\7 de maximis TUTU WELL SITE. ST. THOMAS. U.S.VIRGIN ISLANDS MONTHL Y PROGRESS REPORT #36 JANUARY 1995 WORK COMPLETED DURING PREVIOUS MONTH • Addressed USEPA December 28, 1994 comments on the draft Rl Report and Development and Screening of Remedial Alternatives report. In accordance with the schedule, submitted to USEPA and COM on January 31, 1995 the draft Final Rl Report. At USEPA's request, distribution of the draft was limited to only USEPA and COM. Made preparations for the coordination meeting with TEIC, EPA, DPNR, WAPA, and DPW concerning Feasibility Study (FS) alternates. • Continued preparation of the Draft FS document. WORK TO BE COMPLETED DURING NEXT MONTH Upon direction from the USEPA RPM, full distribution of the Final Rl Report in accordance with the Order will be made. Assist EPA in meetings with DPNR, WAPA, and DPW on February 6 and 7 to discuss project issues, coordination needs and Feasibility Study alternatives. • Attend meeting with USEPA in Region II New York office on February 1, 1995. TUT OO6 O467 FILE: 308».0*Pfl-36 MI-BX *64601* 64601