PAUL E. JOSEPH BASEBALL STADIUM AND SPORT COMPLEX ST. CROIX, U.S.V.1 PREPARED FOR STEVEN E. HUTCHINS ARCHITECTS, INC. 100% CIVIL CONSTRUCTION PLANS & \ \ PROJECT LOCATION - = at jor) t= OTD JOB NO. CWI DRAWING INDEX SHEET NUMBER]SHEET TITLE C—1 COVER = SURVEY C-—2 GENERAL NOTES C-—3 DEMOLITION PLAN C-—4 SEDIMENT EROSION CONTROL PLAN C-—5 SITE PLAN C—6 WATER AND SEWER PLAN Old GRADING PLAN C-8 POTABLE WATER DETAILS C-9 SANITARY DETAILS C—10 PAVING AND DRAINAGE DETAILS C—11 EROSION CONTROL DETAILS C yw Connelly & Wicker Inc. Planning - Engineering - Landscape Architecture 10060 SKINNER LAKE DR., SUITE 500 JACKSONVILLE, FLORIDA 32246 (904) 265-3030 FAX: (904) 265-3031 FLORIDA REGISTRY 3650 L.A. NUMBER: LC26000311 www.cwieng.com U.S. VIRGIN ISLANDS . et oO owas & Se Pee IEG SR 7 i ae a Uwe og cMrF Cw eee” e2@ta0q A-ODkE oe r= X= o2ws XD = SOs 5 OSs — ee + <0 ~ lMar ow nw op) 4 g é Sear ——. = Gy oO z O Bs DATE: 05-08-2020 DRAWN BY: ANB 15—01—0015 Cov&Dets.dwg OW Connelly & Wicker Inc. Planning - Engineering ~- Landscape Architecture 10060 Skinner Lake Drive, Suite 500 Jacksonville, Florida 32246 (904) 256-3030 FAX: (904) 265-3031 www.cwieng.com Florida Registry 3650 L.A. Number: LC26000311 SHEET NUMBER: C-1 Caribbean -) GRID NORTH Legend Il Utility Manhole Water meter Water valve i Power Pole @|aQ] X/-le ll Light Pole — -— Fencing Sanitary Manhole = Fire Hydrant F |z{ |@ = Handicap Plat No, 72 Frederiksted Country Club Drawing No. 153 Water Line, December 2014 Building Remainder of Plot No. See Drawing No. 5611 100 Plot No. 98 Rotary Club Plot No. 40—KA Drawing No. 761 H20 Labled Buried Cable Labled Buried Cable Existing Fence Top of Bank, Ditch aoouir2d g\ohS PARKING inv. = ~—0.6 PARKING Parcel No. 2 See Folio No. 486 CE) Plot No. 40—KD Communications Manhole , 6.82 .co’9?” E 28 nee ny 30°59 22 < paeets 4 ” fo) Communications Manhole 2 Oo ~) oO 4.0 bg x m ta: Communications Manhole z = as oO isi Column L/P he x ® Dw " Na 761 ad L/P Dilapidated pavement > UF KKK Ki Ki. ace ro} 5 pas Sign on conc. as Please note the 25.00’ , © $v nee Metal Frame Bleechers on Benches « buried Cable Line N 81°16734" E 3 concrete foundation nP % Y WOOD ro Inv.W 6” cast=1.93 v4 a Inv.E 6° cast=1.84 A\ Building BUILDING 4 Inv.N 3” cast=2.13 \ L/P % Inv.E 6” cast=2.14 eS f WooD Inv.S.W 3” cast=2.69 < \ Brass Di El = 7.75 BUILDING % ir a 7 : aT 4.3 4.7 Plot. No. 40—GF x x x * n=4.20° g x Drawing\No. 790 0.6’ Wide poured concrete wall Metal Frame Bleechers on Se 8. enue & \ a L/P & substantial concret#oundation 2 Bathrooms e & Bleechers are currently being demolished L/P -) \ OTE: @ intnuoetons Manhole Concrete Frame me Bleechers v4 v4 - 2 4 L/P 8 unr 8 Flood Zone AE {EL10} mnRiteels |S | Plot No. 40-GE mA Cleatr=out FIRM 77G Inv.S 6” cast=0.28 ° Drawing No. 790 seeneecesssseeeeeeeeee it) — we = yee _ . e. x eee ase® une Dilapidated L/P *2 ‘< Indicates Overhead Electric e OL ¢b O® 5 amee Fencing =} ih, ” & 6. Plot No. 40-GA . Drawing No. 790 *ey *. ARMY CORP *e, Brass Disc Ball Park Th. ine P 1 No. 40—D 7 Indicates — Plot No. 40—GD Light pole on Concrete Base A’TCE O. 4 Drawing No. 44—A Se See Drawing No. 44 510032.4 Sq. Feet Ww MH17 Rim=6.12 S 11.709 Acres v4 MH Ps inv. 8. pve= 3-55 11.43 Acres Recorded a Sr cast=-0.98 zg —_ Fencing a 4 Main = —2.70 ot Flood Zone AE di 8 m ~ Water Line, December 2014 re Remainder of Plot No. 40—KC ro} Drawing No. 2793 ~ |w -_ Plot No. 40—GB °° \8 Drawing No. 44—A Ve OA 2m = o \& MH10 s Rim=4.21 re m Inv.N&S 12” cast=—1.60 Inv.W 6” PVC=—0.54 © \o V\a ' A \p Inv.N 6° pyc=OWS w c tw \S Inv.E 6 pyc=0.98 \ ° [om Be. 3” pyc=0.98 Recor a re oor ee, 3.4 Shot in Center, Sate Overhead Electric wo 4) og x bottom @ el. = —0.26 pipe size 6” as & s ® o* MH14 oe i SO Inv 8°=0.08 3 3 4 s® 201.83’ InviE 8°=—0.09 3 & N_17°55’33” W Inv.N= Clogged 3.7 3.4 3.3 a el a 3.7X xX x x wW — 4 Remainder No. 40—GC & Drawing No. 44—A SMH @ MH11 2» ? Rim=4.27 Inv.S 3” PYC=—0.48 <5 Inv.W 6” PYC=1.32 MH12 Plot No. 40—GCC Flood Zone AE fine 27 Drawing No. 44—A wi EP a 7 Invi 15" cast=—2.68 Existing Fence SMH Inv.W 8” cast=—2.42 Top of Bank, Ditch % 3.2 3.3 3.5 3.2 3.3 \ ®9 x x . Professional Land Surveyors 27 — 28 King Cross Street, Christiansted St. Croix, U.S.V.I. 00821 Phone: 340-713-4555 / 340-692-2365 Cad File 14—126—use.dwg Sheet 1 of 2 GENERAL NOTES: 1. 10. Ale 12, 13. 14. 15. 16. Wins 18. 19. 20. 21. 22. 23. 24. 25. 26. Bie ALL WATER AND SEWER WORK SHALL BE DONE IN ACCORDANCE VI WAPA AND VIWMA DESIGN STANDARDS. GENERAL NOTES SUPPLEMENT THE SPECIFICATIONS. SHOULD THESE DIFFER FROM THE SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT OF THE TWO SHALL PREVAIL. ALL WORK SHALL COMPLY WITH APPLICABLE FEDERAL AND LOCAL CODES AND ALL NECESSARY LICENSES AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT HIS EXPENSE. ALL WORK SHALL BE PERFORMED IN A FINISHED AND WORKMANLIKE MANNER TO THE ENTIRE SATISFACTION OF THE OWNER AND IN ACCORDANCE WITH THE BEST RECOGNIZED TRADE PRACTICES. THE ENGINEER SHALL HAVE A MINIMUM OF 48 HOURS NOTICE PRIOR TO STARTUP OF CONSTRUCTION. DEVIATIONS FROM THESE PLANS AND SPECIFICATIONS WTHOUT THE PRIOR WRITTEN CONSENT OF THE ENGINEER MAY BE CAUSE FOR THE WORK TO BE UNACCEPTABLE TO THE ENGINEER. THE EXISTING UTILITIES SHOWN ARE FOR REFERENCE ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THESE PLANS. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATION SHOWN AND IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGE MADE TO EXISTING UTILITIES, WHETHER SHOWN OR NOT SHOWN, SHALL BE REPAIRED AT THE CONTRACTOR’S EXPENSE. THE ENGINEER OR OWNER HAVE CONDUCTED NO SUBSURFACE INVESTIGATION. ALL WORK PERFORMED WITHIN V.I. ROAD RIGHT—OF—WAY SHALL BE IN STRICT CONFORMANCE WITH APPLICABLE DEPARTMENT OF PUBLIC WORKS STANDARDS AND SPECIFICATIONS. CONTRACTOR WARRANTS THAT HIS EMPLOYEES, AGENTS, AND SUBCONTRACTORS POSSESS THE EXPERIENCE, KNOWLEDGE AND CHARACTER NECESSARY TO QUALIFY THEM INDIVIDUALLY FOR THE PARTICULAR CONSTRUCTION TECHNIQUES THEY PERFORM IN CONNECTION WITH THE TASKS TO BE PERFORMED IN STRICT COMPLIANCE WITH ALL OSHA (OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION), AND LOCAL HEALTH AND SAFETY CODES. ALL FILL MATERIAL SHALL BE FREE OF ROOTS, ORGANIC MATERIAL, AND TRASH AND CONSIST ONLY OF ACCEPTABLE MATERIAL ALL EMBANKMENTS SHALL BE PLACED IN ACCORDANCE WITH THE LINES AND GRADES INDICATED ON THE PLANS. ALL TRENCH FILL MATERIAL SHALL BE COMPACTED TO MINIMUM OF 95% OF THE MAXIMUM LABORATORY DRY DENSITY IN ACCORDANCE WITH THE STANDARD PROCTOR COMPACTION TEST (ASTM D—698), UNLESS OTHERWISE INDICATED. THE CONTRACTOR SHALL STAKE OUT THE WATER MAIN AT INTERVALS NOT TO EXCEED 100 FEET. PRIOR TO THE BEGINNING OF ANY CONSTRUCTION, THE ENGINEER SHALL APPROVE THE WATER MAIN LOCATION. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO INCORPORATE EROSION AND SEDIMENTATION CONTROL MEASURES IN ACCORDANCE WITH EROSION CONTROL NOTES, EXCEPT WHERE DIRECTED OTHERWISE BY THE ENGINEER OR SHOWN ON THESE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGES TO PRIVATE PROPERTY. CONTRACTOR SHALL REGRADE AND REESTABLISH VEGETATIVE COVER IN NON— VEHICULAR AREAS AND REGRADE AND APPLY GRAVEL AND/OR TEMPORARY PAVEMENT (AS DIRECTED BY THE ENGINEER) TO VEHICULAR AREA AS SOON AS POSSIBLE FOR EROSION AND DUST CONTROL. "AS—BUILT” DRAWINGS OF THE WATER LINE LOCATION ARE REQUIRED. LOCATIONS ARE TO BE FURNISHED BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SHEETING AND SHORING EXCAVATIONS AS NECESSARY. THE REMOVAL OF SURFACE AND GROUNDWATER IN ORDER TO FACILITATE PROPER CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT SHORING/SHEETING AND DEWATERING PLANS IF REQUIRED. PLANS SHALL BE PREPARED AND SIGNED BY A PROFESSIONAL ENGINEER. THE CONTRACTOR IS TO LOCATE METER BOXES AS CLOSE TO THE PROPERTY BOUNDARY BETWEEN ADJACENT PROPERTIES OR AS CLOSE AS CONDITIONS ALLOW. ALL METER BOX LOCATIONS SHALL BE APPROVED BY THE ENGINEER. ANY PIPE SOLDER AND FLUX USED DURING INSTALLATION OF THE WATER LINES MUST BE "LEAD FREE” WITH NOT MORE THAN 8% LEAD IN PIPES AND FITTINGS AND NOT MORE THAN 0.2% LEAD IN SOLDER AND FLUX. WHERE HORIZONTAL SEPARATION BETWEEN WATER AND SEWER LINES IS LESS THAN 10 FEET, WATER LINE SHALL BE 18” (MIN.) ABOVE THE SEWER LINE. TEST PITS ARE TO BE EXCAVATED TO DETERMINE GRADE REQUIRED TO INSTALL THE WATER LINE. WHERE PROPOSED WATER MAINS CROSS SEWER LINES, WATER MAINS SHALL BE LOCATED 18” MINIMUM ABOVE SEWER LINE. WHERE MINIMUM PIPE COVER AND CLEARANCE BETWEEN SEWER AND WATER MAINS CANNOT BE MAINTAINED, WATER MAIN SHALL BE ENCASED IN CONCRETE A MINIMUM OF 10’ EITHER SIDE OF SEWER LINE. PRIOR TO PROCEEDING WITH CONSTRUCTION. THE CONTRACTOR SHALL VERIFY LOCATION AND ELEVATIONS OF EXISTING PIPELINES. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY WTH ANY DISCREPANCIES FOUND BETWEEN FIELD CONDITIONS AND CONSTRUCTION DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR NOTIFICATIONS AND LIAISON WITH UTILITY COMPANIES FOR THE PROCESS OF LOCATING, RELOCATION, AND TIE—IN TO PUBLIC UTILITIES. INFORMATION REGARDING THE DEPTH AND LOCATION OF UTILITIES ARE SHOWN FOR REFERENCE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL UTILITIES. THE PROPOSED PIPELINE, VALVE, AND HYDRANT LOCATIONS ARE APPROXIMATE. FINAL LOCATIONS SHALL BE DETERMINED DURING CONSTRUCTION. LOCATIONS WILL BE GOVERNED BY THE ACTUAL LOCATION OF UNDERGROUND UTILITIES OR OTHER CONTROLLING FACTORS. ALL LOCATIONS SHALL BE APPROVED BY THE ENGINEER. AT CONNECTIONS BETWEEN THE PROPOSED MAIN AND EXISTING MAIN. THE MINIMUM COVER PROVIDED FOR THE CONNECTION PIPE SHALL BE NO LESS THAN THE COVER ON THE EXISTING MAIN AT THE CONNECTION. EXCEPT WHERE OTHERWISE NOTED, 12” MINIMUM CLEARANCE SHALL BE PROVIDED BETWEEN THE WATER MAINS AND OTHER UTILITIES (EXCEPT SEWER) WHEN CROSSING. WHERE UTILITIES (EXCEPT SEWER) RUN PARALLEL. A MINIMUM OF 24 INCHES HORIZ. SHALL BE PROVIDED. PIPING LAYOUTS ARE SHOWN GRAPHICALLY. ADDITIONAL FITTINGS MAY BE REQUIRED TO ATTAIN ROUTING. FITTINGS ARE TO BE FURNISHED AT NO ADDITIONAL COST TO OWNER. WHERE NECESSARY TO REMOVE SIDEWALKS, CURBS, CATCH BASINS, CULVERTS OR DRAINS, TO COMPLETE THE WORK, THE CONTRACTOR SHALL REPLACE THEM TO THE SATISFACTION OF THE ENGINEER AS PART OF THE CONTRACT WORK. 28. 29. 30. 31. 32. 33. 34. 55. 36. 37. 38. 39. 40. 41. 42. 43. THE CONTRACTOR SHALL SCHEDULE AND CONSOLIDATE WORK INVOLVING ALL EXISTING TRANSMISSION MAINS SO AS TO MINIMIZE THE PERIOD THE MAINS ARE OUT OF SERVICE. THE CONTRACTOR SHALL PROVIDE A 14 DAY ADVANCE NOTICE PRIOR TO ANY WORK REQUIRING THE EXISTING MAINS TO BE OUT OF SERVICE. ELEVATIONS SHOWN ON THE DRAWINGS ARE IN FEET. ALL ASPHALT AND. CONCRETE SHALL BE SAW CUT AND REMOVED NEATLY IN SECTIONS AS REQUIRED TO INSTALL THE NEW WATER LINES. IF ANY SIDEWALK, DRIVEWAYS, FENCES, GUARDRAILS, CURBS, ETC. OR OTHER IMPROVEMENTS ARE REMOVED OR DAMAGED BY THE CONTRACTOR IN THE COURSE OF MAKING EXCAVATION OR HANDLING MATERIAL, OR FOR ANY OTHER REASON WHICH MAY BE ATTRIBUTED TO WORK WHICH HAS BEEN DONE BY THE CONTRACTOR, THEN HE SHALL REPAIR SAME AFTER ALL WORK (INCLUDING BACKFILLING) HAS BEEN COMPLETED. IF ANY STONE SIDEWALKS, DRIVEWAYS, OR CURBS WHICH HAVE BEEN REMOVED OR DAMAGED, ARE UNFIT TO BE RE-LAID, THEN THE CONTRACTOR SHALL FURNISH NEW MATERIAL AND RELAY SAME. ALL CONCRETE OR CEMENT SIDEWALKS, DRIVEWAYS, OR CURBS, WHICH ARE REMOVED OR DAMAGED BY THE CONTRACTOR SHALL BE BROKEN UP BY HIM AND HE SHALL FURNISH ALL LABOR AND MATERIAL AND CONSTRUCT NEW SIDEWALKS, DRIVEWAYS, OR CURBS, TO REPLACE THOSE REMOVED OR DAMAGED AT INTERSECTING WALKS, DRIVES, ETC. ADDITIONAL CONCRETE SLAB BEYOND THE EXCAVATION LIMITS SHALL BE REMOVED AND REPLACED WITH NEW MATERIAL IN ORDER TO AVOID HAVING MORE JOINTS THAN IN THE ORIGINAL WORK. ALL SLABS REPLACED SHALL BE OF FULL WIDTH. THE CONTRACTOR SHALL FURNISH, PLACE, AND MAINTAIN WHEREVER THE SIDEWALK THAT HAS BEEN REMOVED OR DAMAGED BY HIM, A TEMPORARY SIDEWALK SO AS TO PROVIDE A SAFE AND PASSABLE SIDEWALK UNTIL SUCH TIME AS THE FINAL SIDEWALK IS COMPLETED. ALL PAVEMENTS, ROAD SURFACES, SIDEWALKS, DRIVEWAYS, OR CURBS, WHICH THE CONTRACTOR IS REQUIRED TO REPLACE OR TO HAVE REPLACED, SHALL, AT THE EXPIRATION OF THIS CONTRACT BE IN AT LEAST AS GOOD CONDITION AS AT THE TIME OF AWARDING THE CONTRACT. ALL WORK WHICH THE CONTRACTOR MAY DO IN CONNECTION WITH THE OPENING UP OR REPLACING OF PAVEMENTS, ROAD SURFACES, SIDEWALKS, DRIVEWAYS, OR CURBS, AS WELL AS THE FINAL REPAVING, SHALL BE DONE AT HIS EXPENSE IN ACCORDANCE WITH V.I. STANDARDS. THE USE OF EXCAVATING MACHINERY WILL BE PERMITTED EXCEPT IN PLACES WHERE ITS OPERATION WILL CAUSE DAMAGE TO TREES, BUILDINGS OR EXISTING STRUCTURES ABOVE OR BELOW GROUND, IN WHICH CASE, HAND METHODS SHALL BE EMPLOYED. FENCES, POLES, AND ALL OTHER PROPERTY SHALL BE PROTECTED UNLESS THEIR REMOVAL IS AUTHORIZED. ANY PROPERTY DAMAGES SHALL BE SATISFACTORILY RESTORED BY THE CONTRACTOR AT HIS OWN EXPENSE. WHERE MAJOR (16” DIA.) TREE ROOTS ARE ENCOUNTERED, PIPE IS TO BE PLACED UNDER ROOT (DO NOT DAMAGE ROOTS) THE CONTRACTOR SHALL EXERCISE CARE NOT TO DAMAGE EXISTING TREES. THE CONTRACTOR WILL NOT