRUPTION. 15. ITEMS TO BE REMOVED IN DEMOLITION AREAS ARE TO BE VERIFIED BY FIELD INSPECTION. IT IS THE INTENT TO REMOVE EXISTING FEATURES AS REQUIRED TO PREPARE THE AREA FOR CONSTRUCTION. IF A FEATURE OF REMOVED IS NOT SHOWN IT DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF REMOVING SUCH A FEATURE OR ENTITLE HIM TO AN EXTRA FEE FOR THE REMOVAL OF SUCH FEATURE. 16. REPAIR ALL PAVED AND WALK SURFACES DAMAGED BY CONSTRUCTION TO LIKE NEW WITH MATERIAL TO MATCH ADJACENT. 17. FOR ALL GRADING OF SITE SEE CIVIL AND LANDSCAPE DRAWINGS. 18. ALL WIRE FABRIC MESH TO BE NO. 9 GAUGE 2" MESH. ALL CHAINLINK FENCE MATERIAL TO BE ALLIED SS40 OR EQUAL CONFORMING TO CLFMI SPECIFICATIONS. ALL FENCES ARE TO BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITHALL APPLICABLE CODES INCLUDING CURRENT EDITION OF IBC. MINIMUM WIND SPEED OF 140 +40 MILES PER HOUR AND IMPORTANCE FACTOR OF 1.0 BE USED IN DESIGN. 19. ALL SITE LIGHTING POLES ARE TO BE PROVIDED WITH DATA CONDUIT (1" MIN.) RUN TO SERVE ALL FUTURE SECURITY NEEDS. CONDUIT TO BE FED BACK TO MAIN SECURITY PANEL LOCATION (MDF ROOM). ALL SITE LIGHTING POLES TO BE PROVIDED WITH ADDITIONAL CONVENIENCE EXTERIOR GRADE COVERED DUPLEX OUTLET MOUNTED AT BASE. 20. ALL PROPOSED STRUCTURES WHICH INCLUDE SITE LIGHTING POLES, FENCES, WALLS,ETC. MUST COMPLY WITH THE FOLLOWING; IBC 1620.2, IBC 1612.2.1, IBC 1621.1 (ASCE 7) & IBC 1621.2 (ASCE 7). 21. CONTRACTOR TO PROVIDE TERMITE PROTECTION AS REQUIRED BY THE PROVISIONS FOUND IN THE IBC (MOST NOTABLY SECTION 104.2.6 -104.2.7, 1403.1.6, 1816.1-1816.2 AND 2116) SPECIFICATION SECTION 02280 SOIL TREATMENT. 22. PROVIDE GALVANIZED PIPE GROUTED FULL & PAINTED FOR ALL EXTERIOR BOLLARD LOCATIONS. CONTRACTOR TO COORDINATE BASE BOLLARD DIAMETER, REINFORCING HEIGHT AND INSTALLATION AS REQUIRED FOR BOLLARD COVERFINISH TO BE FROM STANDARD COLOR SELECTION AS SELECTED BY ARCHITECT AND OWNER. SITE PLAN NOTES SITE PLAN LEGEND EXISTING STRUCTURE NEW STRUCTURE PROPERTY LINE LANDSCAPE AREA PLAYFIELD 9 10 13 9 PARCEL 385. NO MONUMENTATION FOUND OUTDOOR PLAYCOURTS PALMETTO RD. EXISTING ASPHALT RD. EXIST. NEW TRANSFORMER CHILLER YARD LANDSCAPE AREA (TYP.) CONC. SIDEWALK (TYP.) ENTRY PLAZA LINE OF ELEVATED WALKWAY ABOVE LANDSCAPE AREA (TYP.) LINE OF ROOF ABOVE (TYP.) RAISED PLANTERS LANDSCAPE AREA (TYP.) RAISED PLANTERS (TYP.) PROPOSED ASPHALT RD. CONC. SIDEWALK (TYP.) BATTERY BUILDING D 1-STORY GYMNASIUM AREA= 12,040 SF ASL EL. = 226'-0" BUILDING C 1-STORY DINING AREA= 11,592 SF ASL EL. = 230'-0" BUILDING B 2-STORY CLASSROOMS AREA= 29,162 SF ASL EL. = 226'-0" BUILDING A 2-STORY ADMIN AREA= 15,358 SF ASL EL. = 230'-0" DUMPSTER ENCLOSURE ELEC. RM. CHILLER PUMP CONC. WALL CONC. WALL SIGN ALUMINUM COVERED CANOPY ESTATE FENCE TYP. ENTRY GATE BUS DROP OFF AREA ENTRY GATE REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com DRAFT 11/17/2025 5:45:25 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT OVERALL ARCHITECTURAL SITE PLAN FCD A1.01 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: 1" = 30'-0" FCD A1.01 1 OVERALL ARCHITECTURAL SITE PLAN N Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 /2 A5.08 /1 A5.07 /2 A5.07 /1 A5.08 /1 A5.02 /2 A5.01 /1 A5.01 /2 A5.02 /2 A5.04 /1 A5.03 /1 A5.04 /2 A5.03 /2 A5.06 /2 A5.05 /1 A5.06 /1 A5.05 A-2 B1 B2 B4.5 B6.8 B5 B6 C1 C2 CA CC D1 D2 D3 D-A D-B D-D B4 BC B7 CB A-3 A-C A-5 A-7 A-8 A-D A-E A-F A-9 B8 BB BA.5 BD C4 CD C6 D-C D-E A-1 A-A C5 D4 A-6 A-4 A-B B3 C3 B9 BA B10 B6.5 BA' B7.5 /4 A1.20 6 A1.30 /4 A1.30 /5 A1.30 /3 A1.30 /2 A1.30 2 A6.01 1 A6.01 2 A6.02 1 A6.02 1 A6.03 2 A6.03 1 A6.04 2 A6.04 PLAYGROUND AREA 82'-2" 12'-6" 29'-0" 43 SF C110 RR 202 SF D141 STORAGE 86 SF D142 VEST. 79 SF D145 JANITOR 93 SF D144 FIRE PUMP 138 SF D140 ELEC. 112 SF D143 EMERGENCY ELEC. 175 SF D146 PE/ COACH OFFICE 49 SF D136 STAIR #1 267 SF D149 SPECTATOR RR 257 SF D150 SPECTATOR RR 323 SF D127 GYM LOBBY 229 SF B125 MEP 62 SF B124 RR 122 SF B121 ELEC 1310 SF B123 HEALTH CLASSROOM / SPED 68 SF B120 RR 60 SF B126 ELEVATOR 115 SF B119 SMALL GROUP ROOM 294 SF B100 CORRIDOR 780 SF B118 TEACHER PLANNING 265 SF B101 CORRIDOR 1133 SF B117 LEARNING SUITE 1 CLASSROOM W/RR (PRE-K) 38 SF B116 RR 38 SF B115 RR 1128 SF B114 LEARNING SUITE 1 CLASSROOM W/RR (KINDER) 2260 SF B102 OPEN COLLLABORATION SPACE 66 SF B105 UNISEX RR 61 SF B106 JANITOR 192 SF B107 WOMEN'S RR 176 SF B108 MEN'S RR 846 SF B109 LEARNING SUITE 1 STUDIO (1ST-5TH) 850 SF B110 LEARNING SUITE 1 STUDIO (1ST-5TH) 851 SF B111 LEARNING SUITE 1 STUDIO (1ST-5TH) 851 SF B112 LEARNING SUITE 1 STUDIO (1ST-5TH) 306 SF B103 CORRIDOR 418 SF B113 STORAGE 139 SF A119 RECEPTION/OFFICE 161 SF A118 SECURE VEST. 337 SF A117 PARENT CENTER 846 SF A114 WAITING 268 SF A116 CONFERENCE ROOM 178 SF A115 STAIR # 1 181 SF A112 ELECTRICAL 186 SF A113 MDF 198 SF A107 MECHANICAL 275 SF A108 DISTANCE LEARNING 2709 SF A100 MEDIA 64 SF A105 RR 71 SF A106 RR 43 SF A110 JANITOR 210 SF A111 STORAGE 222 SF A104 WORKROOM (W/ SINK) 178 SF A103 OFFICE 