SOIL TECH JSOI WEEKLY MEETING REPORT - 10 TUTU SITE INVESTIGATION ST. THOMAS, US VIRGIN ISLANDS PERIOD COVERED ATTENDING PREPARED BY DATE PREPARED September 13 to September 27, 1992 Ana Gloria Ramos, Designated Coordinator Clinton Moffatt, G&M Jose" C. Agrelot, Soil Tech Jose C. Agrelot, Soil Tech Project Coordinator October 13, 1992 FIELD WORK COMPLETED FROM SEPTEMBER 13 TO SEPTEMBER 27. 1992 o Drilling of MVV-9S was completed. o Drums containing soil cuttings were all relocated at the Kessler site. o Monitoring well development was completed by September 16, 1992. o Coordination of the initial sampling round continued. PROPOSED SCHEDULE FOR SEPTEMBER 27 TO OCTOBER 11. 1992 o Sampling of monitoring wells will be conducted. JCA/lvl/42614.wpf\921240 TUT OO6 0209 *64574* 64574