BE ALLOWED TO STOCKPILE ANY MATERIAL AT OR AROUND THE BASE OF ANY EXISTING TREES. TREES THAT MUST BE REMOVED SHALL BE REPLANTED AFTER THE WATERLINE INSTALLATION. THE CONTRACTOR SHALL CARE FOR ALL REPLANTED TREES FOR A PERIOD OF 90 DAYS TO INSURE THEIR LIFE. THIS INCLUDES WATERING AND FEEDING TO ESTABLISH THEM TO THE SATISFACTION OF THE ENGINEER. THE CONTRACTOR SHALL VERIFY THAT LINES BEING ABANDONED IS NOT INTERCONNECTED TO THE SYSTEM THAT'S IN SERVICE. HE SHALL OBTAIN APPROVAL FROM THE ENGINEER OF HIS PROPOSED METHOD OF VERIFICATION. EXISTING UTILITIES IN THE STREETS AND WITHIN THE LIMITS OF THE WORK ARE TO REMAIN IN OPERATION DURING CONSTRUCTION. WATER AND WASTEWATER SERVICES SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT THE LIFE OF THE PROJECT. WASTEWATER FLOW SHALL BE MAINTAINED BY BY-PASS PUMPING OR OTHER METHOD AS APPROVED BY THE ENGINEER. ALL COSTS SHALL BE INCLUDED IN THE UNIT PRICES BID. NO CONSTRUCTION WORK SHALL TAKE PLACE UNLESS THE OWNER’S REPRESENTATIVE IS PRESENT. THE OWNER RESERVES THE RIGHT TO REJECT ANY AND ALL WORK NOT MEETING THIS REQUIREMENT. ALL EXCAVATIONS SHALL BE SECURED AS DESCRIBED IN THE SPECIFICATIONS ON A DAILY BASIS BY THE CONTRACTOR AT THE TIME OF COMPLETION OF CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL FURNISH ALL PROTECTIVE AND/OR WARNING DEVICES AS REQUIRED TO CONTROL AND PROTECT THE PUBLIC IN ALL WORK AREAS. THE CONTRACTOR SHALL MAINTAIN EMERGENCY ACCESS TO ALL AREAS AFFECTED BY HIS WORK AT ALL TIMES. . ALL DRAINAGE OUTLETS SHALL BE LOCATED AND HAVE SILT FENCE OR HAY BALES INSTALLED AS REQUIRED PRIOR TO CONSTRUCTION. ALL DEWATERING AND OPERATIONS SHALL CONFORM TO ALL APPROPRIATE AGENCY REGULATIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED DISCHARGE SAMPLING AND TESTING AND SHALL BE INCIDENTAL TO HIS DEWATERING OPERATIONS. PROPERTY LINE / EASEMENT NOTES: PROPERTY LINES AND PARCEL NUMBERS ARE SHOWN FOR REFERENCE ONLY PER AVAILABLE GIS DATA. NO BOUNDARY SURVEY HAS BEEN COMPLETED AS PART OF THIS CONTRACT. CONTRACTOR TO COORDINATE WITH OWNER AND WAPA TO OBTAIN ALL NECESSARY EASEMENTS FOR THE CONSTRUCTION OF THIS PROJECT PRIOR TO THE START OF CONSTRUCTION. WATER MAIN AND SERVICE NOTES: 1 9.1. EXCEPT WHERE SPECIFICALLY NOTED, ALL WATER PIPE MATERIAL SHALL BE: SCH. 80 PVC FOR SIZES 3/4” THRU 2” C900 DR14 FOR SIZES 4” THRU 12” ALL SERVICE TAPS AS SHOWN ON SHEET C-—6 WATER AND SEWER PLAN DEFLECTION OF HORIZONTAL OR VERTICAL ALIGNMENT OF C900 PIPE NOT TO EXCEED LESSER OF MANUFACTURER’S RECOMMENDATIONS AND THE SPECIFIED IN THE TECHNICAL SPECIFICATIONS DEFLECTION OF HORIZONTAL OR VERTICAL ALIGNMENT AT Di PIPE JOINTS NOT TO EXCEED PERMISSIBLE DEFLECTION AS SPECIFIED IN THE TECHNICAL SPECIFICATIONS. CONTRACTOR'S ATTENTION IS DRAWN TO THE FACT THAT THE WORK AREA IS SEWERED, AND SEWER SERVICES COULD BE LOCATED AT ANY DEPTH. THE CONTRACTOR IS RESPONSIBLE FOR THE Nee OF ALL SEWER SERVICES DAMAGED DURING CONSTRUCTION AT THE CONTRACTORS EXPENSE. PIPE JOINT AND FITTINGS INDICATED ON THE WATERLINE DRAWINGS ARE FOR GENERAL GUIDANCE ONLY. THERE MAY BE MORE OR LESS FITTINGS NEEDED TO SATISFY ACTUAL FIELD CONDITIONS. CONTRACTOR SHALL DEVELOP HIS FITTINGS REQUIREMENT LIST AND BE RESPONSIBLE FOR SAME. ALL NEW METER BOXES TO BE INSTALLED WITH A SCH 80 CAPPED STUB OR NIPPLE FOR TRANSFER BY OTHERS AS NEEDED. SERVICES LINES AND METER LOCATIONS ARE APPROXIMATE. SPECIFIC SITE CONDITIONS MAY NECESSITATE ROUTING LINES DIFFERENTLY. PAYMENT FOR INSTALLATION WILL NOT CHANGE WHEN MODIFICATIONS TO SERVICES LINES AND METER LOCATIONS ARE MADE. WAPA’S pr Nisaco PERSONNEL SHALL IDENTIFY SPECIFIC METER POSITION PRIOR TO INSTALLATION BY CON , SERVICE LINES AND METER BOX LOCATIONS MUST SATISFY THE FOLLOWING CRITERIA: METERS MUST BE ACCESSIBLE BY WAPA METER READERS AND MAINTENANCE PERSONNEL FROM THE PUBLIC ROAD. PLACING METERS BEHIND FENCES AND WALLS IS NOT ACCEPTABLE. 9.2. METERS MUST NOT BE PLACED IN DRAINAGE OR FLOOD AREAS. METER BOXES MUST BE POSITIONED SUCH THAT WATER AND DEBRIS WLL NOT FLOW OVER THE TOP OF METER BOXES. THIS MAY BE ACCOMPLISHED BY CAREFUL PLACEMENT TO AVOID DRAINAGE PATHS, OR IN CASES OF LOW VOLUME DRAINAGE TO RAISE THE METER BOX SUFFICIENT ABOVE ADJACENT GRADE. 9.3. PLACEMENT TO AVOID DAMAGE TO METER AND CONNECTED PIPING DUE TO VEHICULAR 10. 10. 10. ts 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 25. 24. ACTION, SITE CONDITIONS AND OTHER FACTORS WHICH MAY DAMAGE METER AND PIPING. METER AND PIPING MUST BE ADEQUATELY SECURED TO PREVENT DIRECT MOVEMENT. IT MAY BE NECESSARY TO CONSTRUCT FOUNDATIONS AND/OR SUPPORTING ENCLOSURES (ESPECIALLY IN AREAS WHERE THE GRADE SLOPES DOWN FROM THE PAVEMENT) TO SECURE METER BOX AND CONNECTING PIPING. WATER MAINS SHALL BE LAID AT LEAST TEN FEET (10°) HORIZONTALLY FROM ANY EXISTING OR PROPOSED SEWER LINE. IF LOCAL CONDITIONS PREVENT A 10’ LATERAL SEPARATION THEN: 1. THE MAIN SHALL BE LAID IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SEWER LINE SO THAT THE BOTTOM OF THE WATER LINE IS 18” ABOVE THE TOP OF THE SEWER LINE 2. WHERE IT IS IMPOSSIBLE OR IMPRACTICAL TO OBTAIN VERTICAL OR HORIZONTAL gir Ll THE WATER LINE SHALL BE ENCASED IN CONCRETE IN ACCORDANCE Wi AILS. IF A SEWER SERVICE OR SEWER MAIN SHALL BE BROKEN DURING THE CONSTRUCTION OF THE WATER MAIN WHERE THE WATER MAIN IS BEING CONSTRUCTED BELOW THE SEWER, THEN THE CONTRACTOR SHALL REPLACE A MINIMUM OF ONE LENGTH OF THE SEWER LINE OR 20° WHICH EVER IS GREATER. THE NEW SECTION OF SEWER LINE MUST BE CENTERED OVER THE WATER MAIN TO BE CROSSED SO THAT THE JOINTS WILL BE AN EQUAL DISTANCE FROM THE INTERSECTION OF THE LINES. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 3° OVER ALL WATER LINES, UNLESS ALTERNATE TRENCH DETAILS ARE APPROVED BY WAPA. CONTRACTOR SHALL COORDINATE INSTALLATION OF WATER SERVICE WITH WAPA AND THE ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION, PURCHASE AND/OR FEES ASSOCIATED WITH ALL APPARATUS INCLUDING: WATER METERS, BACK FLOW PREVENTERS, VALVES, AND ENCLOSURES. WORK DONE ON SANITARY SEWER OR SANITARY SEWER SERVICES DAMAGED BY THE CONTRACTOR SHALL BE REPAIRED IN ACCORDANCE WITH THE VIRGIN ISLANDS WASTE MANAGEMENT AUTHORITY STANDARDS AT THE CONTRACTORS EXPENSE. ALL WATER LINES UPON ACCEPTANCE SHALL BECOME THE PROPERTY OF THE WATER AND POWER AUTHORITY. ee AND POWER AUTHORITY INSPECTOR MUST AUTHORIZE THE BACKFILLING OF ALL THE LOCATION OF ALL CURB STOPS AND VALVES INSTALLED SHALL BE RECORDED BY MEASUREMENTS TO THREE OR MORE PERMANENT SURFACE FEATURES AND SHOWN ON THE AS-BUILT DRAWINGS. ALL GATE VALVES SHALL BE INSTALLED AND PROVIDED WITH A VALVE BOX AS SHOWN ON THE DRAWINGS. FIRE HYDRANTS, HYDRANT BASE AND RISER PIPE SHALL BE SHOP PAINTED WITH AN EPOXY PAINT APPROVED BY THE MANUFACTURER AND ENGINEER AND SHALL BE IN ACCORDANCE WITH AWWA C210. THE FIRE HYDRANT TOP COAT WILL BE YELLOW. FIELD PAINT RETOUCHING SHALL BE PROVIDED TO RESTORE SHOP PAINT DAMAGE. PRIOR TO PUTTING THE SYSTEM INTO OPERATION, THE CONTRACTOR SHALL PERFORM HYDRAULIC TESTS AND SHALL DISINFECT THE PIPE IN ACCORDANCE WITH THE SPECIFICATIONS. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT HIS DISINFECTION AND TESTING PROCEDURES TO V.I. W.A.P.A. ALL EXISTING WATER SUPPLY LINES SHALL REMAIN IN SERVICE UNTIL NEW SYSTEM HAS BEEN ACCEPTED BY THE ENGINEER. ALL THRUST BLOCKS SHALL BE PLACED IN UNDISTURBED MATERIAL. IF THRUST BLOCK IS LOCATED IN EXISTING WATER, SEWER OR OTHER TRENCH, EXTEND THRUST BLOCK TO UNDISTURBED MATERIAL. PVC WATERLINES SHALL BE INSTALLED WITH MAGNETIC DETECTABLE PLASTIC TAPE ABOVE THE PIPE AND A 14 GAUGE SOLID CORE TRACE WIRE BELOW THE PIPE. ADDITIONAL METER BOXES MAY BE REQUIRED DEPENDING ON FIELD CONDITIONS. ALL ADDITIONAL METER BOXES SHALL BE ADDED AT THE BID ITEM PRICE. WATER METER BOXES SHALL BE EQUIPPED FOR AUTOMATIC METER READING (AMR), MTH A PLASTIC LID, FORD METER BOX MODEL # YLHC 171—233-P. O wv (2) ob ae: 1 N \ \ _S oan — a — 22 oa 2 A= oe BE REMOVED + +* eee 7.0 ee ey oe oe eee eee” eee Plot No. 40-GCC Drowing Na. 44~A oe Power Pole LIMITS OF CLEARING POWER POLES AND UTILITY LINE TO BE REMOVED (TYP.) UTL————__uy ny. MLA Y fp he ARENT BOUNDARY LINE OVERLAY APP. —— + — - __ rs Ps Ps # Fi ay y ce = x Z ae Oe is a isis i 3 \ a > ie aD uh St lu — 9 Pa a | of =2 , wy | SEQSX FA | Joe i a Oar | LG) | oe 2 oO Zz i inal rae Zz O 2 i gees 8 ee ee eS LEGEND >.< STRUCTURE TO BE REMOVED LIMITS OF CLEARING vg Ga Gy PAVEMENT TO BE REMOVED NOTES: 1. CONTRACTOR SHALL PROTECT EXISTING UTILITIES ON SITE AND ADJUST AS NEEDED 109-113 ESTATE CASTLE COAKLEY CHRISTIANSTED, ST. CROIX U.S. VIRGIN ISLANDS 00822 TEL 340-778-8898 FAX 340-778-7754 Steven E. Hutchins AIA Architects, Inc. DATE: 05-08-2020 DRAWN BY: ANB 15—01—0015 Demo.dwg SHEET NUMBER: @ "11 /Connelly 8 Wicker Inc 0-3 Planning - Engineering - Landscape Architecture 10060 Skinner Lake Drive, Suite 500 Jacksonville, Florida 32246 (904) 256-3030 FAX: (904) 265-3031 www.cwieng.com Florida Registry 3650 L.A. Number: LC26000311 To Street, 13+00 CONSTRUCTION ENTRANCE /EXIT L SINGLE EROSION CONTROL FENCING W/ WIRE BACKING /; (TYP.) ROADWAY TO BE DESIGNED AND CONSTRUCTED UNDER SEPARATE PROJECT. SINGLE EROSION CONTROL FENCING W/ WIRE BACKING (TYP.) ROADWAY TO BE DESIGNED AND CONSTRUCTED UNDER SEPARATE PROJECT. all j ee -e Se — W — um " PERFORATED = ag | —— = aN ee ae ; PERIMETER DRAINAGE _\—><@6- \ J its 2D ee ? SEE PLAYING-FIELD Bi Pa. Decimal TEs An =< ne a at ‘Je __-DRAINAGE PLAN PF3.00 ere § eas \ Nor, Power: Pol widing 2 ee 46400 een ial + 6” PERFORATED PERIMETER DRAINAGE SEE PLAYING FIELD DRAINAGE PLAN PF3.00 TERRENCE oe FIELD Qe PAULE. #2 \7\ Wee See, [| _ Z JOSEPH — STADIUM jee Ls = = 9) a - f= 1) PC _\— FN aad 0.5% 6 ee \ ne. | SINGLE EROSION ; | * CONTROL FENCING W/ oe :: > y RE BACKING (TYP.) G % , / 8 ; Zz 5 y SWALE AREA TOWARD LEVEL -7 | SPREADER ON SOUTH SIDE rv | Se OF ENTRY SIDEWALK’ DOUBLE EROSION CONTROL FENCING W/ - f WIRE BACKING (TYP.) H / Sas = Y APPARENT BOUND, UNE OVERLAY 8 LEVEL SPREADER WITH A 2’ BERM r MAINTENANCE PLAN THE EROSION CONTROL FENCING WILL BE INSPECTED STRUCTURAL PRACTICES WEEKLY AND AFTER EVERY RAIN EVENT OF %” PER ah a 24 HOURS. ALL HOLES, RIPS, BREACHES, ETC., WILL saat eal Sal oe BE IMMEDIATELY REPAIRED WHEN DISCOVERED. WHEN 1 ; i SILT BUILD-UP REACHES % OF THE HEIGHT OF THE EROSION CONTROL FENCE AND IN CATCH BASIN, IT WILL BE REMOVED AND DISPOSED OF ONSITE AS PART OF THE FINAL SITE GRADING. SEDIMENT WHEN THE CONCRETE TRUCK WASHOUT BASIN IS Bonen FULL, THE DRIED MATERIAL WLL BE REMOVED AND DISPOSED OF TO ALLOW FOR RE-USE OR ANOTHER BASIN CAN BE CREATED. LET SEDIMENT Reta: TRAP Ps Sates ES OT | | 1=50' | 3) st w 1 fe) ey og S = <¢ Cw O SS x< NOTES: fucgsge 1. ALL AREAS WHERE THERE WILL BE SITE DISTURBANCE WILL BE PRE—CLEARED OF BRUSH. ALL MAJOR 2eoSe.u TREES WILL INITIALLY REMAIN. ALL VEGETATION WILL BE LEFT A MINIMUM OF 1 FOOT IN HEIGHT. THIS WILL ner ALLOW FOR EXISTING VEGETATION ROOT SYSTEM TO CONTINUE TO HOLD THE SOIL AND PREVENT EROSION Cah oo UNTIL EXCAVATION IS STARTED. ~-O% ZO 2. FLAGS MARKING THE LIMITS OF SITE DISTURBANCE FOR STRUCTURES AND MAJOR EARTHWORK WILL BE Sumo tO ATTACHED TO TREES OR STAKES AT A HEIGHT THAT IS CLEARLY VISIBLE TO CONSTRUCTION EQUIPMENT S5 my A © OPERATORS. DQ ow 3. EROSION CONTROL FENCING WILL BE INSTALLED WTH RE-BAR OR STEEL FENCE POSTS AND WIRE MESH L a w >t WHERE NEEDED, FOLLOWING THE GUIDELINES IN THE V.I. ENVIRONMENTAL PROTECTION HANDBOOK, 2002 bid Se. 5 S EDITION. LJ > LINE. THE INTENT IS TO EXCAVATE THE LEAST AMOUNT OF THE SITE AS POSSIBLE AND TO AVOID ee ie DISTURBING IT AS MUSH AS POSSIBLE. THIS WLL ALLOW THE EXISTING VEGETATION TO REMAIN UNTIL THE uj — oo” FINAL LANDSCAPING IS DONE. ND : 7. THE SITE WLL BE EXCAVATED IN A CONTROLLED AND LIMITED MANNER. THIS WILL LEAVE PORTIONS OF THE =) SITE THAT WILL NOT BE WORKED ON UNTIL LATER IN THE CONSTRUCTION SCHEDULE IN THEIR NATURAL Oc cs EXISTING STATE UNTIL FINAL LANDSCAPING. or 4 ee 4 8. A CONCRETE TRUCK WASHOUT AREA WILL BE CREATED FOR EACH MAJOR CONSTRUCTION AREA. Kh Os 9. AS THE EARTHWORK IS COMPLETED, THE GRADING WILL BE STABILIZED BY EROSION CONTROL BLANKETS Lu 0 AND HYDROSEEDING UNTIL FINAL LANDSCAPING IS INSTALLED. 