55 SF A102 STORAGE 60 SF A121 ELEVATOR 44 SF D137 VEST. 96 SF D138 VEST. 110 SF D139 VEST. 1299 SF C116 ART 90 SF C114 ELEC. 2518 SF C109 KITCHEN 188 SF C104 GIRL'S RR/CHANGING ROOM 213 SF C105 BOY'S RR/CHANGING ROOM 1480 SF C106 GENERAL MUSIC 83 SF C108 STORAGE 50 SF C102 JANITOR 43 SF C103 FAMILY RR 3555 SF C100 PK-5 DINING AREA 389 SF B104 CORRIDOR Not Enclosed VEST. 52 SF C117 RR 47 SF C118 RR 87 SF C119 IDF 319 SF C115 MEP 168 SF C155 VEST. 100 SF A109 VEST. 7537 SF D130 GYMNASIUM 45'-5" 38'-4" C1 151 SF A12O SRO OFFICE 93 SF A162 SMALL GROUP RM 71 SF A122 RR FLOOR PLAN LEGEND PROPERTY LINE CONCRETE MASONRY CONCRETE DRYWALL / STUD PARTITION PROJECT LIMIT LINE BUILDING SECTION TAG WALL SECTION TAG EXTERIOR ELEVATION TAG /1 A-101 1 A-101 SIM 1 A101 SIM X X X X INTERIOR ELEVATION TAG FENCE LINE DOOR NUMBER TAG WINDOW TYPE TAG LOUVER TYPE TAG A-101 1 1 1 1 101 1t ABV (-2") COLUMN GRID SLAB DEPRESSION 0 SPOT ELEVATION CENTERLINE BREAKLINE Room Name Top Room Name Bot Room Number Program SF/Actual SF Life Safety SF Life Safety SF/Occupants Life Safety Occupants Rev. No. -/-/- Date ROOM ID TAG REVISION TAG 1. BEFORE INSTALLATION, CONTRACTOR SHALL COORDINATE WITH THE ARCHITECT THE EXACT MOUNTING LOCATIONS OF ALL SWITCHES, WALL RECEPTACLES, PLUGS, FEC AND OTHER WALL MOUNTED FIXTURES AND SPECIALTY GRAPHICS / FINISHES. NO SWITCHES, DEVICES, EQUIPMENT, ETC. IS TO BE INSTALLED IN SPECIALTY FINISH / DISPLAY WALL AREAS. 2. REFER TO ENLARGED FLOOR PLAN DRAWINGS AND DETAILS FOR ADDITIONAL DIMENSIONS. 3. REFER TO CIVIL DRAWINGS FOR ALL GRADING INFORMATION. 4. DIMENSIONS ARE TYPICALLY SHOWN FROM OUTSIDE FACE OF CMU WALL TO OUTSIDE FACE OF CMU WALL, OR CENTERLINE OF PARTITION, UNLESS NOTED OTHERWISE CONTRACTOR SHALL NOTE SPECIAL LOCATIONS IN WHICH "CLEAR" DIMENSION IS SPECIFIED. (DIMENSIONS ARE FROM FINISH TO FINISH.) 5. ALL EXPOSED AREAS INCLUDING ALL SYSTEMS ARE TO BE FULLY PAINTED INCLUDING COLOR CODING OF ALL SYSTEMS AND PIPING. COLORS ARE TO BE SELECTED BY ARCHITECT FROM FULL RANGE. 6. CONTRACTOR TO COORDINATE THE LOCATION OF ALL TEMPORARY DUST AND PROTECTION BARRIERS TO MAINTAIN SAFE ACCESS TO EGRESS AT ALL TIMES. CONSTRUCTION IAQ MANAGEMENT PLAN SHALL BE POSTED AT ALL TIMES. 7. CONTRACTOR TO MAINTAIN ALL PROTECTED WALL ASSEMBLIES AND OPENING RATINGS. 8. ALL SLAB RECESSES ARE TO BE COORDINATED AND CONFIRMED PRIOR TO CONSTRUCTION OF FLOOR SLAB. 9. PROVIDE WALL PROTECTION SYSTEMS PER SPECIFICATIONS. 10. PROVIDE SLOPE TO DRAIN AT ALL MECHANICAL ROOM FLOORS PRIOR TO INSTALLATION OF SERVICE PAD. PROVIDE WATERPROOFING PEDESTRIAN MEMBRANE AT ALL ELEVATED MECHANICAL ROOM FLOOR AREAS. 11. PROVIDE ANTI-FRACTURE AND WATERPROOFING MEMBRANE AT ALL TOILET AND SHOWER (INDIVIDUAL AND GROUP) ROOMS ABOVE THE GROUND FLOOR. 12. CONTRACTOR TO COORDINATE WITH SHEET A-650, FINISH PLANS AND LIFE SAFETY DRAWINGS FOR ALL WALL TYPES AND PARTITION CONSTRUCTION. 13. COORDINATE WITH OVERALL SITE PLAN, CIVIL, LANDSCAPE, ELECTRICAL, MECHANICAL PLUMBING AND FIRE PROTECTION DRAWINGS FOR ALL SITE CONDITIONS. 14. SLOPE ALL FLOORS TO DRAIN DOWN TO WHERE A FLOOR DRAIN HAS BEEN PROVIDED. ALL SLOPED SLABS AND RECESSED SLAB AREAS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH T.C.A. RECOMMENDATIONS. FLOOR PLAN GENERAL NOTES 2 1/2" RECESSED FOR WOOD FLOORING / GYM 2" RECESSED FOR CERAMIC TILE, QUARRY TILE & ART LAB SLOPE 3" RECESSED FOR QUARRY CERAMIC TILE AT GYM 4" CONC. CURB FOR LOCKERS SOUND TRANSMISSION CLASS RATING LOW WALL / LOW STUD PARTITION (SEE INTERIOR ELEVATIONS) NOTE A* PROVIDE ST. STL DOWNSPOUT NOZZE ASSEMBLY FLUSH TO FINISH WALL, EQUAL TO ZURN ZANB-199-SS WITH SCREEN. CONTRACTOR TO COORDINATE INSTALLATION 12" ABOVE FINISHED FLOOR (TYP.), REFER TO PLUMBING DRAWINGS FOR PIPE SIZE. REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH DRAFT 11/17/2025 5:45:32 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT FLOOR PLAN LEVEL 01 - OVERALL FCD A2.01 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION N Scale: 1/16" = 1'-0" FCD A2.01 1 OVERALL LEVEL 1 FLOOR PLAN Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 /2 A5.08 /1 A5.07 /2 A5.07 /1 A5.08 /1 A5.02 /2 A5.01 /1 A5.01 /2 A5.02 /2 A5.04 /1 A5.03 /1 A5.04 /2 A5.03 /2 A5.06 /2 A5.05 /1 A5.06 /1 A5.05 A-2 B1B2 B4.5 B6.8 B5 B6 C1 C2 CA CC D1 D2 D3 D-A D-B D-D B4 BC B7 CB A-3 A-C A-5 A-7 A-8 A-D A-E A-F A-9 B8 BB BA.5 BD C4 CD C6 D-C D-E A-1 A-A C5 D4 A-6 A-4 A-B B3 C3 B9 BA B10 B6.5 BA' B7.5 150 SF B226 MEP 176 SF B223 LEARNING SUITE PREP 149 SF B224 IDF 144 SF B225 ELEC 288 SF B200 CORRIDOR 115 SF B203 SMALL GROUP ROOM 68 SF B206 RR 780 SF B205 TEACHER PLANNING 265 SF B202 CORRIDOR 1091 SF B207 LEARNING SUITE STUDIO (6TH-8TH) 966 SF B209 LEARNING SUITE STUDIO (6TH-8TH) 200 SF B210 DISTANCE LEARNING 308 SF B211 CORRIDOR 850 SF B213 LEARNING SUITE STUDIO (4TH-5TH) 418 SF B212 STORAGE 851 SF B214 LEARNING SUITE STUDIO (4TH-5TH) 850 SF B215 LEARNING SUITE STUDIO (1ST-5TH) 2240 SF B201 OPEN COLLABORATION SPACE 1105 SF