7 10. DURING CONSTRUCTION, THOSE AREAS OF EXPOSED SOILTHAT HAVE BEEN GRADED TO FINAL Ite or PRE-LANDSCAPED ELEVATIONS AND THOSE THAT WILL NOT BE WORKED FOR AT LEAST THREE WEEKS WILL > es) BE COVERED WITH STRAW EROSION CONTROL BLANKETS, PNEUMATICALLY APPLIED MULCH. THOSE AREAS, fee) 34 . LQxXa ON xX lugee Ce Oo dp er ies 2abt 6 ow a Sea eo ow aA xt we Fete Bo aoe uWwet og "aie a eat © oS 22@5>oq OA-ODFE coe za +ix- o2uw>s uA wo Pass Gass eee LU @) — ee 2 wae TO EXISTING oe INV = 7.00’ 12° WATER MAIN WITH ty a saatteootehine saat SLEEVE 55 LF ~ 6° PVC pred cate vale / SAN PIPE @ 2.73% SAN PIPE © 1.90% 356 LF ~ PROPOSED DOMESTIC WATER MAIN \ ‘ a = < ee eae ee ee : ee es eee gS 6) — == 7 269 LF ~ 6” PVC SAN PIPE @ 1.19% 2) ob 3 x s2 8 | oa. : 2 oe | ae#oSe | 23538 Sud i = 2 5 DATE: 05-08-2020 DRAWN BY: ANB 15—01—0015 Ws.dwg SHEET NUMBER: C-6 @ "1 {Connelly & Wicker Inc. Planning - Engineering ~- Landscape Architecture 10060 Skinner Lake Drive, Suite 500 Jacksonville, Florida 32246 (904) 256-3030 FAX: (904) 265-3031 www.cwieng.com Florida Registry 3650 L.A. Number: LC26000311 Oo VSLL-BLL-OVE XW4 8688-8LL-OVE TAL TA'S'N ‘XIOHO “LS 8 2| 2 22800 SGNV1SI NIDHIA ’S'N XIIdWOD LHOdSs ee Ww oO XIOHO “LS ‘ALSNVILSIHHO aan ae. AFTAVOO FUSVO ALVLS3 €11-601 CNV WAIOVLS TWeasve NW 1d DNIGVHD : 712 C) ‘oul ‘S}JOSUYOy Wi SUIYOINH “3 UeAZe]S HdaSOFr 3 1NVd Heo |b *LOSrOUd ‘NOLLVNYXOSNI SNIMVYG a a = Hi % > ais. Me 67%, | = le SE ayer ae ed 1. %8 BEd “s, |e 235 - Se ak ~ A 8 onHt SS IS B88 A ee ee ; ¢; es e)|| SES 3 - ne Re ae I aaa \ Ww 2.8 = E ie =a , = 40.8 | \ il. 38 * | “D os ey | \ = | 48s | £ BS? | ‘ % \ a ae ae Gee te pe : Exe & atk Ss 38 A i Planning a H OW) IRA Le lj | | WA) I x il Hh Wf ‘ \ \ = ka ce \ YI “* Re ager Rl \ Pk ee LY LRAT ew “sae 2 0Cl(‘(‘yeSS ES a \@ \| & \] —Ss ,o ea. AVTEAO INN \ & \\ \ Uh, eR “ie ee, AYVONNOG LNaYVdd¥ wa Esty Seo° ’ ‘eas Z ade oie (=) a = > 5.85' M L \ WA OF ENTRY SIDE SWALE AREA TOWARD “EVE SPREADER ON SOUTH \\ c LOH | fay ae \ wie WW G 6 Nail ozs | nan So \ | Wot & a) tas pu op) S a O5< 2 \ ay PES VW aansesest ~Zz0 =e <§o c¥") a : ; IRM, | <9 a pire X dy Ps) C sf Ye See 00+¢1 aa Pal e oy ai /_ —t eT r 1’-6” SQ. x 6” THICK CONCRETE PAD WITH SET COVER OF VALVE BOX AND CONCRETE PAD 1/2” ABOVE GRADE IN PAVEMENT OR SHOULDER AND 3” ABOVE GRADE ELSEWHERE a 2.1%2.1. WWF. CAST IRON LID MARKED "WATER” FINISHED GRADE FINISHED GRADE (GROUND) (PAVEMENT) = = : 0" UPPER SECTION TELESCOPING CONC. BLOCK OR BRICK 6 SCREENEEe i —— TYPE CAST IRON VALVE BOX, DIA. /4 CONC. BLOCK OR BRICK id 6" PER VIWAPA REQUIREMENTS ANCHOR BOLTS a RESTRAINERS (MIN. ) 3-9” (ure Dern) i - rn (MIN.) oO 3” HOT DIPPED GALVANIZED ANCHOR BOLTS \ LOWER SECTION DOUBLE NUT (TYP.) | = Ln \ ee YE fee ts ae GATE VALVE SIZE AND ENDS Se + AS SPECIFIED, PER VIWAPA A/2 NTS 11”+ (2"9) -—— REQUIREMENTS ELEVATION S ELEVATION a ae ADDITIONAL DEPRESSION OF VALVE MAY BE REQUIRED TO INSTALL TYPE A TYPE B ae BURIED GATE VALVE AND BOX NTS NTS IPE TYPE BA TYPE B ANCH. BOLT STRAPS ; L TYPE | SIZE A B C A B C D SIZE (DIA.)| 6”* 38” a2" DE ie 274 27” 2h. 16” |(1) 1/4"x 1 1/8” 5/8” 1’—0” NN, UNDISTURBED EARTH 7% ” ” ” ” ” ” ” ” ” ” ” ‘ C]ORRRR ‘ . Le 8 44 38 27 30 30 30 18 YS yr YS Ir > Yr yY» n i 10” 50” 44” 34” 37% a7 33” 18” |(2) 1/4"x 1 1/4"| 5/78" fee IS ys IIIYIYYO®? 9 Ee Se ee eS LIYE o” + 57” 51” 67” 47” 47” 47” 24” (2) 3/8'x 11/2) 3/4" ‘| 1-0" IS SISEEREESEEERESESSES S m > x = ; ; MMM MMII MI AI AIM AIAIAIA1: = 16 64 57 67” 54” 54 49 24 ; Z rhegesg Mtg we, £92 £ fee ings 20” 78” 63” 80” 64” 64” 64” Bo. C2) 1/2 x1 3/4) Fee ZO" ee a sete fatale, CONCRETE THRUST BLOCK — - = 3 = . 'e . 2° . 24” 93” 75” 83” 78” 78” 78” 36” |(2) 1/2°x 2 1/2 1 20 os NOTE ” 4 TAPP : NOTE *6: OR LESS y _ VIMAPA REQUIREMENTS 1. BASED ON 150 P.S.I. STATIC PRESSURE PLUS A.W.W.A. WATER HAMMER. 2. ALL BEARING SURFACES TO BE CARRIED TO UNDISTURBED GROUND. () a 3. ALL STRAPS, BOLTS AND ANCHORS SHALL BE MADE OF GALVANIZED ( a ( STEEL AND SHALL CONFORM TO ASTM 123 AND 153 J xs i at 4. ALL JOINTS SHALL BE ENCASED IN CONCRETE AFTER THE CONSTRUCTION Zz : OF THE THRUST BLOCK. eae ROO RORY» NEW WATER PIPE > DIREC Ce Ve Se (D NTS 24” MIN.—12” & LARGER PIPE NOTE: 18” MIN.—10” & SMALLER PIPE 1. AT ALL 90° - 45° USE TRUST BLOCK AND RESTRAINERS laa) am @ LE SEE DETAIL OF = TEMP. CONCRETE Oo yoy THRUST BLOCK AY PLAN & ELEVATION | 7 WATER MAIN Ri” és I Dili 427°Xi6" 6” DI, P. E. » REDUCING TEE BENDS & TEES PLUGS SOE CONTR LATeMiiiae Pre [RESTRAINERS A " Z16 ° ° 22-1/2 CORP. STOP = PIPE 90 BENDS 45 BENDS 1 yen TEES PLUGS A cen ae . <15 i (lo SIZE A ? A 5 F = i 5 2 = 2 of Nes 1/2” (TYP.) SCH 80 PVC | | a 5” « 18” 41” 10’ 1” 6” 9” 4” 13” 10” 24” SERVICE LINE URB STOP W/2-1/2” Cll. ( () ; = : . 7 = = = . = : VALVE RISER BOX, PER = ae 3 8” 25 14 14 14 9 11 15 17 12 32 VIWAPA REQUIREMENTS a} i oar 10” i 20” 16” 19” 10” 15” 18” 22" 14” 40” WATER MAIN = : " " " ” * é " - CONCRETE BLOCKING S 12 33 23 el 23 12 18 21 26 16 47 Ee eee cant oO 14” 39” 26” 22 26” ton 22” 24” 30” 18” 54” = c= » pe Ste ee O ” ” ” ” ” ” ” ” ” ” ” / Nf ane ans Ment ae T = fs = P i= A VA LVE = z V D L if OS 16 43 30 24 30 14 26 28 33 20 61 hal IC | INEC TiC - ii A N ” ” ” ” ” 7 ” ” ” ” ” oe = = ss : Le i cS buy Eo; | Sa B AN i 20 50 39 27 39 17 32 33 42 24 74 NTS OR ~ ie AND 24” 60” 45” 55° 45” 20” 38” 40” 49” 28” 88” NOTE: 1. FOR 2 1/2” SERVICE LINES, END LINE AT GATE VALVE WITH 5 1/2” VALVE RISER SER\ Ee INFS OVER o BOX (FIG. 4905, B&T INDUSTRIES, OR APPROVED EQUAL). SEIN \ C a : NOTE *§” OR LESS NTS BASED ON 150 P.S.I. STATIC PRESSURE PLUS A.W.W.A. WATER HAMMER. ALL BEARING SURFACES TO BE CARRIED TO UNDISTURBED GROUND. CONG INE TE. THRU leas LOC K "DEdeaayes Nios SELECT FILL (COMPACTION AS = 12” COVER (MIN.) in Seer /\\CRUSHER RUN TAMPED IN 6” LAYERS SELLE OCCT L “UNDER PAVEMENT PER FP—96 AS SPECIFIED Sen ea PEPER TET Saree + + OO SAND BEDDING ol 2 1/2” PVC SCHEDULE 80 3 $ = N TYPICAL WATER SERVICE Py 5 CONNECTION TRENCH DETAIL ° ii E — —I 1 NTS = } oes o ee oe \ s . fem _ ASS 4 H2ZR rs f Mp PA 3’-0” MIN. ee me a 9o- YS SELECT BACKFILL Sree aes 6” THROROUGHLY COMPACTED o27u0q . NH-OSF PIPE O.D. . eS 6” Pd SCREENED SAND < : eee 12”| PIPE O.D. | 12” ral > UJ > nia wo 2’-0"+ PIPE 0.D. : ree ee ee =. d TRENCH DETAILS FOR PVC PIPES epeRS NTS LL O auc O 15" 48” 6" MIN. STONE BEDDING IN EARTH _| V.C.P. 0-12" 18” Tal, STONE" BEDDING IN LEDGE INSIDE_DROP CONNECTION ic | |e fe TYPICAL SEWER CONNECTION FOR PVC PIPE DRE_GAST REINFORCED (NOT TO SCALE) (TYING INTO EXISTING MAINS) SANITARY SEWER MANHOLE (NOT TO SCALE) (NOT TO SCALE) ae [PAVEMENT LOAM AREA PAVED AREA | Sante 4” COMPACTED \ ! | ; FERROUS METAL LOAM & SEED 129.0 %9S © | | © ae ROD OR PIPE $02 Oe of ; CRUSHED GRAVEL Jo g9:o 9°9:09 Logi 9 On, Hess \ 3/8” DRILLED Si a AES Leave _45° BEND wong |. EGOS! | \ a | ” » SPECFED. URSA Tee PVC_WYE . \ sa Te ROADWAY BACKFILL ml SHALL CONFORM TO | STANDARD SPEC’S 18” DIAM. = un ets 12” MIN. 1 1/2" \ P y/ LAG BOLT Hee * Se \ gp —a— 1/8” PAYMEN WARIESH 2 S Ie (a ray ——— —A Pr 3 UNDISTURBED SO} OR D + 2’ (WHICHEVER IS GREATER) NOTES: fa FOR FULL WIDTH OF THE TRENCH UP TO SPRING LINE OF PIPE. —— 6 BELOW PIPE IN EARTH —- 12° BELOW PIPE IN LEDGE ROCK 1) PAVEMENT REPAIR IN EXISTING ROADWAYS SHALL CONFORM TO STREET OPENING REGULATIONS. DEPTH FOR BITUMINOUS PAVEMENT, SHALL BE EQUAL TO EXISTING PAVEMENT WITH 3” MIN. (1” WEARING, 2” BASE) 2) NEW ROADWAY CONSTRUCTION SHALL CONFORM TO SUBDIVISION SPECIFICATIONS. 3) IN UEU OF THE 12” GRAVEL COURSE AND 9” OF CRUSHED GRAVEL, 18” OF CRUSHED GRAVEL OR RECLAIMED STABILIZED BASE MAY BE USED AS A BASE FOR THE PAVEMENT REPAIR. 4) MATERIAL SHALL BE REPLACED IN KIND WHENEVER POSSIBLE. 5) A MINIMUM 2’ CUTBACK IS REQUIRED AT THE TOP OF THE TRENCH WALL OVER UNDISTURBED MATERIAL. TYPICAL SEWER TRENCH DETAIL (NOT TO SCALE) qd 4 ae > qg : a MANHOLE WALL “ted? v Titi “1/2” DRILL ¢ - HOLE 5/16" LAG—BOLT (SHIELD—LONG) 4 7 4 4d 4 4 ¢ qd sizE| 2 R Cc 4”_|14.176"| 2.125” | 2.063” 6”_|19.638"| 3.188” | 3.125” 8" |25.102”| 4.250” | 4.188” 10” [30.565”| 5.313” | 5.250” 12” |36.028"| 6.375” | 6.313” STRAP DETAIL FOR INSIDE DROP CONNECTION (NOT TO SCALE) 12” MIN. PVC TEE | BEDDING: 6”_IN EARTH 12° IN LEDGE Yt : WM Y ore, NW ,,}W FORMWORK OR SONO-—TUBE SHALL BE LEFT IN PLACE. SERVICE _CHIMNEwakOR-PVC PIPE (NOT TO SCALE) 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 1) 2) 3) 4) 6) NOTES FOR ORDERED EXCAVATION OF UNSUITABLE MATERIAL BELOW GRADE, REFILL WTH BEDDING MATERIAL. BEDDING: CRUSHED STONE, FREE FROM CLAY, LOAM, ORGANIC MATTER, AND MEETING ASTM C33, STONE SIZE NO. 67. 100% PASSING 1 INCH SCREEN 90-100% PASSING 3/4 INCH SCREEN 20— 55% PASSING 3/8 INCH SCREEN O-— 10% PASSING #4 SIEVE O— 5% PASSING #8 SIEVE USE CRUSHED STONE ONLY FOR BEDDING UNDER MANHOLES. WHERE ORDERED BY THE ENGINEER TO STABILIZE THE TRENCH BASE, CRUSHED STONE 1/2 INCH TO 1 1/2 INCH SHALL BE USED. SAND BLANKET: CLEAN SAND FREE FROM ORGANIC MATTER SO GRADED THAT 90 100% PASSES A 1/2 INCH SIEVE AND NOT MORE THAN 15% WILL PASS A NO. 200 SIEVE. SUITABLE MATERIAL: IN ROADS, ROAD SHOULDERS, WALKWAYS AND TRAVEL WAYS, SUITABLE MATERIAL FOR TRENCH BACKFILL SHALL BE THE NATURAL MATERIAL EXCAVATED DURING THE COURSE OF CONSTRUCTION, BUT SHALL EXCLUDE DEBRIS, PIECES OF PAVEMENT, ORGANIC MATTER TOPSOIL, ALL WET OR SOFT MUCK, PEAT OR CLAY, ALL EXCAVATED LEDGE MATERIAL, AND ALL ROCKS OVER SIX INCHES IN THE LARGEST DIMENSION, OR ANY MATERIAL WHICH AS DETERMINED BY THE ENGINEER, WILL NOT PROVIDE SUFFICIENT SUPPORT OR MAINTAIN THE COMPLETED CONSTRUCTION IN A STABLE CONDITION. IN CROSS-COUNTRY CONSTRUCTION, SUITABLE MATERIAL SHALL BE AS DESCRIBED ABOVE EXCEPT THAT THE ENGINEER MAY PERMIT THE USE OF TOPSOIL, LOAM, MUCK OR PEAT, IF HE IS SATISFIED THAT COMPLETED CONSTRUCTION WILL BE ENTIRELY STABLE AND PROVIDED THAT EASY ACCESS TO THE SEWER FOR MAINTENANCE AND POSSIBLY RECONSTRUCTION, WHEN NECESSARY, WILL BE PRESERVED. BASE COURSE, IF ORDERED BY THE ENGINEER, SHALL MEET THE REQUIREMENTS OF THE LATEST EDITION OF THE STANDARD SPECIFICATIONS FOR ROAD IN BRIDGE CONSTRUCTION OF THE STATE OF FLORIDA, DEPARTMENT OF TRANSPORTATION. WOOD SHEETING, IF REQUIRED, WHERE SHEETING IS PLACED ALONGSIDE THE PIPE AND EXTENDS BELOW MID—DIAMETER, IT SHALL BE CUT OFF AND LEFT IN PLACE TO AN ELEVATION NOT LESS THAN ONE FOOT ABOVE THE TOP OF THE PIPE. WHERE SHEETING IS ORDERED BY THE ENGINEER TO BE LEFT IN PLACE, IT SHALL BE CUT OFF AT LEAST THREE FEET BELOW FINISHED GRADE, BUT NOT LESS THAN ONE FOOT ABOVE THE TOP OF THE PIPE. W = MAXIMUM ALLOWABLE TRENCH WIDTH AT A PLANE 12 INCHES ABOVE THE PIPE. FOR PIPES 15 INCHES NOMINAL DIAMETER OR LESS, W SHALL BE NO MORE THAN 36 INCHES; FOR PIPES GREATER THAN 15 INCHES NOMINAL DIAMETER W SHALL BY 24 INCHES PLUS PIPE 0.D. W SHALL ALSO BE THE PAYMENT WIDTH FOR LEDGE EXCAVATION AND FOR ORDERED EXCAVATION BELOW GRADE. FOR CROSS COUNTRY CONSTRUCTION, BACKFILL OR FILL SHALL BE MOUNDED TO A HEIGHT OF SIX INCHES ABOVE THE ORIGINAL GROUND SURFACE. CONCRETE FOR ENCASEMENT SHALL CONFORM TO THE REQUIREMENTS FOR CLASS A CONCRETE OF THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. PVC PIPE SHALL CONFORM TO ASTM 3034. PVC PIPE SHALL HAVE A PIPE STIFFNESS OF AT LEAST 46 POUNDS PER SQUARE INCH AT 5% PIPE DIAMETER DEFLECTION, AS MEASURED IN ACCORDANCE WITH ASTM D2412 DURING MANUFACTURE. JOINT SEALS SHALL BE OIL RESISTANT COMPRESSION RINGS OF ELASTOMERIC MATERIAL CONFORMING TO ASTM D3212 AND SHALL BE PUSH—ON, BELL—AND-—SPIGOT Steven E. Hutchins AIA Architects, Inc. 109-113 ESTATE CASTLE COAKLEY TEL 340-778-8898 FAX 340-778-7754 CHRISTIANSTED, ST. CROIX U.S. VIRGIN ISLANDS 00822 TYPE. NOTE: SEPARATE CONSTRUCTION SPECIFICATIONS ARE ATTACHED OR INCLUDED IN THE CONTRACT DOCUMENTS. THESE STANDARD DRAWINGS ARE NOT COMPLETE WITHOUT THESE SPECIFICATIONS. LEAKAGE TESTING ALL NEW SEWERS AND MANHOLES SHALL BE TESTED FOR WATERTIGHTNESS BY THE USE OF EITHER WATER OR LOW—PRESSURE AIR TESTS. LOW—PRESSURE AIR TESTING SHALL BE IN CONFORMANCE WITH ASTM C828. THE RATE OF INFILTRATION OR EXFILTRATION SHALL BE NOT GREATER THAN 100 GALLONS PER DAY PER INCH OF PIPE DIAMETER PER MILE OF PIPE FOR SIZES UP TO 48 INCHES. PAUL E. JOSEPH BASEBALL STADIUM AND SPORT COMPLEX ST. CROIX, U.S.V.I. MANHOLES SHALL BE TESTED FOR LEAKAGE USING EITHER A WATER EXFILTRATION TEST OR A VACUUM TEST. THE MANHOLE VACUUM TEST SHALL CONFORM TO THE FOLLOWING: a) THE INITIAL VACUUM GAUGE TEST PRESSURE SHALL BE 10” Hg; AND b) THE MINIMUM ACCEPTABLE TEST HOLD TIME FOR A 1” Hg PRESSURE DROP TO 9”Hg SHALL BE: PROJECT: 1) NOT LESS THAN 2 MINUTES FOR MANHOLES LESS THAN 10 FEET IN DEPTH; 2) NOT LESS THAN 2 1/2 MINUTES FOR MANHOLES 10 TO 15 FEET DEEP; AND 3) NOT LESS THAN THREE MINUTES FOR MANHOLES MORE THAN 15 FEET DEEP. THE MANHOLE SHALL BE REPAIRED AND RETESTED IF THE TEST HOLD TIMES FAIL TO ACHIEVE THE ACCEPTANCE LIMITS SPECIFIED ABOVE. ALL PLASTIC SEWER PIPES SHALL BE DEFLECTION TESTED NOT LESS THAN 30 DAYS FOLLOWING INSTALLATION. THE MAXIMUM ALLOWABLE DEFLECTION OF FLEXIBLE SEWER PIPE SHAL BE 7 1/2 PERCENT OF AVERAGE INSIDE DIAMETER. SANITARY DETAILS DRAWING INFORMATION: DATE: 05-08-2020 DRAWN BY: ANB 15-01-0015 Cov&Dets.dwg SHEET NUMBER: 0 ']cormely & Wicker] A Planning ~- Engineering ~- Landscape Architecture 10060 Skinner Lake Drive, Suite 500 Jacksonville, Florida 32246 (904) 256-3030 FAX: (904) 265-3031 www.cwieng.com Florida Registry 3650 L.A. Number: LC26000311 SIGN NO. FTP—21—06 2 ¢& 5 . qe =& FIP-22-06 ae ee a 4, : . a : Mae? aro, a po ee ere Ae pe * +c se a “. ' SAVER SECTION WITH | pees ae a ee eg t,t CONTRASTING COLOR “AND nak z 4: | _ - TEXTURE TO: EXTEND “24” é ree CC“ SCS:*C<‘ dese cis Zz ES BEFORE. IF THE AREA IS TO BE MOWED, CHECK DAMS SHALL BE REMOVED ONCE FINAL mY, 8. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH ui w = oo STABILIZATION HAS OCCURRED. OTHERWISE, CHECK DAMS MAY REMAIN IN PLACE mas VEGETATION. ea OTe fo) PERMANENTLY. AFTER REMOVAL, THE AREA BENEATH THE DAM SHALL BE SEEDED AND 9. STONE QUALITY - SELECT STONE FOR RIPRAP FROM FIELD STONE OR QUARRY STONE. = —- Y= ps MULCHED IMMEDIATELY. THE STONE SHOULD BE HARD, ANGULAR, AND HIGHLY WEATHER-RESISTANT. THE SPECIFIC : ae PLAN GRAVITY OF THE INDIVIDUAL STONES SHOULD BE AT LEAST 2.5. > ® c Pi aol 10. FILTER - INSTALL A FILTER TO PREVENT SOIL MOVEMENT THROUGH THE OPENINGS IN No Sie 2 YA “TONE ) THE RIPRAP. THE FILTER SHOULD CONSIST OF A GRADED GRAVEL LAYER OR A SYNTHETIC 6 Ome See San aS FILTER CLOTH. SEE APPENDIX C; P. C-1. N.T.S bs MAINTENANCE ' INSPECT RIPRAP OUTLET STRUCTURES AFTER HEAVY RAINS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED. QC) IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. a FILTER FABRIC = Fost DRiven NTO TO BE SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN = => LL > = ee 1. THE FLOW CHARACTERISTICS OF THE PIPE AT FULL FLOW INCLUDING PIPE DIAMETER, FLOW i QO. ep) FLOW BLANKET RATE (CFS), VELOCITY (FPS), AND TAILWATER CONDITION dp) Q S 5 Neen eel DETAILS MODIFIED FROM VA SWCC 2. THE DIMENSIONS OF THE APRON INCLUDING LENGTH (La), WIDTH AT THE HEADWALL (W;), O < O 5 DOWNSTREAM WIDTH (W,), AVERAGE STONE DIAMETER (ds9), MAX STONE SIZE (dmax) AND STONE ae i x< DEPTH (D) DESIGNED IN ACCORDANCE WITH FIGURES 6-24.1 AND 6- 24.2 INGREEN BOOK. - Y) 0s Bec WIRE OR NETTING LL pas O 5 wa ae 23 iJ SEOTON STORM DRAIN OUTLET PROTEC TION i208 ENVIROFENCE 100X WITH SED. FILTER = or — op Z O O 4 il =9- TT + is) 2 re 1’-0” 1/16” SEE SHEET S1.12 FOR FOUNDATION NOTES & FOUNDATION DESIGN CONFORMS WI/ ALL APPLICABLE CODES FOR COASTAL FLOODING. PRIOR TO CONSTRUCTION, GENERAL CONTRACTOR MUST VERIFY THAT THE BUILDING SCALE: PLAN NOTES: 1. $1.11 (-\ FIELD LEVEL OVERALL FRAMING/FOUNDATION PLAN Q3LIGIHONd SI NOLLVYOdYHOO SIHL 4O NOISSINYSd NALLIMM G3SSIYdxXd JHL LNOHLIM NOILONGONdSY YO 3SN ANY ‘G3YVdaud SVM LI HOIHM YO4 SLIS TWNIOINO SHL OL GSALOIMLSSY 34 TIWHS ONIMVYG SIHL 40 JSN SHL ‘ONI ‘ONINSSNIONS WNONVW % HOISAOW 40 ALNAdONd GNV JOIAYSS 40 LNSWNYLSNI SHL SI ONIMVYC SIHL 810Z (9) Z04J913N6D ‘WY ZLy:LL OZOZ/ZO0/+70 ‘Bmp udjq puj—Buwos4 |aA27 Plal4 [1042AQ LLLS BBlvl\bup geiri\(xeldwog sjods pud winipoys ydasor J [Nndd) gglyl\rLOZ\ :X X: \2014\14188 (Paul E Joseph Stadium and Sports Complex)\14188_dwg\14188 S1.12 $1.13 S1.14 Field Level Framing—Fnd Plan A B C Piles.dwg, 04/02/2020 3:24 PM, agutierrez 11. AND COMPACTED FILL. FD DENOTES FLOOR DRAIN, SEE 5/S3.01 N Ly NT Steven E. Hutchins AIA Architects 109-113 ESTATE CASTLE COAKLEY CHRISTIANSTED, ST. CROIX TEL 340-778-8898 FAX 340-778-7754 U.S. VIRGIN ISLANDS 00822 Eng. of Record: Matthew C. Main License No.: | “| DENOTES 6” CONC SLAB 6” REINF w/ 6x6—W2.9xW2.9 | a WWF rer TYP AT | | FD (3 ! = $2.01 EDCE OF MAT {S301 $2.02 $2.02 S2.01 FOUNDATION 4 8 8 | I a | ss | | | ‘ FD = 3 \ / =| 1 Fo el ops 5 / 3| i l | Pp] S| ok a 7 \ 1s al | wo . 1 ' bd 4) / , ” | ” 3 | i : N "| aie VISITOR | 15-0} 6-9 < | = =~ (FD, DUG-OUT FD = | oO = nw) “ = Ly poe mt tn = 7 : CED T/SLAB EL, SEE ARCH ii | i “aa ¢ « ; - ar AW ast ; AT, = = lam = OU RS mh : IP eevee Saas ries ee Gears Saco | ty Aviy, VW “ : aq [RDS | ares! Geneon ear imme foes iar ino t | | | . “ el Fey Fe." RF: “a G * “ ee ae Pe ee a ee ee ~ LE i aa a4 ly . fae ¢ oof “4 a i ae * aes ‘. “8 . att 7 ‘< “oe At = a a . on — : ‘ (al | | t * | Vey 7) cv) (ne an ayy" 7) e~yi 1 7 c~\ ani = a / Tw a, V2 Vly Voy Vly | | Lay Vy! Vy VL AL { fey | 1 | | | ' I PRE-—ENGINEERED - I | ; | || F li METAL STAIRS BY |. 7 | ‘ I 4 TYP AT INT STAIR SUPPLIER S4.42 Seo : ! i] | 4 CONC WALL \ 'D } 1 | \ | ly 1 ory _ _ ae _ \ ---f\_ 4-4 fl 7 | |__-—________ | Jf AL NZ oo co} of ee | |_| IN = = E \ _ | _ \ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ — XT _ _ _ _ _ __ — =z _ _ _ --}- _ _ _ _ } 3 ae i vo Lf ; SS 36 | 0 Ar ct lau et “iF 4 : | z A A | ih +H - —— - —#h —— - —- - —- )\-— - —- —48 —--—-- -—--@ -—-—-+-# 8 EQUA EQUAL mi | j 4 | PRE-ENGINEERED COLUMN BY, ty a i ae | | on PRE—-ENGINEERED ! xs B : 4 | 4 | ‘ ra CANOPY/BLEACHER SUPPLIER, | TYP | a ey | I re a 0 a i cy cy - | ! JP ey! \ I he aN a ee .~\ cy ar" | 1 9 . = ma Vly \Ly \Ly | ? ! a | —| | I “2 LA ee E74 = 7 . __ | | 2 Or! | s . s I | a 7 In! Ss ! %0 $4.42 | | - - | ~ i ~ Joa _{I _ cf) [le \ L PI SS — — <= G | : Z Y 4 1 Y J y “ye NEW PILE, SE | | ; , = y 3/S3.03 fal | | 8” CONC WALL SEE ) Y a \ a a | : ! caebane ! Ey ye fe Qo | ls IN { ps 4 SUMP PIT, | N ~ < ! cry >| cry cry Ar, a SEE 6/S3.01 | | \Ly =|5 \Ly M36 ~ \dy | \ip 4 ) v y) | | | | P2424 COLUMN, SEE a A 0 Z [ ] mL | | ty iy Mian EQUAL equal" | Slo CTT Tg Lu} - | oO s Lo alto | Zz — olZ =< l | lec | 4 | \ 1 | x I | | 4 | ' 4 4 S =< pe | |e \ ! _ cry _ _ an _ z Ty _ _ an _ _ _ Ty _ _ an _ 4 _ \ Ty _ __4 rTy S155 Fd! Vy NT? ‘4? NT? ‘4? NT? [ \ Vy NT? on os e ~ \ ia : | | | | | Shu > | LJ Ct $e 1 \ nl > | wy =~ | (7) q \ ” ( \ | | tu) | « ~7 | oj oO — 7. rr 2 —_—= " . ~ | nen - ae Vv. | | | \ \ | “ J \ | | | | \ se 4-—e— e e H e eH ee \ | | | aa f~ f~ lay f~ f~ lay c~\ c~\ ‘TY ; lay 7 a r ITY f~ . J ‘2 ‘2 ly ‘2 ‘2 \y Ly Ly \ly Vly a) \ () L | a) \ ) | I | I \ _-_-_- ee ee Te Te re ee eS Ee Ce ee rr rrr lc lc lc Cr Cer eee er ee ee Terre errr er _-_-—_- a a ee ee 0 | 1 —+ DOWEL S.0.G. REBAR INTO | i A | | \ | | [| MAT SLAB, SEE GEN. (C2 EDGE OF MAT <( 2 ! Cl | EDGE OF MAT NOTES FOR ADHESIVES | 053.02) | FOUNDATION | | ($3.02) tn ! FOUNDATION ! (5 NT TYP | NT Typ \ 5 | l DOWEL S.0.G. REBA l 4,42 | | | | $4.42] | 1 | MAT SLAB, SEE GEt 1 \ | 1 . | ae NOTES FOR ADHESI | ! l | l | \ | | | ” EQUAL EQUAL EQUAL EQUAL EQUAL EQUAL EQUAL! EQUAL EQUAL Equa us | _ as 4 SLAB ON GRADE | ~ i | | | ! ! | REINF. w/ #4012” ! E.W., SAW CUT JOlt ! 4” SLAB ON GRADE | AT 12’-0” 0.C. MA ON COMPACTED FILL, ! ; \ ! Loe | REINF. w/ #4@12” E.W. | 15 \ ! | ' I I | | 1 1 1 1 | \ ! L} L_} L_} L_} | | ’ ” | > ” ’ ” \ u FLEE LC—vX—rr——Y——OT OSS CS SOON SOS 28’-0” 28’-0” 22’-10% |. 5-1% 51’-4% 14’-0” | > eee ee 22s ee 5 6 01.1 : PLA | ot I & = 1 EY | I | | XQ | | | | ! | | | | | ! ! »,? | | | ! | | “#i\ FIELD LEVEL FOUNDATION PLAN A | | | t . ” = » 7” Loi 4 ! | S112] SCALE: 3/16” = 1’-0 | | PLAN NOTES: ¢ a J — 1. ELEVATIONS ARE BASED ON T/SLAB DATUM EL 0’-0”. SEE CIVIL DWGS FOR ACTUAL ELEVATION. Cay 2. [[TCUDZ) DENOTES STRUCTURAL CAST IN PLACE CONCRETE WALL OR COLUMN. | N 3. FOR DESIGN CRITERIA AND GENERAL NOTES, SEE SHEET SO.01. _ ; ; PRIOR TO CONSTRUCTION, GENERAL CONTRACTOR MUST VERIFY THAT THE BUILDING 4. DENOTES 36 THICK 4,000 PSI CONCRETE MAT SLAB ON GRADE WITH #8@8 EA WAY T&B OVER VAPOR & FOUNDATION DESIGN CONFORMS WI/ ALL APPLICABLE CODES FOR COASTAL FLOODING. RETARDER AND COMPACTED FILL. PROVIDE WATERSTOP AT ALL CONSTRUCTION JOINT LOCATIONS, SEE DETAIL 1/S3.01. THIS DESIGN IS BASED ON THE MAT ACTING AS A CONTINUOUS PILE CAP BEARING ON STEEL PIPE A a PILES PER NOTE #5 & THE PILE LAYOUT SHOWN ON PLAN. SEE PLAN FOR SPAN DIRECTION. a i L 5, STEEL PIPE PILE SIZE & LAYOUT IS BASED ON THE GEOTECHNICAL REPORT PROVIDED BY VITEST ENGINEERS DATED / ORIENTATION. OF DECEMBER 12, 2018, SEE SHEET SO.01 GENERAL NOTES FOR ADDITIONAL PILE INFORMATION. STEEL PIPE PILES AS FOLLOWS: REINFORCEMENT (~~) DENOTES EXISTING 166 CONC FILLED STEEL PIPE PILE, SEE DET 1/S3.03. FIELD VERIFY LOCATION AND TOP/PILE M36 . \~/ ELEVATION PRIOR TO MAT CONSTRUCTION. NOTIFY STRUCTURAL ENGINEER OF ANY CONFLICT & COORDINATE TYP. UON REMEDIATION PRIOR TO CONSTRUCTION. , 6. P###4# DENOTES CONCRETE COLUMN/PILASTER DESIGNATION, SEE 5/S4.11. N KEYPLAN [7] DENOTES NON-LOAD BEARING 6” CAST IN PLACE CONCRETE WALL REINFORCED W/#4@12” EA WAY CENTERED ON WALL W/ DOWELS AT BASE TO MATCH VERTICAL REINFORCING. 7. SEE DETAIL 2/S3.03 FOR PILE GROUPS. 8. DENOTES SLAB DRAIN, SEE 5/S3.01 FOR DRAIN DETAIL. MIN 36” SLAB THICKNESS TO BE MAINTAINED. DRAINAGE TO BE PROVIDED W/SLAB TOPPING. M CVEIGH &M ANGUM 9. GC TO VERIFY FINAL MAT DESIGN W/ FINAL PLUMBING DRAWINGS. NOTIFY STRUCTURAL ENGINEER OF ANY ENGINEERING: INC CONFLICT & COORDINATION PRIOR TO CONSTRUCTION. 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 10. DENOTES 24” THICK 4,000 PSI CONCRETE MAT SLAB ON GRADE WITH #7@12” EA WAY T&B OVER VAPOR RETARDER 0-40126-1B email: mail@ MeV eighMangum.com 1431-E CONSTRUCTION ISSUE 03.16.20 | rt — ra 2S Zmr< OW E ag u IO as QO im 6 a KSZ YN = ~ ui — Lu) D> QO < | wo 5 : LL Z O | < 2 = 5 = uz is > Oo Lu Ss LU O LL DATE: 02-19-20 DRAWN BY: SGF SHEET NUMBER: 01.12 10°—" 3-5" 1 7-358" X: \2014\14188 (Paul E Joseph Stadium and Sports Complex)\14188_dwg\14188 $1.12 $1.13 $1.14 Field Level Framing—Fnd Plan A B C Piles.dwg, 04/02/2020 11:48 AM, agutierrez DEI 5/S4.11. —~ lat | |) ad! 1} dl — | ‘ap V4 | | itr ay od itd) $3.02 io Zz LZZLZ. to Z < | | po TD | Oy al EDGE OF MAT a 7 7 ~, FD FD | q | FOUNDATION 7 ' f | | | || ~ ~ f ; I] | \ TYP AT INT Cv) Xe} || | — ~ o | | EDGE OF MAT: CONC WALL Y D7 AL | (2 FOUNDATION aN oo es — $3.07, \ \ LAEZAET A ee | \ N / ae ~ | ee a | ' f~\ “ITN SL S4.42 4 / NL Ally | y / C] a oe ———_—e— Oooo re or — — or err er eee ee ee ee eee ee ese csc ee ese es ee eee ce ere ce eee | Y | | - | 0 | | (08) 1 g | i ] ! & l << N I\ : } | \ fo | < M36 \ : | ———A-—-—---- — =----4 UT Coop rrr erro ooo +. < ft ‘ =a TYP, UON - - | | Nf = a CLT LZ () () | | | Y = + y ~? wan DOWEL S.0.G. REBAR INTO||| | O o | Cc ~a MAT SLAB, SEE GEN. = O A xX \S4 pt) NOTES FOR ADHESIVES fCuP@ os eB x ---------shh---------------- —~ | Li} | QO Or SN \ | 4” SLAB ON GRAD | ~ O D we SLOPE SLAB DOWN AWAY FROM | | ON COMPACTED FILL, | =) 2 - A © . WALL, SEE ARCH. SLOPE AND , REINF. w/ #4@12” | ! I O ep) > Oo we SLAB ELEVATIONS l | E.W., SAW CUT JOINTS um a itd tad i | | | pu taed Pd Ti | | | or & FT sy > | | ~, | | | zr OS © (i ee =~ | i | ¢) EDGE OF MAT | Ov fF 4 TYP AT INT m4 7 ee ee FOUNDATION | 7 8SrtP w CONC WALL | No | | ! | © OlOoordeE: | an | . — i | Ze wa ! UW | + | in = = a | * | | : yo | It ey a ; | S4.42 S4.42 EQUAL : Ne | 7 | . | ! TYP SS i 7) 7 Sen Ages ane gg eee : _ 4 - | I Tk ! a r~\ NX P36 COLUMN, TYP 5 Be ie orare 0 ee -—4—- ™ _—-\- Ie ee LL Na 2 r7\ \Ly . LOCATIONS, SEE DET een ea Spo a Rs r SN — T — = C) th) . KA a7 ! | a SQ | ra < ; 6 4 = . QO < | (JO): } C) NN i y J Fy ~/ ry |S Zine 4,004 aa 4a. "4 a4) 4 \ ---r \Ly \Ly | LJ ww O (ep) LL 7 NE ONY NI ~ . _J , S rro Y \ | | (05) Sa | Y Fy : | (7 se N -—7 ™m LL O y I S4.42 —! ! l | i ano | y c~\ cy) | > ‘am {4 NEW PILE, SEE Ly Ly = O | ! 3/S3.03 4, | LL ; y) Wy | mao 32 J | rp ta) : cy cy (| a Lu Ww | =z ~ \ y UO A Hy SUMP PIT, Cy ~? ~" LU A a) iH y eae? SEE 6/S3.01 ~/ | O l, Y _ 4 /S3. up yy ——- v€ ! | k- z= if y 4 \ 7 | L Y ” < rT } J | ~\ “i =L---- | \y \_ “Vo LL An c\ Ly _ \L yt | wc — P2424 COLUMN, SEE cy ee DO Z Le | \ C) l ! 4 WW D> DET 5/S4.11 | Z|. ns A | ~ x QUAL oY \ | ra | Wet | L ae ‘ L =) i | . a, \ a, 1 \ | ny i | \ =“ | 1 \ \ ~ ! \ | sj a tL = - 1 | ~ Oy \ ! ! | | AB oe aoe Pap - - - - -—J-- - 57 -_-_’s_-__-__-__-__-__-_. — + = \ = ~ VL / \ _~ —— L a ee, - \ | \ - | ° \ of | I ~/ / x aa Sele i ee eed _— \ wy - : aa NT TYP \ 5 l Ns DOWEL S.0.G. REBAR INTO, | 0) x | ! | | \$4.42/ I | MAT SLAB, SEE GEN. ~ ~ 4 Lu \ Tr ! NOTES FOR ADHESIVES \ cy 7 —! OC) | \ real | EDGE OF MAT ~/ yy 7 AZ EQUAL _! EQUAL EQUAL EQ IE | 4” SLAB ON GRADE FOUNDATION Wo? | * rr +—T ON COMPACTED FILL, ne 7 —_| | | REINF. w/ #4012” [ a“ — O | E.W., SAW CUT JOINTS , | oN Oy ey ey r 1 Loe ! | AT 12’-0” 0.C. MAX. I ~/ ~/ ~/ ~/ \ S4.42 Wb l \ Loe a \ _ _ __ a 1 . 15 | . 7 a ra ‘S) ! 7 \ . Q z | \ i 7m a” \ \ Ee — | [I J J J m1 7 J J | fry . J / a | -_— | 1 AA 2 2) LL Or) @ (02) Ea) (10) (10) EQ Vy | GANG (04 S e ey Ne WEE =a ft \ ‘K_! \ ~ / REINF. ROUND CONC. STAIR » q f PIERS w/ #5@8” VERT. & DATE: 02-19-20 ~~, / #4@8” TIES, SEE ARCH. FOR 3 SIZE AND T/PIER ELEV., TYP. DRAWN BY: SGF $4.42 “SL 4 LOCATIONS N KEYPLAN “vv SHEET NUMBER: 1-4? ax F | ELD LE VEL FR AM | N G / FOU N D All ON P L AN B PRIOR TO CONSTRUCTION, GENERAL CONTRACTOR MUST VERIFY THAT THE BUILDING es] SCALE: 3/16" = 1'=0" ‘ & FOUNDATION DESIGN CONFORMS WI/ ALL APPLICABLE CODES FOR COASTAL FLOODING. McVEIGH& M ANGUM , / an ENGINEERING: INC PLAN NOTES: 9133 RG Skinner Parkway : Ph: (004) 483-5200 Fax: (904) 636-6770 1. SEE SHEET $1.12 FOR FOUNDATION NOTES. 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main License No.: 1431-E X: \2014\14188 (Paul E Joseph Stadium and Sports Complex)\14188_dwg\14188 $1.12 S1.13 $1.14 Field Level Framing—Fnd Plan A B C Piles.dwg, 04/02/2020 11:48 AM, agutierrez o! , | | | | = | rr pe rrr 4 | l | VION | | | Cn cmc cc cc cc ce ce we ee we ce we ee we we i we we we we ed w= = = PRE-ENGINEERED : CL PILE METAL STAIRS ay i FL ! STAIR SUPPLIER | any $3.02 * | — in a | \ | if | Ae ee oe a a - - - __AvT. _ _ _ _4 = mall A> - - - am - - - - - - - - - - - - - - - LL) mi \Ly ~7 | (1 8) X re cs G11 1111111111111 111101111 Ju GU HL 11 Y | a, | fo O EDGE OF MAT \ FOUNDATION ‘4 | a i} | I cy) | 5 IN FD ‘4 g Re ~ ~ \ 3 : tn ? ay 7! EDGE OF MAT { a - . ; MA ; 1 " 4” SLAB ON GRADE 5 00 501 7 711) 77 ry | FOUNDATION ON COMPACTED FILL, ? = 7 N Ny DOWN \/ ‘EY (3 \+7 ‘7 | REINF. w/ #4@12” % q 4 M o——+ | S00 E.W., SAW CUT JOINTS < 4 | ‘ | AT 12’-0”" O.C. MAX. Yn < ms — ~ | fs fC ow o) Og z | Oo 4 o = | 5 FO ° | 7 | 54.42 5 QE g Ay + | f | a: S22 2 11-754" fo Nn fee oO = | ; (4 LL, a = = | 1 E mu 2 ® . ! $3.02 ~ iB; LI O O | LL rE YD © Va ee ol Syste tt ite yy A _/--------4-------} eee eeeeeteesesenienseesesanien ie Od nly i ioe ie ae i a ow z= Oo ‘S/ a ‘7 E47 V7 | or && FT L7 4 —, —, ! | | an wo fag “. 