B222 LEARNING SUITE SCIENCE LAB 66 SF B221 UNISEX RR 192 SF B220 WOMEN'S RR 176 SF B219 MEN'S RR 61 SF B218 JANITOR 846 SF B216 LEARNING SUITE STUDIO (1ST-5TH) 71 SF B208 RR 160 SF A201 ASSISTANT PRINCIPAL OFFICE 143 SF A202 MONITOR'S OFFICE 156 SF A203 ASSISTANT PRINCIPAL OFFICE 197 SF A204 CONFERENCE ROOM 276 SF A205 PRINCIPAL OFFICE 63 SF A206 RR 136 SF A216 CLINIC OFFICE 36 SF A214 ELEC. 83 SF A215 CLINIC VEST. 332 SF A217 INFIRMARY 107 SF A218 COT ROOM/EXAM 91 SF A219 RR/SWR 409 SF A221 STAFF LOUNGE 78 SF A224 RECORDS 63 SF A222 STAFF RR 160 SF A223 REGISTRAR 150 SF A225 COUNSELOR 150 SF A226 COUNSELOR 252 SF A227 SPEECH THERAPY 172 SF A228 TIME OUT ROOM 176 SF A229 TIME OUT / TARDY 179 SF A230 RECEPTION / GUIDANCE CLERK 31 SF A232 GUIDANCE WAITING 55 SF A231 STAFF RR 419 SF A211 STAFF WORK/ MAIL 58 SF A213 CUSTODIAL 94 SF A212 MOTHER'S ROOM 44 SF A220 OFFICE SUPPLY 1968 SF A200 CORRIDOR 60 SF A207 ELEVATOR 61 SF A208 STUDENT RR 62 SF A209 STUDENT SERVICE STAFF RR 156 SF D210 STAIR 114 SF D212 IDF 1497 SF D156 MECHANICAL MEZZANINE OPEN TO BELOW OPEN TO BELOW 232 SF D211 MEP 60 SF A204 ELEVATOR 236 SF B217 CORRIDOR 39 SF D136 STAIR 1968 SF A200 CORRIDOR FLOOR PLAN LEGEND PROPERTY LINE CONCRETE MASONRY CONCRETE DRYWALL / STUD PARTITION PROJECT LIMIT LINE BUILDING SECTION TAG WALL SECTION TAG EXTERIOR ELEVATION TAG /1 A-101 1 A-101 SIM 1 A101 SIM X X X X INTERIOR ELEVATION TAG FENCE LINE DOOR NUMBER TAG WINDOW TYPE TAG LOUVER TYPE TAG A-101 1 1 1 1 101 1t ABV (-2") COLUMN GRID SLAB DEPRESSION 0 SPOT ELEVATION CENTERLINE BREAKLINE Room Name Top Room Name Bot Room Number Program SF/Actual SF Life Safety SF Life Safety SF/Occupants Life Safety Occupants Rev. No. -/-/- Date ROOM ID TAG REVISION TAG 1. BEFORE INSTALLATION, CONTRACTOR SHALL COORDINATE WITH THE ARCHITECT THE EXACT MOUNTING LOCATIONS OF ALL SWITCHES, WALL RECEPTACLES, PLUGS, FEC AND OTHER WALL MOUNTED FIXTURES AND SPECIALTY GRAPHICS / FINISHES. NO SWITCHES, DEVICES, EQUIPMENT, ETC. IS TO BE INSTALLED IN SPECIALTY FINISH / DISPLAY WALL AREAS. 2. REFER TO ENLARGED FLOOR PLAN DRAWINGS AND DETAILS FOR ADDITIONAL DIMENSIONS. 3. REFER TO CIVIL DRAWINGS FOR ALL GRADING INFORMATION. 4. DIMENSIONS ARE TYPICALLY SHOWN FROM OUTSIDE FACE OF CMU WALL TO OUTSIDE FACE OF CMU WALL, OR CENTERLINE OF PARTITION, UNLESS NOTED OTHERWISE CONTRACTOR SHALL NOTE SPECIAL LOCATIONS IN WHICH "CLEAR" DIMENSION IS SPECIFIED. (DIMENSIONS ARE FROM FINISH TO FINISH.) 5. ALL EXPOSED AREAS INCLUDING ALL SYSTEMS ARE TO BE FULLY PAINTED INCLUDING COLOR CODING OF ALL SYSTEMS AND PIPING. COLORS ARE TO BE SELECTED BY ARCHITECT FROM FULL RANGE. 6. CONTRACTOR TO COORDINATE THE LOCATION OF ALL TEMPORARY DUST AND PROTECTION BARRIERS TO MAINTAIN SAFE ACCESS TO EGRESS AT ALL TIMES. CONSTRUCTION IAQ MANAGEMENT PLAN SHALL BE POSTED AT ALL TIMES. 7. CONTRACTOR TO MAINTAIN ALL PROTECTED WALL ASSEMBLIES AND OPENING RATINGS. 8. ALL SLAB RECESSES ARE TO BE COORDINATED AND CONFIRMED PRIOR TO CONSTRUCTION OF FLOOR SLAB. 9. PROVIDE WALL PROTECTION SYSTEMS PER SPECIFICATIONS. 10. PROVIDE SLOPE TO DRAIN AT ALL MECHANICAL ROOM FLOORS PRIOR TO INSTALLATION OF SERVICE PAD. PROVIDE WATERPROOFING PEDESTRIAN MEMBRANE AT ALL ELEVATED MECHANICAL ROOM FLOOR AREAS. 11. PROVIDE ANTI-FRACTURE AND WATERPROOFING MEMBRANE AT ALL TOILET AND SHOWER (INDIVIDUAL AND GROUP) ROOMS ABOVE THE GROUND FLOOR. 12. CONTRACTOR TO COORDINATE WITH SHEET A-650, FINISH PLANS AND LIFE SAFETY DRAWINGS FOR ALL WALL TYPES AND PARTITION CONSTRUCTION. 13. COORDINATE WITH OVERALL SITE PLAN, CIVIL, LANDSCAPE, ELECTRICAL, MECHANICAL PLUMBING AND FIRE PROTECTION DRAWINGS FOR ALL SITE CONDITIONS. 14. SLOPE ALL FLOORS TO DRAIN DOWN TO WHERE A FLOOR DRAIN HAS BEEN PROVIDED. ALL SLOPED SLABS AND RECESSED SLAB AREAS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH T.C.A. RECOMMENDATIONS. FLOOR PLAN GENERAL NOTES 2 1/2" RECESSED FOR WOOD FLOORING / GYM 2" RECESSED FOR CERAMIC TILE, QUARRY TILE & ART LAB SLOPE 3" RECESSED FOR QUARRY CERAMIC TILE AT GYM 4" CONC. CURB FOR LOCKERS SOUND TRANSMISSION CLASS RATING LOW WALL / LOW STUD PARTITION (SEE INTERIOR ELEVATIONS) NOTE A* PROVIDE ST. STL DOWNSPOUT NOZZE ASSEMBLY FLUSH TO FINISH WALL, EQUAL TO ZURN ZANB-199-SS WITH SCREEN. CONTRACTOR TO COORDINATE INSTALLATION 12" ABOVE FINISHED FLOOR (TYP.), REFER TO PLUMBING DRAWINGS FOR PIPE SIZE. REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH DRAFT 11/17/2025 5:45:37 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT FLOOR PLAN LEVEL 02 - OVERALL FCD A2.02 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: 1/16" = 1'-0" FCD A2.02 1 OVERALL LEVEL 2 FLOOR PLAN N Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 ROOFING LEGEND 1. RAIN WATER CALCULATIONS BASED ON A 5.75" PER HOUR RATE OF RAINFALL. 2. ALL LEADERS "L" SHALL BE SIZED TO MATCH THE "CH" SPECIFIED ABOVE. 3. ALL OVERFLOW SCUPPERS (Os) SHALL BE SET NOT LESS THAN 2" NOR MORE THAN 4" ABOVE THE ROOF LINE AT THE PRIMARY DRAIN. 