4 PRE-ENGINEERED |. S4aD OloOodeE: i : COLUMN BY i | TYP AT | ! PRE-ENGINEERED |’ DOWEL S.0.G. REBAR INTO FD (5 i? g CANOPY /BLEACHER Ik | MAT SLAB, SEE GEN. SH . SUPPLIER, TYP q | NOTES FOR ADHESIVES . 7 ’ | Sate ey yf I : ‘ | RY }----------}-----------------------4----------. PTT TPT 4 uu = Ay MS SF “4 A: Se, “4 “4 ( | — [ | DENOTES 6” CONC SLAB \, } ee fe \) ED) va 4 cP >, \ | a = ie (J | - (a) REINF w/ 6x6—W2.9xW29 || T/SLAB EL, |} Ly Lo ¥ ah ; 2 | WWF SEE ARCH : : | cestesTerTesnTenTenTeenTanD (DennenTanTanTEESTESTEnTESTnTEETEETESTEEETEETEETEEETEETE TE a< a ran 4 My], <——— M36 ——— | Z - x< ae Ly : rp TYP, UON 5 Y) | _* | : 7 : | Ey O44 2 . a 4s 7 Zl - at | >A? << = : | 3 + ; 5 (o FIELD LEVEL FRAMING /FOUNDATION PLAN ‘C NUS HOME " 5 ay | \suia] SCALE: 3/16” = 1’-0” _I i DUG-OUT ia : || - | xt nO } “ALD ; | ‘> \_) PLAN NOTES: a a dy a ees eern ie re ah ; {| a os (3. -—-_-_- + eo (16) 1. SEE SHEET S1.12 FOR FOUNDATION NOTES. = = . QO | ; | (> C) | oad ree : « | | PRIOR TO CONSTRUCTION, GENERAL CONTRACTOR MUST VERIFY THAT THE BUILDING Q LU w) el * 4 4 & FOUNDATION DESIGN CONFORMS WI/ ALL APPLICABLE CODES FOR COASTAL FLOODING. Wu ep) Q teas) Me x F | = ceils s a nO ix a'-0f6" . tr) 8” CONC WALL ISEE | 2 r Vy DETAIL 5/S4.41] FOR $3.02 | : af REINFORCNG | SI rp Oo z _ | ; lan aa cry | ° a QO. (i , “ TA a " Loy | Et] V7 ML Ly | © 5 a TaN ‘ i a | wo \$2.03/ : DOWN | .. | | fa 1. DOWN <( 2 o™. % | or he $5.07 T$3.02 ‘| SLOPE SLAB DOWN AWAY FROM EDGE OF MAT Je o> : 4 2 ‘ aI WALL, SEE ARCH. SLOPE AND FOUNDATION GB, —- 6 ie Pe f i SLAB ELEVATIONS | Oy ea); Oy C} | : i, if "b / 7 -—-—-—-4l.—- fi tl tet ft eg cn 15 =z ‘ii : {i ¢~ ‘ A ¢~ - ro | — Wy \_) : rs) j\_) > | Oo an | * A= AL | a 7 ~) | - ~ | S — O | je) ! | CL S < | al S = I LL fy = < NL | 9 ‘am A ! Se | | ml Oo a I Ife] | to IR ey (07) DATE: 02-19-20 7 4 ia | GC DRAWN BY: SGF P424 COLUMN, el 4 | N KEYPLAN DET 5/S4.11 al | ! | . if] -) / at | SHEET NUMBER: vil | \ 7 | | | | t [| a on McVEIGHQMANGUM ? | ENGINEERING: INC = 7 L sold 4! $3.02 NN re) 9133 R.G. Skinner Parkway . el | Jacksonville, Florida 5 ED ED | | | NL VL 4 | FOUNDATION Eng. of Record: Matthew C. Main License No.: 1431-E yl oO | i | CONSTRUCTION ISSUE 03.16.20 == WM) V JV). 7 Li f Vf i) @i) ee ee | 7 Hr —— FP} te Eh Ly) tg tg tk oa a< 4+ 1} ty cy iy dy Jt} ty tk a a ee eee a Po vr 07.1 | @ Ais | Se [| fo \ ~s HO \ Va oA Hl “KL fs | / >> \ / ———— =p = wae KS QV - ey oes LAT} GL gf 7 Yo / ch SSS SS ——————— [1 SS ——————— fn SS SS fn SS ==> [Tr + ¥F oN Ry 4 VA Eo \ Ry ——— | — — a ) | Epa Re a mph 2 A a en i ne // Re YY 7 Bt C74 CO © © © © ©) Qe DATE: 02-19-20 KEYPLAN DRAWN BY: AGO Gy “Ld SHEET NUMBER: G 3~(b-20 (-\ CONCOURSE OVERALL FRAMING PLAN MATTHEW C. MAIN 1431-E McVEIGHQMANGUM ENGINEERING: INC \s2r) SCALE: 1/16” = 1’-0” 9133 R.G. Skinner Parkwa Jacksonville, Florida 32256 91.21 /R Ph: (904) 483-5200 Fax: (904) 636-6770 hi Eng. of Record: Matthew C. Main 0-40126-1B email: mail@McVei ghMangum.com L N 1431-E CONSTRUCTION ISSUE 0 3.16.20 i] i} i} i} 1 i) i) i) i] i} i} i} $2.01 SEE NOTE 2 \ $2.02 $2.02 $2.01 | U, 4 4-4 A 1 \ . qo | \ 1 | 4 44.0: 4 , g “lI x= 5 v : : ra | 4 1 a Oo ~ “J \4 ‘ 6 . 4 oF: g " | < an 4 . , v7. Jo: 4 - 4 . <7 . A . . 4 J . a N L & A ; ae ‘ ; J ‘ A . . : . A I og : A, - : . [aa ‘7 ; ; . a g- . . Ld . v4) J , 14 A Av : > Vv ; . A : J 1 : 1A v. 4 _ 4 A- co i A Zi A J .! | | 3 Ie | | | co | le l - : / i = i re z | | 5 | 2 | l l eh / | | 2 | E | | my c ] = - ai al. ow ow ow Lo a Qa ae Tae PRE-ENGINGERED GIRDER / PRE-ENGINEERED GIRDER AHRE-ENGINEERED GIRDER PRE-ENGINEERED GIRDE _ _ _ _ J _ l VA [ VA a a a a ae a —————————————— a Sy +4 PRE-ENGINEERED BLEACHER SYSTEM ' \ FY BY PRE—ENGINEERED | BLEACHER SUPPLIER oO 1 i) i) i) i] i} i} i} 1 i) i) i) i] i} i} i} 1 i) i) i) ] i] i} i} i} 1 1 i) i) i) ] i] i} i} i} \ i] i} i} i} i] 1 i) i) i) ] i] i} i} i} \ 1 i) i) i) ] i] i} i} i} 1 1 i) i) i) ] i] i} i} i} 1 i] i} i} i} i] 1 i) i) i) ] i] i} i} i} 1 i) i) i) \ 28'-0” 28'-0” 28'-0” 22’—10%” | 5’-1%" (2\ CONCOURSE FRAMING PLAN < Oo. u << Lu DNS a 70 O O a: < O O = DATE: 02-19-20 DRAWN BY: SGF McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main License No.: 1431-E CONSTRUCTION ISSUE 03.16.20 SHEET NUMBER: 91.22 5'-15" 15 ——\ "> ) > O ) ~ 7 = 3 < x 7 < , < in LL wm a tg S : © nN = t Cc Q Xa — al ~ ee ~~ (be 58g g LO OZ D - 00 .H iT 5 @ A? LU < 5 2 KS (1\ CONCOURSE FRAMING PLAN B ch ZZrn J \st-23] SCALE: 3/16” = 1’-0" oO 8 < Og /“ LT GA STUD PLAN NOTES: > ~ aos / WALL ABOVE, 1 - J / SEE S1.53 1 DECK-1 DENOTES 5” THICK MIN. NWC CONC SLAB WITH #5 T&B @ 12” OC m~ ore uw NSO de SPANNING IN DIRECTION SHOWN AND #4@12” OC CENTERED TRANSV. 2. SEE SHEET S1.22 FOR ADDITIONAL PLAN NOTES 3. FD DENOTES FLOOR DRAIN. COORDINATE WITH ARCH AND PLUMB DWGS. 15+ \ CONC WALL BELOW, \ SEE SHEET S1.13 \ Lo \& iL | \ a" XS ° / ) sani / \ ~~ INN NN 1 N \ Ay a & ~ ' \ Ca ; Q Sy Sy / | a \ y 4 \ J : —_ — y ~\ 7 | | 2-7 \ \ FD a / sal - | AN 4 =u \ Q gt 2 \ / [ \ \ % TypAS#M1 | \ . 4 @ COL 4 \ t \ Q LS LT GA ‘STUD ow , Rw) “ SS { SEE $1.3 es C4 FREDERIKSTED REVITALIZATION PROJECT PAUL E. JOSEPH BASEBALL STADIUM AND SPORT COMPLEX 7 NX Z » \ =o) DECK-" ny DECK-1 is FD JS —$§_ SS fa) 7, e| | \y 4 — db ' _— _ — b— / fl Jj / & / KE 3/ / O A | fe) /| siM\S4-01 9" ane & 1 c-BM1 ~ 1 [| | —--— ye | / C-BMB , e Ne i] aar-| Ly age Ap TTT TG N % ‘am | Ca)\ Do | 3) \. O ! O Z Zz i} ] : O | | | > O \ oc O \ LL © \ \ Zz ; \ S Fs fl ; \ a ] DATE: 02-19-20 | | | \ DRAWN BY: SGF 15° \ \ i} \ \ | 51%” 51’-4%” \ 14’-0” SHEET NUMBER: Eng. of Record: Matthew C. Main McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com License No.: 1431-E CONSTRUCTION ISSUE 03.16.20 91.23 VGZZ-8ZZ-OVE XVA 8688-8ZZ-0VE TAL 22800 SGNV1SI NIDUIA ‘S'N XA IdNOO LYOdS GNV iO. NV1d : 5 a XIOHD “LS ‘GALSNVILSINHO WNIGVLS TIVGSSVdE HdSeSOPr “4 1NVd ONIWVH4 SSHNOONOD o © : AKIWDIWVOD FILSV9 BLVLSS ELL-GOL LOArOYd NOILVZIIVLIASY GALSMIY¥saqdsuSs a 5 . SRSHAOIN WI SENSI AL OASIS :LOAPOUd :NOLLVAWHOSNI ONIMVHC 5 : : Y) License No.: 1431-E 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com ENGINEERING: INC McVEIGHQMANGUM Eng. of Record: Matthew C. Main 1 *_Q” SEE SHEET S1.22 FOR ADDITIONAL PLAN NOTES PLAN NOTES: (2) CONCOURSE FRAMING PLAN ‘C’ (6) (5) a oF | «0-82 | «0-82 | «0-82 | «#OL—.0C whl—S (a3) : By BLEACHER SUPPLI SEE PLAN NOTE 3 ON SHEET $1.22 a rem a Li ud = oO) Zz 1 Lu a oO BLEACHER SYSTE PRE—ENGINEERED i} i} ! i} ' l | | | | | | | | | | | | | na | d I | | | | | | | | | | | | | | | LAX | A | | | | | | | | l I 4. | | | | | | | | | | | | | -© 1 | «| | | | | | | | | | | | | | l aa | | = | | l | | | an | | | | | | I | | | | «| | | | + | | | | | | | | | fe) “| | | | | | | | | | PRE-ENGINEERED METAL STAIR BY YAGHIQ GSYSSNPN3-Jwd = YACHIO | GAYSINIDN3S—JYd] = WAGHID GAYSSINIONG—-J3Yd = YAGHIQ G3SYSSNIPN3S—Jy 3 {o} {o] & a) & | ‘tel Q " d ke = | | | s | | (aa) a | eel 2 fo wa = Oo | ‘teat 2 "do Wy a | | | | | ra : : 5 O° “o| [Es asGsif dss4s4dNPNa—sdd = aAdalo G3agS3SNi DNA-3adj = Hsj0sid- GHSSSNIONE—S8d — == dsadaigG- dsads3SNipNa—-sa | | I ~ - a XN . w . tS | | | , Y | a mo a a | | | ) “oy | ! = y on . 1 q > . < XN g° : > y. . / V , v- v 2 SEE NOTE 2 ~ 1 1 CONSTRUCTION ISSUE 03.16.20 VGZZ-8ZZ-OVE XVA 8688-8ZZ-OVE TAL ° ~— y 22800 SGNV1SI NIDUIA ‘Sn XA IdWOO LdOdS ONV : : ; ap) ‘ XIOHO “LS ‘ALSNVILSINHO WMIQVLS TIVWdaSVd HdSasor ‘A INWd NV1d DNINWH4 TIVHSAO 4OOHU | © ~ f " | AFWVO)D AILSV) ALVLSS ELL-GOL LOsdrOud NOILVZIIWLIASY GSALSyMIYvsaq0sus a 5 Tr } spSeLYoy VI SUIYOINH “4 UeAe1S , wz f Y) -LO5fOud -NOILVWHOANI DONIMVYG a a on © | — . ois © O a 2 228216 >| 5 Wee 5 7 WnsSsa Dz © 10 O > oc — ¢p) Z O O wv, (2) ROOF OVERALL FRAMING PLAN $1.31) SCALE: 1/16” = 1’-0” 79:1 BMP’NV1d JOON TIVYSAO ISLS B8lbl HH LL 0Z/Z0/¥0 ] ' ' ' i] ' i} i} ] ' ' ' i] ' i} i} ] ' ' ] ' [} ' PRE-—ENGINEERED | ; CANOPY SYSTEM BY PRE-—ENGINEERED 5 oN CANOPY SUPPLIER. ——| | $2.01 / SEE PLAN NOTE 3 oY Sa $2.01 Re \ \ ro) / N / | i} a |=] _— | Ze I) Z Ic) _L | | - - - Ys - - - - - - - - - - - - - - - - - 1 - - - - - - - - - - - — = — - - - - - - - - - - - L - -7 pT a + + a = + sb | | ara | | [nay Fy ' | | tl 2) | | ra Eb BD & Z ao 2 Z | | a ea WI a faa) ra] a | | Ll = n 1 | l l ry ir OE ry @ te ir | TP C n o 5 C | s | a (an) a =) | x | ud a rr WW ir | o | Zz ry Zz 3S Zz | — | S 5 el 9 cay 2) S ; | ee on rr] Zz Gi Fra ool | Lh iD i" a i} Lh 5) al fe i re x f £ ! jam i} — | -_— -—— -_— _— _ _ _ 4 _ ___|— ——— — SS —l ee — — See a _ — See —l ee — — See a — SS -H ' i] ' ] ' ' - i] te me | i} ro) i} ] ' i} i] — 1 __— --— a _ _ _ _ _ 1 _ _ i _ _ _ _ _ _ _ _ _! _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _! _ _ _ _ _ _ _ _ _ ~— -— [ea —_ _ ) i] i} ' I ; 12 LT ' ] ' ' i] i} i] i} i} i] ' ] ' ' i] i} i] i} i} i] i} ] ' i} i] ' ] ' ' ] i} i] i} i} i] ' ] ' ' i] i} i] i} i} i] ' ] ' ' i] i} i] i} i} i] i} ] ' i} i] ' ] ' ' ] i} i] i} i} i] ' ] ' ' ' 28’-0” ' 28'-0” 28'-0” ' 22’—10%e" (a\ ROOF FRAMING PLAN ‘A’ \s1.32/] SCALE: 3/16” = 1’-0” PLAN NOTES: 1. | PRE-ENGINEERED CANOPY SYSTEM IS TO BE DESIGNED BY THE PRE—ENGINEERED CANOPY SUPPLIER. LAYOUT SHOWN IS DIAGRAMATIC TO SHOW GENERAL FRAMING CONCEPT. ACTUAL DESIGN SHALL BE AS REQUIRED TO MEET BUILDING CODE, CONSTRUCTABILITY, AND COORDINATION WITH ARCHITECTURAL DRAWINGS. 2. DEcK-3 DENOTES CORRUGATED METAL DECK DESIGNED BY THE ———— PRE-ENGINEERED CANOPY SUPPLIER SPANNING IN THE DIRECTION SHOWN. 3. | PRE-ENGINEERED CANOPY STRUCTURE BY CANOPY SUPPLIER REQUIRES SIGNED AND SEALED DESIGN DRAWINGS AND CALCULATIONS BY A LICENSED PROFESSIONAL ENGINEER FOR REVIEW AND APPROVAL BY THE PROJECT ENGINEER OF RECORD. McVEIGHQ MANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main CONSTRUCTION ISSUE 03.16.20 License No.: 1431-E Hy Ly LHI Ni NU “”) > O () = © S D { N - cy eR qi n Zz fo) nO < t CQxX a CfCuegse (oe) Sbeo. J OQ < | wo 5 : LL __3” x20 GA FORM DECK SPANNING IN DIRECTION SHOWN. - O DF 2. DECK-2 DENOTES 14°x20 GA GALV MTL DECK SPANNING IN THE DIRECTION ——> SHOWN. 3. SEE SHEET S1.32 FOR ADDITIONAL PLAN NOTES. = O Uu > ra fs . ZMy nx ; oman a —— | No 2 5 WO x nO _ _ _ _ _ — < |— > or uj) IO qaQoao a Lu Ww ! — \s4 =p ee OQ 4 a , PNG |— O Zz 600S162—54 LT GA \ Xx ~ = | - -— studs @ V6” oc. oa aN WY | \ ma ‘ a $4.32 x< LL] | tpoob20p-6B | | - ti O — AY UT ch uISTB + D6 IN : { — — — — ” e es NN @ ps 0C ; \_DECK-1 uy fc \ + de oO ” _ > | on ft TT 3 " ! 4 +] * \ N 1 \$4.32/ L im —_—- / in : i; : AN . peog 9 x nn | ee eer VA ‘ \ J LLLLLLLLLLL LALIT LLLP ILA LLL ETAL POPEATER LLALL LEO iO \ : - = —— = Pal cE J. i|_. ee ae a ie REE Ae \ \ a a zt = So a waar ge AY a 7° ae tf [Le AGN 1 ~ Tia 7 ~ ~ ~ ~ ~ B? 1 To Sy TV a ny ER t = Z | ougnsg/ \ 2-1200S200-68 5 P . LT GA JOISTS LT GA BEAM ee ee ee - @ 24” OC NZ ae i en Ge) Aa Q> aa) 1 \ Al ' | \ s s XC . QS : ! 5 S <> ! ! Q> s < ! ' = = © \ 2 ° = | \ QW 7 . ay O | wa, Zz | S ! < Li ] | g oO | ; O \ \ oc ‘am O 1 \ > ] = fj \ = \ cc ] I \ DATE: 02-19-20 | | . DRAWN BY: SGF 15 \ | \ 51'—4%" \ SHEET NUMBER: McVEIGHQ MANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 a Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main License No.: 1431-E CONSTRUCTION ISSUE 03.16.20 ~ © © @ _———— _ ST Ww | | | 4 ' | | | | | | ' | | | | ' | | | | | ee oy PRE-ENGINEERED STEEL BENT ee (18) ry PRE-ENGINEERED CANOPY SYSTEM BY PRE-ENGINEERED CANOPY SUPPLIER SEE PLAN NOTE 3 ON SHEET S132 28’-0” PRE—-ENGINEERED $TEEL BENT| Steven E. Hutchins AIA Architects 109-113 ESTATE CASTLE COAKLEY CHRISTIANSTED, ST. CROIX TEL 340-778-8898 FAX 340-778-7754 U.S. VIRGIN ISLANDS 00822 DECK-3 28’-0” (ROOF FRAMING PLAN °C’ e A | | | \s34] SCALE: 3/16” = 1’-0” PLAN NOTES: 1. SEE SHEET S1.32 FOR ADDITIONAL PLAN NOTES. vty PRE-ENGINEERED STEEL BENT 1 6 ~ ~ ~ ~ ~ ~ ~ ~ yl ~ ~ ~ 71 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ PRE—-ENGINEERED || STEGL PURLINS,} TYP WD FREDERIKSTED REVITALIZATION PROJECT PAUL E. JOSEPH BASEBALL STADIUM AND SPORT COMPLEX . \ ' oO uu | | Ai ¢ % oO l ' | ' On | | \$2.02 ' | ' | ' | ! O \ | y Zz ! < - - - - - _ - - ql l PRE—HNGINEERED |STEEL BENT + Ld - _ - _ - - - - - - - - - - - _ - - - - 7 _ - - (15) _j | | oO | O | Z | — | | | = lan ! < 1 | ‘am i < O I | ' 5 | Z ' | ' oO | = | = 1 | 1 pS | fa | ” DRAWN BY: SGF am PRE-ENGINEERED BTEEL BENT ee a en q ° T ! | DATE: 02-19-20 SHEET NUMBER: McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 a Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main License No.: 1431-E CONSTRUCTION ISSUE 03.16.20 X:\2014\14188 (Paul E Joseph Stadium and Sports Complex)\14188_dwg\14188 $2.01 BLDG SECTIONS.dwg, 04/02/2020 11:50 AM, agutierrez ©) 2018 THIS DRAWING IS THE INSTRUMENT OF SERVICE AND PROPERTY OF MCVEIGH & MANGUM ENGINEERING, INC. THE USE OF THIS DRAWING SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED, ANY USE OR REPRODUCTION WITHOUT THE EXPRESSED WRITTEN PERMISSION OF THIS CORPORATION IS PROHIBITED PRE-ENGINEERED COLUMN BY PRE-ENGINEERED BLEACHER/ CANOPY SUPPLIER PRE-ENGINEERED BLEACHER-<——______| SYSTEM BY PRE-ENGINEERED BLEACHER SUPPLIER PRE-ENGINEERED BLEACHER SUPPORT BEAM BY PRE-ENGINEERED BLEACHER SUPPORT SUPPLIER ~ 2’-6” x 2’-6” BENT BARS TO MATCH CONC CEILING REINF. ~ 6” CONC WALL, cm SEE 5/S4.41 FOR REINF f «\ DETAI \ $2.01 QD /-—PRE-ENGINEERED BLEACHER GIRDER AND BEAM CONNECTIONS BY PRE-ENGINEERED BLEACHER SUPPLIER . “ Ww ; “N (2\_DETAIL ~. “XN $2.01 SCALE: 3/4” = 1’-0” we ; “XN Ww ; aN Ww ; PRE-ENGINEERED BLEACHER SYSTEM BY PRE—ENGINEERED il BLEACHER SUPPLIER BLEACHER TO MAT FOUNDATION aa 3 4 BY PRE-ENGINEERED BLEACHER | SUPPLIER 524 - a _ - RAILING, p | ~ SEE ARCH — MAT FOUNDATION, SEE PLAN STEEL PILE, SEE PLAN NOTE: SEE 9/S3.02 FOR INFO NOT SHOWN (2\_ DETAIL \s2.0r] SCALE: 3/4” = 1'-0" ” » As SCALE: 3/4” = ~\ PRE-ENGINEERED COLUMN AND BASEPLATE DESIGN BY PRE—ENGINEERED BLEACHER/CANOPY SUPPLIER 6” CONC CEILING w/ #5@12” OC EW SUPPLIER PRE-ENGINEERED PURLIN BY PRE—ENGINEERED CANOPY SUPPLIER PRE-ENGINEERED BEAM BY PRE-ENGINEERED cer \ PRE-—ENGINEERED SUPPORT— | GIRDER AND BEAM CONNECTIONS BY PRE-ENGINEERED CANOPY SUPPLIER PRE-ENGINEERED COLUMN BY—~ | PRE-ENGINEERED BLEACHER/ CANOPY SUPPLIER PRE-ENGINEERED ROOF DECK BY PRE-ENGINEERED CANOPY SUPPLIER (2) DETAIL ; \s2.0r] SCALE: 3/4” = 1’-0" / NOTE: COORDINATE CANOPY/BLEACHER DIMENSIONS AND DETAILS WITH ARCHITECTURAL DRAWINGS (~\ BUILDING SECTION ‘. \s2.or] SCALE: 1/8” = 1’-0” / / / VA wat NOTE: SEE 4/S3.01 FOR INFO NOT SHOWN FOUNDATION, SEE PLAN (10 \ DETAIL \s2.or] SCALE: 3/4” = 1'-0” \N PRE-ENGINEERED COLUMN AND SU PRE-ENGINEERED BEAM BY PRE-ENGINEERED CANOPY PPLIER PRE-ENGINEERED PURLIN BY PRE-ENGINEERED CANOPY SUPPLIER PRE-ENGINEERED ROOF DECK BY PRE—ENGINEERED CANOPY SUPPLIER /~—PRE-ENGINEERED SUPPORT GIRDER AND BEAM CONNECTIONS BY PRE-ENGINEERED CANOPY SUPPLIER /—PRE-ENGINEERED COLUMN BY PRE-ENGINEERED BLEACHER/ CANOPY SUPPLIER / (e\ DETAIL / $2.01} SCALE: 3/4” = 1’-0” PRE-ENGINEERED COLUMN BY PRE-ENGINEERED BLEACHER/ CANOPY PRE-ENGINEERED BLEACHER | SUPPORT GIRDER AND BEAM CONNECTIONS BY PRE-ENGINEERED BLEACHER SUPPLIER e000 | J CONC WALL, SEE PLAN FOR THICKNESS AND REINF CONC PILASTER BEYOND, SEE PLAN DETAIL SCALE: 3/4” = 17-0” CONC WALL, : de a / / SUPPLIER \ “a y a \ ) 7 L a \ / a \ / a \ / a ee ee | | VA “7 Se 7 TOP_OF CANOPY, . | ——OT EL VARIES, - ~ -* SEE P. “XN | | i] | -" “ a . —_— | | (2) we L 4 S2.01 TOP OF WALL Z EL 16’—2” CONCOURSE LEVEL EL 12’-8” CONC CEILING, SEE 4/S2.01 FOR | THICKNESS oo — AND REINF | 7 LL | -~ > L — | “lI TOP OF SLAB PRE-ENGINEERED COLUMN BY | EL 0-0 PRE-ENGINEERED BLEACHER/ | CANOPY SUPPLIER | NN! | | | x SEE PLAN FOR THICKNESS AND REINF L-—CONC PILASTER BEYOND, SEE PLAN BASEPLATE DESIGN BY PRE—ENGINEERED BLEACHER/CANOPY SUPPLIER STEEL PILE, SEE PLAN HPN NOTE: SEE 4/S3.02 DETAIL (2 _ DETAIL S2.01 SCALE: 3/4” = 17-0” MAT FOUNDATION, SEE PLAN FOR INFO NOT SHOWN $2.01 x Ly SCALE: 3/4” = 1’-0” McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main CONSTRUCTION ISSUE 03.16.20 License No.: 1431-E N Ly NT Steven E. Hutchins AIA Architects 109-113 ESTATE CASTLE COAKLEY CHRISTIANSTED, ST. CROIX TEL 340-778-8898 FAX 340-778-7754 U.S. VIRGIN ISLANDS 00822 FREDERIKSTED REVITALIZATION PROJECT PAUL E. JOSEPH BASEBALL STADIUM AND SPORT COMPLEX 7 (e) LU im O oc oO Cp) S | O LU Cp) S z : 0 x = — c > a aa) Zz = x oc im) DATE: 02-19-20 DRAWN BY: AGO SHEET NUMBER: 92.01 X:\2014\14188 (Paul E Joseph Stadium and Sports Complex)\14188_dwg\14188 $2.02 BLDG SECTIONS.dwg, 04/02/2020 11:51 AM, agutierrez ©) 2018 THIS DRAWING IS THE INSTRUMENT OF SERVICE AND PROPERTY OF MCVEIGH & MANGUM ENGINEERING, INC. THE USE OF THIS DRAWING SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED, ANY USE OR REPRODUCTION WITHOUT THE EXPRESSED WRITTEN PERMISSION OF THIS CORPORATION IS PROHIBITED PRE-ENGINEERED CANOPY SYSTEM BY PRE—ENGINEERED CANOPY SUPPLIER. _—— + PRE-ENGINEERED BLEACHER SYSTEM WITH BEAM AND COLUMN SUPPORT BY PRE-ENGINEERED BLEACHER SUPPLIER. NOTE: COORDINATE CANOPY/ BLEACHER DIMENSIONS AND DETAILS WITH ARCHITECTURAL DRAWINGS TOP OF CANOPY EL VARIES, SEE PLAN TOP OF WALL EL 16’—2” CONCOURSE LEVEL ~_— — — YH (3 Pa fi EL 12-8" CONC. WALL BEYOND, - ia SEE PLAN “ al || ¥ a NO EXT CONC WALL, ri 4! SEE DET 5/S4.11 FOR MAT FOUNDATION, || : “| lays | REINFORCING SEE PLAN | | | | 2 Fl f pr nleseal | TOP OF SLAB l l | | l l EL 0-0" | | | | | | | | | Sa | | | | | | | | | | : | | | | | A | | | | | \ | | % STEEL PILE, ee ee _) Cn ee J ( ae | SEE PLANS (2) SECTION \s2.02] SCALE: NTS (*) ©) NOTE: COORDINATE CANOPY/ BLEACHER DIMENSIONS AND DETAILS (6 WITH ARCHITECTURAL DRAWINGS PRE-ENGINEERED CANOPY SYSTEM BY PRE—ENGINEERED CANOPY SUPPLIER. TOP OF CANOPY r-PRE-ENGINEERED BLEACHER SYSTEM WITH BEAM AND COLUMN SUPPORT BY PRE-ENGINEERED BLEACHER SUPPLIER. — EL VARIES, SEE PLAN TOP OF WALL EL 16'—2” CONCOURSE LEVEL ee a a — EL 12-8" +6” CONC CEILING : $2.0) SLAB, SEE PLAN = 6” INT CONC WALL Ms \ a \ SEE DET 5/S4.41 . y Pa 8” EXT CONC WALL, FOR REINFORCING L: Fa af SEE DET 5/S4.11 FOR MAT FOUNDATION, y 2 REINFORCING SEE PLAN F a-ha L i ul TOP OF SLAB T Tl EL 0-0” ee (2\_ SECTION ee es ee) eee — — — — ]}- — — — — — }- 4 \ sree PILE, SEE PLANS $2.02 SCALE: NTS CONC DUGOUT ROOF SLAB, SEE PLAN FOR REINF ss KR z T/SLAB EL, a 7 oo —s —— SEE PLAN 4 qd 2 : . . a @s#6g ae°. iT) 4 4a qV A 4 ¢ . : 9 . . ta a. a. Np CLOSED TIES Aa ed @ 4” OC joe 30) B/BEAM EL 7-0" 3 45 wa | SEE PLAN 1’-0 (3s\_DETAIL $2.02} SCALE: NTS RAILING SEE ARCH CONC DUGOUT ROOF SLAB, SEE PLAN FOR PRE-ENGINEERED BLEACHER REINF SYSTEM BY PRE-—ENGINEERED — BLEACHER SUPPLIER io “sagt dat 4 , * ~ 4 ‘Ja. rn . 4 . OS “J . : A ne cv J CONC WALL, a ‘Pe SEE PLAN FOR a PRE-ENGINEERED BLEACHER THICKNESS i A SUPPORT BEAM BY AND REINF - on PRE-ENGINEERED BLEACHER 9 4 q SUPPLIER ge - BLEACHER TO CONC WALL CONN BY PRE-ENGINEERED BLEACHER SUPPLIER 8” CONC WALL w/ . #4 VERT @ 12” OC & ° #4 HORIZ @ 9” OC oe CONC SLAB, SEE PLAN FOR REINF T/WALL EL, (+ _DETAIL $2.02 PRE-ENGINEERED COLUMN BY PRE-ENGINEERED BLEACHER/ 17-7%" VER. w/ ARCH. dA CANOPY SUPPLIER PRE-ENGINEERED BLEACHER SYSTEM BY PRE-ENGINEERED BLEACHER SUPPLIER Aa PRE-ENGINEERED BLEACHER SUPPORT BEAM BY PRE-ENGINEERED BLEACHER SUPPLIER BLEACHER TO CONC SLAB CONN BY PRE—ENGINEERED BLEACHER SUPPLIER (2) DETAIL $2.02 SCALE: NTS McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main License No.: 1431-E CONSTRUCTION ISSUE 03.16.20 N Ly NT Steven E. Hutchins AIA Architects 109-113 ESTATE CASTLE COAKLEY CHRISTIANSTED, ST. CROIX TEL 340-778-8898 FAX 340-778-7754 U.S. VIRGIN ISLANDS 00822 FREDERIKSTED REVITALIZATION PROJECT PAUL E. JOSEPH BASEBALL STADIUM AND SPORT COMPLEX : fe) it Cp) z O | O LL] s (Cp) 2 O < Zz = O = —! z 5 : Mm DATE: 02-19-20 DRAWN BY: AGO SHEET NUMBER: 92.02 X: \2014\14188 (Paul E Joseph Stadium and Sports Complex)\14188_dwg\14188 $3.01 FDN DETAILS.dwg, 04/02/2020 11:51 AM, agutierrez ©) 2018 THIS DRAWING IS THE INSTRUMENT OF SERVICE AND PROPERTY OF MCVEIGH & MANGUM ENGINEERING, INC. THE USE OF THIS DRAWING SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED, ANY USE OR REPRODUCTION WITHOUT THE EXPRESSED WRITTEN PERMISSION OF THIS CORPORATION IS PROHIBITED CONC MAT SLAB, KEYWAY W/ - WALL CONC MAT SLAB, SEE PLAN WATERSTOP all DOWEL SEE PLAN TYP |: i yn . en ae / i _.. ; : v a gq | 4 A e @ oa e e ow toy: e. : ey ° ° x) e@ e v Ze . 4597 ‘ 4s fas 3). 8 a . a Ss, z : A. “J - 4 4 “a . . | . 4. ; Lo oT, Lg a . a E|oO —e a 49 a nr, o - ae —— “4 a => Re tA vo Dog fo a : A ° vo q ! PA] “eg e eo. fe... e e e o_ e ) ° ‘ e 4 Ae ° oo a a “J . me, / . rm) : 464g tJ g — | 4 _ A. A: | Ny] A 27 © A | \ .J g ¢ Mop te 44 7 I ‘ , ° a = ——SS== —_——_—— nn Xm mn | | | | | STEEL PIPE PILE, A, VAPOR SEE PLAN & S303 RETARDER JOINT AT WALL CONSTRUCTION JOINT NOTE: (2) MAT SLAB JOINT DETAILS CONSTRUCTION JOINT TO BE THIRD POINTS OF SPAN BETWEEN SUPPORTS. $3.01 SCALE: NTS 2” CLRY &. “2 — (2) ADDITIONAL REINF @ SLAB CL SUPPORT CL SUPPORT ADD AT EACH SIDE OF OPNG % OF SLAB REINF INTERRUPTED BY OPENING SLAB REINF INTERRUPTED BY OPNG CL SUPPORT CL SUPPORT OPNG>8" $3.01 SCALE: NTS DUMMY GROOVE JOINT. NS (2 ADDITIONAL REINF RECESSED ADD 2-—#4x3’-0” LG CTR’D @ EACH PT OF DIAMOND MAT $3.01 SCALE: NTS 8” TYP A 3} ° 4. 4 s] SEE PLAN s}. {* SEE DETAIL ”A” Jog 7 MAT SLAB, A: \ th *|4 “4 L6x3%x% (LLV) x 2 —_+ DOOR WIDTH + 4” W/ "40 ° ia D) rr az . %’$x3” STUDS @ 2’-0” ‘a a 4. 4. XQ Sf “A ; So 4 a NL ca 4 aa a %_ 2-12 > “ fe fe i y, | fe : — a eee —s ae =| es _ e. —* 4 a —s*- N SRI TET i 2’-0” SQUARE HOLE LOCATE [7]U-47 SSS SSS YIY IY) ) 7% ale AS REQ’D BY ELEV MANUF FILL f*} .* 2 OXY YN v NA fb as HOLE W/ NON-SHRINK GROUT f°} .. | | % LI 2 “A |. & AFTER ELEVATOR IS ERECTED |¢] 44 45@12” EW DETAIL _"A” 2 1’-0” 7 a fe] a> y. S : ll EF TYP TYP : SUMP PIT |. | by W/ ve \ -{4 q ali 17-6” STEEL REINF, an 2 . A SEE PLAN se a tr5—5 1. ed | SHE PLAN | je A q 7 oe By .q 4 e ae 7 e | : ‘a . T/SLAB EL, | . po . oo | —=s SEE PLAN : . @ NOTES: CJ . e » +8 C) WA) e.- C) . . a —— i ee —— nae _ ie ' atg.ca- | 1) SEE SPECS FOR WATERPROOFING. L, ; ‘ a oy gv .! | . a | 2) PROVIDE WATERSTOP @ EACH ns ae 4 4 ae. N |. 2 | JOINT—SEE SPECS. & 2) . 4, a - : mn | 2 a 2 a | | . “a a a 4. , ~ “40 ! . 4 J ht J rr ne Le } . a} VAPOR RETARDER a Vv : 4, ; 9 go: . TTD eo > 7 TT e oe 24 ‘ 4". A °. q e | | | | ag 3 | | #6@6” EW T&B | Pp a at !_4,_1 #6@6" EW CTR'D a SEE PLAN & 5503 (>=\ DRAIN DETAIL (e\ ELEVATOR PIT SECTION S3.01/ SCALE: NTS S3.01/ SCALE: NTS CL COL STAIR STRINGER BY STEEL COLUMN BY BASE PLATE AND ANCHOR PRE-—ENGINEERED PRE—ENGINEERED BOLTS BY PRE—-ENGINEERED STAIR SUPPLIER STAIR SUPPLIER, STAIR SUPPLIER. SEE PLAN NON-METALLIC, NON-SHRINK GROUT 1” CORN to Poon MIN, 2’ MAX BY PRE—ENGINEERED a MAT SLAB, STAIR SUPPLIER MAT SLAB, a SEE PLAN [ SEE PLAN Liu | T/SLAB EL, | T/SLAB EL, ee SS | st OSEE PLAN 4 a a | ss SEE PLAN . } OG. h A: , . . : J a 4° . . : 4. oo al : g A. “oy : g "4 “ae * b. Ale e J “ 4 e . e. ‘Ave e J a . Ba 4 Wt 4 3 4 Wt 4 (2) STAIR COL TQ MAT FOUNDATION $3.01 SCALE: NTS J. “TT TT I (2\ STAIR STRINGER TQ MAT FOUNDATION $3.01 SCALE: NTS WRAP WITH 2 LAYERS OF OILED HEAVYWEIGHT KRAFT PAPER, TWIST END CLOSED %’ 6 SMOOTH %” PREMOLDED BAR @ 1’—6” EXP JT MATERIAL VQYY . otoof \ } / : ~ do WwW gio. a 4 ” % CHAMFER 9” Q” CONSTRUCTION JOINT (7) CONCRETE WALL NOTES: STEEL COLUMN BY PRE-—ENGINEERED CL COL BASE PLATE AND ANCHOR BOLTS BY PRE—-ENGINEERED CANOPY/BLEACHER CANOPY/BLEACHER SUPPLIER. SUPPLIER, SEE PLAN NON-METALLIC, NON—SHRINK GROUT 1” MIN, 2” MAX ar MAT SLAB, oo ja SEE PLAN Su (ri) T/SLAB EL, a v1 J SEE PLAN a] ; a. 7 ag | . 74 +. é a 7 4% * 40 “4 eg! . J. 4) . a 4 ee ft (2) RECESSED COL TO MAT FOUNDATION $3.01 SCALE: NTS 1) SHEAR KEY SHALL END 3” FROM TOP OF WALL. 2) STOP HORIZ REINF 1%” EA SIDE EXP AND CONST JOINT. 3) PROVIDE CONTRACTION OR CONST JNT AT 3 TIMES WALL HEIGHT OR 30’ MAX. PROVIDE EXPANSION JT @ 90’ MAX. in CONTRACTION JOINT WX - Wa “a a cat, . ee eee = : pe et As 4 “J : 4. ; . at g. 0.1xWALL THICKNESS x” TYP , CONTRACTION JOINT JOINTS $3.01 SCALE: NTS McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main CONSTRUCTION ISSUE 03.16.20 License No.: 1431-E N Ly NT Steven E. Hutchins AIA Architects 109-113 ESTATE CASTLE COAKLEY CHRISTIANSTED, ST. CROIX TEL 340-778-8898 FAX 340-778-7754 U.S. VIRGIN ISLANDS 00822 | rt us O- or QO aS Zm x OW E << & Ni a 5 WO qt NO E ak s(n u IO ras (a) im 6 a KSZ YN <= < WwW — Lu > QO < | wo 5 : LL Op — < | Lu 2 Z O | < QO S ? 9 = rs DATE: 02-19-20 DRAWN BY: SGF SHEET NUMBER: 93.01 X:\2014\14188 (Paul E Joseph Stadium and Sports Complex)\14188_dwg\14188 $3.02 FDN DETAILS.dwg, 04/02/2020 11:51 AM, agutierrez ©) 2018 THIS DRAWING IS THE INSTRUMENT OF SERVICE AND PROPERTY OF MCVEIGH & MANGUM ENGINEERING, INC. THE USE OF THIS DRAWING SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED, ANY USE OR REPRODUCTION WITHOUT THE EXPRESSED WRITTEN PERMISSION OF THIS CORPORATION IS PROHIBITED RAILING 2’-0” MIN TO (2) SECTION 8” VON SEE PLAN ; eZ REINF ld REINF EF TO MATCH : KEYWAY W/ WATERSTOP | of SN eae Or Ng ; = MAT REINF. PROVIDE 4 AT EXTERIOR WALLS |. if ao MAT REINFORCING, HOOKED ENDS FOR ° non SEE PLAN ait ao. VERT REINF Hk SH MAT SLAB, dt / SEE PLAN T/ORADE PSHE T/SLAB EL, 4 -| |} =} 7s 4A, SEE PLAN PAVEMENT, SEE CIVIL ai ae : : SEE CIVIL 4 40 Pa) a. en N Wy a: 180 HOOKS AT Sf ah * ot a BAR ENDS fb s ; 3 ; TIT nw oN e ° e 2 e 4e ey = DOWELS TO MATCH r 4 ° J: .| | WALL/PILASTER REINF ===> nN STEEL PIPE oe, SEE PLAN & $3.03 Vv RETARDER fi \ SECTION f2\ SECTION $3.02 SCALE: NTS $3.02 SCALE: NTS ry 8” RAILING, SEE ARCH UON ame y SEE PLAN STANDARD 7 FOR REINF HOOKS e olf. I, Ik MAT SLAB, 8” CONC WALL aie SEE PLAN W/ #5 VERT @ 12”0C & #4 x J HORIZ @ 12” OC eae - T/SLAB EL, Lye —s : a i ae SEE PLAN . e eo e : ev .e a °a 8 7 al Q al . 4 7 7 7 , ‘oO “e : gf! ° ) 4. , 4 . a. v . ~ 3 A. s . 