4. SEE DETAILS FOR COLLECTOR HEAD (CH), AND OVERFLOW (Os) SCUPPER SPECIFIED ABOVE. 5. ALL PRIMARY STORM LEADERS SHALL BE CONNECTED TO UNDERGROUND STORM WATER COLLECTION/DISPOSAL SYSTEM AND/OR RAINWATER CISTERN COLLECTION SYSTEM. REFER TO PLUMBING AND CIVIL DRAWINGS FOR LOCATION, SIZE & DETAILS. 6. REFER TO STRUCTURAL DRAWINGS FOR HEIGHT OF ROOF DECK AND COORDINATION OF DRAIN/SCUPPER OPENINGS. 7. COORDINATE ALL HIGH AND LOW POINTS OF JOISTS WITH STRUCTURAL DRAWINGS. 8. SEE SITE PLAN FOR COORDINATION / LOCATION OF ALL WALKWAY CONNECTIONS. 9. ALL ROOF & HURRICANE ANCHORING CABLES, FLASHING, GUTTERS, CATCHBOX, DOWNSPOUTS / LEADERS, STRAPS AND COPING SHALL BE METAL PER SPECIFICATION. 10. PROVIDE UL 96 AND NFPA 780 LISTED LIGHTNING PROTECTION SYSTEM FOR ALL ROOF AND CANOPY AREAS. SEE ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. KEY NOTES GENERAL NOTES 11. COORDINATE LOCATION OF ALL WALKPADS WITH MECHANICAL DRAWINGS AND OWNER. WALK PADS SHALL BE DIFFERENT COLOR FROM FINAL ROOF SURFACE TO CLEARLY DELINEATE TRAFFIC AREAS. SEPARATION TO BE PROVIDED AT WALK PADS TO ENABLE FREE FLOWS OF WATER TO DRAINS. 12. ALL WOOD COMPONENTS TO BE PRESSURE TREATED. 13. ROOFING TO HAVE HIGH ALBEDO COATING PER SPECIFICATIONS FOR CONTINUOUS SURFACE AT TIME OF PROJECT COMPLETION. 14. ALL ROOFING INSULATION TO HAVE R-30 MINIMUM AT ALL AREAS. SLOPED INSULATION AND COVERBOARD SHALL BE ABOVE REQUIRED MINIMUM R-VALUE. 15. ALL AREAS ARE TO HAVE ROOF PROTECTION FOR ALL OPENINGS IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE (IBC) W/ APPLICABLE SUPPLEMENTS. 16. CONTRACTOR TO PROVIDE ALL REQUIRED PRODUCT APPROVALS FOR REVIEW BY ARCHITECT AND OWNER, PRIOR TO PRE-ROOFING CONFERENCE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING SIGNED AND SEALED, ENGINEERED (FLA. REGISTERED ENGINEER) SHOP DRAWINGS FOR REVIEW AND SUBMISSION TO BLDG. DEPARTMENT TO ACQUIRE A ROOFING SUB-PERMIT INCLUSIVE OF THE WATERPROOFING (IBC SECTION 1519.16) FOR ALL ROOF DECKS. 17. CONTRACTOR TO MAINTAIN MINIMUM 48" CLEAR AREA IN FRONT OF ALL SCUPPER OPENINGS. 18. ALL ROOF CURBS SHALL COMPLY WITH IBC CH. 15 SECTION 1511.7. 19. IF REQUIRED, PROVIDE ALL SAFETY TIE-OFF LOCATIONS AND ANCHORS PER MANUFACTURER'S RECOMMENDATIONS AND OSHA REGULATIONS. NOTE: PROVIDE ENGINEERING DESIGN COMPUTATIONS WITH RESPECT TO SPECIFIED UP-LIFT LOAD REQUIREMENTS AND AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) 7-10, & THE INTERNATIONAL BUILDING CODE (IBC) WITH THE APPLICABLE SUPPLEMENTS, AS NOTED ON THE CONTRACT DRAWINGS. CALCULATIONS AND SHOP DRAWINGS SHALL BE SIGNED AND SEALED BY LICENSED PROFESSIONAL STRUCTURAL ENGINEER AS THE DELEGATED SPECIALTY ENGINEER. **SEE DETAILS FOR MORE INFORMATION ON OVERFLOW/EMERGENCY DRAINS, SCUPPERS AND GUTTERS (AS APPLICABLE). "RD": ROOF DRAIN "CH": COLLECTOR HEAD W/ LEADER "L": LEADER "SC": SCUPPER "OS": OVERFLOW SCUPPER "SB": SPLASH BLOCK MODIFIED BITUMEN ROOFING MEMBRANE WITH HIGH ALBEDO TOP COATING PREFINISHED SLOPED METAL PANEL SYSTEM (COMPOSITE MTL. PANEL) PREFINISHED SLOPED METAL PANEL SYSTEM (STANDING SEAM) A-2 B1 B2 B4.5 B6.8 B5 B6 C1 C2 CA CC D1 D2 D3 D-A D-B D-D B4 BC B7 CB A-3 A-C A-5 A-7 A-8 A-D A-E A-F A-9 B8 BB BA.5 BD C4 CD C6 D-C D-E A-1 A-A C5 D4 A-6 A-4 A-B B3 C3 B9 BA B10 B6.5 BA' B7.5 6 A1.30 ALUMINUM CANOPY 92° 90° 81° 97° 90° 90° 90° 83° 92° 94° 90° 1" / 12" 1" / 12" 1" / 12" 1" / 12" 90° 70° 99° 101° 79° 170° ROOF STORM DRAINAGE CALCULATIONS ROOF AREA HORIZ. PROJ. AREA (H) TOTAL AREA (H+V)=T ZONES REQUIRED FLOW RATE IN GALLONS PER MINUTE A 12,381 SF 516 SF 12,897 SF VERT. PROJ. AREA /2 (V) (T X 0.0104 X 5) 671 GPM PROVIDED FLOW RATE IN GALLONS PER MINUTE (DRAINS) (# DRAINS x GPM) PROVIDED PRIMARY DRAINAGE PROVIDED SECONDARY EMERGENCY DRAINAGE PIPE DIAMTER SIZE (INCHES) 3" STORM DRAIN PIPE SIZING (SUMMARY FROM IBC-P TABLE 1106.2) CAPACITY (GPM) / VERTICAL DRAIN 87 GPM 4" 180 GPM 5" 311 GPM 6" 538 GPM 8" 933 GPM PROVIDED VERTICAL STORM DRAINAGE STACK (3)- 6" LEADERS 1. CALCULATIONS BASED ON FBC PLUMBING TABLE 1106.2 & FIGURE 1106.1 2. RAIN WATER CALCULATIONS BASED ON A 5" PER HOUR RATE OF RAINFALL, CODE ONLY REQUIRES 4.5" PER FBC FIGURE 1106.1 3. REQUIRED ROOF DRAINAGE IN GALLONS PER MINUTE = ( 0.0104) X (RAINFALL RATE) X (ROOF AREA) 4. RAINFALL RATE IS EXPRESSED IN INCHES PER HOUR. / ROOF AREA IS GIVEN IN SQUARE FEET. 5. PER FBC-P 1106.5 PARAPET WALL SCUPPER OPENINGS SHALL BE NOT LESS THAN 4 INCHES IN HEIGHT AND HAVE A WIDTH THAT IS EQUAL TO OR GREATER THAN THE CIRCUMFERENCE OF A ROOF DRAIN SIZED FOR THE SAME ROOF AREA. 6. PER 29 V.I.C.SECTION 292 CHAPTER 5 SS 292A (B)(4)(C) GUTTERS. WHERE EXTERNAL GUTTERS ARE PROVIDED, GUTTER SYSTEMS SHALL MEET THE REQUIREMENTS SPECIFIED IN THE LATEST EDITION OF ANSI/SPRI GT-1, TES 7. PER 29 V.I.C.SECTION 292 § 308 (D) ONE CISTERN MAY SERVE SEVERAL BUILDINGS PROVIDED THAT ITS CAPACITY IS AT LEAST EQUAL TO THE SUM OF THE MINIMUM REQUIRED CAPACITIES FOR EACH BUILDING ACCORDING TO ITS USE AND PROVIDED THE CISTERN IS NOT USED FOR A FIRE SPRINKLER SYSTEM. 