4 ‘|s CONC SLAB ON oy q 2 AQ ro a GRADE, SEE PLAN a] : “4 a ; rm Pp = = “ whe e . e e T/GRADE, 1 —_—_—__— 7 a SEE CIVIL |. — ee ee g sg 4 Fas 2 woz a! S 9” #4x1’-6” LG DOWEL © 24” O.C. 2-#5 CONT BOT | A 1-6 EXIST STEEL PIPE PILE, SEE PLAN ABANDONED —~_| & $3.03, TYP y STEEL PIPE PILE, V SEE PLAN & S3.03, TYP (CUT TOP OF PILE IF NEEDED) (2 \ SECTION $3.02 SCALE: NTS O PRE-ENGINEERED BLEACHER SYSTEM BY PRE-ENGINEERED BLEACHER SUPPLIER BLEACHER TO FOUNDATION CONNECTION BY PRE—ENGINEERED BLEACHER SUPPLIER RAILING SYSTEM, SEE ARCH a a or eee T/SLAB EL, SEE PLAN PROVIDE MIN. 3” GROUT COVER OVER TOP OF PILE AND 6” DOWN PILE SIDE TOP OF GRADE, SEE CIVIL EXIST STEEL PIPE PILE, SEE PLAN & S3.03, TYP (CUT TOP OF PILE IF NEEDED PER THE RECOMMENDATIONS OF THE 4 PROJECT GEOTECHNICAL ENGINEER) (2 \ SECTION 1’°-4” MIN RETARDER SEE PLAN $3.02 SCALE: NTS MAT FOUNDATION SYSTEM, SEE ARCH J SEE PLAN . T/SLAB EL, a ‘. 4, 4 a SEE PLAN eo. a D e. e e e Aa @. eg ° ° a ” | - 8 “A a q 4 5 af UON - 4 A Sos : v : @ 4 a. q . hy i - ; oe oy Rai SEE PLAN "sa oe ot ge AE, t—=n CONC WALL, SEE PLANS . 4h FOR REINF 9 TR? 7 4, FOR LOCATIONS : . ga a 4 . , . De, 4foou. | fl Pals DOWELS TO MATCH | of (OS de 4 WALL/PILASTER REINF a! 7 of. METAR 2” DROP AT EXTERIOR | 2 - 4 | ta REE RDER, CONDITIONS _ MAT SLAB, a —_ , ARCH. : / SEE PLAN . “., 4 f all’ * I . T/SLAB EL, | . fo fed. = eel 2400 SEE PLAN v : _ I: . : @ @ Z ; .e°N @ J eo” 4 oe [4 : a a | 6 4 4. : q . : . _. . ‘4 : ° J 4. <- » 4 a |- | 4 Ya.t oc. Oo . ; 4|- 4 a: 4 4 4 ; . J e : e 4 e o. aff a} tf | 1-0" MIN WS | vg qa: 44-7 a . A o a fod A” 4 g 47 }-° A 1 _ 4 STEEL PIPE PILE, | |-—_STEEL PIPE PILE SEE PLAN & S3.05 RETARDER SEE PLAN & NOTE: S3.03 TYP FOR ADDITIONAL INFO, SEE 1/S3.02. 8” UON SEE PLAN FOR REINF | | | | i HK | (|. PRE-ENGINEERED I HH Ht / STEEL COLUMN, SEE PLAN. ” | : 4” DROP AT EXTERIOR i OR UL. (CONC COL AT SIM) T/SLAB EL, rr SEE PLAN Aas os bg 40 aaa STEEL PIPE PILE, SEE PLAN & S3.03 $3.02 SCALE: NTS SEE ARCH FOR RISER AND MAT SLAB, TREAD DIMENSIONS SEE PLAN T/SLAB EL, SEE PLAN C) e ge e tC) e e ¢ C) mr) SEE 5/S3.02 FOR | ee | ie | grt: “oy os 5 STAIR REINF 7, rey. 405 a4 rv z es . — q Ss =: a CONC SLAB ON nee re _ 4 7 Ga GRADE, SEE PLAN ag a ig 4 ty = Xx = : : Ma qv ; @ A : (7) ” . . .g ee er ee T/SLAB EL, ____ "MIN 40M, ; A are | 9” #4x1’-6” LG DOWEL @ 24” O.C. EXIST STEEL PIPE / PILE, SEE PLAN & $3.03, TYP Wy NOTE: FOR ADDITIONAL INFO, SEE 5/S3.02. (2 \ SECTION S3.027 SCALE: NTS RAILING SYSTEM, SEE ARCH a wn ~ LL. = T/SLAB EL, Tl TT SEE PLAN PROVIDE MIN. 3” GROUT COVER OVER TOP OF PILE AND 6” DOWN PILE SIDE TOP OF GRADE, cn Be SEE CIVIL ~(\ STEEL PIPE PILE, SEE PLAN & S3.03, TYP (CUT TOP OF PILE IF NEEDED PER THE RETARDER RECOMMENDATIONS OF THE y PROJECT GEOTECHNICAL ENGINEER) 1’-4” MIN (2 \ SECTION $3.02 SCALE: NTS (4) SECTION NOTE: RETARDER FOR ADDITIONAL INFO, SEE 1/S3.02. $3.02 SCALE: NTS 8” UON \- SEE PLAN Hl IL, FOR rene ; STANDARD HOOKS Wo df |le3e . T/SLAB EL, — a SEE PLAN e@ ky @ ea. e e e D N aug 7 , v A ag- é 4 “A ce | oo, . 4: . . << . CONC SLAB ON “4 a er bo GRADE, SEE PLAN . . Se td q. — gd , ; a (Tp) { oe : ‘ee Ae e@ e @ T/SLAB EL, Te 4. a, SEE PLAN [oO ee , . 4 » a y. a A A 9” #4x1'-6” LG DOWEL @ 24” O.C. EXIST STEEL PIPE S/S PILE, SEE PLAN & $3.03, TYP (2\ SECTION $3.02 SCALE: NTS CONSTRUCTION ISSUE 03.16.20 Eng. of Record: Matthew C. Main N Ly NT Steven E. Hutchins AIA Architects 109-113 ESTATE CASTLE COAKLEY CHRISTIANSTED, ST. CROIX TEL 340-778-8898 FAX 340-778-7754 U.S. VIRGIN ISLANDS 00822 FREDERIKSTED REVITALIZATION PROJECT PAUL E. JOSEPH BASEBALL STADIUM AND SPORT COMPLEX ep) — < | LL} Q z O | < -Q 5 = DATE: 02-19-20 DRAWN BY: SGF McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com License No.: 1431-E SHEET NUMBER: 93.02 ©) 2018 THIS DRAWING IS THE INSTRUMENT OF SERVICE AND PROPERTY OF MCVEIGH & MANGUM ENGINEERING, INC. THE USE OF THIS DRAWING SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED, ANY USE OR REPRODUCTION WITHOUT THE EXPRESSED WRITTEN PERMISSION OF THIS CORPORATION IS PROHIBITED X: \2014\14188 (Paul E Joseph Stadium and Sports Complex)\14188_dwg\14188 S3.03 CAST PILE DETAILS & ELEVATION.dwg, 04/02/2020 11:52 AM, agutierrez EXISTING EXISTING 160 STEEL PIPE EXISTING a 16’o STEEL PIPE L a PILE, TYP, UON 16” STEEL PIPE | PILE, TYP, UON _ an te + i PILE, TYP, UON _ an _ 7 lam _ _ _ la 7) \T7 \Ty | | CL PILE = A = 2’-0” MIN ~ N N | STD cc EDGE OF MAT —J . is | oz Fy | _| FS ON 8-46 ts ° - ° (PY) + 3a n ty ty n ~ T/PILE EL pan en OY, - T - a ccs (111111111111 * =” L | [ [ : 1 | | Lo ~~ PN | 2’-0” | 2’-0” | ® LAP SPLICE, —~ | EXISTING . 2’-0” ! 2’-0” - SEE SCHED. 3—#5 TIES @ 3 la © TYPE 2 TYPE 3 TYPE 4 O st io EXISTING { N Lp) Lv | 4 STEEL PIPE PILE N EXISTING a FILLED W/ CONC < ee 8—$6x35'-0" Pe (-) = 3 S TYP EXISTING EXISTING fg o #3 TIES @ 12” a 18"e STEEL PIPE - 0 x 9 FOR 35’-0 7 chy - - _ _ _ ay co EXISTING £& X gy © +7 | / 16"@ STEEL PIPE € 72s a — | | " PILE, TYP, UON O = Ot — in x - lm (fy — - —- —- gy - — - —- 5 O2EQ i TSe23 ro) .! WwW O cO FS | ' LU —| i NS, " i WU <2 o 00 ~ Ee wm NR 16” DIA | | C D Z Z N fo) EXISTING | iA 2 T eo i | 9 FULL HEIGHT = | ¢p) - O DF a | - I 2 | . | ) I N L L a ) | ) | | rT to - Co — — — — — ay) 4’—0” ! 4’-0” | C = & APPROX EL 85’—0” MIN* o or a BELOW EXISTING GRADE 2-10 2-10 oO zx (DENOTED IN PLAN TYPE 5 TYPE 6 O 4 WwW NOTE: NOTE: Nj a = EXISTING TOP OF PILE ELEVATION SHALL BE EXISTING PILE LOCATIONS SHALL BE —~ WO VERIFIED PER FOUNDATION PLAN NOTES VERIFIED PER FOUNDATION PLAN NOTES _I PRIOR TO MAT CONSTRUCTION. PRIOR TO MAT CONSTRUCTION. x Y O a — 0 > o 9 FF ut LO (a EXISTING 16 @ STEEL PIPE PILE ELEVATION (2\_ EXISTING GROUPS FOR 16 @ PILES roe \$3.037 SCALE: NTS \s3.037 SCALE: NTS —2 Lu Ww mPa : OZ - > CL PILE Si . 2’-0” MIN ~< Ul — HOOK ° 8'+0 WwW as 2-0” 2-0” 2-0” 2-0” 7 EDGE OF MAT ue iS or ON 8-46 = 8 2 TP) = ona fe 7 T/PILE EL pan a : =o o 169 STD PIPE FILLED = . WITH SOLID GROUT, TYP Ll N a LAP SPLICE, ~~ | 3-45 TIES @ 3” ~ SEE SCHED. | | =) _ _ _ (hy — _ _ _ _ _ _ | ip p PN greet PIPE PILE a a 085 4 = FILLED W/ CONC | | o-&B Tee * 8—#6x35’—0” N , 7 nr TYP we a Va —! N #3 TIES @ 12” qt Zz FOR 35’—0” — to (a) <™s LU S ‘ i ) —ie i z ~ a — in _ _ Th _ _ _ _ ty _ _ _ . Cp) 16” DIA a a 5 <{ Ee O NS | | Ss INTERRUPTED BY #3 1’-9” 7-4” 7-2" 1°—0" OPENING WHERE BEAM TERMINATES aS e ae yon , on , ge AT A SLAB, EXTEND TOP N Y ‘ x #4 2’-0 1-7 1-7 1-3 BARS INTO ADJACENT 5 76” 50” yoy 6" SLAB IN LIEU OF HOOK \ gor BAR \ sor BAR \ por BAR | # +6 BAR %e SPG, 1-#5 "T’=8” OR UNDER— : #6 3-4” 2’-8” 2’-7” 2’-0” 6” TYP DIA TYP 6" TYP TYP STIRRUP OR TIE SPACING 5, ¥ > 45 » OVER 8” ANG, eis ——— AS SCHEDULED (TYP EE, UON) naz ~ a #7 4’-6” 3'-6” 3'-6” 2’-8” re AB OR WALL REINF Zz, a0 INTERRUPTED BY OPNG 8 ay” _ ‘_o» 6” Wd Su # 5’-11 4’-7 4’-7 3’-6 SPAN L1 SPAN L2 SPAN L3 mCdW — — END SPAN LEFT INTERIOR SPAN END SPAN RIGHT ts CL SUPPORT #9 7-6” 5’-9 5’-9” 4’°-5 a ne) Yn . “ CL SUPPORT CL SUPPORT #11 11’-8” 9’-0” 8’—10” 6’—11" NOTES: 1) BARS MARKED ”"CONTINUOUS” REQUIRE LAPS OF 24 BAR DIAMETERS. NOTE: 2) ”C” BARS ARE PLACED IN THE RIGHT END OF THE BEAM WHICH THEY 1) TOP REINF IS HORIZONTAL BARS WITH MORE THAN 12” ARE SCHEDULED. THE RIGHT END OF BEAM FOR LOCATION OF ”C” BARS IS DETERMINED BY THE ORIENTATION OF THE BEAM MARK ON THE ADDED REINFORCING AT OPENING IN CONCRETE 2) Dee CLASS 8 OPLIGe LENGTH ONLY WHERE DES One TED FRAMING PLAN. WALL OR SLAB WHERE MAIN REINF IS INTERRUPTED 7 TYPICAL REINFORCEMENT PLACEMENT DIAGRAM FOR BEAMS AND ONE WAY SLABS 7 DETAIL 7>\ LAP SPLICE SCHEDULE $4.01 SCALE: NTS $4.01 SCALE: NTS $4.01 SCALE: NTS CLEAR SPAN L STUD WALL AT Q L/2 SIM, SEE ARCH. RAILING SYSTEM, L/4 SEE NOTE 3 L/4 SEE ARCH CONC TOPPING CONC TOPPING SEE ARCH SEE ARCH A —4— CONC SLAB CONC SLAB Pe oe SEE PLAN SEE PLAN " "ZA .- 4 tt 243.3 pe re ns ee a ee Pw tens ates. T/STRUCT T/STRUCT LI z |g, . fog. . poate [ft SLAB, SEE PLAN SLAB, SEE PLAN ra ee an . . . an : . . -< ; . - 4 aan * . . ” ; i . : _ . . i _ ; JA a ‘ala g . . a ‘aja an i : re ay re) + awe ¢ 4, 4 4 4 foe yt Sets ‘@ . — . is ee ; e ‘4, J °) le e lo :4, J - “4. : fy 40°48, ao at nln . 2 4,- 4. . 7 ot ae ‘eA ‘ ; ~ 44. “4 4 cfd. —|: ee 4 | = a eet i ‘Sie se a: tte HOOKED DOWELS—~ | HOOKED DOWELS—~ | 7 Pope fats Z ~ Ae ae TO MATCH SLAB TO MATCH BEAM to 4} 4 gla: of. 4 LEGS — OPEN SHAPE 4 LEGS — CLOSED SHAPE Soa A we te TOP REINE TOP. REINE sate ae ce b . eS =) 1 6 4 vay a, > = . , hf . f era NZ coe HOOKED DOWELS—~ | HOOKED DOWELS—— |. 4a pip t o Tilak TO MATCH SLAB P TO MATCH BEAM ik \L ~~ rn ———> Ye oe BOTT REINF t BOTT REINF kv TIES PER 1/S4.02 ~ a RS a y weve 4] ae UA : A BEAM SCHED fo, a ae fa CONC WALL, SEE l CONC WALL, SEE fe," AND 4/S4.01 Al ae %y 4 PLAN FOR PLAN FOR | . 4: SEE PLAN 2 1) SLEEVES W/ DIAMETERS LARGER THAN D/3 ARE NOT ALLOWED. ALL SLEEVES ARE 2 LEGS — OPEN SHAPE 2 LEGS — CLOSED SHAPE TO BE ROUND IN SHAPE. 2) SPECIAL PERMISSION SHALL BE OBTAINED BEFORE INSTALLING ANY SLEEVES. 3) PLACE NO SLEEVES OUTSIDE OF THE MIDDLE HALF OF THE BEAM SPAN WITHOUT THE APPROVAL OF THE ENGINEER. (4a STIRRUP TYPES (s\ TYP BEAM SLEEVE DETAIL (fe DETAIL (7\ DETAIL $4.01 SCALE: NTS $4.01 SCALE: NTS $4.01 SCALE: NTS $4.01 SCALE: NTS sie. s ‘leu SEE ARCH SEE ARCH cone easter" | |” SEE ARCH BEYOND, SEE ot. CONC SLAB CONC SLAB PLAN & ARCH fe CONC SLAB SEE PLAN SEE PLAN ee SEE PLAN ATTACH TRACK Aye TO CONC SLAB ao T/STRUCT 7 T/STRUCT Ny w/ PAF @ 8” OC, T/STRUCT im SLAB, SEE PLAN eo jeje 02,0. a rr ae ~ohere | Je ,e,e.e,. SLAB, SEE PLAN pee ese esereso b 2 2 a. 1 eg Y o:.28 je 18 ye sre LT GA MTL TYP SLAB, SEE PLAN ia lg / 4 q E 4 jo 3° oe 8 . ar. doa t- ‘ (jo @ @ © 0) . . ae ee ie STUD WALL, : LO TS a Sheek Seo 7 SEE PLAN CONC TOPPING Lt / Pop fe bp ome * hh ch Pf ab PS [fo 4oe) 4 wo fal fae PTE Jota bbe SHEATHING. CONC SLAB HOOKED DOWELS an <. ne 2 4) 4g} 4 ; on oe J.4r 7. | ¢ 1 ne ° a ac ae ' SEE PLAN TO MATCH BEAM | | [4° . . od . . vl : q -~I 4. : : ot . ‘Al ‘oy | tayo 4 : a: | mo. a] | . . SEE ARCH TOP REINF I a | 4-4 4 - oo a |: NY dacd lee ° qa {4 - | | aH | a a Ad: In qd. A 7 4 4 = .. — = ” g|_- af. 2 —_+ Jj. 4 . a: : : , fe} < | a4 e : — 2 : ; am a ; ~ Se —, a A T/STRUCT : ‘fa. TIES PER 1/S4.02 TIES PER 1/S4.02 SLAB, SEE PLAN at i acres BEAM SCHED BEAM SCHED Pie SEE PLAN ) rn SEE PLAN CONC WALL, SEE ale: 4. CONC GIRDER, 5/S4.41 FOR | q —/, CONC COLUMN, SEE PLAN REINF 7 NOTE: BEAM ON ONLY ONE SIDE OF COLUMN AT SIM (2 DETAIL $4.01 SCALE: NTS SEE PLAN NOTE: BEAM ON ONLY ONE SIDE OF COLUMN AT SIM C DETAIL $4.01 SCALE: NTS (co) DETAIL $4.01 SCALE: NTS (a _DETAIL S4.01 SCALE: NTS McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main License No.: 1431-E CONSTRUCTION ISSUE 03.16.20 | ir us Oo= or QO a Zm x OW - << & NY @ 5 WO qt NO E ak >+Ccn Wu IO = A im 6 a rsSZ YN <= < ui Oo —l Lu QO < . Lu OW 5 : Le Cp) — < oe Lu a) fan) , < fe) —! < op) S fore) Z => Z < DATE: 02-19-20 DRAWN BY: SGF SHEET NUMBER: 54.01 VGLZZ-8ZZ-OVE XVA 8688-8ZZ-0VE TAL o 22800 SGNV1SI NIDUIA ‘SN XA IdWOO LadOds GNV : G N XIOHD “18 “GLSNVILSIUHO Wnldvls Tivaasva Hdasor “3 1nd 83) |g , AaMvOO JUsvO svisaeii6o: | LOAPOYUd NOILVZIMVLIASY GALSMI¥aqsY4 SFINGSHOS aWIS BWWSE | sy) feo SJDSHUDIY WIV SUIYOINH “4 UeAe1S a ne?) -LOarOud -NOILVWHYOSNI DNIMVEG a a 7) 1431-E CONCRETE BEAM SCHEDULE = g > E100 io) ots OY §)- - 5 0 Z $m2) Z., = ><$53| CO co~ x< Ss 3'5 a Ze als LU ¢ mM SEy8 a wv foeA fad SEEOE ) Hn ssen ae! C5 72 2222| = HORUS — m4 HF Sma 7° tl> Z es c > w aS 2 C) Yo oo . a “- 2 5 a 3 O a Zz ty =) ci or i = — oO oO < ep) 4 S| eo cS) cS) cS) cS) cS) cS) cS) cS) s ro) ro) ro) ro) ro) ro) ro) ro) ro) ne r og aA a ae ° wi A A , | 49 - iS : 4 Or ‘A 3 o y. 4 4 “4 A. 2 AGS « a> [S) ; 4 A | . as zi A. | xa 4: 4 1F & . on | yA) ‘ . v0 an in 427. (os) q oe g _ : . : 4 4 4 a on ee 7 vy) 4 oth | q ion <1 40 | _|_ i | SS | < | ~ NO | = Su | “4 IN | eo woe L____ | eee Se xem : | SZ “ {ata . ou J oR 3 TIES @ 3” gl... 4°. q So . . a rr a ae _. co ” ai | pe J. . = : 4 . . ¢: 4). pg Tp De ee i TOON COL STEEL, CONCRETE REINFORCEMENT HE Se — 4} — od SEE SCHED, TYP LAP SPLICE SCHEDULE (INCHES)} TTT ga ; a, . a-ha a wr) ) ee eee ee ‘ ; S 7 ae TIES, BAR | HORIZONTAL VERTICAL ~ ° . fe oop Od SEE SCHED SIZE BARS BARS es | ao ma. alts lft pa DOWELS #4 52 24 o HORIZ REINF,—~ | “@ee 4 bgt. | \-HorIZ REINF, ane Te paeriticd ar C SEE 5/S4.41 a | , SEE 5/S4.41 tlt a, | w Tl. ws O p/ | 4 ood nA s 4 tt ats pe VERT REINF.—“] ato NOTE: Ks ARE bl, > g] VERT REINF, 4), wie it < 4.41 ) *} a. ed ee 4.41 ne ; a - 4a SEE 5/S a STANDARD ACI HOOKS 9 SEE 5/S 4 a ee oe a. a #7 70 54 { sy 4 ad > a g 4) 41-4 4 Co { alg NOTE: da Y So ee ee #8 80 62 al 7 FOR WALLS WITH a ce Se a. ) a REBAR EACH FACE . aA 1 ——~ a4. a EE een DEE #9 90 70 Cc SEE DET 4/S4.43 2 0 SO 4. a a [s mM g . = #10 100 78 O I =) C ® > ® o 109-113 ESTATE CASTLE COAKLEY TEL 340-778-8898 FAX 340-778-7754 CHRISTIANSTED, ST. CROIX U.S. VIRGIN ISLANDS 00822 LU => 6 > 10” 10” la T/WALL EL T/WALL EL a S [o) , . . . N N #5@12 HORIZ—__4— Ww | fiz $F ale aj Ww OQ af 2 |_ WALL BEYOND ee ee 8-45 x YO | “ | | . ¢-—+—+| 10-#9 VERT x | | | = = fa]? #4@3” CLOSED = fr GRADE ,. 