8. PER 29 V.I.C.SECTION 292 § 308 (B) (4) ADEQUATE GUTTERS AND DOWNSPOUTS SHALL BE INSTALLED ON ALL BUILDINGS FOR CONDUCTING WATER INTO CISTERNS. GUTTERS AND DOWNSPOUTS SHALL BE KEPT IN GOOD REPAIR AND FREE OF DIRT AND DEBRIS AT ALL TIMES. GUTTERS AND DOWNSPOUTS INSTALLED FOR CONDUCTING WATER INTO CISTERNS SHALL MEET ALL REQUIREMENTS IN THE APPLICABLE CODES AND STANDARDS REFERENCED IN THIS CHAPTER, SPECIFICALLY THE CAPABILITY TO RESIST THE WIND LOADS. 9. REFER TO STRUCTURAL SHEETS FOR WIND DESIGN CRITERIA CALCULATIONS AND WIND PRESSURE DIAGRAMS. WIND DESIGN IS BASED ON IBC 2024, CHAPTER 16 – STRUCTURAL DESIGN, SECTION 1609 – WIND LOADS. GENERAL NOTES - ROOF CALCULATIONS - - B 22,190 SF 925 SF 23,115 SF 1,202 GPM 1,244 GPM (4)- 6" LEADERS - C 17,098 SF 713 SF 17,811 SF 927 GPM - D 15,245 SF 636 SF 15,355 SF 799 GPM - LEADERS / DRAINS PRIMARY SCUPPERS - 1,080 GPM (6)- 6" LEADERS 900 GPM (5)- 6" LEADERS GUTTERS (1)- 10"W X 12"D (1/4" SLOPE) GUTTERS GUTTER DIM 4.5" W x 6" D (1/4" SLOPE) STORM DRAIN GUTTER SIZING (SUMMARY FROM IBC-P TABLE 1106.6) CAPACITY (GPM) / VERTICAL DRAIN 348 GPM 5" W x 8" D (1/4" SLOPE) 651 GPM 4" W x 10" D (1/2" SLOPE) 1,055 GPM - - - 10" DIAM. (1/16" SLOPE) 331 GPM 10" W X 12 "D (1/4" SLOPE) - - - - - - REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com DRAFT 11/17/2025 5:45:41 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT OVERALL ROOF PLAN FCD A4.01 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: 1/16" = 1'-0" FCD A4.01 1 OVERALL ROOF PLAN N BUILDING A ROOF AREA A 12,381 SF BUILDING B ROOF AREA B 22,190 SF BUILDING D ROOF AREA D 15,245 SF BUILDING C ROOF AREA C 17,098 SF Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 EL: + 230' - 0" ASL Area A - Level 1( + 0' - 0" AFF) EL: + 244' - 0" ASL Area A - Level 2( + 14' - 0" AFF) A-C A-D A-E A-F A-B EL: + 230' - 0" ASL LEVEL 4( 1 5 15 9 10 2 11 16 17 EL: + 37' - 8" EL: + 28' - 4" 1" 12" EL: + 230' - 0" ASL Area A - Level 1( + 0' - 0" AFF) EL: + 244' - 0" ASL Area A - Level 2( + 14' - 0" AFF) A-2 A-3 A-5 A-7 A-8 A-1 A-6 A-4 1 5 10 4 9 2 16 16 11 16 15 17 EL: + 37' - 8" EL: + 36' - 11" EXTERIOR FINISH MATERIALS STANDING SEAM METAL ROOF BASIS OF DESIGN FINISH: CARDINAL RED ROOF EXTERIOR PAINT EPT1: HIGH PERFORMANCE PAINT. COLOR TO MATCH SHERWIN WILLIAMS: xxxx (@ALL EXPOSED STRUCTURAL STEEL FRAMING) EXTERIOR STAIRS 8" CAST IN PLACE CONCRETE WITH ALUMINUM GUARDRAIL NOTE: REFER TO WALL ASSEMBLIES ON SHEET A8.0 GLAZING CLEAR TEMPERED INSULATED GLAZING UNITS CLEAR TEMPERED INSULATED GLAZING UNITS WITH FROSTED GLASS CWP-1: SOLID / FIELD COLOR 1 CWP-2: HORIZONTAL PATTERN / ACCENT COLOR 1 CWP-3: SOLID ACCENT COLOR 3 CWP-4: SOLID FIELD COLOR 4 COLOR & TEXTURE LEGEND COMPOSITE WALL PANEL CLADDING SYSTEM CWP-5: VERTICAL PATTERN / ACCENT COLOR 5 CWP-6: SOLID ACCENT COLOR 6 CWP-7: SOLID ACCENT COLOR 7 SHEET NOTES # Scale: 1/8" = 1'-0" FCD A5.01 2 AREA A (ADMIN) NORTH ELEVATION Scale: 1/8" = 1'-0" FCD A5.01 1 AREA A (ADMIN) WEST ELEVATION 1 STANDING SEAM METAL ROOF/WALL SYSTEM 2 TRANSLUCENT CANOPY WITH POTENTIAL SOLAR PV SYSTEM 3 OCULUS DORMER 4 ALUMINUM FRAMED GLAZING SYSTEM 5 ALUMINUM FRAMED WINDOW GLAZING SYSTEM 6 HURRICANE-RATED LOUVER. COLOR TO MATCH 9 CAST IN PLACE CONCRETE STAIRS 10 ALUMINUM GUARDRAIL 11 METAL SUNSHADE LOUVER SYSTEM ON METAL SUBSTRUCTURE, TYP. 12 PRE-FINISHED METAL PARAPET CAP 14 HORIZONTAL SUNSHADE 15 PRE-FINISHED PAINTED ALUMINUM CONTINUOUS GUTTER SYSTEM WITH LEAF GUARD (SEE SPECS) 16 STRUCTUAL ROUND CONCRETE COLUMN 17 CONCRETE BENCH Scale: FCD A5.01 3 501_AXO - AREA A, NORTH_256 Copy 1 REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH DRAFT 11/17/2025 5:45:49 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT EXTERIOR ELEVATIONS - AREA A - 1 FCD A5.01 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION N.T.S. Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 EXTERIOR FINISH MATERIALS STANDING SEAM METAL ROOF BASIS OF DESIGN FINISH: CARDINAL RED ROOF EXTERIOR PAINT EPT1: HIGH PERFORMANCE PAINT. COLOR TO MATCH SHERWIN WILLIAMS: xxxx (@ALL EXPOSED STRUCTURAL STEEL FRAMING) EXTERIOR STAIRS 8" CAST IN PLACE CONCRETE WITH ALUMINUM GUARDRAIL NOTE: REFER TO WALL ASSEMBLIES ON SHEET A8.0 GLAZING CLEAR TEMPERED INSULATED GLAZING UNITS CLEAR TEMPERED INSULATED GLAZING UNITS WITH FROSTED GLASS CWP-1: SOLID / FIELD COLOR 1 CWP-2: HORIZONTAL PATTERN / ACCENT COLOR 1 CWP-3: SOLID ACCENT COLOR 3 CWP-4: SOLID FIELD COLOR 4 COLOR & TEXTURE LEGEND COMPOSITE WALL PANEL CLADDING SYSTEM CWP-5: VERTICAL PATTERN / ACCENT COLOR 5 CWP-6: SOLID ACCENT COLOR 6 CWP-7: SOLID ACCENT COLOR 7 SHEET NOTES # EL: + 230' - 0" ASL Area A - Level 1( + 0' - 0" AFF) EL: + 244' - 0" ASL Area A - Level 2( + 14' - 0" AFF) A-2 A-3 A-5 A-7 A-8 A-1 A-6 A-4 EL: + 230' - 0" ASL LEVEL 4( 1 5 10 2 16 4 11 15 EL: + 36' - 11" EL: + 37' - 8" 0" 12" 7'-0" EL: + 230' - 0" ASL Area A - Level 1( + 0' - 0" AFF) EL: + 244' - 0" ASL Area A - Level 2( + 14' - 0" AFF) A-C A-D A-E A-F A-B EL: + 230' - 0" ASL LEVEL 4( 1 5 10 9 2 5 16 11 16 15 16 EL: + 28' - 4" EL: + 37' - 8" 4 7'-0" 7'-0" 1 STANDING SEAM METAL ROOF/WALL SYSTEM 2 TRANSLUCENT CANOPY WITH POTENTIAL SOLAR PV SYSTEM 3 OCULUS DORMER 4 ALUMINUM FRAMED GLAZING SYSTEM 5 ALUMINUM FRAMED WINDOW GLAZING SYSTEM 6 HURRICANE-RATED LOUVER. COLOR TO MATCH 9 CAST IN PLACE CONCRETE STAIRS 10 ALUMINUM GUARDRAIL 11 METAL SUNSHADE LOUVER SYSTEM ON METAL SUBSTRUCTURE, TYP. 12 PRE-FINISHED METAL PARAPET CAP 14 HORIZONTAL SUNSHADE 15 PRE-FINISHED PAINTED ALUMINUM CONTINUOUS GUTTER SYSTEM WITH LEAF GUARD (SEE SPECS) 16 STRUCTUAL ROUND CONCRETE COLUMN 17 CONCRETE BENCH Scale: 1/8" = 1'-0" FCD A5.02 1 AREA A (ADMIN) EAST ELEVATION Scale: 1/8" = 1'-0" FCD A5.02 2 AREA A (ADMIN) SOUTH ELEVATION REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH DRAFT 11/17/2025 5:45:55 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT EXTERIOR ELEVATIONS - AREA A - 2 FCD A5.02 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 EL: + 226' - 0" ASL Area B - Level 1( - 4' - 0" AFF) EL: + 240' - 0" ASL Area B - Level 2( + 10' - 0" AFF) BC BB BD BA BA' EL: + 230' - 0" ASL LEVEL 4( 1 5 10 4 16 9 16 EL: + 24' - 4" EL: + 35' - 9" 1" 12" EL: + 226' - 0" ASL Area B - Level 1( - 4' - 0" AFF) EL: + 240' - 0" ASL Area B - Level 2( + 10' - 0" AFF) BC BB BD BA BA' EL: + 230' - 0" ASL LEVEL 4( 1 10 4 16 9 5 EL: + 24' - 4" EL: + 35' - 9" EXTERIOR FINISH MATERIALS STANDING SEAM METAL ROOF BASIS OF DESIGN FINISH: CARDINAL RED ROOF EXTERIOR PAINT EPT1: HIGH PERFORMANCE PAINT. COLOR TO MATCH SHERWIN WILLIAMS: xxxx (@ALL EXPOSED STRUCTURAL STEEL FRAMING) EXTERIOR STAIRS 8" CAST IN PLACE CONCRETE WITH ALUMINUM GUARDRAIL NOTE: REFER TO WALL ASSEMBLIES ON SHEET A8.0 GLAZING CLEAR TEMPERED INSULATED GLAZING UNITS CLEAR TEMPERED INSULATED GLAZING UNITS WITH FROSTED GLASS CWP-1: SOLID / FIELD COLOR 1 CWP-2: HORIZONTAL PATTERN / ACCENT COLOR 1 CWP-3: SOLID ACCENT COLOR 3 CWP-4: SOLID FIELD COLOR 4 COLOR & TEXTURE LEGEND COMPOSITE WALL PANEL CLADDING SYSTEM CWP-5: VERTICAL PATTERN / ACCENT COLOR 5 CWP-6: SOLID ACCENT COLOR 6 CWP-7: SOLID ACCENT COLOR 7 SHEET NOTES # REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH DRAFT 11/17/2025 5:46:07 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT EXTERIOR ELEVATIONS - AREA B - 1 FCD A5.03 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: FCD A5.03 3 AXO AREA B Scale: 1/8" = 1'-0" FCD A5.03 1 AREA B (CLASSROOMS) NORTH ELEVATION Scale: 1/8" = 1'-0" FCD A5.03 2 AREA B (CLASSROOMS) SOUTH ELEVATION 1 STANDING SEAM METAL ROOF/WALL SYSTEM 2 TRANSLUCENT CANOPY WITH POTENTIAL SOLAR PV SYSTEM 3 OCULUS DORMER 4 ALUMINUM FRAMED GLAZING SYSTEM 5 ALUMINUM FRAMED WINDOW GLAZING SYSTEM 6 HURRICANE-RATED LOUVER. COLOR TO MATCH 9 CAST IN PLACE CONCRETE STAIRS 10 ALUMINUM GUARDRAIL 11 METAL SUNSHADE LOUVER SYSTEM ON METAL SUBSTRUCTURE, TYP. 12 PRE-FINISHED METAL PARAPET CAP 14 HORIZONTAL SUNSHADE 15 PRE-FINISHED PAINTED ALUMINUM CONTINUOUS GUTTER SYSTEM WITH LEAF GUARD (SEE SPECS) 16 STRUCTUAL ROUND CONCRETE COLUMN 17 CONCRETE BENCH N.T.S. Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 EXTERIOR FINISH MATERIALS STANDING SEAM METAL ROOF BASIS OF DESIGN FINISH: CARDINAL RED ROOF EXTERIOR PAINT EPT1: HIGH PERFORMANCE PAINT. COLOR TO MATCH SHERWIN WILLIAMS: xxxx (@ALL EXPOSED STRUCTURAL STEEL FRAMING) EXTERIOR STAIRS 8" CAST IN PLACE CONCRETE WITH ALUMINUM GUARDRAIL NOTE: REFER TO WALL ASSEMBLIES ON SHEET A8.0 GLAZING CLEAR TEMPERED INSULATED GLAZING UNITS CLEAR TEMPERED INSULATED GLAZING UNITS WITH FROSTED GLASS CWP-1: SOLID / FIELD COLOR 1 CWP-2: HORIZONTAL PATTERN / ACCENT COLOR 1 CWP-3: SOLID ACCENT COLOR 3 CWP-4: SOLID FIELD COLOR 4 COLOR & TEXTURE LEGEND COMPOSITE WALL PANEL CLADDING SYSTEM CWP-5: VERTICAL PATTERN / ACCENT COLOR 5 CWP-6: SOLID ACCENT COLOR 6 CWP-7: SOLID ACCENT COLOR 7 SHEET NOTES # EL: + 226' - 0" ASL Area B - Level 1( - 4' - 0" AFF) EL: + 240' - 0" ASL Area B - Level 2( + 10' - 0" AFF) B2 B4.5 B6.8 B5 B6 B4 B7 B8 B3 B9 B10 B6.5 B7.5 EL: + 230' - 0" ASL LEVEL 4( 1 5 16 16 10 15 EL: + 35' - 9" EL: + 34' - 4" 0" 12" EL: + 226' - 0" ASL Area B - Level 1( - 4' - 0" AFF) EL: + 240' - 0" ASL Area B - Level 2( + 10' - 0" AFF) B2 B4.5 B6.8 B5 B6 B4 B7 B8 B3 B9 B10 B6.5 B7.5 EL: + 230' - 0" ASL LEVEL 4( 10 4 16 16 4 15 EL: + 34' - 4" EL: + 35' - 9" 1 5 9 REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH DRAFT 11/17/2025 5:46:15 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT EXTERIOR ELEVATIONS - AREA B - 2 FCD A5.04 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION 1 STANDING SEAM METAL ROOF/WALL SYSTEM 2 TRANSLUCENT CANOPY WITH POTENTIAL SOLAR PV SYSTEM 3 OCULUS DORMER 4 ALUMINUM FRAMED GLAZING SYSTEM 5 ALUMINUM FRAMED WINDOW GLAZING SYSTEM 6 HURRICANE-RATED LOUVER. COLOR TO MATCH 9 CAST IN PLACE CONCRETE STAIRS 10 ALUMINUM GUARDRAIL 11 METAL SUNSHADE LOUVER SYSTEM ON METAL SUBSTRUCTURE, TYP. 12 PRE-FINISHED METAL