4 | | .! _ dors 14 TIES AND 10-#9 VERT —_ aa) oO SE ye of ty 9 #4@5" CLOSED ui © O _| « te a @ OPENINGS IN FIELD WALL t 4d. ale = TES & CROSS A + a fr, a | te: ol - le} J 2) TIES or Lu OW “| & i N NOTES: #4@5” CLOSED 12-49 VERT QO Y) a fle 7 ey " TIES & CROSS TIES dp) | T/FTG EL 1. SEE ARCH & CIVIL FOR LOCATION AND 9” #4@5° CLOSED 17-0” LL 2 — i SEE PLAN EXTENTS. TIES AND — O Zz 4A pot 2. SHALLOW WALL FOUNDATION WAS CROSS TIES > To . oo % DESIGNED FOR 3,500 PSF SOIL BEARING YM 4 N gf a a! CAPACITY. GEOTECHNICAL ENGINEER P2424 P12x12 P36 ENTRANCE P1 ENTRANCE P2 «x Lu ne Ly MUST VERIFY THE SOIL CAPACITY AND — alo WHETHER SHALLOW FOOTINGS ARE oO NY SUITABLE FOR THE ENTIRE EXTENTS i > 4#5 CONT 12 T x 3” CLR af #O12 THB 3. MAX OPENING EQUALS 8’-0”. Q a Sy ee ee STEP PER sa \ | SEE ARCH SEE me J SEE ARCH ®&. . , a a * Zz ao - - a o | : | “ B | ; ; | | 5 Jot at a a4, a * : RRL ORL Wa ih 8” CONC WALL W/ t : RRL CRORE ih 8” CONC WALL W/ - —* + ——*- = ‘ YD LYYOY yy Va 4 HORIZ @ 12” OC ‘ > LY aa Va 4 HORIZ @ 12” OC “ . LAY fs KRY 14 i . SON f LYN. COMPACTED SOIL KY COMPACTED SOIL KR , REPORT S YN! fe ~\ IS NS ES SEE CIVIL NICAL S YN f \ SS SS SY se clwListsi— YY 8” CONC WALL W/ ped fe og Be 8” CONC WALL W/ oJ pe _I ON - | Cle ee a ey #5 VERT @ 12” OC & Vy AKKXKKKKKKKKS #5 VERT @ 12” OC & oe ne ae a Pe #5 VERT @ 12” OC & abe 4 qt nO SA ep _ co seEoMe means |e RRP COMPACTED SOIL #4 HORIZ @ 12° OC ne Ae #4 HORIZ @ 12° OC Pl Oe — [~ BS E- Amn LT RRR T RX ee 1) DYXNNDYDyY* 2} DQNNDYS > NAN Be | RSQSASS 2 tL KSX KAKO KKKOKRWK i“ xO vy a : a Y re \ XN ba -l 5 XN bod: sl EXISTING STEEL WE os CK, “ RORORE. Ay 7G, 4 ROX al. YS COMPACTED SOIL CRORE. al. YS compacteo soi. PIPE PILE, SEE Q LU Y) YY PY, z OOOO | ASS z YX AXIAL | KASS PER PROJECT z YN AYA | KASS PER PROJECT PLAN & 33.05, (Cp) AK CG 4 CLG = URRE =e Re = RRQ ok RR GEOTECHNICAL = RRQ be RR GEOTECHNICAL TYP _ O = a a SS VS ° DOD) 1 PONY, ° WOYYY" 1 BY ° MOOOY TPA > PQ Te SS RRA KKK LR PARR LORRY PARR 7 “X KKK . _ x ; "4 ° “+8 ia ~ “ e. — oe , . KK = = ; 1s s — - . 7 = 7 ee :, RK % = : 1a - at ; ~ rm ~$ LU > #5 @ 12” EA 1'-0" al OX a ee r VR Ss a r VX Sa a QO = Way 738 A ee NA eee CNN SQA SE, nm RUE QXRIQOES KIO 5 1'-0" 1'-0" 1'-0" 3 LL | 4-0" (4)-#5 CONT T&B | 4-0" (4)-#45 CONT T&B | 4-0" (4)-#5 CONT T&B a & #4 @ 12” & #4 @ 12” & #4 @ 12” TRANSV T&B TRANSV T&B TRANSV T&B (4 \ SECTION (2 \ SECTION (e\ SECTION (7\_ SECTION \s442] SCALE: NTS \s4a2] SCALE: NTS \s442] SCALE: NTS \s442] SCALE: NTS RAILING, | RAILING, | SEE me SEE we SEE ARCH DWGS FOR RAILINGS GRAND STAIR AND SITE WALL DETAILS CONSTRUCTION ISSUE 03.16.20 — 2 SLAB —ON-—GRADE, = SEE PLAN RAMP RAMP SLAB- oe T/WALL EL, an " T/WALL EL, b aaa £ \ i ; SEE ARCH IP ae / SEE PLAN | se _ / SEE PLAN” pall SEE ARCH ® | Z 8” CONC WALL W/ 5 a ne ee (ee Ve eee ed 8” CONC WALL W/ Z ¥ XYYD #5 VERT @ 12” OC & ale RX QQ QQYQYQAYQYQOAQOOAYAGAY 447 Po Te RY QA AAODYONAYT “TP” 45 VERT @ 12” OC & 6 co TO MATCH YP 2 DQQQOQQ2YQQ YY YY YN)” 4 SEE PLAN TF PDOOYYYYYY™”")7-_ Le np 2 t STAIR REINF #4 NOSING “ III “b wd a KKKKKKQK fe is e LADD DQDYD2YNM”OO™LWONONY’ - fs of. — Fl PAOD 2OY2N >»: _ ‘ CONCRETE STAIR Oe OM CNENEN . Je ILEIIIAIEREKIAAIERVANSIA ao WN QR a ea, ILIKIIKRKAARICA b&b ASQysgyy Ea z ‘ @ 12" OC EA SEE ARCH FOR RRA || KKEKKKKKKKKQR) “RRR. PAA KR AC KKXCCE AF = z “ ee 8 YOM | RRRARRRRRRA Le YON | RRRRRRAG | RRRARRRA IRS g 1 RRA I IKKKEKKKKKEKRARAL | RRR RRL | EKXSESEAERASIE IP ISKASKEKAESAAN RRR : : MN DOVEL BARS | SKA PN ASNNNNORAN + KKK KA 1 PDINNLNNLNN] 1 RNDNNNNDA- KAKO : UE KK C_(7-‘“W[XYWau I OO RE A KKKX CEES DATE: 02-19-20 3 PAVEMENT, KKK #2 DSAOOOMOMNOAIONMMWALE KK SEEKER TL DAHA DD 1 TPO AYANM DAODNOW_ EK*k*&k««KKK DRAWNBY: AGO c ro) Ws 4 a te ¢ Coe on \ \ re es | . a 4. a.@ ; ; ae ¢ NS S | ON ; fdas: ; eg | i” AN WY? ne a ces 4 . eG ee 4 __ YN E ° WARK AS MAXNKXKXKK OO) .Z OKAY 7 SAXRKXLAERXKZ SHEET NUMBER: & = 1’-0" 1’-0” 1’-0" 1’-0 8 | 8’-0" MAX 10’-6” MAX = e N45 CONT @ 12” OC #5 CONT @ 12” OC McVEIGHQMANGUM ¥ \s442] SCALE: NTS \s442] SCALE: NTS \s442] SCALE: NTS Eng. of Record: Matthew C. Main License No.: 1431-E X: \2014\14188 (Paul E Joseph Stadium and Sports Complex)\14188_dwg\14188 S4.43 SHEARWALL DETAILS.DWG, 04/02/2020 11:54 AM, agutierrez ©) 2018 THIS DRAWING IS THE INSTRUMENT OF SERVICE AND PROPERTY OF MCVEIGH & MANGUM ENGINEERING, INC. THE USE OF THIS DRAWING SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED, ANY USE OR REPRODUCTION WITHOUT THE EXPRESSED WRITTEN PERMISSION OF THIS CORPORATION IS PROHIBITED T/SLAB EL, LAP VERT REINF ABOVE FLOOR, PER SCHEDULE, TYP SEE PLAN #3 TIES SEE DETAIL 5/S4.43 SEE DETAIL 5/S4.43 FOR CORNER REINF #5 EF REINF ABOVE OPNG PROVIDE HOOK AS SHOWN T/SLAB EL, LAP VERT REINF ABOVE FLOOR, PER NY : A , | A | |4 4 SCHEDULE, TYP SEE PLAN 77-4” MIN DOOR OPNG @ CORNERS (-)\ DOOR QPENING DETAILS WALL REINF, SEE PLAN REINFORCING EQUAL TO 1/2 OF THE BARS INTERRUPTED BY OPNG WALL REINF, SEE PLAN T/SLAB EL, SEE PLAN 2—#5 DIAGONAL BARS EF EA DIRECTION #5 EF ABOVE OPNG 1—#5x4’—0” CORNER BAR EA FACE T/SLAB EL, LAP VERT REINF ABOVE FLOOR, PER SCHEDULE, TYP SEE PLAN TYP DOOR OPNG WALL REINF, SEE PLAN 2—#5 DIAGONAL BARS EF EA DIRECTION 1—#5x4’—0” CORNER BAR EA FACE WALL REINF, SEE PLAN REINFORCING EQUAL TO 1/2 OF THE BARS INTERRUPTED BY OPNG UNLESS OTHERWISE SHOWN AS A CONCEALED COLUMN $4.43 SCALE: NTS 2’-6” UON ‘JZ WALL REINF SEE PLAN #3 TIES @ 6” CORNER VERT REINF 16—#9 TYPICAL WALL CORNER ey 2’—6” UON PSN 1 4” MIN TYPICAL WALL CORNER WALL REINF SEE PLAN #3 TIES @ 6” CORNER VERT REINF 16—#9 al a REINF SEE PLAN #3 TIES @ 6” (CROSS — TIES EVERY OTHER INTERMEDIATE VERT BAR) WALL END REINF 16-49 TYPICAL WALL CORNER @ ENDS @ DOOR OPNG (4+) TOWER CONC WALL DETAILS \s443] SCALE: NTS SHEARWALL REINFORCEMENT LAP SPLICE SCHEDULE (INCHES) BAR HORIZONTAL VERTICAL SIZE BARS BARS #4 32 24 #5 40 32 #6 48 38 #7 70 54 #8 80 62 (2\_SCHEDULE S4.43 SCALE: NTS #5@12” EF VERT & #4012” EF HORIZ CENTERED REINF HOYV 34S ‘sniavy COL PER PLAN WALL REINF WALL REINF INTERRUPTED BY OPENING (MIN) — < V4 AWN Z Z 1’-0"@ OPENING L— YY MAX UON Bales — VA N A EACH SIDE OF ADDED REINFORCING OPENING 1-#5 EF EACH SIDE OF OPENING, K SEE NOTE 2 ADDED STEEL REINFORCING AT SHEARWALL PENETRATIONS WHERE REINFORCING IS INTERRUPTED NOTES: 1) NO PENETRATION ARE PERMITTED IN SHEARWALLS WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER, UNLESS OTHERWISE SHOWN. 2) ADDED REINFORCING EQUAL TO 1/2 OF THE BARS INTERRUPTED BY OPENING, MINIMUM 1—#5 EF, TYP. (2\ WALL OPENING DETAIL $4.43 SCALE: NTS CONC WALL, SEE ma REINF, /\ se PLAN — a 6 — ; fs o a 5 = 00 ‘4; a Cl 4 4 a) : 40. a 2’-0” PILASTER (7 \_ TYPICAL WALL ELEVATION ALONG GRID B $4.43 SCALE: NTS CONSTRUCTION ISSUE 03.16.20 w/REINF PER DET 5/S4.11 (s>\ DETAIL (oe \ DETAIL S4.43 7 SCALE: NTS S4.43 SCALE: NTS | | #5012” VERT & #4@10” HORIZ 2-45 BOT, CENTERED REINF TYP T/WALL EL, a J SEE PLAN ! | | | | || T/ARCH EL, | SEE ARCH mS DA 2 ~ [ (6 = S4.43 | I~ 1’-0” 12’-0” 2’-0" 12’-0” 1-9" / a SEE ARCH FOR } a RECESSES, REVEALS, AND “ ACCENTS | T/FLOOR EL, SEE PLAN 28’-0” N Ly NT Steven E. Hutchins AIA Architects 109-113 ESTATE CASTLE COAKLEY CHRISTIANSTED, ST. CROIX TEL 340-778-8898 FAX 340-778-7754 U.S. VIRGIN ISLANDS 00822 FREDERIKSTED REVITALIZATION PROJECT PAUL E. JOSEPH BASEBALL STADIUM AND SPORT COMPLEX McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main License No.: 1431-E : O LU : O oc a Cp) | x | LL} QA : 5 z O = _IN DIRECTION SHOWN AND #4012” OC BOT TRANSV . CONSTRUCTION ISSUE 03.16.20 N KEYPLAN McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main License No.: 1431-E N N N Ly NT Steven E. Hutchins AIA Architects 109-113 ESTATE CASTLE COAKLEY CHRISTIANSTED, ST. CROIX TEL 340-778-8898 FAX 340-778-7754 U.S. VIRGIN ISLANDS 00822 FREDERIKSTED REVITALIZATION PROJECT PAUL E. JOSEPH BASEBALL STADIUM AND SPORT COMPLEX PROJECT: TERRANCE MARTIN FIELD BATHROOM ROOF PLAN DRAWING INFORMATION: DATE: 02-19-20 DRAWN BY: SGF SHEET NUMBER: 96.02 X: \2014\14188 (Paul E Joseph Stadium and Sports Complex)\14188_dwg\14188 S6.03 Terrance Martin Field Canopy Roof Plan.dwg, 04/02/2020 11:55 AM, agutierrez ©) 2018 THIS DRAWING IS THE INSTRUMENT OF SERVICE AND PROPERTY OF MCVEIGH & MANGUM ENGINEERING, INC. THE USE OF THIS DRAWING SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED, ANY USE OR REPRODUCTION WITHOUT THE EXPRESSED WRITTEN PERMISSION OF THIS CORPORATION IS PROHIBITED $6.11 12 HHSS6x6x3/8_PURLINS HSS20k12x% (LLV) @ 5'-0"0C $6.11 ® © MAX MTL} DECK — ____] HSS20k12x5% (LLV) $6.11 (-\_TERRENCE MARTIN FIELD CANOPY ROQF PLAN $6.03 SCALE: 3/16” = 1’-0” $6.11 $6.11 (1 HSS20x12x% (LLV) i S6.11 MTL |DECK ——__}—_—_—— op) = | a D al x< as alt Mw +|© (7 $6.11 HSS20x1}2x5% (LLV) VON “| \s6.44/ NL, <( 11 ( 12 IN IN a 1) MTL DECK DENOTES 1 1/2” x 20 GA TYPE B MTL ROOF DECK ——§® — SPANNING IN DIRECTION SHOWN. N KEYPLAN 2) CANOPY ROOF DESIGN SHOWN ON THIS SHEET MAY BE SUBSTITUTED WITH A Li ; Yi PRE-ENGINEERED CANOPY STRUCTURE. PRE-ENGINEERED CANOPY STRUCTURE REQUIRES SIGNED AND SEALED DESIGN DRAWINGS AND CALCULATIONS BY A LICENSED PROFESSIONAL ENGINEER FOR REVIEW AND APPROVAL BY THE PROJECT ENGINEER OF RECORD. McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main License No.: 1431-E ¥ vat Steven E. Hutchins AIA Architects 109-113 ESTATE CASTLE COAKLEY CHRISTIANSTED, ST. CROIX TEL 340-778-8898 FAX 340-778-7754 U.S. VIRGIN ISLANDS 00822 FREDERIKSTED REVITALIZATION PROJECT PAUL E. JOSEPH BASEBALL STADIUM AND SPORT COMPLEX : fe) fo A —_ D LL — z= Oo ie On a O z 5 cae © O&O = LL 5 = Z O Zz = rs QO DATE: 02-19-20 DRAWN BY: SGF SHEET NUMBER: 96.03 X: \2014\14188 (Paul E Joseph Stadium and Sports Complex)\14188_dwg\14188 S6.11 TERRENCE MARTIN FIELD DETAILS.dwg, 04/02/2020 11:55 AM, agutierrez ©) 2015 THIS DRAWING IS THE INSTRUMENT OF SERVICE AND PROPERTY OF MCVEIGH & MANGUM ENGINEERING, INC. THE USE OF THIS DRAWING SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED, ANY USE OR REPRODUCTION WITHOUT THE EXPRESSED WRITTEN PERMISSION OF THIS CORPORATION IS PROHIBITED HSS PURLINS, SEE PLAN METAL ROOF DECK, SEE PLAN $6.11 4 DETAIL 8/S6.11 yar 2 ty SEE DETAIL oN © | - | | ;— | | \ y ® on} | | — T Ny T (ce) || | | | | ! | il y | | | N on | | | | | fl | HSS BEAM, | | tH | SEE PLAN | | Sa - 4-7 | | HSS COLUMN, bt | | SEE PLAN | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | BASE PL & ANCHOR RODS, | | HSS COLUMN, | SEE DETAIL 5/S6.11 | | SEE PLAN 25 | | | | © |! | | | NO Li. | 1 | | | . om L | | ° > | | T/GRADE, ~ we | | SEE CIVIL 3-#3 TIES @ 3” OC | | | | | | | a 2 =i) =n ==n1 | | | | | | | | ———_reINFoRCED CONCRETE REINFORCED CONCRETE PIER, SEE DET 4/S6.11 | | PILE CAP, SEE DET 4/S3.03 | | | | - | | ine) | | STEEL BASE PL, _| | | SEE DETAIL 5/S6.11 Cc. ° ° ° ° ° _—) | | IZ Aa —— ~ REINF CONC PIER, ; a SEE DETAILS 2 & 4/S6.11 io) 9 ST UH G C) es of e f— je —_ e _) | | | | | | | | to | | | | REINF CONC PILE CAP, | | | | LOSE DETAILS 2/S6.11 | | | | & 4/S3.03 | | | | | | | | | | | | | | | | | | | | | | | rN I" 1 | | STEEL PIPE PILES rt | 169 STD PIPE SE DETAILS 2/S6.11 & : #10 DOWEL BAR CTR’D | | | | PILE, SEE 4/S3.03 4/53.03 S IN EACH PIPE PILE | | | ae = W/ STD 90° #10 BAR CENTERED IN HOOK AT TOP | PILE GROUT FULL LENGTH l OF PILE, TYP 4 4 (a SECTION (2\ SECTION S6.117 SCALE: 3/8” = 1'—0" $6.11] SCALE: 3/4” = 1’-0" CONT L3x3x4 DECK METAL ROOF 3'-0” SUPPORT ANGLE DECK, SEE PLAN 3” CLR, TYP HSS PURLIN, SEE PLAN T/GRADE BEAM= _ T/PILE CAP ana le e e ©) | aa CLOSED TIES [I » @ 18” OC a | . ° cS %” CAP PL | [o) = ats EA SIDE eT | ° Cm HSS COLUMN, | SEE PLAN | | HB T&B | | HSS BEAM, \ | SEE PLAN | REINFORCED CONCRETE CUT HSS, GRADE BEAM | SEE DET 10/S6.11 ! (>\ REINF CONC GRADE BEAM (7 \_ DETAIL \se11J ScaLe: 3/4" = 1-0" (sen scat: 3/4” = 1-0" SEE_PLAN METAL ROOF DECK, METAL ROOF SEE PLAN SEE PLAN HSS . / SEE Oe HSS BEAM. HSS12x12x2 W TOP CUT PER ELE (oN DETAIL \sey] SCALE: 3/4” = 1’-0" CONT L3x3x% %” END PL HSS PURLIN, SEE PLAN HSS BEAM W/ BOT CUT PER ELEV, SEE PLAN FOR SIZE ()\_ DETAIL \sey] SCALE: 3/4” = 1’-0" %" x12” CONT PL DECK, SEE PLAN CONT L3x3x% %” END PL (2\_ DETAIL \sev] SCALE: 3/4” = 1’-0" —— PRE—ENGINEERED BLEACHER SYSTEM BY BLEACHER SUPPLIER (s\ SECTION \se] SCALE: 3/4” = 1’-0" JIE I \S 5 PRE-ENGINEERED BLEACHER— CONN TO FOUNDATION BY BLEACHER SUPPLIER = RAILING SYSTEM, is +" SEE ARCH if TT 4 7 J fg! A . & “4 4 i st a oo . tte % DO . v..4 4g (4 = sa - ae _ -o ; jG. - - e a ea _“@A : e .. On A SE

\ DETAIL S611 SCALE: 3/4” = 1’-0” $6.11 SCALE: 3/4” = 1’-0” SEE_PLAN (V REINF CONC WALL | 4 SEE PLAN DOWELS TO fh 4 METAL ROOF MATCH VERT ARS: DECK, SEE PLAN REINF Sst CONC SLAB, ml SEE PLAN 4” WWF, SEE PLAN T/SLAB EL, / | SEE PLAN _ HSS PURLIN, ° SEE PLAN ay | HSS BEAM. a K : SEE PLAN a | HSS12x12x/4 W 2-45 TOP CUT PER ELE CONT BOT McVEIGHQMANGUM ENGINEERING: INC 9133 R.G. Skinner Parkway Jacksonville, Florida 32256 Ph: (904) 483-5200 Fax: (904) 636-6770 0-40126-1B email: mail@McVeighMangum.com Eng. of Record: Matthew C. Main License No.: 1431-E CONSTRUCTION ISSUE 03.16.20 ¥ vat Steven E. Hutchins AIA Architects 109-113 ESTATE CASTLE COAKLEY CHRISTIANSTED, ST. CROIX TEL 340-778-8898 FAX 340-778-7754 U.S. VIRGIN ISLANDS 00822 FREDERIKSTED REVITALIZATION PROJECT PAUL E. JOSEPH BASEBALL STADIUM AND SPORT COMPLEX : CQ — — LL < oc