PARAPET CAP 14 HORIZONTAL SUNSHADE 15 PRE-FINISHED PAINTED ALUMINUM CONTINUOUS GUTTER SYSTEM WITH LEAF GUARD (SEE SPECS) 16 STRUCTUAL ROUND CONCRETE COLUMN 17 CONCRETE BENCH Scale: 1/8" = 1'-0" FCD A5.04 2 AREA B (CLASSROOMS) EAST ELEVATION Scale: 1/8" = 1'-0" FCD A5.04 1 AREA B (CLASSROOMS) WEST ELEVATION Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 EL: + 230' - 0" ASL Area C - Level 1( + 0' - 0" AFF) CA CB EL: + 230' - 0" ASL LEVEL 4( 2 4 14 16 17 EL: + 24' - 10" EL: + 16' - 4" 1 EL: + 230' - 0" ASL Area C - Level 1( + 0' - 0" AFF) CA CB EL: + 230' - 0" ASL LEVEL 4( 1 2 5 16 4 15 EL: + 16' - 4" EL: + 24' - 10" 1" 12" EXTERIOR FINISH MATERIALS STANDING SEAM METAL ROOF BASIS OF DESIGN FINISH: CARDINAL RED ROOF EXTERIOR PAINT EPT1: HIGH PERFORMANCE PAINT. COLOR TO MATCH SHERWIN WILLIAMS: xxxx (@ALL EXPOSED STRUCTURAL STEEL FRAMING) EXTERIOR STAIRS 8" CAST IN PLACE CONCRETE WITH ALUMINUM GUARDRAIL NOTE: REFER TO WALL ASSEMBLIES ON SHEET A8.0 GLAZING CLEAR TEMPERED INSULATED GLAZING UNITS CLEAR TEMPERED INSULATED GLAZING UNITS WITH FROSTED GLASS CWP-1: SOLID / FIELD COLOR 1 CWP-2: HORIZONTAL PATTERN / ACCENT COLOR 1 CWP-3: SOLID ACCENT COLOR 3 CWP-4: SOLID FIELD COLOR 4 COLOR & TEXTURE LEGEND COMPOSITE WALL PANEL CLADDING SYSTEM CWP-5: VERTICAL PATTERN / ACCENT COLOR 5 CWP-6: SOLID ACCENT COLOR 6 CWP-7: SOLID ACCENT COLOR 7 SHEET NOTES # REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH DRAFT 11/17/2025 5:46:21 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT EXTERIOR ELEVATIONS - AREA C - 1 FCD A5.05 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: FCD A5.05 5 AXO AREA C Scale: 1/8" = 1'-0" FCD A5.05 2 AREA C (DINING ) NORTH ELEVATION Scale: 1/8" = 1'-0" FCD A5.05 1 AREA C (DINING ) SOUTH ELEVATION 1 STANDING SEAM METAL ROOF/WALL SYSTEM 2 TRANSLUCENT CANOPY WITH POTENTIAL SOLAR PV SYSTEM 3 OCULUS DORMER 4 ALUMINUM FRAMED GLAZING SYSTEM 5 ALUMINUM FRAMED WINDOW GLAZING SYSTEM 6 HURRICANE-RATED LOUVER. COLOR TO MATCH 9 CAST IN PLACE CONCRETE STAIRS 10 ALUMINUM GUARDRAIL 11 METAL SUNSHADE LOUVER SYSTEM ON METAL SUBSTRUCTURE, TYP. 12 PRE-FINISHED METAL PARAPET CAP 14 HORIZONTAL SUNSHADE 15 PRE-FINISHED PAINTED ALUMINUM CONTINUOUS GUTTER SYSTEM WITH LEAF GUARD (SEE SPECS) 16 STRUCTUAL ROUND CONCRETE COLUMN 17 CONCRETE BENCH N.T.S. Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 EXTERIOR FINISH MATERIALS STANDING SEAM METAL ROOF BASIS OF DESIGN FINISH: CARDINAL RED ROOF EXTERIOR PAINT EPT1: HIGH PERFORMANCE PAINT. COLOR TO MATCH SHERWIN WILLIAMS: xxxx (@ALL EXPOSED STRUCTURAL STEEL FRAMING) EXTERIOR STAIRS 8" CAST IN PLACE CONCRETE WITH ALUMINUM GUARDRAIL NOTE: REFER TO WALL ASSEMBLIES ON SHEET A8.0 GLAZING CLEAR TEMPERED INSULATED GLAZING UNITS CLEAR TEMPERED INSULATED GLAZING UNITS WITH FROSTED GLASS CWP-1: SOLID / FIELD COLOR 1 CWP-2: HORIZONTAL PATTERN / ACCENT COLOR 1 CWP-3: SOLID ACCENT COLOR 3 CWP-4: SOLID FIELD COLOR 4 COLOR & TEXTURE LEGEND COMPOSITE WALL PANEL CLADDING SYSTEM CWP-5: VERTICAL PATTERN / ACCENT COLOR 5 CWP-6: SOLID ACCENT COLOR 6 CWP-7: SOLID ACCENT COLOR 7 SHEET NOTES # EL: + 230' - 0" ASL Area C - Level 1( + 0' - 0" AFF) C1 C4 C5 C3 EL: + 230' - 0" ASL LEVEL 4( 5 2 16 15 EL: + 24' - 5" EL: + 24' - 10" 0" 12" EL: + 230' - 0" ASL Area C - Level 1( + 0' - 0" AFF) C1 C4 C5 C3 EL: + 230' - 0" ASL LEVEL 4( 5 4 1 2 16 14 4 15 17 EL: + 24' - 5" EL: + 24' - 10" C116 REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH DRAFT 11/17/2025 5:46:26 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT EXTERIOR ELEVATIONS - AREA C - 2 FCD A5.06 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION 1 STANDING SEAM METAL ROOF/WALL SYSTEM 2 TRANSLUCENT CANOPY WITH POTENTIAL SOLAR PV SYSTEM 3 OCULUS DORMER 4 ALUMINUM FRAMED GLAZING SYSTEM 5 ALUMINUM FRAMED WINDOW GLAZING SYSTEM 6 HURRICANE-RATED LOUVER. COLOR TO MATCH 9 CAST IN PLACE CONCRETE STAIRS 10 ALUMINUM GUARDRAIL 11 METAL SUNSHADE LOUVER SYSTEM ON METAL SUBSTRUCTURE, TYP. 12 PRE-FINISHED METAL PARAPET CAP 14 HORIZONTAL SUNSHADE 15 PRE-FINISHED PAINTED ALUMINUM CONTINUOUS GUTTER SYSTEM WITH LEAF GUARD (SEE SPECS) 16 STRUCTUAL ROUND CONCRETE COLUMN 17 CONCRETE BENCH Scale: 1/8" = 1'-0" FCD A5.06 1 AREA C (DINING ) WEST ELEVATION Scale: 1/8" = 1'-0" FCD A5.06 2 AREA C (DINING ) EAST ELEVATION Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 EL: + 226' - 0" ASL Area D - Level 1( - 4' - 0" AFF) EL: + 240' - 0" ASL Area D - Level 2( + 10' - 0" AFF) EL: + 252' - 0" ASL Area D - Roof( + 22' - 0" AFF) D-A D-B D-D D-C D-E EL: + 219' - 0" ASL Area D - GYM CISTERN( 16 1 4 5 15 1 EL: + 226' - 0" ASL Area D - Level 1( - 4' - 0" AFF) EL: + 240' - 0" ASL Area D - Level 2( + 10' - 0" AFF) EL: + 252' - 0" ASL Area D - Roof( + 22' - 0" AFF) D-A D-B D-D D-C D-E EL: + 219' - 0" ASL Area D - GYM CISTERN( 1 5 16 1 4 15 EXTERIOR FINISH MATERIALS STANDING SEAM METAL ROOF BASIS OF DESIGN FINISH: CARDINAL RED ROOF EXTERIOR PAINT EPT1: HIGH PERFORMANCE PAINT. COLOR TO MATCH SHERWIN WILLIAMS: xxxx (@ALL EXPOSED STRUCTURAL STEEL FRAMING) EXTERIOR STAIRS 8" CAST IN PLACE CONCRETE WITH ALUMINUM GUARDRAIL NOTE: REFER TO WALL ASSEMBLIES ON SHEET A8.0 GLAZING CLEAR TEMPERED INSULATED GLAZING UNITS CLEAR TEMPERED INSULATED GLAZING UNITS WITH FROSTED GLASS CWP-1: SOLID / FIELD COLOR 1 CWP-2: HORIZONTAL PATTERN / ACCENT COLOR 1 CWP-3: SOLID ACCENT COLOR 3 CWP-4: SOLID FIELD COLOR 4 COLOR & TEXTURE LEGEND COMPOSITE WALL PANEL CLADDING SYSTEM CWP-5: VERTICAL PATTERN / ACCENT COLOR 5 CWP-6: SOLID ACCENT COLOR 6 CWP-7: SOLID ACCENT COLOR 7 SHEET NOTES # REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH DRAFT 11/17/2025 5:46:31 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT EXTERIOR ELEVATIONS - AREA D - 1 FCD A5.07 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: FCD A5.07 3 AXO AREA D Scale: 1/8" = 1'-0" FCD A5.07 2 AREA D (GYM) NORTH ELEVATION Scale: 1/8" = 1'-0" FCD A5.07 1 AREA D (GYM) SOUTH ELEVATION 1 STANDING SEAM METAL ROOF/WALL SYSTEM 2 TRANSLUCENT CANOPY WITH POTENTIAL SOLAR PV SYSTEM 3 OCULUS DORMER 4 ALUMINUM FRAMED GLAZING SYSTEM 5 ALUMINUM FRAMED WINDOW GLAZING SYSTEM 6 HURRICANE-RATED LOUVER. COLOR TO MATCH 9 CAST IN PLACE CONCRETE STAIRS 10 ALUMINUM GUARDRAIL 11 METAL SUNSHADE LOUVER SYSTEM ON METAL SUBSTRUCTURE, TYP. 12 PRE-FINISHED METAL PARAPET CAP 14 HORIZONTAL SUNSHADE 15 PRE-FINISHED PAINTED ALUMINUM CONTINUOUS GUTTER SYSTEM WITH LEAF GUARD (SEE SPECS) 16 STRUCTUAL ROUND CONCRETE COLUMN 17 CONCRETE BENCH N.T.S. Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 EXTERIOR FINISH MATERIALS STANDING SEAM METAL ROOF BASIS OF DESIGN FINISH: CARDINAL RED ROOF EXTERIOR PAINT EPT1: HIGH PERFORMANCE PAINT. COLOR TO MATCH SHERWIN WILLIAMS: xxxx (@ALL EXPOSED STRUCTURAL STEEL FRAMING) EXTERIOR STAIRS 8" CAST IN PLACE CONCRETE WITH ALUMINUM GUARDRAIL NOTE: REFER TO WALL ASSEMBLIES ON SHEET A8.0 GLAZING CLEAR TEMPERED INSULATED GLAZING UNITS CLEAR TEMPERED INSULATED GLAZING UNITS WITH FROSTED GLASS CWP-1: SOLID / FIELD COLOR 1 CWP-2: HORIZONTAL PATTERN / ACCENT COLOR 1 CWP-3: SOLID ACCENT COLOR 3 CWP-4: SOLID FIELD COLOR 4 COLOR & TEXTURE LEGEND COMPOSITE WALL PANEL CLADDING SYSTEM CWP-5: VERTICAL PATTERN / ACCENT COLOR 5 CWP-6: SOLID ACCENT COLOR 6 CWP-7: SOLID ACCENT COLOR 7 SHEET NOTES # EL: + 226' - 0" ASL Area D - Level 1( - 4' - 0" AFF) EL: + 240' - 0" ASL Area D - Level 2( + 10' - 0" AFF) EL: + 252' - 0" ASL Area D - Roof( + 22' - 0" AFF) D1 D2 D3 D4 EL: + 219' - 0" ASL Area D - GYM CISTERN( 1 16 1 15 15 EL: + 226' - 0" ASL Area D - Level 1( - 4' - 0" AFF) EL: + 240' - 0" ASL Area D - Level 2( + 10' - 0" AFF) EL: + 252' - 0" ASL Area D - Roof( + 22' - 0" AFF) D1 D2 D3 D4 EL: + 219' - 0" ASL Area D - GYM CISTERN( 16 4 5 15 16 1 REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH DRAFT 11/17/2025 5:46:35 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT EXTERIOR ELEVATIONS - AREA D - 2 FCD A5.08 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION 1 STANDING SEAM METAL ROOF/WALL SYSTEM 2 TRANSLUCENT CANOPY WITH POTENTIAL SOLAR PV SYSTEM 3 OCULUS DORMER 4 ALUMINUM FRAMED GLAZING SYSTEM 5 ALUMINUM FRAMED WINDOW GLAZING SYSTEM 6 HURRICANE-RATED LOUVER. COLOR TO MATCH 9 CAST IN PLACE CONCRETE STAIRS 10 ALUMINUM GUARDRAIL 11 METAL SUNSHADE LOUVER SYSTEM ON METAL SUBSTRUCTURE, TYP. 12 PRE-FINISHED METAL PARAPET CAP 14 HORIZONTAL SUNSHADE 15 PRE-FINISHED PAINTED ALUMINUM CONTINUOUS GUTTER SYSTEM WITH LEAF GUARD (SEE SPECS) 16 STRUCTUAL ROUND CONCRETE COLUMN 17 CONCRETE BENCH Scale: 1/8" = 1'-0" FCD A5.08 1 AREA D (GYM) WEST ELEVATION Scale: 1/8" = 1'-0" FCD A5.08 2 AREA D (GYM) EAST ELEVATION Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH 11/17/2025 5:46:53 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT BUILDING AXONOMETRICS FCD A5.21 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: FCD A5.21 1 BUILDING AXONOMETRIC N.T.S. Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025 REVISIONS - NOT FOR CONSTRUCTION - A B C D E F 1 2 3 4 5 KEY PLAN 305-266-6553 Miami, FL 33126 5757 Waterford District Drive Suite 400 MEP Engineers TLC Engineering 786-491-7660 Miami, FL 33130 80 SW 8th Street, Suite 2160 Structural Engineers Thornton Thomasetti 617-876-2100 Newton, MA 02458 63 Chapel Street Food Service RealFood Hospitality, Strategy & Design 786-264-7200 Miami, FL 33131 1221 Brickell Avenue, Suite 1800 Civil & Landscape Langan Architect 100 Biscayne Blvd., 27th Floor Miami. Florida 33132 t 305 .372 . 5222 e info@zyscovich.com w www.zyscovich.com A B C D NORTH 11/17/2025 5:47:11 PM Autodesk Docs://USVI - Emmanuel Benjamin Oliver PreK- 8/ZYS_Oliver_Arch_R24.rvt 2025-0289.05 DECEMBER 15TH, 2025 EMANUEL BENJAMIN OLIVER PK-8 SCHOOL DESIGN DEVELOPMENT BUILDING AXONOMETRICS FCD A5.22 325 Palmetto Rd, Anna's Retreat, St Thomas 00802, U.S. Virgin Islands U.S. VIRGIN ISLANDS DEPARTMENT OF EDUCATION Scale: FCD A5.22 1 BUILDING AXONOMETRIC N.T.S. Rev Date Note FCD DRAWINGS NOVEMBER 17th 2025